Search NASA⌕ Search

SEARCH · Search NASA

Results for “energy infrastructure siting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analytical Modeling of Planetary Excavation for in Situ Resource Utilization

The space-faring capabilities of humans are dependent on the ability to interact with plan-etary surfaces safely and efficiently and utilize local re-sources. Since planetary regolith will be the primary feedstock for in situ resource utilization (ISRU) and infrastructure development activities [1,2], the site-specific geomechanical properties must be understood to optimize excavation operations [3]. Excavating planetary regolith is challenging due to its unique geomechanical properties, 1/6th G reduced gravity extreme conditions, and limited energy resources. Therefore, it is critical to develop technologies that reduce excavation force requirements and minimize tool path inefficiencies to save time and energy during planetary re-source acquisition and infrastructure development [3]. There have been several experimental investigations of methods to optimize planetary excavations [4,5], but none developed predictive capabilities. This abstract presents a simple analytical method that will be used to model laboratory and mission excavation data. Future work will build on the simple analytical method here to include high-fidelity numerical simulations of planetary excavation mechanics.

Regolith↗

Cybersecurity Standards for Photovoltaic Operations

Solar energy plays an important role in securing a more resilient, cyber-secure electrical grid in Pennsylvania. Solar's ability to be widely "distributed" on residential and large roofs, marginal lands, and many other locations across Pennsylvania - as opposed to being centralized - offers a strong option for addressing the myriad of potential disruptions that can occur to the grid's infrastructure. And when combined with energy storage, local energy needs can be met immediately without having to wait on the delivery of an off-site fuel source. As more and more distributed solar electricity generation is brought online, researchers, technology developers, solar developers and grid operators are paying close attention to the potential for solar to enhance grid cybersecurity. Although nobody may know when, where, or how the next cyberattack will take place, there are security measures, technical solutions, and management practices that are being implemented across the industry to protect against network control issues and grid operations. Everyone participating in the solar value chain stands to gain from a coordinated, iterative approach to protect against cyber vulnerabilities and build deeper resilience into the architecture of our grid.

cybersecurity↗

Life Cycle Analysis of Natural Gas Extraction and Power Generation: U.S. 2020 Emissions Profile

This work summarizes the U.S. Department of Energy National Energy Technology Laboratory's (NETL) recent life cycle analysis (LCA) study of the U.S. natural gas supply chain. In recent years, there has been growing interest in accurate accounting of methane emissions, with a specific focus on those from natural gas infrastructure, due to its much higher global warming potential as compared to carbon dioxide.

Khutal, Harshvardhan [NETL Site Support Contractor↗

EV Champion Training Webinar 2: ZEV and EV Charging Planning [Slides]

The Electric Vehicle (EV) Champion Training Series, hosted by the National Renewable Energy Laboratory (NREL), is tailored for fleet managers, facility managers, and other stakeholders involved in the deployment of EVs and charging stations. This series equips participants with the skills and knowledge necessary to become subject matter experts in EV implementation. This is the second training in a four-part series and serves as an intermediate training. This training covers the first four steps in the ZEV Ready Center process, including how to identify and train your zero-emission vehicle (ZEV) team, align headquarters strategy with site-level planning, identify ZEV opportunities, and identify charging needs for your project sites. Participants will gain a solid foundation to support the effective deployment and management of EVs and their infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Abstract for CRADA between NETL and Louisiana State University

The National Energy Technology Laboratory (NETL) and Louisiana State University (PARTICIPANT) will collaborate in developing and testing distributed optical fiber CO 2 sensors for CO 2 storage site monitoring. Safe and reliable monitoring of CO 2 storage sites and transport infrastructure is critical for ensuring the long-term effectiveness and integrity of carbon capture and storage (CCS). In this project, the objective is to develop a novel optical fiber-based distributed CO 2 sensor for long-term monitoring of CCS sites and CO 2 pipelines and also implement machine learning to automate leak and structural anomaly detection. This effort aligns with NETL’s mission in reliable and sustainable energy and decarbonization.

47 OTHER INSTRUMENTATION↗

Analysis of hydrogen infrastructure for the feasibility, economics, and sustainability of a fuel cell powered data center

Data centers used for internet data services, cloud computing, and/or data storage consume vast amounts of electricity and are increasing rapidly in capacity. Consequently, their power consumption has raised concerns about energy sustainability and environmental impacts. Large-scale, on-site renewable energy could help reduce data centers’ carbon footprint; however, wind and solar power alone cannot provide an uninterrupted power supply to computer servers due to their natural variability. Instead, reliable power integration can be achieved by using fuel cells powered by hydrogen from sustainable resources (e.g., wind and solar energy). Establishing a hydrogen infrastructure will be critical for realizing these benefits and establishing fuel cells as a viable power source for data centers. Here, to facilitate the development of novel carbon-free fuel cell data enters, this paper presents renewable power integrated with hydrogen infrastructures in four scenarios to provide reliable hydrogen supply from production to storage. Various paths were analyzed toward a hydrogen supply infrastructure by determining the proper component sizes and calculating the cost of meeting the server load. We used a microgrid modeling software, Hybrid Optimization of Multiple Energy Resources (HOMER), and studied the feasibility of fuel cell powered data centers employing renewable hydrogen. The modeling results show various renewable integration configurations to meet reliable and sustainable power requirement under four scenarios for a carbon-free data center.

08 HYDROGEN↗

Land use and turbine technology influences on wind potential in the United States

As clean energy ambitions have expanded, critically evaluating renewable energy supply has become increasingly important to the energy research community and stakeholders. This study examines the onshore wind resource potential for the conterminous United States and its sensitivity to siting constraints and turbine technology innovation. We compile localized regulatory information and use high-resolution data to present multiple siting regimes covering relatively constrained to unconstrained potentials. Our efforts reveal high sensitivity to these variables and sizable uncertainty in the overall wind energy resource potential. Specifically, we find that siting constraints may shift the total capacity available to commercial wind energy by 2.3–15.1 TW. Furthermore, our results illustrate that technology advancement could require larger setbacks from buildings and infrastructure, reducing the total available capacity potential by 20% relative to estimates using current technology, but that this reduction is largely offset by increased generation such that the net effect on generation is 1%. The observed sensitivity to and uncertainty resulting from the variables we analyze suggest there is value in continued study and development of increasingly sophisticated approaches to characterizing wind resource potential.

14 SOLAR ENERGY↗

Development of Methane Emissions Model to Assess Fuel Recovery Potential at Gas Well Sites Using On Site Compression

The U.S. natural gas production and consumption has increased 85.5% since 2005 primarily due to the unconventional production methods of horizontal drilling and hydraulic fracturing. Natural gas used as a fuel has a lower greenhouse gas (GHG) footprint than coal and petroleum due to lower Carbon Dioxide (CO2) emissions when combusted. However, the “greener” benefit to natural gas may be negated by leaks in production and transmission systems. Methane (CH4), the primary hydrocarbon in natural gas, has an estimated Global Warming Potential (GWP) of 28-36 over 100 years, meaning it can absorb 28-36 more energy than CO2 which has a GWP of 1.0. Natural gas well sites are prone to methane emissions, or leaks and irregular gas releases, vented to atmosphere throughout production and transmission. The U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) has recently granted West Virginia University (WVU) funding under agreement DE-FOA-0002005, to “Advance technologies to mitigate methane emissions and increase the efficiency of the natural gas transportation infrastructure”. As part of this funding WVU was tasked with identifying and quantifying sources of methane emissions at unconventional well sites, processing this data, and developing a system to recapture these emissions. A 0-D Simulink model was developed, utilizing standardized methodologies, data from previously conducted studies, as well as collected data from well sites in the Marcellus shale play region. The model was developed to predict emission rates from various components at natural gas well sites as well as the potential to utilize these emissions as fuel for the natural gas powered compressor engines on-site. This model was utilized to run high, medium, and low cases for four identified emission sources, engine size, pneumatic controller count, liquid level production which dictates tank emissions, and compressor packing vent emissions. Due to discrepancies in transient tank emission data, a high and low emission factor for tanks was used, resulting in two sets of 81 executed cases, and 162 unique cases of total site emissions and potential for fuel consumption. Each of the cases were run over 86,400 seconds at a 1 Hz, representative of a full 24 hour day of operation. The fuel consumption offset an average of 557% of fuel consumption on an energy density basis across all 81 cases with the high tank emission factor with a maximum offset of 2334%. The fuel consumption offset was an average of 82.9% for all 81 cases with the low tank emission factor with a maximum offset of 337%. This study highlights flaws in the use of publicly available methane number calculations to determine natural gas’s suitability as an engine fuel as well as the lack of public data for transient liquid storage tank emissions.

03 NATURAL GAS↗

Innovative rail transport of a supersized land-based wind turbine blade

Wind turbine blade logistic providers are being challenged with escalating costs and routing complexities as one-piece blade approach lengths of 75 m in various regions of the U.S. land-based market. New lower cost solutions are needed to enable further reductions in the levelized cost of energy (LCOE) and continued market expansion. In this paper, a novel method of using existing U.S. rail infrastructure to deploy 100-m, one-piece blades to U.S. land-based wind sites is numerically investigated. The study removes the constraint that blades must be kept rigid during transport, and it allows bending to keep blades within a clearance profile while navigating horizontal and vertical curvatures. Novel system optimization and blade design processes consider blade structural constraints and rail logistic constraints in parallel to develop a highly flexible, rail-transportable blade. Results indicate maximum deployment potential in the Interior region of the United States and limited deployment potential in other regions. The study concludes that innovative rail transportation solutions combined with advanced rotor technologies can provide a feasible alternative to segmentation and support continued LCOE reductions in the U.S. land-based wind energy market.

17 WIND ENERGY↗

Central Africa Energy: Utilizing NASA Earth Observations to Explore Flared Gas as an Energy Source Alternative to Biomass in Central Africa

Much of Central Africa's economy is centered on oil production. Oil deposits lie below vast amounts of compressed natural gas. The latter is often flared off during oil extraction due to a lack of the infrastructure needed to utilize it for productive energy generation. Though gas flaring is discouraged by many due to its contributions to greenhouse emissions, it represents a waste process and is rarely tracked or recorded in this region. In contrast to this energy waste, roughly 80% of Africa's population lacks access to electricity and in turn uses biomass such as wood for heat and light. In addition to the dangers incurred from collecting and using biomass, the practice commonly leads to ecological change through the acquisition of wood from forests surrounding urban areas. The objective of this project was to gain insight on domestic energy usage in Central Africa, specifically Angola, Gabon, and the Republic of Congo. This was done through an analysis of deforestation, an estimation of gas flared, and a suitability study for the infrastructure needed to realize the natural gas resources. The energy from potential natural gas production was compared to the energy equivalent of the biomass being harvested. A site suitability study for natural gas pipeline routes from flare sites to populous locations was conducted to assess the feasibility of utilizing natural gas for domestic energy needs. Analyses and results were shared with project partners, as well as this project's open source approach to assessing the energy sector. Ultimately, Africa's growth demands energy for its people, and natural gas is already being produced by the flourishing petroleum industry in numerous African countries. By utilizing this gas, Africa could reduce flaring, recuperate the financial and environmental loss that flaring accounts for, and unlock a plentiful domestic energy source for its people. II. Introduction Background Africa is home to numerous burgeoning economies; a significant number rely on oil production as their primary source of revenue. Relative to its size and population density, the continent has a wealth of natural resources, including oil and natural gas deposits. The exploration of these resources is not a new endeavor, but rather one that spans decades, up to a century in some places. Their resources, if realized, could provide a great means of economic and social mobility for the people of Africa. Currently, Africa represents about 12 % of the energy market, yet at the same time, consumes only 3 % of the world's energy (Kasekende 2009). The higher

Jones, Amber↗

Best Practices for Resilience in Smart Grid-Interactive Efficient Buildings

The Federal Energy Management Program (FEMP) supports federal agencies' energy decisions with information and guidance on design, funding, and operations to ensure federal buildings are efficient and resilient. The modernization of building infrastructure and the evolution of buildings to support decarbonization involves complex implementation of multiple components across several systems. This includes energy-efficient equipment, on-site energy generation and storage systems, and control systems. These systems have operational modes that can operate more efficiently if they are able to behave responsively to the conditions of the electrical grid. These grid-interactive efficient buildings (GEB) allow facilities to manage power demand according to operational constraints and market signals issued by grid operators. With proper design and planning, these same capabilities have the potential to enable building and facility resilience - coordinating with microgrids, maintaining power on critical circuits to sustain essential operations, and monitoring building health and safety status during an outage. By managing the load of buildings, GEBs can also reduce the cost of backup generation and make better use of renewable power sources on site. This document outlines some of the processes and considerations to guide the design and operation of GEBs in ways that promote facility resilience.

building decarbonization↗

Carbon storage cost modeling for the offshore Gulf of Mexico

Groundbreaking for geologic carbon storage (GCS) projects in the offshore Gulf of Mexico is imminent, and there is great interest in utilizing this region for GCS projects. Offshore saline reservoirs provide a significant and accessible resource for GCS. However, conducting GCS in the offshore environment will pose distinct challenges pertaining to site selection, operations, infrastructure use, and monitoring compared to operating onshore that ultimately affect technoeconomic assessment of offshore GCS projects. Carbon storage and transport costs are critical to project developers looking to deploy carbon storage in the offshore environment. We present CO2_S_COM_Offshore, a model developed by the National Energy Technology Laboratory (NETL) as a screening-level offshore saline GCS cost modeling tool. Based on NETL’s widely used CO2_S_COM cost model for onshore saline CS, CO2_S_COM_Offshore enables technoeconomic analysis of GCS in offshore areas. This model comprehensively incorporates multiple facets of offshore GCS projects, from regional evaluation and site selection to permitting, transport, operations, monitoring, site closure, and decommissioning. In general, the model can explore the cost implications for potential offshore GCS project(s) by enabling the user to change several project operational and financial attribute configurations. Key inputs include offshore storage formation options, CO2 injection rate and duration, infrastructure types, monitoring intensity, project financing, and post-injection site care duration. Supporting cost algorithms within CO2_S_COM_Offshore were compiled utilizing S&P Global’ s QUE$TORTM cost estimation software alongside a variety of open-source scientific literature. In addition to reviewing key model components, we discuss several sensitivity analyses, input variabilities, and results on analysis of break-even CO2 price required by a project based on different regulation/policy and operational scenarios for the offshore Gulf of Mexico. These results indicate the value of modeling offshore GCS specifically, and the potential of offshore GCS within a decarbonization value chain. Presented at the 41st USAEE/IAEE North American Conference, 3-6 November 2024, Baton Rouge, LA, United States.

Mark-Moser, Mackenzie K.↗

Hawai‘i National Marine Renewable Energy Center (HINMREC)

The Hawaii National Marine Renewable Energy Center (HINMREC) was established to facilitate the commercialization of wave energy converter (WEC) devices, and to accelerate development and testing of Ocean Thermal Energy Conversion (OTEC) technologies. Housed at the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii (UH), this program started with execution of the contract between the US Department of Energy (DOE) and UH in March 2009, and activities ran through the end of the project in September 2019. The DOE tasked HINMREC with facilitating and accelerating the build-out of the Navy’s Wave Energy Test Site (WETS), the nation’s first grid-connected open water wave energy conversion test facility, located off Marine Corps Base Hawaii (MCBH) in Kaneohe, on the island of Oahu. WETS was expanded from an existing test berth at 30m water depth to include test berths at 60m and 80m water depths. In recognition of the high costs associated with at-sea testing and evaluation of WEC devices, it was deemed imperative that HINMREC seek ways to reduce costs to developers by providing key research support to these early-stage technologies. WETS and HINMREC’s support allowed development of wave energy technology by providing a testing infrastructure that allows technology developers to test, demonstrate and evaluate their WEC devices, and generate data in order to advance WEC designs toward commercial readiness. HINMREC’s roles have included support in the establishment of the full site, including of wave resource characterization and site survey, followed by the essential roles of independent WEC device power performance assessment and environmental monitoring in support of deployed pre-commercial WECs. This DOE-funded work transitioned effectively to continue Navy-funded tasks for OTEC development, and activities at WETS, now under Naval Facilities Engineering Command (NAVFAC) funding. A secondary objective in the establishment of HINMREC was to assist the private sector in moving OTEC systems beyond proof-of-concept to pre-commercialization, primarily focused on system and component engineering, and local and global investigations into the potential environmental impacts of OTEC systems. HINMREC was tasked with maintaining high-resolution models of ocean thermal resources and the potential sustainable power output of OTEC systems. Ongoing tests begun previously under Navy funding at the OTEC Heat Exchangers (HXs) Test Facility at the Natural Energy Laboratory of Hawaii Authority (NELHA), in Kona on Hawaii Island, have been continued to identify cost-effective aluminum alloys for use in OTEC systems operating in the corrosive marine environment.

16 TIDAL AND WAVE POWER↗

ARM Lead Mentor Selection Process

The Atmospheric Radiation Measurement (ARM) Program was created in 1989 with funding from the U.S. Department of Energy (DOE) to develop several highly instrumented ground stations to study cloud-formation processes and their influence on radiative transfer. This scientific infrastructure provides for fixed sites, mobile facilities, an aerial facility, and a data archive available for use by scientists worldwide through the ARM Climate Research Facility—a scientific user facility. The ARM Climate Research Facility currently operates more than 300 instrument systems that provide ground-based observations of the atmospheric column. To keep ARM at the forefront of climate observations, the ARM infrastructure depends heavily on instrument scientists and engineers, known as Mentors. Mentors must have an excellent understanding of instrumentation theory and operation for their instrument areas and have comprehensive knowledge of critical scale-dependent atmospheric processes. They must also possess the technical and analytical skills to develop new data retrievals that provide innovative approaches for creating research-quality data sets. The ARM Facility seeks the best overall qualified candidate, or team when appropriate, that can fulfill Mentor requirements in a timely manner. The roles and responsibilities of the ARM Instrument Operations Manager are provided in Appendix A. The key role and responsibilities and detailed responsibilities of ARM Lead Mentors are provided in Appendix B and Appendix C, respectively.

47 OTHER INSTRUMENTATION↗

A Life Cycle Analysis Framework for Point Source Capture Systems

NETL studies the costs and benefits of PSC for electricity, industry, and mobile applications. Mobile point source capture (MPSC) and storage applied to freight modes captures emissions directly from exhaust. This poster presents a framework for conducting LCA of PSC systems applied to heavy-duty trucks, freight trains, and marine vessels. The framework defines a wheels-to-storage (gate-to-grave) boundary, including energy demands (electricity, heat, and cooling requirements), solvent use and cycling, onboard system components, carbon storage in a saline aquifer, and upstream manufacturing impacts for equipment, with a suggested functional unit of 1 tonne-km. Potential data sources for analysis include material, energy, and operational data from Oak Ridge National Laboratory, GREET (Greenhouse gases, Regulated Emissions, and Energy use in Technologies) model, and scientific literature. The suggested analytical approach includes comparison to publicly available business-as-usual systems without capture across all modes of transportation, sensitivity to composition of the capture solvent, and sensitivity to capture rate variation, all of which would support a wholistic PSC business case analysis. For future consideration, analysis can be augmented with consideration of different sources of electricity (e.g., nuclear), fuel substitution, deploying supportive infrastructure such as pipeline offloading points, and downstream applications like enhanced oil recovery (EOR).

life cycle analysis (LCA)↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗