Search NASA⌕ Search

SEARCH · Search NASA

Results for “femp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Metering Best Practices, A Guide to Achieving Utility Resource Efficiency, Release 2.0

This release is an update and expansion of the information provided in Release 1.0 of the Metering Best Practice Guide that was issued in October 2007. This release, as was the previous release, was developed under the direction of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government's implementation of sound cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. Each of these activities is directly related to achieving requirements set forth in the Energy Policy Acts of 1992 and 2005, the Energy Independence and Security Act (EISA) of 2007, and the goals that have been established in Executive Orders 13423 and 13514 - and also those practices that are inherent in sound management of Federal financial and personnel resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Y-12 National Security Complex Water Assessment

The Department of Energy's Federal Energy Management Program (FEMP) sponsored a water assessment at the Y 12 National Security Complex (Y 12) located in Oak Ridge, Tennessee. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment is to develop a comprehensive understanding of the current water-consuming applications and equipment at Y 12 and to identify key areas for water efficiency improvements that could be applied not only at Y-12 but at other Federal facilities as well. FEMP selected Pacific Northwest National Laboratory to coordinate and manage the water assessment. PNNL contracted Water Savers, LLC to lead the technical aspects of the water assessment. Water Savers provided key technical expertise in water auditing, metering, and cooling systems. This is the report of that effort, which concluded that the Y-12 facility could realize considerable water savings by implementing the recommended water efficiency opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans - Implementing Sustainability: The Institutional-Behavioral Dimension

This document is part of a larger, programmatic effort to assist federal agencies in taking action and changing their institutions to achieve and maintain federal sustainability goals, while meeting their mission goals. FEMP is developing guidance for federal agency efforts to enable institutional behavior change for sustainability, and for making sustainability “business as usual.” The driving requirement for this change is Executive Order (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance. FEMP emphasizes strategies for increasing energy efficiency and renewable energy utilization as critical components of attaining sustainability, and promotes additional non-energy action pathways contained in EO 13514. This report contributes to the larger goal by laying out the conceptual and evidentiary underpinnings of guidance to federal agencies. Conceptual frameworks focus and organize the development of guidance. We outline a series of progressively refined conceptual frameworks, including a multi-layer approach, key steps in sustainability implementation, a process view of specific approaches to institutional change, the agency Strategic Sustainability Performance Plans (SSPPs), and concepts related to context-specific rules, roles and tools for sustainability. Additionally, we tap pertinent bodies of literature in drawing eight evidence-based principles for behavior change. These principles are important foundations upon which to build in selecting strategies to effect change in organizations. Taken together, this report presents a suite of components that inform the training materials, presentations, web site, and other products that provide guidance to federal agencies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Rainwater Harvesting State Regulations and Technical Resources

Pacific Northwest National Laboratory (PNNL) conducted in-depth research of state-level rainwater harvesting regulations for the Federal Energy Management Program (FEMP) to help federal agencies strategically identify locations conducive to rainwater harvesting projects. Currently, rainwater harvesting is not regulated by the federal government but rather it is up to individual states to regulate the collection and use of rainwater. There is no centralized information on state-level regulations on rainwater harvesting maintained by a federal agency or outside organization. To fill this information gap, PNNL performed detailed internet searches for each state, which included state agencies, universities, Cooperative Extension Offices, city governments, and related organizations. The state-by-state information on rainwater harvesting regulations was compiled and assembled into an interactive map that is color coded by state regulations. The map provides a visual representation of the general types of rainwater harvesting policies across the country as well as general information on the state programs if applicable. The map allows the user to quickly discern where rainwater harvesting is supported and regulated by the state. This map will be available on the FEMP website by September 2015.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Facility Cybersecurity Framework Best Practices

Federal facilities are increasingly adopting automation and connecting to the Internet creating an energy-internet-of-things environment that converges operational technology (OT) and information technology (IT). Today's buildings increasingly weave together networked sensors and cyber and physical systems that enable data to be collected, aggregated, exchanged, stored and monetized in new ways. Building technological advances have created new energy technology, services, markets and value creation opportunities (e.g. transactive energy, two-way grid communications, machine learning, and increased use of renewable and distributed energy resources). But as larger data sets are being exchanged at faster speeds between an increasing number of OT systems, it becomes more difficult to protect the security of the data lifecycle and the physical equipment it interacts with. These challenges are especially difficult to overcome because the economic and environmental gain (interoperability, big data, social networks and ubiquitous information sharing) are driving these prominent trends in the digital age. Often cybersecurity is an afterthought. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) funded the Pacific Northwest National Laboratory (PNNL) to develop various cybersecurity tools, trainings, and reports to aid federal facility managers – and other building owners and operators – in better applying frameworks and lessons learned from the National Institute of Standards and Technology (NIST) Cybersecurity Framework (CSF), risk management framework (RMF), DOE’s cybersecurity capability maturity model (C2M2), and a wide variety of industry best practices and guidance documents (i.e., NIST 800 series, Department of Defense United Facilities Criteria). This set of tools, collectively known as the FEMP Facility-Related Control System Cyber Toolkit (FRCS Cyber Toolkit)2, is focused on cybersecurity concerns from facility-related control systems and other operational technology (OT), such as industrial control systems (ICS). The FRCS Cyber Toolkit can be applied across six of the sixteen critical infrastructure sectors designated by the Department of Homeland Security, including government facilities, healthcare and public health, commercial facilities (e.g., public assembly, offices, lodging), financial services (e.g., banking and insurance), emergency services (e.g., fire and police stations), and information technology. With increasingly converged IT and OT systems, it is crucial to address OT cybersecurity considerations and assess how the seam of these two systems could impact the overall cybersecurity posture of a facility. The objective of this report is to provide an overview of the best possible method to use FRCS Cyber Toolkit (section 2.0) and distilled cybersecurity best practices for the federal facilities to address growing non-linear cyber threats (section 3.0). Recommendations in this document are aggregated from several NIST and other documents (see Appendix A for additional details).

97 MATHEMATICS AND COMPUTING↗

Understanding Solar Photovoltaic System Performance: An Assessment of 75 Federal Photovoltaic Systems

This report presents a performance analysis of 75 photovoltaic systems based on PV system production data collected as part of a FEMP Federal PV Performance Assessment project combined with co-incident insolation, and ambient temperature to analyze how actual performance compares with a performance model. FEMP collaborated with 17 Federal agencies and sub-agencies to collect the information required to analyze the performance of each system. The systems represent a total capacity of 30,714 kW and range in size from 1 kW to 4,043 kW, with an average size of 410 kW, and were installed between 2011 and 2020. The data is analyzed for Key Performance Indicators, Availability, Performance Ratio and Energy Ratio by comparing the measured production data to model production data. The System Advisor Model (SAM) combines a description of the system (such as inverter capacity, de-rating for temperature, balance-of-system efficiency) with environmental parameters (coincident solar and temperature data) to calculate predicted performance. The performance metrics are calculated by lining up the measured production data with the model estimate on an hour-by-hour, day-by-day, or month-by-month basis (depending on the interval resolution of the production data). A report with system description, photo of the system, special assumptions made for the site, graph of measured production and model production, table of key performance indicators, and links to O&M resources that might improve performance was produced and delivered to site and agency staff with a short on-line briefing.

14 SOLAR ENERGY↗

Battery Energy Storage System Evaluation Method

This report describes development of an effort to assess Battery Energy Storage System (BESS) performance that the US DOE Federal Energy Management Program (FEMP) and others can employ to evaluate performance of deployed BESS or solar photovoltaic (PV) +BESS systems. The proposed method is based on actual battery charge and discharge metered data to be collected from BESS systems provided by federal agencies participating in the FEMP's performance assessment initiatives. Long-term (e.g., at least one year) time series (e.g., hourly) charge and discharge data are analyzed to provide approximate estimates of key performance indicators (KPIs).

25 ENERGY STORAGE↗

Best Practices for Renewable Energy Installations in the National Parks

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) and National Park Service (NPS) have partnered to support the development and utilization of renewable energy technology at federal facilities and on federal lands. FEMP provides technical support to NPS on renewable energy projects to identify and generate significant cost savings and efficiency benefits, investigate opportunities to reduce carbon footprint and/or achieve carbon neutrality, and improve resilience to NPS-owned facilities and sites. The purpose of this report is to support NPS staff as they evaluate whether and how to use renewable energy technologies in park operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Ground Source Heat Pump ECMs: Implemented Under DOE ESPC IDIQ Contract

Several federal performance and decarbonization objectives are driving the U.S. government to transition to net-zero emissions across the federal building portfolio. The overarching purpose of this Federal Energy Management Program (FEMP)-Geothermal Technologies Office (GTO) work is to support federal facilities in accomplishing the administration’s federal building decarbonization goals. Creating awareness of existing geothermal (or ground-source) heat pump (GHP) systems deployed on federal property, implemented using performance contracts and evaluating the energy and environmental impacts of these systems, this work will assist federal facilities in considering inclusion of GHP technology energy conservation measures (ECMs) in future performance contracting project awards. This report summarizes analyses of data from GHP ECMs installed under the DOE ESPC IDIQ contract across various climate areas and geographic locations, agencies, and building use types. Through the analysis of proposed GHP ECMs and understanding key metrics on implemented GHP systems in a variety of applications, FEMP and GTO can further support federal agencies in meeting decarbonization and net-zero building goals by evaluating and incorporating GHP systems into performance contracts and communicate the benefits of this technology.

15 GEOTHERMAL ENERGY↗

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Facilitating Sound, Cost-Effective Energy Management (Fact Sheet)

FEMP focuses on the needs of its Federal customers, delivering an array of products grouped into project transaction services, applied technology services, and decision support services. This document outlines FEMP services and programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program?s future, this question arises How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness? This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program's past and future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

Developing, Renewable, Energy, Projects, Facilitie↗

Sustainable Federal Fleets: Deploying Electric Vehicles and Electric Vehicle Supply Equipment

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for Sustainable Federal Fleets. To assist agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams.

30 DIRECT ENERGY CONVERSION↗

Supporting Electric Vehicle Supply Equipment Deployment

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies electrify their fleets and support the deployment of charging infrastructure. To assist agencies with the transition to zero-emission vehicles (ZEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through on-site and virtual EVSE Tiger Teams.

ADVANCED PROPULSION SYSTEMS↗

Federal Energy Savings Performance Contracts Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et. seq.

The U.S. Department of Energy's Federal Energy Management Program (FEMP) is issuing this document to provide clarifications and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. This document is intended to supplement FEMP's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contracting (ESPC) projects.

42 U.S.C. § 8287 et. seq.↗

Evolution of Energy Efficiency Programs Over Time: The Case of Standby Power

Issued in 2001, Presidential Executive Order 13221 directed federal agencies to purchase products with low standby power, with the goal of 1) reducing energy consumption in federal facilities, and 2) drawing attention to the problem of high standby power consumption, with guidance provided by the Federal Energy Management Program (FEMP). At that time, standby power was newly recognized as an increasing building energy load. Since then, procurement of products with low standby power have been set in place in acquisition processes, and the purchasing power of the federal government continues to influence manufacturers’ design decisions related to standby power. In recent years, FEMP has shifted effort from direct manufacturer outreach for data collection, to integrating low standby requirement into broader acquisition programs including Energy Star and Electronic Product Environmental Assessment Tool (EPEAT). Another milestone has been the labeling of low standby products on the GSA Advantage website to simplify and enhance compliance. Looking forward into the program’s future, this question arises “How do we design programs over time to reflect market and technology changes, by adjusting programmatic requirements while maintaining effectiveness?” This paper discusses that question for the case of standby power, which transitioned from covering a single to multiple environmental attributes, both in the context of the program’s past and future.

Payne, CT↗