Search NASA⌕ Search

SEARCH · Search NASA

Results for “flexibility metric”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. NASA is working diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond LEO large ]scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decisionmaking framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing FOM-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decision-making framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Streamline‐Traced, External‐Compression Supersonic Inlets for Mach 2

A computational study was performed to explore the aerodynamic design and performance of streamline-traced, external‐compression (STEX) inlets for Mach 2.0. The performance metrics included inlet flow rates, total pressure recovery, and total pressure distortion. The study explored the use of round and flattened capture cross‐sections and a bleed slot. The design of the inlet and generation of the inlet geometry was performed using the Supersonic Inlet Design and Analysis (SUPIN) Tool. Computational grids were generated, and methods of computational fluid dynamics (CFD) were applied to solve the three dimensional, turbulent flow through the inlets using the Wind‐US CFD flow solver. It was found that the use of a bleed slot with about 5% bleed resulted in an inlet total pressure recovery of 95% at Mach 2 with acceptable radial and circumferential total pressure distortion. It was also found that there was only a slight decrease in performance between a round and flattened capture cross‐section. This suggests that the use of streamline tracing offers flexibility in shaping the inlet capture cross‐section for a more favorable integration with an aircraft wing or fuselage. This flexibility and the good performance of the inlet provides a novel inlet design for future commercial supersonic aircraft.

Computational Fluid Dynamics↗

Benefits Assessment of Algorithmically Combining Generic High Altitude Airspace Sectors

In today's air traffic control operations, sectors that have traffic demand below capacity are combined so that fewer controller teams are required to manage air traffic. Controllers in current operations are certified to control a group of six to eight sectors, known as an area of specialization. Sector combinations are restricted to occur within areas of specialization. Since there are few sector combination possibilities in each area of specialization, human supervisors can effectively make sector combination decisions. In the future, automation and procedures will allow any appropriately trained controller to control any of a large set of generic sectors. The primary benefit of this will be increased controller staffing flexibility. Generic sectors will also allow more options for combining sectors, making sector combination decisions difficult for human supervisors. A sector-combining algorithm can assist supervisors as they make generic sector combination decisions. A heuristic algorithm for combining under-utilized air space sectors to conserve air traffic control resources has been described and analyzed. Analysis of the algorithm and comparisons with operational sector combinations indicate that this algorithm could more efficiently utilize air traffic control resources than current sector combinations. This paper investigates the benefits of using the sector-combining algorithm proposed in previous research to combine high altitude generic airspace sectors. Simulations are conducted in which all the high altitude sectors in a center are allowed to combine, as will be possible in generic high altitude airspace. Furthermore, the algorithm is adjusted to use a version of the simplified dynamic density (SDD) workload metric that has been modified to account for workload reductions due to automatic handoffs and Automatic Dependent Surveillance Broadcast (ADS-B). This modified metric is referred to here as future simplified dynamic density (FSDD). Finally, traffic demand sets with increased air traffic demand are used in the simulations to capture the expected growth in air traffic demand by the mid-term.

Bloem, Michael↗

Streamline-Traced, External-Compression Supersonic Inlets for Mach 2

A computational study was performed to explore the aerodynamic design and performance of streamline-traced, external-compression (STEX) inlets for Mach 2.0. The performance metrics included inlet flow rates, total pressure recovery, and total pressure distortion. The study explored the use of round and flattened capture cross-sections and a bleed slot. The design of the inlet and generation of the inlet geometry was performed using the Supersonic Inlet Design and Analysis(SUPIN) Tool. Computational grids were generated, and methods of computational fluid dynamics (CFD) were applied to solve the three-dimensional, turbulent flow through the inlets using the Wind-US CFD flow solver. It was found that the use of a bleed slot with about 5% bleed resulted in an inlet total pressure recovery of 95% at Mach 2 with acceptable radial and circumferential total pressure distortion. It was also found that there was only a slight decrease in performance between a round and flattened capture cross-section. This suggests that the use of streamline tracing offers flexibility in shaping the inlet capture cross-section for a more favorable integration with an aircraft wing or fuselage. This flexibility and the good performance of the inlet provides a novel inlet design for future commercial supersonic aircraft.

Computational Fluid Dynamics↗

Cost Analysis In A Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature serviceoriented, multi-mission control centers to streamline or refine their cost analysis process.

Newhouse, M.↗

Cost Analysis in a Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single mission-type support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multi-mission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature service-oriented, multi-mission control centers to streamline or refine their cost analysis process.

Felton, Larry↗

Europa Clipper Payload Verification and Validation: Test and Analysis Program Design

NASA’s Europa Clipper mission – which is planned to launch in the mid-2020s – is designed to investigate the habitability of the jovian moon Europa with a state-of-the-art suite of over 10 sensors and instruments. Now past its project critical design review, Europa Clipper is starting the execution of its verification and validation (V&V) program. The payload V&V function in particular is responsible for designing and coordinating a thorough test and analysis program that will confirm the proper functioning and performance of our payload instruments. Given the large number of instruments to manage, we have developed a suite of standardized tests and analyses that are designed to cover all of the common interfaces across instruments, while allowing for flexibility to support the unique needs of individual instruments. This suite of activities, coordinated and/or performed by the payload team, forms the bulk of our payload verification and validation campaign. This paper provides a detailed summary of the full set of V&V activities in that suite, covering the four categories of activities: analysis of lower-level evidence, analysis via simulation, testing in the system testbeds, and testing in assembly, test, and launch operations (ATLO). We will describe the purpose of each activity type, how the activities are developed, and the review process for each type of activity. We then define the complete list of activities written for each instrument and how subtleties specific to certain instruments are managed. The discussion will provide a comprehensive understanding of the activities in the payload V&V purview and how various interfaces with different levels of the project are managed. This paper also describes key metrics the payload team uses to track V&V progress and some insights into the teaming design and division of labor we use to ensure consistency and completeness across the entire payload suite. Finally, the paper will offer a snapshot of the status of the Payload V&V program prior to instrument delivery and offer insights into the upcoming phase of instrument delivery and the start of ATLO.

Lee, Dennis↗

An Overview of NASA's Current Materials Development Efforts for Mars EDL

Current roadmaps point to landing heavy masses (cargo, followed by manned vehicles) on Mars in the 2030's and the existing entry, descent and landing (EDL) technology will not be sufficient to facilitate such missions. In 2009 the Exploration Technology Development Program (ETDP) established the Entry, Descent and Landing Technology Development Project (EDL TDP), to be managed programmatically at Langley Research Center (LaRC) and technically a Ames Research Center (ARC). The purpose of the project is to further the technologies required to land heavy (approximately 40 metric ton) masses on Mars to facilitate exploration. The EDL TDP contains three technical elements. They are: 1) Thermal Protection Systems (TPS) development 2) Modeling and Tools (MAT) development 3) Supersonic Retropropulsion (SRP) development The primary goals of the EDL TDP TPS element is to design and develop TPS materials capable of withstanding the severe aerothermal loads associated with aerocapture and entry into the Martian atmosphere while significantly decreasing the TPS mass fraction contribution to the entry system. Significant advancements in TPS materials technology are needed in order to enable heavy mass payloads to be successfully landed on the Martian surface for robotic precursors and subsequent human exploration missions. The EDL TDP TPS element is further divided into two different TPS concepts for Mars EDL those being: 1) Rigid TPS for a mid L/D aeroshell with the capability to withstand dual pulsed heating environments as high as 500 W/square cm for aerocapture and 130 W/square cm for entry 2) Flexible TPS for a deployable aerodynamic decelerator with the capability to withstand dual pulsed heating environments as high as 120 W/square cm for aerocapture and 30 W/square cm for entry NASA, along with its vendors, has begun developing and testing materials for each of the deceleration approaches. These include multi-layer rigid ablators and flexible ablative materials. In order to model the response of these types of materials, new and improved modeling techniques will be required. This presentation will outline the types of materials that are under development and illustrate the need for advancement in modeling of ablative materials.

Beck, Robin A.↗

Mirror fusion propulsion system - A performance comparison with alternate propulsion systems for the manned Mars mission

The performance characteristics of several propulsion technologies applied to piloted Mars missions are compared. The characteristics that are compared are Initial Mass in Low Earth Orbit (IMLEO), mission flexibility, and flight times. The propulsion systems being compared are both demonstrated and envisioned: Chemical (or Cryogenic), Nuclear Thermal Rocket (NTR) solid core, NTR gas core, Nuclear Electric Propulsion (NEP), and a mirror fusion space propulsion system. The proposed magnetic mirror fusion reactor, known as the Mirror Fusion Propulsion System (MFPS), is described. The description is an overview of a design study that was conducted to convert a mirror reactor experiment at Lawrence Livermore National Lab (LLNL) into a viable space propulsion system. Design principles geared towards minimizing mass and maximizing power available for thrust are identified and applied to the LLNL reactor design, resulting in the MFPS. The MFPS' design evolution, reactor and fuel choices, and system configuration are described. Results of the performance comparison shows that the MFPS minimizes flight time to 60 to 90 days for flights to Mars while allowing continuous return-home capability while at Mars. Total MFPS IMLEO including propellant and payloads is kept to about 1,000 metric tons.

Deveny, M.↗

Mirror fusion propulsion system: A performance comparison with alternate propulsion systems for the manned Mars Mission

The performance characteristics of several propulsion technologies applied to piloted Mars missions are compared. The characteristics that are compared are Initial Mass in Low Earth Orbit (IMLEO), mission flexibility, and flight times. The propulsion systems being compared are both demonstrated and envisioned: Chemical (or Cryogenic), Nuclear Thermal Rocket (NTR) solid core, NTR gas core, Nuclear Electric Propulsion (NEP), and a mirror fusion space propulsion system. The proposed magnetic mirror fusion reactor, known as the Mirror Fusion Propulsion System (MFPS), is described. The description is an overview of a design study that was conducted to convert a mirror reactor experiment at Lawrence Livermore National Lab (LLNL) into a viable space propulsion system. Design principles geared towards minimizing mass and maximizing power available for thrust are identified and applied to the LLNL reactor design, resulting in the MFPS. The MFPS' design evolution, reactor and fuel choices, and system configuration are described. Results of the performance comparison shows that the MFPS minimizes flight time to 60 to 90 days for flights to Mars while allowing continuous return-home capability while at Mars. Total MFPS IMLEO including propellant and payloads is kept to about 1,000 metric tons.

Schulze, Norman R.↗

Crew Scheduling Performance

As NASA considers long-duration exploration missions (LDEMs), it is envisioned that crew will behave more autonomously as compared to low-Earth orbit missions. The necessary shift of Ops Planners’ complete management of scheduling and planning to provide flexibility for crew to manage their own schedule in real-time requires significant research and investigation in evaluation of concepts of operations, of software tools to support tasks, and of crew performance to complete scheduling tasks. Our research objective is to characterize the human performance envelope for the task of planning and scheduling (crew self-scheduling), develop countermeasures to mitigate adverse performance effects due to plan complexity, and inform performance standards and guidelines based on research results. In our efforts to understand and characterize scheduling performance of crew members, we have conducted subject matter expert interviews to obtain feedback on scheduling plan complexity drivers and plan goodness. Following the pilot study conducted last year, we designed a study and have begun remote human subject testing to evaluate non-expert human performance, workload, and situational awareness for the task of planning and scheduling. This study investigates the effects of the number and type of constraints on human performance, and the differences in scheduling metrics between scheduling and rescheduling tasks. Subject testing is currently in progress, and we aim to collect data from approximately thirty subjects. We will summarize the methods used and impacts of the number and type of scheduling constraints. We will also present lessons learned as well as relevant results of the study.

crew scheduling↗

NASA Space Launch System Operations Strategy

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human and scientific exploration beyond Earth orbit. The SLS also will provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130 t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and 21st Century Ground Systems programs are working together to create streamlined, affordable operations for sustainable exploration.

Singer, Joan A.↗

Design of an Excavation Robot: Regolith Advanced Surface Systems Operations Robot (RASSOR) 2.0

To continue on a sustainable and flexible path, NASA needs to address the challenge of collecting and moving large amounts of regolith at the destination. Acquiring the water resources on Mars will require mining significant quantities of regolith and this is not possible with the state-of-the-art low mass excavation systems. Low gravity environments (Mars = 3/8 G) and launch mass restrictions limit the traction and the resulting reaction force of the vehicle, making current terrestrial techniques impractical. This project addressed this challenge by developing a completely new technology that can mine large quantities of regolith on Mars. Recent measurements by the “Curiosity” rover on Mars have found that the regolith contains ~ 2% water by weight globally, ~4% in Jezero Crater (Human Architecture Team’s reference landing site), and much more at the poles(Leshin et al, 2013). RASSOR 2.0 is a planetary excavator, which has a mass of 66 kg, with a 0.38 kg vehicle mass per kilogram, per hour of excavation rate and power usage of 4 W per kg of regolith excavation rate. A single RASSOR 2.0 can excavate a minimum of 2.7 metric tons of regolith per day.This is accomplished by using counteracting excavation forces on two opposing digging implements called bucket drums and an autonomous mining control system. This work has addressed several major research areas outlined in the NASA Technology Area (TA) 04 Robotics & Autonomous Systems and TA 07 Human Destination Systems roadmaps. This project started at Technology Readiness Level (TRL) 4 as a low fidelity “proof of concept” prototype which has successfully demonstrated basic regolith simulant excavation functionality in a lab-scale gravity off load test. The foundational technology described here was awarded US patent number: US 9027265 for a “Zero horizontal reaction force excavator” on May 12, 2015.

RASSOR↗

NASA Space Launch System Operations Strategy

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is charged with delivering a new capability for human and scientific exploration beyond Earth orbit (BEO). The SLS may also provide backup crew and cargo services to the International Space Station, where astronauts have been training for long-duration voyages to destinations such as asteroids and Mars. For context, the SLS will be larger than the Saturn V, providing 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The SLS Program knows that affordability is the key to sustainability. This paper will provide an overview of its operations strategy, which includes initiatives to reduce both development and fixed costs by using existing hardware and infrastructure assets to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat using competitively selected advanced technologies that offer appropriate return on investment. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. A series of design reference missions has informed the SLS operations concept, including launching the Orion Multi-Purpose Crew Vehicle (MPCV) on an autonomous demonstration mission in a lunar flyby scenario in 2017, and the first flight of a crew on Orion for a lunar flyby in 2021. Additional concepts address the processing of very large payloads, using a series of modular fairings and adapters to flexibly configure the rocket for the mission. This paper will describe how the SLS, Orion, and Ground Systems Development and Operations (GSDO) programs are working together to create streamlined, affordable operations for sustainable exploration for decades to come.

Singer, Joan A.↗

NASA's Space Launch System Advanced Booster Engineering Demonstration and/or Risk Reduction Efforts

The National Aeronautics and Space Administration (NASA) formally initiated the Space Launch System (SLS) development in September 2011, with the approval of the program s acquisition plan, which engages the current workforce and infrastructure to deliver an initial 70 metric ton (t) SLS capability in 2017, while using planned block upgrades to evolve to a full 130 t capability after 2021. A key component of the acquisition plan is a three-phased approach for the first stage boosters. The first phase is to complete the development of the Ares and Space Shuttle heritage 5-segment solid rocket boosters (SRBs) for initial exploration missions in 2017 and 2021. The second phase in the booster acquisition plan is the Advanced Booster Risk Reduction and/or Engineering Demonstration NASA Research Announcement (NRA), which was recently awarded after a full and open competition. The NRA was released to industry on February 9, 2012, with a stated intent to reduce risks leading to an affordable advanced booster and to enable competition. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the advanced boosters. There are no existing boosters that can meet the performance requirements for the 130 t class SLS. The expected thrust class of the advanced boosters is potentially double the current 5-segment solid rocket booster capability. These new boosters will enable the flexible path approach to space exploration beyond Earth orbit (BEO), opening up vast opportunities including near-Earth asteroids, Lagrange Points, and Mars. This evolved capability offers large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements. NASA developed the Advanced Booster Engineering Demonstration and/or Risk Reduction NRA to seek industry participation in reducing risks leading to an affordable advanced booster that meets the SLS performance requirements. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an advanced booster. This paper will discuss, for the first time publicly, the contract awards and how NASA intends to use the data from these efforts to prepare for the planned advanced booster DDT&E acquisition as the SLS Program moves forward with competitively procured affordable performance enhancements.

Crumbly, Christopher M.↗

NASA's Space Launch System Advanced Booster Engineering Demonstration and Risk Reduction Efforts

The National Aeronautics and Space Administration (NASA) formally initiated the Space Launch System (SLS) development in September 2011, with the approval of the program s acquisition plan, which engages the current workforce and infrastructure to deliver an initial 70 metric ton (t) SLS capability in 2017, while using planned block upgrades to evolve to a full 130 t capability after 2021. A key component of the acquisition plan is a three-phased approach for the first stage boosters. The first phase is to complete the development of the Ares and Space Shuttle heritage 5-segment solid rocket boosters for initial exploration missions in 2017 and 2021. The second phase in the booster acquisition plan is the Advanced Booster Risk Reduction and/or Engineering Demonstration NASA Research Announcement (NRA), which was recently awarded after a full and open competition. The NRA was released to industry on February 9, 2012, and its stated intent was to reduce risks leading to an affordable Advanced Booster and to enable competition. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the Advanced Boosters. There are no existing boosters that can meet the performance requirements for the 130 t class SLS. The expected thrust class of the Advanced Boosters is potentially double the current 5-segment solid rocket booster capability. These new boosters will enable the flexible path approach to space exploration beyond Earth orbit, opening up vast opportunities including near-Earth asteroids, Lagrange Points, and Mars. This evolved capability offers large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements. NASA developed the Advanced Booster Engineering Demonstration and/or Risk Reduction NRA to seek industry participation in reducing risks leading to an affordable Advanced Booster that meets the SLS performance requirements. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an Advanced Booster. This paper will discuss, for the first time publicly, the contract awards and how NASA intends to use the data from these efforts to prepare for the planned Advanced Booster DDT&E acquisition as the SLS Program moves forward with competitively procured affordable performance enhancements.

Crumbly, Christopher M.↗

Benchmarking Computational Tools for Calling SNPs and Indels in Complex Microbial Populations

The NASA BioNutrients missions seek to understand the suitability of microorganisms for bioproduction during space flight. One topic of interest is the stability of microbial genomes during long-term ambient storage and subsequent rehydration and growth. To address these questions, samples from 8 species were flown to ISS for 5 years of desiccated storage at ambient temperature (Stasis Packs) and 2 species were packaged along with powdered media inside a bioreactor system to allow hydration and growth in microgravity (Production Packs). For both systems, Whole Genome Sequencing (WGS) of the DNA extracted from the returned samples and paired ground controls will be conducted to identify changes in genome stability due to time, storage conditions and growth in space. Across the technical replicates, ground controls, 10 timepoints, and multiple experimental conditions, ~300 samples have been selected for initial analysis with WGS sequencing to 100x coverage. A flexible and resource efficient mutation calling pipeline is needed to process this large dataset and allow for comparisons between species. Many bioinformatics tools for calling Indels and Single Nucleotide Variants (SNVs) are designed for use with pure isolates, where true variations from the reference genome are expected to dominate the reads aligning to the location of mutation. In contrast, DNA from the Stasis Pack (SP) samples was collected directly after recovery from desiccated storage and the Production Pack (PP) samples were collected after fermentation. In this context, reads with mutations are expected to be less frequent than reads that align with the reference genome, as each sample will include multiple lines of cells. Thus, BioNutrients samples are expected to be similar to samples from cancer cell or “pooled” sequencing approaches. In preparation for the analysis of the BioNutrients samples, we have tested three mutation calling tools (GATK for Microbes, BreSeq and DiscoSNP) designed for complex samples. A challenge of validating mutation identification pipelines is a lack of “Ground Truth” datasets, especially for complex samples. To compare these three tools, we sought to identify mutations in pre-existing WGS data collected from populations of Chlamydomonas reinhardtii that were exposed to UV mutagenesis and growth in LEO as part of the Space Algae-1 mission. Here we present a summary of these tools against the analysis originally conducted using the CRISP tool. Critical metrics are compared such as runtime, the number of SNPs, the number and size of Indels, and patterns of transversion and transitions identified by each tool are reported. By sharing these benchmarking results collected in support of the BioNutrients mission, we aim to guide others seeking to identify SNVs in similarly complex microbial samples.

Biology↗