Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Columbia University Synthetic Power Grid with Geographical Coordinates

The following data set is generated based on the statistical properties of the US Western Interconnection. This data set consists of four tables, each contained in a single comma-delimited CSV file. The files contain the data regarding the buses and lines in the synthetic network generated based on the topology of the Western Interconnection (WI) power grid.

synthetic data↗

Method for Spatiotemporal Solar Power Profile Estimation for a Proposed U.S.–Caribbean–South America Super Grid under Hurricanes

Solar photovoltaic (PV) generation technology stands out as a scalable and cost-effective solution to enable the transition toward decarbonization. However, PV solar output, beyond the daily solar irradiance variability and unavailability during nights, is very sensitive to weather events like hurricanes. Hurricanes nucleate massive amounts of clouds around their centers, shading hundreds of kilometers in their path, reducing PV power output. This research proposes a spatiotemporal method, implemented in MATLAB R2023b coding, to estimate the shading effect of hurricanes over a wide distribution of PV solar plants connected to a high-voltage power infrastructure called the U.S.–Caribbean–South America super grid. The complete interconnection of the U.S., the Caribbean, and South America results in the lowest power valley levels, i.e., an overall percentual reduction in PV power output caused by hurricane shading. The simulations assess the impact of hurricanes in 10 synthetic trajectories spanning from Texas to Florida. The Caribbean would also experience lower power valleys with expanded interconnectivity schemes. The U.S.–Caribbean–South America super grid reduces Caribbean variability from 37.8% to 8.9% in the case study. The proposed spatiotemporal method for PV power profile estimation is a valuable tool for future solar power generation expansion, transmission planning, and system design considering the impact of hurricanes.

14 SOLAR ENERGY↗

On the operational characteristics and economic value of pumped thermal energy storage

Pumped thermal energy storage (PTES) systems use an electrically-driven heat pump to store electricity in the form of thermal energy, and subsequently dispatch the stored thermal energy to generate electricity using a thermodynamic heat engine. Optimal day-ahead operational scheduling and annual value of a PTES system based on Joule-Brayton thermodynamic cycles and two-tank molten salt hot thermal storage is evaluated in this work. Production cost models, which simultaneously optimize commitment and dispatch schedules for an entire set of generators to minimize the cost of satisfying electricity demand, are employed to determine system-optimal operation and day-ahead energy value of the PTES system within each of six hypothetical near-future grid scenarios intended to approximately represent the U.S. Western Interconnection or the Texas Interconnection. Sensitivity to grid scenario (including the contribution of variable renewable energy sources), thermal storage capacity, relative heat pump and heat engine capacities, and startup/shutdown cycling costs are evaluated. PTES energy value and heat engine annual capacity factor increase strongly as the contribution of variable renewable resources increases, heat pump capacity increases relative to heat engine capacity, or PTES cycling costs decrease. Grid scenarios in which the contribution of variable renewable energy is dominated by solar photovoltaics (PV) vs. wind produce inherently different PTES operational patterns. Annual PTES energy value within PV-dominated scenarios increased with storage capacity only up to approximately seven hours of full-load discharge capacity, whereas that within wind-dominated scenarios exhibited a continual increase with storage duration up to at least 16 hours.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Role of Pre-Application Reports in Improving Distributed Generation Interconnection Processes

Several tools have emerged in recent years to increase data exchange and transparency in the distributed generation interconnection process with the goal of reducing interconnection costs. One example is pre-application reports. These reports are generated by a utility at the request of prospective interconnection applicants to provide technical information about a specific point of interconnection. Formal pre-application report processes have been established in 12 states at the distribution system level as well as at the transmission level by the Federal Energy Regulatory Commission. These reports are a relatively low-cost method of informing applicants of grid conditions and potential interconnection limitations early in the interconnection process. Thus, this information may encourage interconnection in locations with little to no detrimental impact to the grid and low interconnection costs. Increasing transparency of these grid conditions may also enable applicants to better plan for interconnection costs and requirements, such as system modifications and complex engineering studies. By providing these benefits, pre-application reports are expected to reduce the number of canceled interconnection applications. This report evaluates this hypothesis by quantifying the impact pre-application report processes have on application approval rate. To evaluate this hypothesis this analysis uses utility-reported distributed generation interconnection data from four utilities in Massachusetts. The analysis considers a four-year time period before and a five-year period after pre-application report process were implemented. The results indicate that once pre-application reports were required for projects 500 kilowatts and larger the approval rate of applications increased by 24%. This suggests that pre-application reports may decrease the percentage of canceled projects. However, due to data and other limitations, these results do not necessarily connote causation. This analysis is an important first step and a prerequisite for future analyses regarding the impact of pre-application reports. Other potential impacts also recognized during this analysis included reducing sunk costs and reducing the number of projects requiring a complex review. Collection of additional data would allow for forming more robust conclusions about these impacts in the future. Such data include circuit-level data, interconnection cost data, policy and regulatory background, national-level data, and utility and developer attributes. These data provide necessary context to account for interrelated factors while evaluating pre-application reports. Filling such knowledge gaps ultimately aids regulators in applying best practices within the industry. As more and more distributed energy resources are interconnected, these best practices will become an integral aspect of efficiently transitioning to an electric grid capable of meeting the needs of the 21st century.

14 SOLAR ENERGY↗

Grid Code Essentials and Streamlining Process for Interconnections

This presentation was part of a webinar entitled "A Practitioner's Guide to Implementing Solar Rooftop Programs and Navigating Net-Metering Policies," hosted by USAID Clean Power Asia and included speakers the Hawaii Natural Energy Institute as well as NREL. This presentation outlines grid codes in general, and IEEE Std 1547-2018 specifically, and discusses their adoption into interconnection requirements. Key capabilities, now enabled by IEEE Std 1547-2018, such as voltage regulation and frequency ride-through are described.

DER↗

Providencia Island White Papers: Hawaii, USA: A Grid Planning Case Study for Providencia Island, Colombia

Special considerations exist for island grids seeking to smoothly integrate distributed energy resources (DERs), such as rooftop photovoltaics (PV), with an existing fossil fuel-based grid without compromising system stability and reliability. Hawaii, having successfully integrated nonconventional renewable energy sources for a hybrid electricity grid, may serve as a guide for technical specifications and interconnection policy. Island grid planners may seek to follow Hawaii's example by standardizing technical specifications of generators, particularly for advanced inverter components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Level Assessment of Grid Infrastructure in Southeast Asia to Support Regional Interconnections

The purpose of this slide deck is to provide an overview of the benefits of interregional transmission and to assess the specific transmission landscape of Southeast Asia, with respect to potential interconnections between Singapore and neighboring countries. This analysis also explores the distribution of renewable resources and electricity demand in ASEAN (the Association of Southeast Asian Nations) as well as current and anticipated interregional transmission, in order to inform future interconnection plans.

ASEAN↗

Columbia University Synthetic Power Grid with Geographical Coordinates

The following data set is generated based on the statistical properties of the US Western Interconnection. This data set consists of four tables, each contained in a single comma-delimited CSV file. The files contain the data regarding the buses and lines in the synthetic network generated based on the topology of the Western Interconnection (WI) power grid.

Soltan, Saleh↗

Grid‐responsive smart manufacturing: A perspective for an interconnected energy future in the industrial sector

Abstract With the growing amount of renewable energy sources, the grid has become responsible for accounting for intermittency and the flexibility needed to utilize dynamic sources. Expensive peaking plants and energy storage systems have been proposed as ways to mitigate those problems. There is a large group of energy consumers that can respond to grid conditions. Historically, these consumers have been residential and commercial users, but with modern innovations and practices, industrial consumers have the potential to become a major player in this space. Grid‐responsive smart manufacturing can be used to utilize modern tools in manufacturing innovation as enablers for grid response. These modern tools already exist but are not widely used for industrial grid‐side energy management. This article defines grid‐responsive smart manufacturing, identifies five major barriers to its widespread implementation, and portrays the path to getting industrial users to be key players in grid stability and flexibility.

Billings, Blake W.↗

Autonomous Energy Grids

Current frameworks to monitor, control, and optimize large-scale energy systems are becoming increasingly inadequate because of significantly high penetration levels of variable generation and distributed energy resources being integrated into electric power systems; the deluge of data from pervasive metering of energy grids; and a variety of new market mechanisms, including multilevel ancillary services. This paper outlines the concept of autonomous energy grids (AEGs). These systems are supported by a scalable, reconfigurable, and self-organizing information and control infrastructure, are extremely secure and resilient (self-healing), and can self-optimize in real time to ensure economic and reliable performance while systematically integrating energy in all forms. AEGs rely on cellular building blocks that can self-optimize when isolated from a larger grid and participate in optimal operation when interconnected to a larger grid. This paper describes the key concepts and research necessary in the broad domains of optimization theory, control theory, big data analytics, and complex system theory and modeling to realize the AEG vision.

autonomous energy grids↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

Small Hydropower Interconnections: Small Hydropower in the United States

Small hydropower projects, which we define as generators below 20 MW in capacity have been the predominant source of hydropower growth over the past decade and create the most cost-effective and environmentally permissible avenues for new hydropower installation in the United States (DOE 2016; Johnson et al. 2018). Small hydropower developers across the United States have found that interconnecting these projects with the grid can be challenging due to unexpected costs and schedule overruns. Understanding the interconnection challenges and improving the process may allow more small hydropower projects to be successful. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. To begin to analyze the existing interconnection processes and challenges facing small hydropower, the state of small hydropower development in the U.S. must first be described to understand the characteristics of the industry. The first in a series, this paper presents the state of small hydropower projects in the U.S. to describe their type, location, and size based on data extracted from the HydroSource database (ORNL 2020). The following papers in the series will detail the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”), and present best practices in interconnection processes (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

A generative graph model for electrical infrastructure networks

We propose a generative graph model for electrical infrastructure networks that accounts for heterogeneity in both node and edge type. To inform the design of this model, we analyze the properties of power grid graphs derived from the U.S. Eastern Interconnection, Texas Interconnection, and Poland transmission system power grids. Across these datasets, we find subgraphs induced by nodes of the same voltage level exhibit shared structural properties atypical to small-world networks, including low local clustering, large diameter and large average distance. On the other hand, we find subgraphs induced by transformer edges linking nodes of different voltage types contain a more limited structure, consisting mainly of small, disjoint star graphs. The goal of our proposed model is to match both these inter and intra-network properties by proceeding in two phases: we first generate subgraphs for each voltage level and then generate transformer edges that connect these subgraphs. The first phase of the model adapts the Chung-Lu random graph model, taking desired vertex degrees and desired diameter as inputs, while the second phase of the model is based on a simpler random star graph generation process. We test the performance of our model by comparing its output across many runs to the aforementioned real data. In nearly all categories tested, we find our model is more accurate in reproducing the unusual mixture of properties apparent in the data than the Chung-Lu model. We also include graph visualization comparisons, as well as a brief analysis of edge-deletion resiliency. Ultimately, our model may be used to generate synthetic graph data, test hypotheses and algorithms at different scales, and serve as a baseline model on top of which further electrical network properties, device models, and interdependencies to other networks, may be appended.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Active power control of solar PV generation for large interconnection frequency regulation and oscillation damping

Because of zero greenhouse gas emission and decreased manufacture cost, solar photovoltaic (PV) generation is expected to account for a significant portion of future power grid generation portfolio. Because it is indirectly connected to the power grid via power electronic devices, solar PV generation system is fully decoupled from the power grid, which will influence the interconnected power grid dynamic characteristics as a result. In this study, the impact of solar PV penetration on large interconnected power system frequency response and inter-area oscillation is evaluated, taking the United States Eastern Interconnection (EI) as an example. Furthermore, based on the constructed solar PV electrical control model with additional active power control loops, the potential contributions of solar PV generation to power system frequency regulation and oscillation damping are examined. The advantages of solar PV frequency support over that of wind generator are also discussed. Finally, simulation results demonstrate that solar PV generations can effectively work as ‘actuators’ in alleviating the negative impacts they bring about.

14 SOLAR ENERGY↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Advanced Grid Simulator for Multi-Megawatt Power Converter Testing and Certification

Grid integration testing of inverter-coupled renewable energy technologies is an essential step in the qualification of renewable energy and energy storage systems to ensure the stability of the power system. New types of devices must be thoroughly tested and validated for compliance with relevant grid codes and interconnection requirements. For this purpose, highly specialized custom-made testing equipment is needed to emulate various types of realistic grid conditions that are required by certification bodies or for research purposes. For testing multi-megawatt converters, a high power grid simulator capable of creating controlled grid conditions and meeting both power quality and dynamic characteristics is needed. This paper describes the new grid simulator concept based on ABB's medium voltage ACS6000 drive technology that utilizes advanced modulation and control techniques to create an unique testing platform for various multi-megawatt power converter systems. Its performance is demonstrated utilizing the test results obtained during commissioning activities at the National Renewable Energy Laboratory in Colorado, USA.

17 WIND ENERGY↗

Energy Storage for Frequency Control in High Photovoltaic Power Grids

Frequency stability of power systems becomes more vulnerable with the increase of solar photovoltaic (PV). Energy storage provides an option to mitigate high PV impact. Using the United States Eastern Interconnection (EI) and Texas Interconnection (ERCOT) power grid models, this paper investigates the capabilities of using energy storage to improve frequency stability of high PV power grids. The study result helps to identify the potential and impact factors in utilizing energy storage to regulate frequency in high renewable power grids.

14 SOLAR ENERGY↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗