Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Simple XML Producer-Consumer Protocol

There are many different projects from government, academia, and industry that provide services for delivering events in distributed environments. The problem with these event services is that they are not general enough to support all uses and they speak different protocols so that they cannot interoperate. We require such interoperability when we, for example, wish to analyze the performance of an application in a distributed environment. Such an analysis might require performance information from the application, computer systems, networks, and scientific instruments. In this work we propose and evaluate a standard XML-based protocol for the transmission of events in distributed systems. One recent trend in government and academic research is the development and deployment of computational grids. Computational grids are large-scale distributed systems that typically consist of high-performance compute, storage, and networking resources. Examples of such computational grids are the DOE Science Grid, the NASA Information Power Grid (IPG), and the NSF Partnerships for Advanced Computing Infrastructure (PACIs). The major effort to deploy these grids is in the area of developing the software services to allow users to execute applications on these large and diverse sets of resources. These services include security, execution of remote applications, managing remote data, access to information about resources and services, and so on. There are several toolkits for providing these services such as Globus, Legion, and Condor. As part of these efforts to develop computational grids, the Global Grid Forum is working to standardize the protocols and APIs used by various grid services. This standardization will allow interoperability between the client and server software of the toolkits that are providing the grid services. The goal of the Performance Working Group of the Grid Forum is to standardize protocols and representations related to the storage and distribution of performance data. These standard protocols and representations must support tasks such as profiling parallel applications, monitoring the status of computers and networks, and monitoring the performance of services provided by a computational grid. This paper describes a proposed protocol and data representation for the exchange of events in a distributed system. The protocol exchanges messages formatted in XML and it can be layered atop any low-level communication protocol such as TCP or UDP Further, we describe Java and C++ implementations of this protocol and discuss their performance. The next section will provide some further background information. Section 3 describes the main communication patterns of our protocol. Section 4 describes how we represent events and related information using XML. Section 5 describes our protocol and Section 6 discusses the performance of two implementations of the protocol. Finally, an appendix provides the XML Schema definition of our protocol and event information.

Smith, Warren↗

Organizational Influence on Supply Chain for Digital Energy Infrastructure: Business Models, and Policy Landscape

Significant investment is driving the essential modernization and digitization of U.S. energy infrastructure, but the United States faces a key challenge in this grid transformation: our renewable and clean energy supply chains have limited capacity to source necessary digital assets through U.S. or allied sources. Batteries and their associated power electronic interfaces are key components to delivering clean and more resilient energy delivery, providing much-needed fast ramping, emergency discharge, generation, and operations support to the electric grid. These services have grown to be invaluable over the past 10 years and will soon be an irreplaceable component of energy delivery. While there have been significant strides to move supply chains for raw and critical materials to U.S. and allied nations, the control and power electronic industry has lagged, in part because of lower cost margins. For example, the United States now has growing capacity to manufacture solar photovoltaic (PV) panels, but 90% of the inverters—which are essential to the conversion of DC to AC for grid connection and controls—are made in or source parts from the People’s Republic of China (PRC). While a global supply chain is beneficial for many economic and supply diversification reasons, presence of foreign entities of concern (FEOC) in a dominant role in this supply chain brings additional concerns for national security of infrastructure. The BESS relationship and new clean energy have features that warrant discussions and additional focus on impact for technology security, given their critical role. This review considers the impact and solutions for complex business and policy landscapes in clean energy supply chain, and the benefit trade-offs, focusing on the Battery Energy Storage System case study, and its complex organizational relationships across both the US, Allied countries and Foreign Entities of Concern. While many examples in this paper are presented on PRC focused manufacture, this could apply to any potentially adversarial relationship

25 - ENERGY STORAGE↗

Occupant-driven end use load models for demand response and flexibility service participation of residential grid-interactive buildings

As demand response becomes increasingly used as a tool to support improved grid flexibility, it is important to consider that there are many potential types of energy end uses that may be used to support such flexibility. Residential appliances, often accounting for 30 % or more of residential energy use, are a currently untapped source of demand flexibility, particularly when aggregated together across homes. To date there has been very limited analysis of residential appliances for use as grid-interactive loads. As such, this research uses disaggregated energy end use data for 564 households, to model the electricity demand flexibility potential of the use of residential dishwashers, clothes washers, clothes dryers, ovens, and ranges (oven + stovetop) on both weekdays and weekends. This includes both at the building level, as well as aggregated to the grid level, specifically the Midcontinent Independent System Operator (MISO) region. This study was divided into two parts. Part 1 focuses on determining appliance-level loads, and Part 2, which involves aggregation to the grid. Findings suggest that among the studied appliances, clothes dryers provide the greatest demand reduction potential for most times of the day, followed by dishwashers and clothes washers. The maximum potential reduction for clothes dryers is found to be approximately at 11:00 a.m. and this potential sustains throughout most of the daytime period. When considering the willingness of households to participate, based on a survey of households in the Midwest region, clothes dryers still have the most potential for demand reduction. The availability of appliances for load modulation on weekdays and weekends indicates similar load reduction potential for all appliances. Overall, the results of this study suggest that there is an opportunity for shifting appliance usage to optimize grid efficiency and enhance demand response strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modelling and analysis of nuclear reactor system coupled with a liquid metal battery

Traditionally, nuclear power plants in the U.S. provide baseload power to the power grid because they have less flexibility for ramping their output power than natural gas peaking plants. However, achieving climate goals to reduce the consumption of fossil‐based natural gas places pressure on nuclear power plants and other power generators to ramp up their power output to balance grid generation with demand. This paper presents the modelling and performance analysis of a nuclear reactor system (NRS) coupled to a liquid‐metal battery (LMB) to improve its dynamic response and enable its black start capability. The NRS and LMB thermal behaviour are modelled in Dymola, while the electrical dynamics of the LMB and power grid are modelled in RTDS‐RSCAD. Both simulation platforms are coupled and share their thermal and electrical data using a Transmission Control Protocol/Internet Protocol (TCP/IP) communication protocol. The dynamic performance of the NRS‐LMB integration is tested on the IEEE 9 bus, which demonstrates its ability to respond and provide frequency and voltage regulation. The black start capability of the NRS‐LMB is also evaluated by simulating a grid outage and using the LMB to supply the auxiliary loads required to bring the NRS back online as soon as possible. The results show that coupling an NRS to an LMB improves the system dynamic performance and enables it to black start after being disconnected from the grid for several days.

25 ENERGY STORAGE↗

Hardware-in-the-Loop Evaluation for Potential High Limit Estimation-Based PV Plant Active Control

This paper validates the efficacy of an artificial intelligence (AI)-based photovoltaic (PV) plant control and optimization approach in enabling PV plants as accountable grid reliability service providers. The validation is performed in a realistic laboratory controller-hardware-in-the-loop environment, leveraging accurate PV plant modeling and standard industrial communication protocols. Through simulations that account for diverse weather conditions and active control scenarios, the results highlight the superior performance of the AI-based solution in comparison to a state-of-the-art reference-control grouping-based approach. Such a finding contributes to mitigating the risk of overcurtailment and uninstructed deviations of active PV plant controls, and offers practical guidance for its field deployment. Furthermore, it establishes a standardized testing framework for comparing various PV active control strategies.

hardware-in-the-loop↗

Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning

Recent changes to the principal causes of energy shortage events on the electric grid have necessitated are thinking of paradigms for resource adequacy (RA) assessment and the related topic of procurement of a reliable portfolio. Prior studies have laid out elements of a modern paradigm for these planning activities, but there does not exist a comprehensive overview of the topic spanning academic and gray literature, and the relationship of these suggested paradigms to methods used in industry has also not been surveyed. In this paper we review recent literature establishing best practices for RA assessment and reliable portfolio procurement, and survey current practices used in industry in relation to these best practices. We establish seven key best practices for RA assessment, cover a modern methodology for capacity accreditation, and find that industry practices are not far behind the identified best practices, though some key gaps remain. We also present a suggested agenda for both academic research on the topic and opportunities for advancement in the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-Driven Modeling of High-Resolution Residential Load Profiles Using Low-Resolution Smart Meter Measurements

Accurate and high-resolution residential load profiles are essential for power system modeling, demand response planning, and effective grid operation. As the energy sector moves towards a more actively managed distribution system, the ability to understand residential energy consumption at a minute-by-minute scale becomes increasingly critical. High-resolution load profiles provide key insights into demand patterns and user behavior, enabling grid operators to design more effective energy solutions; however, residential load measurements in the field are typically recorded at low resolutions, such as 15-60 minutes, which makes it hard to study the characteristics of different residential customers. This paper addresses these challenges by introducing a data-driven approach to generate realistic, high-resolution residential load profiles based on lowre-solution measurements and weather information. The proposed method retains the key features of the actual residential load measurements while offering appliance-level energy consumption details for each residential building. The results demonstrate the effectiveness of the proposed load profile generator, proving its capability to support utilities in optimizing residential energy management and ensuring a more reliable and resilient grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Oxygen-Free Electrolyzer for Ultra-Low-Cost H 2 Storage for Fossil Plants (Final Technical Report)

DOE’s Office of Fossil Energy and Carbon Management has determined that long-duration energy storage solutions co-located with fossil energy assets offer significant benefits to the fossil industry, electric utilities, and customers. T2M Global has developed an Advanced O 2 -Free Electrolyzer System (AES) Technology for low-cost, long-duration H 2 energy storage for fossil plants. The MW-class AES Module conceptual design aims to upgrade stranded assets (dilute/waste syngas streams, excess electricity, and waste heat) at fossil plants to higher value H 2 for additional revenue and greater sustainability. The H 2 energy storage equips fossil plants with the load following capability needed for the lucrative grid-support services market created by Variable Renewable Energy resources.

08 HYDROGEN↗

Integrate Latimer Controls' Solution into RTAC (CRADA Final Report, CRD-23-24672)

Latimer Controls, Inc. was awarded two vouchers under the Department of Energy's American-Made Solar Prize Round 6 to conduct collaborative research at a national laboratory. The National Renewable Energy Laboratory (NREL) was selected as a partner to assist Latimer Controls in the performance evaluation of its photovoltaic (PV) control software. This collaboration focuses on developing a hardware-in-the-loop (HIL) testbed at NREL, which will be used to test and validate the Latimer PV control technology in a realistic yet de-risked environment. Both Latimer and NREL teams will work together to analyze the collected test data, derive insights, and disseminate the scientific findings. Recent studies underscore the potential of solar energy as a zero-marginal-cost and zero-emission flexibility resource within the bulk power system, particularly when integrated with advanced control systems. To enhance the performance of such systems, Latimer Controls has developed leading-edge technologies, including machine learning (ML) algorithms and hierarchical inverter set-point allocation methods. These innovations are designed to estimate the operational headroom of large PV plants for grid integration and control. However, comprehensive validation under real-world conditions remains necessary. To address this gap, the concurrent CRADA project proposes the real-world application and validation of the Latimer Control solution within a HIL environment. Initially, the Latimer algorithm was developed and tested within MATLAB Simulink, a platform suitable for research-level simulations and iterative development. However, transitioning this technology to a real solar site as an industry-ready solution necessitates implementation in a format compatible with widely used solar power plant controllers. In this additional CRADA work, the MATLAB Simulink-based logic will be translated into Structured Text, a programming language compliant with IEC 61131 standards, which is commonly used for custom logic implementations in industry-leading programmable logic controllers (PLCs), such as the Schweitzer SEL real-time automation controller (RTAC). This transition will facilitate the deployment of the Latimer Control solution in real-world solar power plants, thereby advancing the technology towards commercialization.

14 SOLAR ENERGY↗

BESSIE: Battery & Energy Storage Supply Chain Analysis, Mitigation Deployment, and Tools

Battery energy storage systems (BESS) and their associated power electronic interfaces are key components to delivering clean and more resilient energy, providing much-needed fast-ramping, emergency discharge, generation, and operations support to the electric grid. These services have grown to be invaluable over the past ten years and will soon be an irreplaceable element of energy delivery. The Idaho National Laboratory (INL) strives to address these challenges through a strategic approach to supply chain risk assessment and mitigation for BESS and related digital energy equipment through the BESSIE project under the Center for Securing Digital Energy Technology. Recognizing that decreasing dependence on a foreign supply chain will take significant time and investment, BESSIE’s focus is strategically addressing battery supply chain risks by pairing short-term steps to operate securely through today’s risks with long-term steps to shape the supply chain over the coming years.

25 ENERGY STORAGE↗

NPSS on NASA's Information Power Grid: Using CORBA and Globus to Coordinate Multidisciplinary Aeroscience Applications

This paper describes a project to evaluate the feasibility of combining Grid and Numerical Propulsion System Simulation (NPSS) technologies, with a view to leveraging the numerous advantages of commodity technologies in a high-performance Grid environment. A team from the NASA Glenn Research Center and Argonne National Laboratory has been studying three problems: a desktop-controlled parameter study using Excel (Microsoft Corporation); a multicomponent application using ADPAC, NPSS, and a controller program-, and an aviation safety application running about 100 jobs in near real time. The team has successfully demonstrated (1) a Common-Object- Request-Broker-Architecture- (CORBA-) to-Globus resource manager gateway that allows CORBA remote procedure calls to be used to control the submission and execution of programs on workstations and massively parallel computers, (2) a gateway from the CORBA Trader service to the Grid information service, and (3) a preliminary integration of CORBA and Grid security mechanisms. We have applied these technologies to two applications related to NPSS, namely a parameter study and a multicomponent simulation.

Lopez, Isaac↗

ISS Space-Based Science Operations Grid for the Ground Systems Architecture Workshop (GSAW)

Contents include the following:What is grid? Benefits of a grid to space-based science operations. Our approach. Score of prototype grid. The security question. Short term objectives. Long term objectives. Space-based services required for operations. The prototype. Score of prototype grid. Prototype service layout. Space-based science grid service components.

Welch, Clara↗

Using Computing and Data Grids for Large-Scale Science and Engineering

We use the term "Grid" to refer to a software system that provides uniform and location independent access to geographically and organizationally dispersed, heterogeneous resources that are persistent and supported. These emerging data and computing Grids promise to provide a highly capable and scalable environment for addressing large-scale science problems. We describe the requirements for science Grids, the resulting services and architecture of NASA's Information Power Grid (IPG) and DOE's Science Grid, and some of the scaling issues that have come up in their implementation.

Johnston, William E.↗

Energy Services Interface: Architecture, Requirements, and Agreements

This report continues and extends the development of the Energy Services Interface (ESI) that recently has been led by the U.S. Department of Energy’s Grid Modernization Laboratory Consortium. The ESI is intended to facilitate the coordination of multiple, flexible energy resources that work in tandem to satisfy grid objectives by using performance attributes encoded within an ESI Service Template. The ESI relies on a pair of interfaces, representing the service requestor (the consumer of a service) and a service provider (who manages its resources per the agreed performance attributes) to achieve what is commonly known as a “grid service”. Due to its performance-driven approach, the ESI is hypothesized to be able to satisfy all common grid needs via only six common ESI service types. This report first reviews the status of ESI development, including its fundamental tenets. The report makes three important contributions to ESI development: First, it recognizes the similarity between service level agreements and the contract-like agreements that would be needed between energy service requestors and providers and recommends that ESI service agreements be modeled after the web services agreement specification. Second, whereas prior development efforts had focused on a flat, five-stage lifecycle, this report asserts that the ESI should have three behavioral layers in its architecture—the discovery, agreement, and service layers. Finally, this report offers concrete requirements that should be useful toward the development of the service requestors’ and service providers’ respective communications interfaces.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Northeast Freight Corridor Charging Plan (Roadmap Report)

Final report produced as part of grant awarded to National Grid. The final report is a roadmap of 39 prioritized sites. These sites would create a minimum viable network of charging infrastructure, enabling the electrification of trucks across the Northeast

02 PETROLEUM↗

Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.

33 ADVANCED PROPULSION SYSTEMS↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long Duration Test Hardware: Ion Optics

A Long Duration Test (LDT) was initiated in June 2005 as a part of NASA's Evolutionary Xenon Thruster (NEXT) service life validation approach. Testing was voluntarily terminated in February 2014, with the thruster accumulating 51,184 hours of operation, processing 918 kg of xenon propellant, and delivering 35.5 MN-s of total impulse. The post-test inspection objectives for the ion optics were derived from the original NEXT LDT test objectives, such as service life model validation, and expanded to encompass other goals that included verification of in situ measurements, test issue root causes, and past design changes. The ion optics cold grid gap had decreased only by an average of 7% of pretest center grid gap, so efforts to stabilize NEXT grid gap were largely successful. The upstream screen grid surface exhibited a chamfered erosion pattern. Screen grid thicknesses were ≥ 86% of the estimated pretest thickness, indicating that the screen grid has substantial service life remaining. Deposition was found on the screen aperture walls and downstream surfaces that was primarily composed of grid material and back-sputtered carbon, and this deposition likely caused the minor decreases in screen grid ion transparency during the test. Groove depths had eroded through up to 35% of the accelerator grid thickness. Minimum accelerator aperture diameters increased only by about 5-7% of the pretest values and downstream surface diameters increased by about 24-33% of the pretest diameters. These results suggest that increasing the accelerator aperture diameters, improving manufacturing tolerances, and masking down the perforated diameter to 36 cm were successful in reducing the degree of accelerator aperture erosion at larger radii.

Ion Thruster↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long Duration Test Hardware: Ion Optics

A Long Duration Test (LDT) was initiated in June 2005 as a part of NASA’s Evolutionary Xenon Thruster (NEXT) service life validation approach. Testing was voluntarily terminated in February 2014, with the thruster accumulating 51,184 hours of operation, processing 918 kg of xenon propellant, and delivering 35.5 MN-s of total impulse. The post-test inspection objectives for the ion optics were derived from the original NEXT LDT test objectives, such as service life model validation, and expanded to encompass other goals that included verification of in situ measurements, test issue root causes, and past design changes. The ion optics cold grid gap had decreased only by an average of 7% of pretest center grid gap, so efforts to stabilize NEXT grid gap were largely successful. The upstream screen grid surface exhibited a chamfered erosion pattern. Screen grid thicknesses were ≥ 86% of the estimated pretest thickness, indicating that the screen grid has substantial service life remaining. Deposition was found on the screen aperture walls and downstream surfaces that was primarily composed of grid material and back-sputtered carbon, and this deposition likely caused the minor decreases in screen grid ion transparency during the test. Groove depths had eroded through up to 35% of the accelerator grid thickness. Minimum accelerator aperture diameters increased only by about 5-7% of the pretest values and downstream surface diameters increased by about 24-33% of the pretest diameters. These results suggest that increasing the accelerator aperture diameters, improving manufacturing tolerances, and masking down the perforated diameter to 36 cm were successful in reducing the degree of accelerator aperture erosion at larger radii.

George C. Soulas↗