Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

H2@Scale - Validating an Electrolysis System with High Output Pressure: Cooperative Research and Development Final Report, CRADA Number CRD-18-00741

Electrolysis has been a commercially available product for a while and electrolyzers have been a proven capability to provide additional benefits (e.g. controllable load for grid services) in addition to production of hydrogen. The hydrogen output is typically compressed for storage and dispensing. Compression adds cost and decreases system reliability. Honda’s electrolyzer systems have been developed to include electrochemical compression to leverage the production system itself for at least partial compression. In this project, the team will evaluate Honda’s PEM based electrochemical compression system. The system is capable of compressing hydrogen up to 70 MPa electrochemically. Validation testing is the next step to accelerate this technology into the marketplace, as the validation will provide needed data under a variety of operation conditions and controls. These operating conditions and controls are based on over a decade of NLR research and development with low-temperature electrolysis. The validation testing will include preparing NLR’s site for third party evaluation, benchmark testing of Honda’s stack and system, and simulating operation connected to renewables or in a grid service profile. NLR’s Energy System Integration Lab will be the location for the electrolyzer validation research and integrated into the Hydrogen Infrastructure Test & Research Facility (HITRF). This will build into the existing retail style hydrogen fueling station for a fully integrated experimental setup.

08 HYDROGEN↗

A Scalable PDC Placement Technique for Fast and Resilient Monitoring of Large Power Grids

The wide-area measurement system (WAMS) is a key enabler of real-time monitoring of power grids. The essential goals of WAMS design are fast and resilient data transfer from phasor measurement units (PMU) to phasor data concentrators (PDC). We propose a scalable two-stage PDC placement technique for minimizing the end-to-end delay while maintaining resiliency. In the prescreening stage, the plausible candidates of PDC configurations are identified based on a graph theory-based multi-median function (MMF). Here, in this article, a computationally efficient meta-heuristic algorithm is used to address scalability. In the candidate selection stage, two different algorithms, namely, Suurballe's and Dijkstra's, are employed to identify the best of those plausible PDC configurations as the final design. This technique not only minimizes the hop paths between PMUs and PDCs, but also ensures network resiliency against single PMU, PDC, or communication link failure by incorporating the roles of PMUs in power grid observability into routing policy. Simulation results on the IEEE 57-bus test power system and the 2000-bus test power system demonstrate the effectiveness and scalability of the proposed technique.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Photovoltaic and Behind-the-Meter Battery Storage: Advanced Smart Inverter Controls and Field Demonstration

Electric utilities have little visibility of the electrical distribution system, and consequently, limited diagnostic capabilities. The distribution grid was designed for a unidirectional power flow, where energy is supplied by few large centralized power plants; however, this is set to change to meet California’s aggressive decarbonization goals. The large-scale deployment of distributed renewable generation, such as photovoltaics (PV), can have many negative effects on an unprepared grid. As illustrated in the California “duck curve,” PV generation modifies load profiles during the day, which causes steep ramping in the evening. This effect indicates the need to revise the electrical grid’s design and operation. This project sought to (a) create a centralized resource in California to test and validate distribution technology controls with industry standard PV, storage, and high-fidelity sensors, (b) support strategic and operational decisions for new grid architectures by providing simulation models, (c) promote new ways to control clusters of PV smart inverters, in accordance with California Rule 21, and (d) innovate, develop, and field test a predictive controller to maximize economic profit for the customer while supporting the grid. The controller was built using the state-of-the-art model predictive control methodology to optimally control behind-the-meter PV and battery storage. In consideration of the duck curve, the controller optimally controls the battery dispatch by charging during excess generation periods and discharging during the critical afternoon demand hours. The controller was evaluated in annual simulations and revealed the potential cost-effectiveness of behind-the-meter battery storage. The simulations showed that the annual electricity bill could be reduced by as much as 35 percent, with a payback period of the investment in battery storage in about 6 years – significantly shorter than the manufacturer’s 10-year warranty. All developed simulation models, the grid event library, and the MPC controller are open-source and available online.

Model Predictive control↗

Type 5 Wind Turbine Technology: How Synchronised, Synchronous Generation Avoids Uncertainties About Inverter Interoperability under IEEE 2800:2022

Degradation of system strength because of inverter-based resources (IBRs) is a major concern facing the zero-carbon transition. A new standard released this year, IEEE Standard 2800, attempts to codify the relationship between IBRs and the Transmission System Operator (TSO). It is apparent from IEEE 2800:2022 that there remain fundamental problems with quantifying whether source impedance (the measure of "system strength" with which the standard is concerned) will present a problem for allowing an IBR to connect. This is "because of complex interdependencies between IBR and power system characteristics". So developers are increasingly required to adopt mitigation options such as adding synchronous condensers or curtailing IBRs. A proven Type 5 (synchronous) wind turbine exists and has been running at 0.5 MW scale in a 46 MW wind farm in New Zealand since 2006 and eight turbines in Scotland since 2013. The US National Renewable Energy Laboratory (NREL) is conducting a study of the impacts on grid reliability, stability, and resilience of Type 5 wind turbines. The project has both simulation and testing tasks and will result in proposing a variable generation solution that will help system operators and utilities address all reliability and most resilience challenges in the evolving grid.

grid stability↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Model-Predictive Hierarchical-Control Framework for Aggregating Residential DERs to Provide Grid Regulation Services

This paper develops a hierarchical control frame-work to aggregate and to manage behind-the-meter distributed energy resources (DERs), which will be ubiquitous in future distribution systems. In the proposed framework, firstly, each controller in the hierarchy determines the flexibility of the DERs such that the obtained flexibility is feasible with respect to its operational purview. For example, the operational purview of a home energy management system may only consider consumer comfort preferences, while that for an aggregator or a grid controller may consider network voltage management as well. Based on the feasible flexibility, optimal setpoints for the DERs is then determined by the hierarchical controllers to help the distribution power network in voltage regulation, coordination issues with existing transmission-level conventional generators, etc. Therefore, the proposed strategy, which is based on model-predictive control, can be effectively utilized by the distribution network to coordinate several DERs to provide grid regulation services. Numerical simulations performed on the IEEE 37-bus test system demonstrate the efficacy of the proposed approach.

behind-the-meter↗

Joint Matrix Completion and Compressed Sensing for State Estimation in Low-observable Distribution System

Limited measurement availability at the distribution grid presents challenges for state estimation and situational awareness. This paper combines the advantages of two sparsity-based state estimation approaches (matrix completion and compressive sensing) that have been proposed recently to address the challenge of unobservability. The proposed approach exploits both the low rank structure and a suitable transform domain representation to leverage the correlation structure of the spatio-temporal data matrix while incorporating the powerflow constraints of the distribution grid. Simulations are carried out on three phase unbalanced IEEE 37 test system to verify the effectiveness of the proposed approach. The performance results reveal - (1) the superiority over traditional matrix completion and (2) very low state estimation errors for high compression ratios representing very low observability.

Dahale, Shweta↗

Effects of high pressure-dependent leakoff and high process-zone stress in coal-stimulation treatments

Hydraulic fracturing in coals has been studied extensively over the last two decades; however, there are factors that were often ignored or incorrectly diagnosed, resulting in screenouts. Assuming that a majority of the perforations are open and there are no problems with the stimulation fluids, screenouts during coal hydraulic-fracture treatments can be attributed to either high pressure-dependent leakoff (PDL), high process-zone stress (PZS) or in some cases both. The objective of this work is to discuss, help identify, and present solutions to address these reservoir-related issues such that screenouts can be avoided in optimized refracture treatments and new well stimulations. The tools for identifying these reservoir-related parameters include a diagnostic fracture-injection test (DFIT) and a grid-oriented fully functional 3D fracture simulator with shear decoupling. An example for each respective case is presented in this paper. In the first example, in which high PZS was considered to be the dominant reason for screenout or pressure out, the well was restimulated successfully by implementing the solutions presented in this paper. In the second example, in which high PDL was considered to be the main reason for screenout, there were several wells in the same project area that exhibited the same behavior resulting in screenouts. After implementing the solutions presented in this paper to address high PDL, all new wells were stimulated successfully without any issues.

01 COAL, LIGNITE, AND PEAT↗

A Novel Statistical Method for Measuring the Temperature–Density Relation in the IGM Using the b – N Hi Distribution of Absorbers in the Ly α Forest

We propose a new method for determining the thermal state of the intergalactic medium based on Voigt profile decomposition of the Lyα forest. The distribution of Doppler parameter and column density (b–N H i distribution) is sensitive to the temperature–density relation T = T 0 (ρ/ρ 0 ) γ-1 , and previous work has inferred T 0 and γ by fitting its low-b cutoff. This approach discards the majority of available data and is susceptible to systematics related to cutoff determination. We introduce an approach that exploits all information encoded in the b – N H i distribution by modeling its entire shape. We apply kernel density estimation to discrete absorption lines to generate model probability density functions, and then we use principal component decomposition to create an emulator that can be evaluated anywhere in thermal parameter space. We introduce a Bayesian likelihood based on these models enabling parameter inference via Markov Chain Monte Carlo. The method's robustness is tested by applying it to a large grid of thermal history simulations. By conducting 160 mock measurements, we establish that our approach delivers unbiased estimates and valid uncertainties for a 2D ( T 0 , γ) measurement. Furthermore, we conduct a pilot study applying this methodology to real observational data at z = 2. Using 200 absorbers, equivalent in path length to a single Lya forest spectrum, we measure $\mathrm{log}{T}_{0}={4.092}_{-0.055}^{+0.050}$ and $\gamma ={1.49}_{-0.074}^{+0.073}$ in excellent agreement with cutoff fitting determinations using the same data. Our method is far more sensitive than cutoff fitting, enabling measurements of log T 0 and γ with precision on $\mathrm{log}{T}_{0}$ (γ) nearly two (three) times higher for current data set sizes.

79 ASTRONOMY AND ASTROPHYSICS↗

Energy Systems Integration Facility (ESIF): Golden, CO - Energy Integration

At NREL's Energy Systems Integration Facility (ESIF) in Golden, Colo., scientists and engineers work to overcome challenges related to how the nation generates, delivers and uses energy by modernizing the interplay between energy sources, infrastructure, and data. Test facilities include a megawatt-scale ac electric grid, photovoltaic simulators and a load bank. Additionally, a high performance computing data center (HPCDC) is dedicated to advancing renewable energy and energy efficient technologies. A key design strategy is to use waste heat from the HPCDC to heat parts of the building. The ESIF boasts an annual EUI of 168.3 kBtu/ft2. This article describes the building's procurement, design and first year of performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Dispatch Controller for Fuel Cell-Integrated Building: Preprint

Stationary fuel cells can generate both electrical power and heat, making it them a promising local source to serve building loads. In this paper, we develop an optimal energy dispatch controller to operate a fuel cell-integrated building. The controller leverages the inherent thermal in the building to lower reduce its operating cost and allows the building to participate in providing grid services. The proposed controller is tested in a co-simulation setup, where the real building is represented as a high-fidelity model in EnergyPlus.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Model-Predictive Hierarchical-Control Framework for Aggregating Residential DERs to Provide Grid Regulation Services: Preprint

This paper develops a hierarchical control fram-ework to aggregate and control behind-the-meter distributed energy resources (DERs), which will be ubiquitous in future distribution systems. Even though the increasing penetration of DERs will strain the power networks in terms of voltage regul-ation and coordination issues with existing transmission-level conventional generators, the distribution-level DERs can also be utilized to help provide flexibility to the power network while providing cost savings to the DER owners. Therefore, this paper develops a model-predictive control strategy to determine the available power flexibility, and to utilize the flexibility in an aggregated form to provide grid regulation services. Numerical simulations performed on the IEEE 37-bus test system demonstrate the efficacy of the proposed approach.

14 SOLAR ENERGY↗

Gripper Test Assembly Status Report (FY2020)

Refueling systems for fast reactors are designed to handle fresh and used core assemblies (fuel, reflector, and shield core assemblies) within the reactor vessel in an opaque coolant environment without visual reference. These refueling machines are designed to work in a sodium (or other fast reactor coolant) and argon vapor space environment and are engineered with the rotatable plug system to allow for the movement of fresh and spent fuel into and out of the reactor core. The refueling machines are a critical component in any reactor and thus need to undergo extensive testing in a prototypic environment to ensure that they will meet all of the system functions and requirements. Argonne has developed an innovative compact refueling system design for the Advanced Fast Reactor-100 that is based upon some mechanisms used in previous reactor designs, such as the U.K.’s Prototype Fast Reactor (PFR) and some mechanisms that have not been used in sodium. This compact refueling machine supports the reduction in size of the AFR-100’s reactor vessel, and if fully developed, would support and inform the development of the in-vessel refueling machines for such commercial reactors as the GEH PRISM reactor plant, the ARC Clean Energy’s ARC-100 reactor, and the Natrium reactor, among others. This refueling system is a vital component of a fast reactor that supports reducing the cost of the reactor and increasing its reliability. During the development of the compact fuel handling machine conceptual design for the AFR-100, a lack of testing data for many mechanical components in sodium under typical in-reactor loads and conditions was discovered. The reduction in lifetime of the various mechanical components in the liquid sodium environment needs to be quantified versus the calculated component lifetimes under normal conditions in the testing while they are subjected to typical loading profiles experienced in the past. The Gripper Test Assembly discussed here includes a full-size gripper device with appropriate mechanical features that will be tested in sodium to provide this testing data. The Gripper Test Assembly is used to test various mechanical fuel handling components submerged in high temperature liquid sodium. These mechanisms are gears, bearings, gripper jaws and head, universal joints and shafts, ball screws, among others. These components will be tested under the typical sodium environmental conditions experienced during refueling operations with appropriate loading conditions that simulate the removal and insertion of core assemblies into a fast reactor grid plate structure. This Gripper Test Assembly is the second in a series of refueling system mechanisms developed for testing in sodium. The first test assembly is the Gear Test Assembly (GTA) which was used to test the performance of gears and bearings operating in sodium. Because of the successful testing conducted with the GTA, it was decided to continue with the development of the Gripper Test Assembly which uses the same gears and bearings tested in GTA. Using the data collected during operation of this gripper test assembly, lifetime reduction factors of the various mechanical components can be calculated for the material combinations selected. These lifetime reduction factors can be used in the design of future mechanical systems which operate in these environments to accurately predict component end of life. In addition, an understanding of the ability of these components and mechanisms to operate under-sodium with the chosen materials will be accomplished. Again, this Gripper Test Assembly is the follow-on test article to the Gear Test Assembly which was testing the ability of gears and bearings operating in a sodium environment. Once fabricated and qualified, it will be tested in the Mechanism Engineering Test Loop (METL) facility located in Building 308 at Argonne National Laboratory.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Distributed Real-Time Simulation and its Applications to Wind Energy Research

This paper presents a novel approach - distributed Real-Time Simulations (RTS) - for innovative wind energy and grid integration research. Distributed RTS is performed with Digital Real-Time Simulators (DRTS) in different geographical locations and connected over the Internet. Geographically distributed RTS supports - higher computation capability for RTS, leveraging distributed assets, novel testing techniques and hybridized smart grid testbeds. This paper discusses some of the basic aspects of distributed RTS with the communication delay as a probabilistic variable. To leverage hardware resources and enable flexible collaboration of national laboratories, the distributed RTS connection between the simulators at Idaho National Laboratory (INL) and National Wind Test Center (NWTC) at National Renewable Energy Laboratory (NREL) is established. The main objective of this distributed lab setup is to perform wind turbine characterization and assessment of wind integration studies in large scale grids. Several systematic steps based on integrating models are carried out to assess the impact of communication delay on distributed RTS.

17 WIND ENERGY↗

Long-duration Energy Storage Technology Analysis and Development

This project develops a new low-cost and flexible long-duration energy storage (LDES) technology based on simultaneous regeneration technology. In lieu of the technology development, the project team also conducts a complete cost analysis for LDES based on various currently available technologies, as well as grid economic and environmental benefits analysis for LDES. There are three tasks in this project: Task 1. Fe-H2 flow cell fabrication, testing, demonstration; Task 2. Dynamic modeling, simulation and control architecture of power system; Task 3. Cost and grid analysis.

25 ENERGY STORAGE↗

Experimental Determination of PV Inverter Response to Grid Phase Shift Events: Preprint

With the continued growth of renewable energy resources which interface to the electric grid via inverters, the understanding of such devices becomes ever more important to the safe and reliable operation of the bulk power system. This work investigates the specific response of a utility-scale PV inverter to grid voltage phase shift-type disturbances which sometimes occur during grid fault events. The role of the PV inverter's phase-locked-loop (PLL) is identified as important to modeling the response. Switching-level simulations of a utility-scale PV inverter with a modeled PLL show a characteristic response when phase shift disturbances require the PLL to track what appear as fast frequency changes. Additionally, in this work a full-scale laboratory testing was carried out using the Opal real time (RT) OP5142 real time simulator and a large grid simulator to create phase shift disturbances with a high degree of repeatability. A photovoltaic (PV) inverter was connected to a grid simulator, and phase shifts were instantaneously implemented on the simulated grid, the results of the currents were then obtained. The experimental results obtained were validated with simulation results obtained from MATLAB/Simulink.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fully coupled simulation of cosmic reionization. I. numerical methods and tests

Here, we describe an extension of the Enzo code to enable fully coupled radiation hydrodynamical simulation of inhomogeneous reionization in large similar to(100 Mpc)(3) cosmological volumes with thousands to millions of point sources. We solve all dynamical, radiative transfer, thermal, and ionization processes self-consistently on the same mesh, as opposed to a postprocessing approach which coarse-grains the radiative transfer. But, we employ a simple subgrid model for star formation which we calibrate to observations. The numerical method presented is a modification of an earlier method presented in Reynolds et al. differing principally in the operator splitting algorithm we use to advance the system of equations. Radiation transport is done in the gray flux-limited diffusion (FLD) approximation, which is solved by implicit time integration split off from the gas energy and ionization equations, which are solved separately. This results in a faster and more robust scheme for cosmological applications compared to the earlier method. The FLD equation is solved using the hypre optimally scalable geometric multigrid solver from LLNL. By treating the ionizing radiation as a grid field as opposed to rays, our method is scalable with respect to the number of ionizing sources, limited only by the parallel scaling properties of the radiation solver. We test the speed and accuracy of our approach on a number of standard verification and validation tests. We show by direct comparison with Enzo's adaptive ray tracing method Moray that the well-known inability of FLD to cast a shadow behind opaque clouds has a minor effect on the evolution of ionized volume and mass fractions in a reionization simulation validation test. Finally, we illustrate an application of our method to the problem of inhomogeneous reionization in a 80 Mpc comoving box resolved with 3200(3) Eulerian grid cells and dark matter particles.

79 ASTRONOMY AND ASTROPHYSICS↗