Search NASA⌕ Search

SEARCH · Search NASA

Results for “grouted waste forms”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

SALTSTONE 1QCY08 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample and Z-Area premix material for the first quarter of calendar year 2008 (1QCY08). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the first quarter of the 2008 calendar year (1QCY08), in addition to Effluent Treatment Project (ETP) waste that is regularly added at approximately 10 kgal/month, Tank 50H received significant waste transfers from Tank 23H and from Tank 49H. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). SRNL was asked to prepare saltstone from a sample of Tank 50H obtained during 1QCY08 processing to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSGRACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals-arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver-analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Form Development for Solidification of Liquid Secondary Wastes to Support Hanford Direct Feed Low Activity Waste Vitrification - 17484

The US Department of Energy/Office of River Protection DOE/ORP has funded a program led by Washington River Protection Solutions (WRPS) to develop and test cementitious waste forms for immobilization of liquid secondary waste (LSW) at the Hanford site in Southeastern Washington State. The LSW comprises a concentrated brine from processing liquid effluents at Hanford's Effluent Treatment Facility. The liquid effluents include condensates from the 242-A tank waste evaporator and future offgas condensates from the Low Activity Waste (LAW) Vitrification Facility. To facilitate waste form formulation development and testing, WRPS developed LSW simulants and engaged subject matter experts at the Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL). This paper describes results of recent work done to develop and test a grout formulation tailored to address the elevated sulfate levels in Hanford LSW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CRADA FINAL REPORT FOR CRADA NO. CR-08-001 CEMENTITIOUS BARRIERS PARTNERSHIPS

The Cementitious Barriers Partnership (CBP), led by the Savannah River National Laboratory, has achieved its ultimate purpose to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex. The CBP achieved its goal by developing experimental programs with results that supported the development of a reasonable and credible set of software tools to improve understanding and prediction of the structural, hydraulic and chemical performance of cementitious barriers and waste forms used in nuclear applications. These experimental data and software tools are and will continue to reduce the uncertainties in the current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process. The CBP has made a significant impact in reducing risk and uncertainties in the performance assessments that directly impact U.S. Department of Energy (DOE) environmental cleanup and closure programs. The CBP has developed an experimentally-based, integrated modeling tool that serves as a screening tool known as the CBP Software Toolbox, Version 3.0. The CBP products reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increasing the consistency and transparency of the DOE assessment process. This CBP Software Toolbox predicts the hydraulic properties and chemical stability of cement matrix phases and release fluxes of constituents, in response to variable boundary conditions. Therefore, the CBP tools are reducing the uncertainty by coupling multiscale and multi-physics processes, including physical-chemical evolution and transport phenomena applied to heterogeneous materials with changing boundary conditions. In addition, the CBP Experimental and Characterization Program has provided test data to support chemical and physical degradation mechanisms for cementitious barriers. These tools have application to low activity waste forms, high level waste tank closure, D&D and entombment of major nuclear facilities, landfill waste acceptance criteria, and in-situ grouting and immobilization of vadose zone contamination. The CBP also provided: 1) a forum for DOE-NRC technical exchange, 2) material characterization to support performance assessment (PA) predictions, 3) uncertainty reduction in PA predictions, 4) base case performance to improve PA predictions, and 5) improvement in understanding and quantification of moisture and contaminant transport used in PAs. Additional CBP accomplishments include: sponsorship of a national test bed workshop to obtain collaboration in establishing the path forward to obtain actual data supporting future predictions of cementitious barrier performance, and participation in an International Atomic Energy Agency (IAEA) Cooperative Research Project on the use of cementitious barriers for low-level radioactive waste treatment and disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Bottled Liquid Waste During Remediation of the Hanford 618-10 Burial Ground - 13001

A problematic waste form encountered during remediation of the Hanford Site 618-10 burial ground consists of bottled aqueous waste potentially contaminated with regulated metals. The liquid waste requires stabilization prior to landfill disposal. Prior remediation activities at other Hanford burial grounds resulted in a standard process for sampling and analyzing liquid waste using manual methods. Due to the highly dispersible characteristics of alpha contamination, and the potential for shock sensitive chemicals, a different method for bottle processing was needed for the 618-10 burial ground. Discussions with the United States Department of Energy (DOE) and United States Environmental Protection Agency (EPA) led to development of a modified approach. The modified approach involves treatment of liquid waste in bottles, up to one gallon per bottle, in a tray or box within the excavation of the remediation site. Bottles are placed in the box, covered with soil and fixative, crushed, and mixed with a Portland cement grout. The potential hazards of the liquid waste preclude sampling prior to treatment. Post treatment verification sampling is performed to demonstrate compliance with land disposal restrictions and disposal facility acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Insights for Saltstone PA Maintenance

The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP - Early Experience - 12200

Spent ion-exchange resins are considered to be problematic waste that, in many cases, requires special approaches and precautions during their conditioning to meet the acceptance criteria for disposal. In Belgium, for economical reasons, the Volume Reduction Factor is a key criterion. After Tractebel Engineering performed a technical and economical comparison of the industrially available systems, Tihange NPP decided to install a spent ion-exchange resins hot supercompaction unit with Tractebel Engineering in the role of architect-engineer. The treatment and conditioning unit processes the spent ion-exchange resins through the following steps: dewatering of the resins, drying the resins under deep vacuum, discharging the dried resins into compactable drums, super-compacting the drums to generate pellets, grouting the pellets into standard 400 litres waste drums (overpacks) licensed for final disposal in the near-surface repository in Belgium. Several developments were required to adapt the reference process and equipment to PWR spent ion-exchange bead resins and Belgian radioactive waste acceptance criteria. In order to avoid cracks on the compacted drum, and external surface contamination from resin leaks, some improvements were achieved to minimize spring-back as well as the risk of cracking the drum wall. Placing the compactable drum inside a second, slightly larger drum, guarantees clean and reproducible pellets. Currently the commissioning phase is on-going. Numerous process validation tests have been completed. An acceptance file was transmitted to the Belgian Waste Management Authority recently. This will be followed by demonstration tests necessary to obtain their final acceptance of the installation. More than 3 800 drums of mixed powdered and bead resins have been processed by the reference Hot Compaction process, achieving a Volume Reduction Factor (VRF) of 2.5. The equipment has been proven to be a reliable technology with low operation and maintenance costs. Tractebel Engineering has managed the construction of a new application of this process in Belgium at Tihange NPP. Several developments were required to adapt the reference process and equipment to PWR spent ion-exchange bead resins and Belgian radioactive waste acceptance criteria. The chosen method of conditioning (draining, drying and compaction of the spent resins followed by grouting of the pellets in a 400 litres drum) immobilizes the spent resins under the form of a solid, compact, stable, and non dispersible block free of interstitial water. The various series of inactive tests which were conducted at Tihange NPP, helped among others to determine the best design of the compactable drum and lid and to set the value of critical parameters such as vapour temperature at the end of drying, speed, force and duration of compaction. In an environment of very limited space for interim storage and in the absence of an operational final repository site, or in the case of high final disposal costs, the process exhibits the following key advantages: - Achieving a Volume Reduction Factor (VRF) close to 1 (overpack included) for the interim storage instead of increased volumes observed with other currently available processes; - Achieving a water free end product; - Creating a flexible waste product for interim storage (pellet), which can be retrieved and routed into alternative types of package later, if not initially grouted; - Using well proven standard technologies like drying and compaction; - Flexible use of the system components for the supercompaction of other operational solid waste streams when not conducting resins conditioning campaigns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SALTSTONE 3QCY09 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the third quarter of calendar year 2009 (3QCY09). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the third quarter of the 2009 calendar year (3QCY09), Tank 50H accepted transfers of approximately 37 kgal from the Effluent Treatment Project (ETP) waste, approximately 5 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 26 kgal from Tank 221H, approximately 319 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT), and approximately 358 kgal from Tank 23H. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). Savannah River National Laboratory (SRNL) was asked to prepare saltstone from a sample of Tank 50H obtained August 5, 2009 during 3QCY09 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals-arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver-analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SALTSTONE 3QCY09 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the third quarter of calendar year 2009 (3QCY09). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the third quarter of the 2009 calendar year (3QCY09), Tank 50H accepted transfers of approximately 37 kgal from the Effluent Treatment Project (ETP) waste, approximately 5 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 26 kgal from Tank 221H, approximately 319 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT), and approximately 358 kgal from Tank 23H. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). Savannah River National Laboratory (SRNL) was asked to prepare saltstone from a sample of Tank 50H obtained August 5, 2009 during 3QCY09 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals - arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver - analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SALTSTONE 2QCY09 TCLP RESULTS

A Saltstone waste form was prepared in the Savannah River National Laboratory from a Tank 50H sample and Z-Area premix material for the second quarter of calendar year 2009 (2QCY09). After the prescribed 28 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the second quarter of the 2009 calendar year (2QCY09), Tank 50 accepted transfers of approximately 32 kgal from the Effluent Treatment Project (ETP) waste, approximately 4 kgal from Tank 710 - the H-Canyon General Purpose Evaporator, approximately 156 kgal from the Modular Caustic Side Solvent Extraction Unit (MCU) Decontaminated Salt Solution Hold Tank (DSS-HT), and approximately 484 kgal from Tank 23. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (ISWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). SRNL was asked to prepare saltstone from a sample of Tank 50H obtained May 20, 2009 during 2QCY09 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&WTSGRACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals - arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver - analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&WTSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SIMPLE TRANSIENT CALCULATIONS OF CELL FLAMMABLE GAS CONCENTRATIONS

The Saltstone Facility at Savannah River Site (SRS) mixes low-level radiological liquid waste with grout for permanent disposal as cement in vault cells. The grout mixture is poured into each cell in approximately 17 batches (8 to 10 hours duration). The grout mixture contains ten flammable gases of concern that are released from the mixture into the cell. Prior to operations, simple parametric transient calculations were performed to develop batch parameters (including schedule of batch pours) to support operational efficiency while ensuring that a flammable gas mixture does not develop in the cell vapor space. The analysis demonstrated that a nonflammable vapor space environment can be achieved, with workable operational constraints, without crediting the ventilation flow as a safety system control. Isopar L was identified as the primary flammable gas of concern. The transient calculations balanced inflows of the flammable gases into the vapor space with credited outflows of diurnal breathing through vent holes and displacement from new grout pours and gases generated. Other important features of the analyses included identifying conditions that inhibited a well-mixed vapor space, the expected frequency and duration of such conditions, and the estimated level of stratification that could develop.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative mercury treatment technology options for the liquid waste system at the Savannah River Site: scoping studies

The Savannah River Site (SRS) Liquid Waste System (LWS) contains liquids, salts and sludges that are currently being processed into final wasteforms for disposition, specifically, waste glass for sludges, solids and liquids containing high levels of radioactivity, and saltstone grout for low activity decontaminated liquid solutions. The LWS also contains approximately 60,000 kg of mercury present in the following physical and chemical forms, specifically: a) ionic inorganic mercury, organomercury (e.g., methylmercury), and other minor components found in LWS fluids b) mercury solids such as oxides, hydroxides, amalgams sulfides and sorbed mercury, c) accumulations of dense liquid elemental mercury, and d) vapor phase elemental and organomercury mercury found in tank headspace gas and in evaporators. An effective and proactive management strategy of the mercury present in the LWS is needed to support processing of LWS wastes into glass and saltstone. Sustainable processing of the LAWS to completion requires mercury removal from the LWS at a rate of approximately 2,900 kg/yr. This removal can be accomplished through existing mercury treatment systems or newly implemented LWS “purge points”. The chemical speciation of mercury has emerged as the key factor that controls mercury behavior in the LWS. For example, past studies demonstrated that mercury speciation is adversely impacting the performance of existing removal systems so that significant levels of mercury are recycled from the Defense Waste Processing Facility (DWPF) back to the tank farm. Consequently, mercury concentrations have slowly increased in the LWS tank fluids over time. The presence of organo-mercury has also been identified as the cause of increased mercury leaching from saltstone. In response to these challenges, the Department of Energy (DOE) Office of Environmental Management (EM-TD) Technology Development Program has supported a series of scoping studies predicated on manipulating or controlling mercury speciation and mercury behaviors within the constraints of LWS waste chemistry and safety conditions. The intent of these studies was to rapidly triage potential technology options and develop a technically based go / no go recommendation for further work. This composite report presents the results of three scoping studies: 1) advanced photooxidation processes, 2) chemical reduction, and 3) mercury getters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full Scale HEPA Filter Encapsulation in Ultra-High-Performance Grout - Proof of Concept

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) currently being constructed to treat radioactive waste, includes vitrification facilities for both the high-level waste (HLW) and low activity waste (LAW) fractions. Operation of the WTP will produce contaminated high-efficiency particulate air filters (HEPA), as part of the solid secondary waste (SSW) stream. The HEPA filters receive off-gas from the vessel vent header and primary off-gas treatment system in LAW Facility and remove particulate contaminants including 99 Tc and 129 I salts. The current disposal method for HEPA filters is encapsulation in metal containers using cementitious material (CM) and disposal in the Integrated Disposal Facility (IDF). Results from the 2017 IDF Performance Assessment (PA) WRPS (2018) demonstrated that while compliance is maintained for the 1000 year compliance period mandated by DOE O 435.1 and its accompanying manual, release of constituents from the HEPA filters result in exceedance of the performance objective imposed as the groundwater regulatory limit at later times. For example, at about 1500 years post-closure, solid secondary waste (SSW), including HEPA filters is predicted to become a dominant contributor to 99 Tc release and over the 10,000-year sensitivity analysis period, SSW is the dominant contributor of 129 I release to the groundwater. The estimated release could potentially be reduced if the HEPA filters are not compacted and waste containers could be distributed throughout a large space, thereby diluting the contaminant release. Additionally, a better cementitious material could be used to encapsulate the HEPA filters. One alternative method for disposal of contaminated HEPA filters is encapsulation of the filters in ultra high-performance grout (UHPG). UHPG is a variation of ultra-high-performance concrete (UHPC) is commonly used in the prestressed concrete industry for large structural members. Recent studies of UHPG show it has excellent properties for containing radionuclides such as 99 Tc and 129 I Nichols and Kaplan (2021). This report presents the results of the first attempt to encapsulate a clean, full-size HEPA filter in UHPG and evaluate the effectiveness of the immobilization process and final waste form. A full-scale proof-of-concept simulated waste form was prepared by encapsulating a HEPA filter in a 110-gallon stainless steel (SS) drum using UHPG. A change from Type I/II PC to Type 1L PLC was made after American Rock Products informed the team that they would no longer be using Type I/II by the end of 2024 and the northwest was phasing out Type I/II PC overall. Type I/II PC used in previous studies of UHPG for encapsulation (Nichols and Kaplan 2021). After the UHPG was cured both the scaled mockup and the full-scale simulated waste forms were sectioned for visual examination. UHPG completely encapsulated the filters and bonded to the external surfaces of materials comprising the filters. No cracks were observed in the sectioned waste forms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PERFORMANCE PROPERTIES OF SALTSTONE PRODUCED USING SWPF SIMULANTS

The overwhelming majority of waste to be immobilized at the Saltstone Production Facility will come from the waste stream exiting the Salt Waste Processing Facility (SWPF). These SWPF batches are salt solutions that result from pretreatment of the High Level Waste (HLW) supernate by an Actinide Removal Process followed by Caustic Side Solvent Extraction. The concentration of aluminate within these streams will vary and be determined by (1) the concentration in the incoming salt waste stream, (2) the degree of aluminum leaching from the HLW, (3) the method for introducing the aluminate into the waste stream (continuous or batch) and (4) and any operational or regulatory limitations. The overall Performance Assessment outcome for the Saltstone Disposal Facility will depend significantly on the performance properties of the SWPF Saltstone grouts. This report identifies and quantifies, when possible, those factors that drive the performance properties of the projected SWPF grouts. Previous work has identified aluminate concentration in the salt waste stream as a key factor in determining performance. Consequently, significant variation in the aluminate concentration to a maximum level of 0.65 M was investigated in this report. The SWPF baseline grout is a mix with a 0.60 water to cementitious ratio and a premix composition of 45 wt % slag, 45 wt % fly ash and 10 wt % portland cement. The key factors that drive performance of the SWPF mixes were determined to be (1) the time/temperature profile for curing, (2) water to cementitious materials ratio, (3) aluminate concentration in the waste stream, and (4) wt % slag in the premix. An increase in the curing temperature for mixes with 45 wt % slag resulted in a 2.5 times decrease in Young's modulus. The reduction of Young's modulus measured at 60 C versus 22 C was mitigated by an increase in the aluminate concentration but was still significant. For mixes containing 60 wt % slag, the reduction in Young's modulus between these two curing temperatures was significantly lessened. The importance of curing conditions can not be overemphasized. The gain realized in performance by, e.g., a higher level of aluminate or wt % slag or a reduction in w/cm ratio, can be offset by the effects of a higher curing temperature. In fact, the final performance properties of a mix cured at 60 C can be lower than the initial values before any of the performance enhancing changes are introduced. Control of the time/temperature curing profile can be managed by pour schedules and other temperature control measures. The reduction in performance at higher curing temperatures is consistent with results obtained in a separate study. Although preliminary, results from this task on the measurement of hydraulic conductivity at MACTEC showed that curing of a Saltstone mix at 60 C increased the hydraulic conductivity by several orders of magnitude. The permeability data are based on only one mix but, were consistent with a measured reduction in Young's modulus for these same samples. Therefore, it is recommended that impact of curing temperature on performance properties be further investigated. An increase in dynamic Young's modulus (indicator of performance) is observed as the water to cementitious materials (w/cm) ratio decreases. The w/cm ratio is a process parameter which can be adjusted to improve performance as long as the processing properties of the grout are still within an operational window that will lead to successful placement. The same conclusions apply to wt % slag in the premix. That is, an increase in the wt % slag at the expense of fly ash in the premix increases Young's modulus and performance. An increase in wt % slag (as with a decrease in w/cm ratio) increases viscosity and yield stress and a final mix design must be balanced such that acceptable processing properties are obtained. The performance properties of SWPF mixes show a non-linear dependence on aluminate concentration. As the aluminate concentration is increased from 0.1 M to 0.25 M, the Young's modulus and compressive strength increase and the porosity is reduced. Consistent with this improvement in performance is an increase in the heat of hydration, reflective of an increase in the degree of hydration. Higher degrees of hydration in mixes generally lead to better performance. In the region of 0.25 to 0.45 M aluminate, very little additional change is observed in any of the properties. A further increase in the aluminate concentration from 0.45 M to 0.65 M leads to a slight reduction in Young's modulus. It was observed however, that the values of Young's modulus for samples cured at 22 C decreased after approximately 50 days. This was the first time a reduction in Young's modulus was observed as a function of time and is most likely correlated with the high levels of aluminate present in these mixes. This reduction can be accounted for by cracking of the Saltstone samples with time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone 3QCY11 TCLP Results

A Saltstone waste form was prepared in the Savannah River National Laboratory (SRNL) from a Tank 50H sample and Z-Area premix material for the third quarter of calendar year 2011 (3QCY11). After the prescribed 32 day cure, samples of the saltstone were collected, and the waste form was shown to meet the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24 and R.61-79.268.48(a) requirements for a nonhazardous waste form with respect to RCRA metals and underlying hazardous constituents. These analyses met all quality assurance specifications of USEPA SW-846. The Saltstone Production Facility (SPF) receives waste from Tank 50H for treatment. In the third quarter of the 2011 calendar year (3QCY11), Tank 50H accepted transfers of approximately 20 kgal from the Effluent Treatment Project (ETP), approximately 236 kgal from the Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit (ARP/MCU) Decontaminated Salt Solution Hold Tank (DSS-HT), and approximately 25 kgal from other sources. The Saltstone Grout Sampling plan provides the South Carolina Department of Health and Environmental Control (SCDHEC) with the chemical and physical characterization strategy for the salt solution which is to be disposed of in the Z-Area Solid Waste Landfill (SWLF). During operation, samples were collected from Tank 50H and grout samples prepared to determine the non-hazardous nature of the grout to meet the requirements of the South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79.261.24(b) and R.61-79.268.48(a). Savannah River National Laboratory (SRNL) was asked to prepare saltstone from samples of Tank 50H obtained July 7, 2011 during 3QCY11 to determine the non-hazardous nature of the grout. The samples were cured and shipped to Babcock & Wilcox Technical Services Group-Radioisotope and Analytical Chemistry Laboratory (B&W TSG-RACL) to perform the Toxic Characteristic Leaching Procedure (TCLP) and subsequent extract analysis on saltstone samples for the analytes required for the quarterly analysis saltstone sample. In addition to the eight toxic metals - arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver - analytes included the underlying hazardous constituents (UHC) antimony, beryllium, nickel, and thallium which could not be eliminated from analysis by process knowledge. B&W TSG-RACL provided subsamples to GEL Laboratories, LLC for analysis for the UHCs benzene, phenols and total and amenable cyanide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Form Release Calculations for the 2005 Integrated Disposal Facility Performance Assessment. Erratum

This report refers to or contains K g values for glasses LAWA44, LAWB45 and LAWC22 affected by calculations errors as identified by Papathanassiu et al. (2011). The corrected K g values are reported in an erratum included in the revised version of the original report. The revised report can be referenced as follows: Pierce E. M. et al. (2004) Waste Form Release Data Package for the 2005 Integrated Disposal Facility Performance Assessment. PNNL-14805 Rev. 0 Erratum. Pacific Northwest National Laboratory, Richland, WA, USA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The corrosion behavior of borosilicate glass in the presence of cementitious waste forms

Borosilicate glasses are widely used for radioactive waste disposal due to their ability to incorporate a variety of contaminants and radionuclides while exhibiting high durability in various disposal scenarios. This research evaluated the dissolution of borosilicate glass using both single-pass-flow-through (ASTM C1662-18) and product consistency test (ASTM C1285-21) methods with different solutions, including a cementitious-contacted water (called grout-contacted, GC, from this point) and solutions with varying levels of dissolved cementitious species such as Si, Ca, Al. Here, the results indicated that the presence of Ca plays a crucial role in suppressing glass corrosion, as evidenced by the slower normalized dissolution rates, which were one order of magnitude lower for boron and two orders of magnitude lower for rhenium, observed in both Ca-amended and GC solutions compared to the pH 12 buffer solution. This effect is attributed to the formation of a dense, low-porosity, and strongly bonded calcium silicate hydrate (CSH) layer on the glass surface, which implies that a glass corrosion process is influenced by ion exchange involving alkali ions Na + , K + , Ca 2+ , and hydrogen-containing species. A small number of glass particles treated in the GC solution showed minor corrosion pits in the form of shallow craters with an average diameter of approximately 500 μm. This observation is correlated with a significant reduction, 2000 to 3000 times lower, in the cumulative volume of glass pores, indicating that smaller pore voids were “sealed” in the presence of Ca 2+ ions, likely attributed to the formation of CSH precipitation or other corrosion products such as calcium carbonate saturated from the grout solution. These findings suggest that the presence of dissolved Ca in the GC solution can slow down the dissolution of borosilicate glass, contrary to the expected trend of higher dissolution rates resulting from exposure to high alkaline and thus higher pH solutions.

36 MATERIALS SCIENCE↗

Opportunities to Update the Model of Tank Closure Grout Aging (SRNL-STI-2012-00404) Based on Experimental Results by the Savannah River Ecology Laboratory

The purpose of this report was to review the results of experiments on evolution of tank grout pore fluids performed by the Savannah River Ecology Laboratory (SREL) and reported in Seaman et al. (2020) and highlight opportunities for updating the model of tank grout degradation presented in Denham and Millings (2012). The SREL experimental results validate some assumptions used in the 2012 grout degradation model and provide information useful for updating the model. All experiments on tank grout degradation have limitations because of reaction rates and the enormous disparity between duration of the experiments and the duration of the degradation of the real tank grout system. Given these limitations, the experimental results form the basis for several recommendations for updating the grout degradation model described in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗