Search NASA⌕ Search

SEARCH · Search NASA

Results for “hourly dispatching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Study of Cost-Saving Potential of Load Flexibility Measures in Grid-Interactive Multifamily Buildings

With recent advances in smart technologies, more and more smart devices are penetrating the residential and commercial buildings market. The introduction of these smart devices is also helping IoT companies emerge with load aggregator roles in the sector. With more utility companies on the track of supporting OpenADR protocols, the aggregators could play a significant role in providing load flexibilities by automatically responding to demand response (DR) events and coordinating load flexibility measures between customers. This would benefit utility companies by reducing stress on the grid during critical peak demand hours as well as customers by allowing them to utilize utility rate structures advantageous to those able to reduce electric usage during high-demand hours. This study evaluates cost and energy savings from adopting multiple load flexibility measures in multifamily buildings. Combinations of different load flexibility measures, including space temperature floating, light dimming, automatic window shading, and water heater temperature floating, are considered. The simulations are performed using OpenStudio®, an open-source U.S. Department of Energy (DOE) simulation platform. For the case study, we used a midrise apartment building with weather conditions from Denver, Colorado. To compare climate zone differences, simulations were also performed for Los Angeles, California, and Chicago, Illinois. Initial results indicate that the application of automated load flexibility measures without careful consideration of dispatching strategies and DR program enrollments could significantly affect the savings. To get meaningful cost savings, aggregators need to encourage tenant awareness to curtail energy usage through occupant behavior in addition to dispatching automatic load flexibility measures. The outcomes from this study are believed to help load aggregators understand the risks and benefits of load flexibility opportunities.

building energy modeling↗

Deep-Learning-Based Multi-Timescale Load Forecasting in Buildings: Opportunities and Challenges from Research to Deployment

Electricity load forecasting for buildings and campuses is becoming increasingly important as the penetration of distributed energy resources (DERs) grows. Efficient operation and dispatch of DERs require reasonably accurate predictions of future energy consumption in order to conduct near-real-time optimized dispatch of on-site generation and storage assets. Electric utilities have traditionally performed load forecasting for load pockets spanning large geographic areas, and therefore, forecasting has not been a common practice by buildings and campus operators. Given the growing trends of research and prototyping in the grid-interactive efficient buildings domain, characteristics beyond simple algorithm forecast accuracy are important in determining the algorithm's true utility for smart buildings. Other characteristics include the overall design of the deployed architecture and the operational efficiency of the forecasting system. In this work, we present a deep-learning-based load forecasting system that predicts the building load at 1-hour intervals for 18 hours in the future. We also discuss challenges associated with the real-time deployment of such systems as well as the research opportunities presented by a fully functional forecasting system that has been developed within the National Renewable Energy Laboratory's Intelligent Campus program.

building load forecasting↗

Availability Estimates of Low-Cost, Dispatch-Constrained Electricity (LDE)

This dataset accompanies the report "Potential Availability of and Supply Curves for Low-Cost, Dispatch-Constrained Electricity", which provides initial estimates of the quantity and availability of the potential low-cost, dispatch-constrained electricity (LDE) resource in the United States under scenarios with high variable renewable energy (VRE) penetrations. The analysis also estimates supply curves that can be used in subsequent analysis of the opportunity to use the LDE. The estimated LDE resource could be used for various applications that value low-cost electricity and can operate at reduced capacity factors, including electrolytic hydrogen production and carbon capture. The analysis accompanying this dataset was performed in 2018-2019 to support an analysis of "The Technical and Economic Potential of the H2@Scale Concept within the United States" ( https://www.nlr.gov/docs/fy21osti/77610.pdf ). This dataset includes the quantity of estimated LDE resource for each hour of the year in 2050, aggregated to both the national level and the ReEDS balancing area level. As described in the accompanying report, the ReEDS model was used to project the evolution of the power sector over time. Links to the mapping of ReEDS balancing areas to states and ReEDS balancing area shape files are provided. This dataset also includes the report figure data.

08 HYDROGEN↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Evaluating power grid model hydropower feasibility with a river operations model

Production cost models (PCMs) simulate dispatch of generators across a large power grid and are used widely by planners to study the reliability of electricity supply. As energy systems transition away from the thermoelectric technologies that have traditionally balanced electricity supply and demand, hydropower and its representation in PCMs is of increasing importance. A limitation of PCMs applied to continental power grids with diverse generation portfolios is that hydropower generation is simulated without full consideration of complex river dynamics, leading to possible misrepresentation of grid flexibility and performance. In addition, data used in PCMs may reflect outdated operating policies. In this paper we propose a hydropower generation feasibility test for PCMs. The approach uses a detailed hydropower model to determine whether the hourly hydropower schedule from a PCM with simplified monthly parameterization can be attained after accounting for realistic river dynamics and operating policies, such as spill requirements and general water movement and balance through a cascade reservoir system. We perform this hydropower generation test for the ‘Big 10’ hydropower system on the Columbia River (part of the Western Interconnect of the United States), revealing 9% overestimation of available hydropower generation in a PCM solution in an average hydrologic year. Our evaluation provides insight on the cost and opportunities for better representing hydropower in PCMs.

54 ENVIRONMENTAL SCIENCES↗

End-Use Savings Shapes Measure Documentation: Thermostat Control for Load Shifting in Large Offices

This documentation focuses on a single end-use savings shape measure - thermostat control for load shifting. The thermostat control for load shifting measure applies heating and cooling temperature setpoint adjustment for pre-conditioning before the peak window. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start time of the peak window, and then adjusts the thermostat cooling or heating setpoints by a specified offset value from original schedules to precool or preheat the space , for a specified length of time before the start of peak window, and thus shifts load in the peak window to the pre-conditioning period. The measure is flexible and allows users to adjust the heating and cooling offset values and length of pre-conditioning period, but for this study, the load shifting strategy is applied as pre-cooling only (adjusting only cooling setpoints). The default adjustment for cooling setpoints is set to -1 degrees Celsius , and the default duration of pre-cooling is 1 hour. This measure is applicable to large offices equipped with electric HVAC system, which account for approximately 8.72% of the ComStock floor area. The thermostat control for load shifting measure demonstrates -1% daily peak demand reduction and 0% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Techno-Economic Analysis of a Concentrating Solar Power Plant Using Redox-Active Metal Oxides as Heat Transfer Fluid and Storage Media

We present results for a one-dimensional quasi-steady-state thermodynamic model developed for a 111.7 MW e concentrating solar power (CSP) system using a redox-active metal oxide as the heat storage media and heat transfer agent integrated with a combined cycle air Brayton power block. In the energy charging and discharging processes, the metal oxide CaAl 0.2 Mn 0.8 O 2.9-δ (CAM28) undergoes a reversible, high temperature redox cycle including an endothermic oxygen-releasing reaction and exothermic oxygen-incorporation reaction. Concentrated solar radiation heats the redox-active oxide particles under partial vacuum to drive the reduction extent deeper for increased energy density at a fixed temperature, thereby increasing storage capacity while limiting the required on sun temperature. Direct counter-current contact of the reduced particles with compressed air from the Brayton compressor releases stored chemical and sensible energy, heating the air to 1,200°C at the turbine inlet while cooling and reoxidizing the particles. The cool oxidized particles recirculate through the solar receiver subsystem for another cycle of heating and reduction (oxygen release). We applied the techno-economic model to 1) size components, 2) examine intraday operation with varying solar insolation, 3) estimate annual performance characteristics over a simulated year, 4) estimate the levelized cost of electricity (LCOE), and 5) perform sensitivity analyses to evaluate factors that affect performance and cost. Simulations use hourly solar radiation data from Barstow, California to assess the performance of a 111.7 MW e system with solar multiples (SMs) varying from 1.2 to 2.4 and storage capacities of 6–14 h. The baseline system with 6 h storage and SM of 1.8 has a capacity factor of 54.2%, an increase from 32.3% capacity factor with no storage, and an average annual energy efficiency of 20.6%. Calculations show a system with an output of 710 GWh e net electricity per year, 12 h storage, and SM of 2.4 to have an installed cost of $329 million, and an LCOE of 5.98 ¢/kWh e . This value meets the U.S. Department of Energy’s SunShot 2020 target of 6.0 ¢/kWh e ( U. S Department of Energy, 2012 ), but falls just shy of the 5.0 ¢/kWh e 2030 CSP target for dispatchable electricity ( U. S Department of Energy, 2017 ). The cost and performance results are minimally sensitive to most design parameters. However, a one-point change in the weighted annual cost of capital from 8 to 7% (better understood as a 12.5% change) translates directly to an 11% decrease (0.66 ¢/kWhe) in the LCOE.

Gorman, Brandon T.↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions

This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Drone Applications for Wildfires and Other Emergency Situations

Potential Solutions to Wildfires This project is looking at multiple aspects of the use of UAV’s during wildfire season. This project identifies multiple solutions to communication problems, early action response, and innovative tactics to fight wildfires during the dark hours of the second shift. This project will identify the features and innovations needed to create a second shift that can more effectively fight wildland fires at night. In addition, this project will look to find which satellite systems work best for detection of wildfires, with a special focus on remote locations with more rural communities. There will also be a focus on ways to improve current UAVs and sensors for aerial fire surveillance as well as the understanding on how to establish a safe airspace for these UAVs during wildfires. More specifically, unmanned ariel vehicles (UAV) or drones can be used during natural disasters and other situations to help first responders be a more efficient team, ultimately saving hundreds of more lives. Depending on the situation, drones can be equipped with many different accessories, each with their own advantages. When it comes to operating a drone, communication between the first responder, dispatcher, and the person flying the drone is very important when exchanging useful information. A focus on existing systems, and what changes could be made to create more novel systems will also be shown. Moreover, wildfires not only pose a hazard to human safety and a dent on communication methods, but it also has detrimental effects on the environment. Specifically, the use of common fire retardants have dangerous health effects on human health and the environment as a whole. Therefore, this project will also explore the use of alternative eco-friendly fire retardants and recent innovations to the use of sustainable retardants.

Drones↗

Geothermal Deep Direct Use for Turbine Inlet Cooling in East Texas

The National Renewable Energy Laboratory (NREL), the Southern Methodist University Geothermal Laboratory (SMU), Eastman Chemical (Longview, TX), and TAS (Houston, TX) evaluated the feasibility of using geothermal heat to improve the performance of a natural-gas power plant in East Texas. The area of interest is the Eastman Chemical plant in Longview, Texas, which is on the northwestern margin of a geologic region known as the Sabine Uplift. The feasibility study focused on determining the potential for accessing a subsurface hot-water geothermal resource within a 10-km radius of the site to provide thermal energy for absorption chillers. Wells within a 20-km radius are included for broader geological comparison to determine the heat flow, temperature-at-depth, field porosity and permeability. The lithologies of most interest are the Lower Cretaceous Trinity Group and Upper Jurassic Cotton Valley Group. The deeper Cotton Valley formations are hotter (averaging 117 to 130°C), yet permeability and porosity are low. The shallower Trinity Group contains more variability in permeability and porosity and lower temperatures averaging about 98 to 117°C. The shallower formations are considered despite the lower temperature because of increased ability to produce larger volumes of water and extract enough heat before reinjection. The complete SMU analysis is available in the National Geothermal Data System (NGDS). Tapping such deep geothermal sources for direct heating (as opposed to power generation) is known as geothermal deep direct use (DDU). Geothermal DDU has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are typically small-scale, variable-demand projects. This project examines the feasibility of geothermal energy integration in a natural-gas combined cycle power station in East Texas. The DDU resource is tapped to drive absorption chillers (24/7) for production of chilled water at 5-10°C (41-50°F). This chilled water is stored until needed, which allows for continuous operation with a relatively small-capacity geothermal/absorption chiller system. When conditions are favorable, the chilled water is dispatched to cool the air entering the compressor stage of a gas combustion turbine. This process, known as turbine inlet cooling (TIC), boosts power production during periods of high temperature and high-power demand. Such systems can enhance grid reliability and reduce the cost for peak-demand power. A simulation model of the power plant was developed in IPSEpro software and validated against operational data from the plant. This model allowed the team to estimate the additional power that could be produced by applying TIC under different operating and ambient conditions. Absorption chiller performance was estimated from vendor sources to determine the production rate of chilled water from the geothermal resource. Geothermal drilling and development costs were estimated using NREL's GEOPHIRES 2.0. The expected lower drilling costs in this region led to an estimated cost of geothermal heat of about $4/MMBtu (1.4 cents/kWh t ). The estimated cost for the absorption chillers and TIC hardware were obtained from literature sources and project partners. Hourly data were obtained for weather, natural gas and electricity prices, and plant operating state for 2017, which served as a representative year. NREL estimated the capital cost, operating cost, and additional electricity production and revenue for different combinations of geothermal capacity, chiller capacity, and water storage-tank size. The analysis drove toward smaller geothermal and chiller systems to reduce equipment cost. A relatively low-cost water storage tank accumulated the near-continuous chilled water output for later use when TIC was most valued.

15 GEOTHERMAL ENERGY↗

Design of a Geothermal Power Plant With Solar Thermal Topping Cycle

Geothermal power plants are a reliable source of low-carbon power generation. However, modern electricity markets comprise relatively large proportions of variable renewable energy generation that may require power plants to flexibly dispatch energy. The power output, efficiency, and dispatch flexibility of a geothermal plant can be enhanced by integrating solar thermal energy into the system, as well as possibly compensating against ambient temperature variations. Concentrating solar thermal (CST) can generate temperatures much higher than conventional geothermal systems. Using a solar topping cycle is one way to efficiently convert high-temperature solar heat to electricity while also cascading lower-temperature heat to the geothermal power cycle, thereby increasing its power output and possibly its efficiency. A hybrid power cycle design is proposed and simulated using SimTech IPSEpro process modeling software. The design configuration depends on the expected temperature of the geothermal resource and the quantity of solar heat added at the design point. These design considerations are described and expected performance is calculated. The solar heat addition varies throughout the day and year; therefore, off-design models are necessary to assess the impact of solar availability (and ambient temperature) on the power plant performance. Off-design models are developed and combined with hourly weather data to facilitate an evaluation of annual system performance.

concentrating solar power↗

Design of a Geothermal Power Plant With Solar Thermal Topping Cycle: Preprint

Geothermal power plants are a reliable source of low-carbon power generation. However, modern electricity markets comprise relatively large proportions of variable renewable energy generation that may require power plants to dispatch energy flexibly. The power output, efficiency, and dispatch flexibility of a geothermal plant can be enhanced by integrating solar thermal energy into the system, as well as possibly compensating against ambient temperature variations. Concentrating Solar Thermal (CST) can generate temperatures much higher than conventional geothermal systems. Using a solar topping cycle is one way to efficiently convert high-temperature solar heat to electricity while also adding lower-temperature heat to the geothermal power cycle, thereby increasing its power output and possibly its efficiency. A hybrid power cycle design is proposed and is simulated using SimTech IPSEpro process modelling software. The design configuration depends upon the expected temperature of the geothermal resource and the quantity of solar heat added at the design point. These design considerations are described and expected performance is calculated. The solar heat addition varies throughout the day and year, therefore off-design models are necessary to assess the impact of solar availability (and ambient temperature) on the power plant performance. Off-design models are developed and combined with hourly weather data to facilitate an evaluation of annual system performance.

concentrating solar power↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Wind

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production by conducting a statistical analysis of historical wind data over a five-year period (2020-2025) from a single 1.5MW turbine manufactured by General Electric (GE) located at NLR’s Flatirons Campus, to generate an experimental test profile that was deployed on a 1.25-MW proton exchange membrane type MC250 electrolyzer system manufactured by Nel Hydrogen . [1] While the electrolyzer balance-of-plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. The historical wind data provided several metrics, however, the analysis particularly focused on the measured power output by the wind turbine. The power output time series of data for each day was categorized by total energy generation and standard deviation, and the day that represented the highest combination of these two metrics was chosen – December 25th, 2022. This process was then repeated for a moving four-hour window within this day to identify the most statistically variable period. Finally, this four-hour period was scaled by 65% to match the 1.25 MW electrolyzer. The electrolysis system controls hydrogen production by varying DC current applied to the stack, from a maximum of 3000 A to a minimum safe operation of 300 A, or 10%. Because the current – voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical wind profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1 Hz frequency. For more details on the statistical analysis process, see the presentation labeled “ Public Reference Data for Megawatt-Scale Hydrogen Electrolysis” provided with each data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wind turbine electrolysis experiment and is formatted as follows: {technology}_{scaling factor}-{electrolyzer ramp rate in amperes/second} For instance, “wind-GE1.5MW_0.65-400.zip” represents the hour-long experiment using historical data from the wind-GE1.5MW turbine, scaled to 65%, with the electrolyzer power supply set to a maximum ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and wind power input. A PDF file detailing the historical wind data statistical analysis used to generate the wind profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all simulated wind experiments combined into one dataset labeled "combined_historical_wind_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis [1] nelhydrogen.com/product/mc-series-electrolyser .

08 HYDROGEN↗

Real-Time Optimization Workflow Status Update

Economically optimal and safe operation of integrated energy systems (IES) requires optimization at many different time scales. A real-time optimization (RTO) workflow will attempt to maximize revenue and minimize operational costs on a time scale of minutes to hours. Such a workflow requires the use of a digital twin (DT), which is a virtual representation of a physical system. The DT is updated using real-time data from the physical system, and serves as a model in an optimization framework. The optimization results are then sent back to the physical system to complete the loop. This report details the progress made in developing building blocks for a DT/RTO framework. The Risk Analysis Virtual Environment (RAVEN) platform within the Framework for Optimization of Resources and Economics (FORCE) tool suite can perform many of the tasks required for building a DT and performing RTO. The first item of this report details RAVEN enhancements that enable RAVEN workflows to be run in various environments. Data communication between the physical system and its DT is essential for successful RTO. This includes preprocessing real-time data, loading data into a data warehouse, and querying the stored data. The second section of this report describes the progress made in implementing an adapter in Python in order for Deep Lynx to handle the data communication. Typical dispatch optimization frameworks are built on linear programming (LP). The prototype RTO workflow developed in this report uses an LP problem as a part of a receding-horizon- or economic model predictive control (EMPC) based optimization. The third section of this report details the framework of an RTO workflow in which the system consists of a simple electrical storage device. A DT can be built from a reduced-order model (ROM). Integrating a ROM into a typical LP optimization framework has been challenging because most optimization packages require the user to write algebraic expressions for the system model. The final section of this report shows how an externally built RAVEN ROM can be integrated in an RTO framework by using the Python package Pyomo. This demonstrates the RTO workflow capability from a software-only perspective and is an important step in demonstrating the capability to implement an RTO workflow for a physical system.

97 MATHEMATICS AND COMPUTING↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Solar PV

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) research platform. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence data centers and other variable loads. This dataset entry describes the behavior of a 1.25-MW proton exchange membrane MC250 electrolyzer system, manufactured by Nel Hydrogen , [1] when fed historical data generated by the 430-kW, fixed-axis solar photovoltaic (PV) array located at NLR’s Flatirons Campus. (While the electrolyzer balance of plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack.) Solar PV power output data for the 2020 calendar year were categorized on a daily basis by total energy generation and standard deviation. Each day was then ranked by these metrics, and the 25th, 50th, and 100th percentiles were selected. The 75th percentile day did not exhibit sufficient variability to make for a valuable experiment. A similar process was used for the related historical wind dataset . [2] The historical days in 2020 that represented these percentiles are Dec. 19, March 29, and May 4, respectively. The entire solar day’s power profile was then fed through the MC250 electrolyzer. Due to its length, the 100th percentile day experiment was split into two parts, and the final 3 hours of the solar day were not captured. These final 3 hours contained no spikes or dips of interest and simply represented a slow decay of input solar power. Also, a single timestamp (13:13:47 on Jan. 14, 2026) was lost in the hydrogen system supervisory control and data acquisition. Finally, during the 25th percentile experiment (solar day Dec. 19, 2020) data recording was lost from 11:00:13 to 11:14:45. The roughly 15 minutes of the solar profile were rerun at the end of the experiment and spliced into this time slot during post-processing. The electrolysis system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operation of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical solar profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. For more details on the statistical analysis process, see the slide deck “Public Reference Data for Megawatt-Scale Hydrogen Electrolysis: NLR Historical Solar PV Analysis and Profile Generation” accessible with this data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single solar PV electrolysis experiment and is formatted as: {technology}_{percentile}_{scaling factor} For instance, “solarPV-430kW_25_2x.zip” reports the experiment using the 25th percentile solar data from the historical 2020 solar PV dataset, scaled to 200%. Scaling factors were applied to the generated solar PV power output files to more closely match the 1.25-MW capacity of the electrolyzer. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and solar power input. A PDF file detailing the historical solar data statistical analysis used to generate the solar profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all experiments combined into one dataset labeled "combined_solarPV_experiments.csv". [1] nelhydrogen.com/product/mc-series-electrolyser . [2] data.nlr.gov/submissions/316 .

08 HYDROGEN↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗