Search NASA⌕ Search

SEARCH · Search NASA

Results for “infrastructure assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

Monell, Donald W.↗

Supporting Disaster Assessment and Response with the VIIRS Day-Night Band

When meteorological or man‐made disasters occur, first responders often focus on impacts to the affected population and other human activities. Often, these disasters result in significant impacts to local infrastructure and power, resulting in widespread power outages. For minor events, these power outages are often short-lived, but major disasters often include long‐term outages that have a significant impact on wellness, safety, and recovery efforts within the affected areas. Staff at NASA's Short‐term Prediction Research and Transition (SPoRT) Center have been investigating the use of the VIIRS day‐night band for monitoring power outages that result from significant disasters, and developing techniques to identify damaged areas in near real‐time following events. In addition to immediate assessment, the VIIRS DNB can be used to monitor and assess ongoing recovery efforts. In this presentation, we will highlight previous applications of the VIIRS DNB following Superstorm Sandy in 2012, and other applications of the VIIRS DNB to more recent disaster events, including detection of outages following the Moore, Oklahoma tornado of May 2013 and the Chilean earthquake of April 2014. Examples of current products will be shown, along with future work and other goals for supporting disaster assessment and response with VIIRS capabilities.

Schultz, Lori A.↗

Assessing C2 Communications

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

aircraft communications↗

Update on NASA’s ISRU Development and Mission Plans for the Artemis Program

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. One was the release of the Artemis Architecture Definition Document Revision 1 that included ISRU as a sub-architecture. The second was the release of several STMD solicitations including the Announcement of Collaborative Opportunities (ACO) and Tipping Point (TP). The third was the release of a Request for Information for the Lunar Infrastructure Foundational Technology-1 (LIFT-1) mission with the primary objective of extracting oxygen from lunar regolith. The fourth was the release of STMD technology and capability Shortfalls, and the review, ranking by numerous stakeholders and individuals, and subsequent prioritization of the Shortfalls that will be utilized in future solicitation and development plans. This paper will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related mission, and the impacts of the Shortfall prioritization.

NASA↗

Moon to Mars In Situ Resource Utilization (ISRU) Status Update

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. This presentation will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related activities.

NASA↗

A PCR Based Microbial Monitoring Alternative Method of Detection and Identification of Microbes Aboard ISS

Previous research has shown that microorganisms and potential human pathogens have been detected on the International Space Station (ISS) with additional introduction of new microflora occurring with every exchange of crew or addition of equipment and supplies. These microbes are readily transferred between crew and subsystems (i.e. ECLSS, environmental control and life support systems). As this can be detrimental to astronaut health and optimal performance of ISS systems, monitoring of systems such as ECLSS to include identification of microbial contaminants could prevent adverse effects on human health and life support systems. Current monitoring on ISS is laborious and utilizes culture based methods followed by sample return to Earth for complete analysis. Future, long-distance spaceflight missions will require real-time monitoring capabilities that enable efficient and rapid assessments of the microbial environment allowing for expedited decisions and more targeted response to cope with anomalies. Polymerase chain reaction (PCR), a molecular microbial monitoring method was chosen and numerous PCR instruments investigated for their potential to perform in microgravity conditions. Using ISS as a test bed for PCR verification in microgravity will enable NASA to assess whether molecular based microbiological sensors may be components of reliable, closed-loop life support and habitation systems in spacecraft, enhancing infrastructure capabilities through increased efficiency, reliability, and time savings by enabling sample analysis on orbit. NASA selected the Water Monitoring Suite as one of the rapid spaceflight hardware demonstration activities utilizing a streamlined process to minimize the time required to fly experimental flight hardware. The RAZOR EX (BioFire Defense, Salt Lake City, UT) system was part of the water monitoring suite and is a commercial off-the-shelf (COTS) real-time PCR instrument designed for field work. The RAZOR EX was originally designed for Department of Defense (DoD) under a small business innovative research (SBIR) grant and is ruggedized, compact and provides a rapid, sample to answer in less than an hour. PCR assays using a fluorescent probe were optimized and spiked with known concentrations of DNA (Pseudomonas aeruginosa) ranging from 0.002 to 20 ng. PCR reagents were lyophilized and configured in customized pouches and tested for flight readiness. Three types of water were used to rehydrate the reagents and demonstrate the fidelity of the PCR reaction in microgravity. Molecular grade deionized water served as a control while filtered and unfiltered ISS potable water served to test for chemical or biological inhibitors. All three types were compared to parallel ground test results. Nine tests were run on ISS (3 of each water type) and the critical threshold cycle (Ct) was compared to parallel ground tests completed at Kennedy Space Center, FL and Johnson Space Center, TX. All concentrations of Pseudomonas aeruginosa DNA were detected. A comparison of the Ct produced in real time PCR indicated similarity between flight and ground samples. There appeared to be no significant difference between flight or ground PCR reactions or between any of the three water types. This testing demonstrated the ability to perform molecular testing during spaceflight operations with similar sensitivity. It will allow for future ground development of molecular protocols and minimize the need for spaceflight testing. Future testing will include development of additional targets including environmental and health related organisms.

Christina Khodadad↗

Unique Science from the Moon in the Artemis Era

Since the beginning of the space age, the Moon has been proposed as a platform for astronomy. The Moon provides unique capabilities for astrophysics observations. NASA’s Artemis plan to return humans to the Moon in the mid-2020s in a sustainable manner provides an opportunity to advance synergistic approaches between human and robotic exploration. This NASA Engineering and Safety Center (NESC) workshop assesses the feasibility and value proposition of using the Moon as a location for performing unique science observations, leveraging Artemis-era infrastructure while evaluating risks and key engineering challenges.

NASA Engineering and Safety Center↗

Characterization Study of TestBed Infrastructure Performance in a Distributed Simulation Environment: Baseline Analysis

Characterization of the performance of Air Traffic Management Exploration (ATM-X) TestBed integration environment has been investigated and documented for one system configuration for progressively increasing traffic. Several statistical parameters were used to assess the performance of the TestBed distributed system such as mean, standard deviation, skewness, and kurtosis of latency, and update rate for aircraft state messages that are transmitted through the simulated system under investigation. It is necessary to assess the performance characteristics of distributed systems in terms of the indicated statistical parameters mentioned above. It is critical to verify the system performance with respect to a researcher’s required system performance. Computer host specifications are documented in terms of Central Processing Unit (CPU) clock speed and core count. Transmission Control Protocol/ Internet Protocol (TCP/IP) message protocol was used for data transmission. The system network topology also contributes to the latency and update rate variations from the one imposed by the data source. The motivation for selecting the TestBed infrastructure as the focus of this study can be attributed to the number of services and capabilities it provides that help simplify the process of preparing and conducting a simulation. These capabilities include an easy to use GUI for simulation configuration, access to TestBed library by the end-user of other simulation software components, a modular adapter paradigm that allows simple connectivity of external software to TestBed, connectivity with other simulation laboratories, and a Software Development Kit (SDK) for quicker development. Two types of traffic generators, Air Traffic Generator (ATG) and Multi Aircraft Control System (MACS) were used to generate messages that were injected into the TestBed distributed environment. Eight different air traffic scenarios with progressively increasing loads were generated for each air traffic simulator. The corresponding air traffic loads between the two simulators had an identical number of aircraft per scenario, but different flight plans. It was observed that the performance of MACS degraded for air traffic scenarios containing more than 200 aircraft (37.5 KB/s nominal throughput). However, ATG performed adequately under all tested air traffic loads up to 1200 aircraft (225. KB/s nominal throughput). The tests show that MACS exhibits better latency performance with smaller aircraft loads when compared to ATG. The tests also show that the TestBed infrastructure successfully transmits 1200 aircraft without significant degradation of its performance. From the latency trends for both MACS and ATG, it is clear that as aircraft load increases, the latency in the system increases as well as its standard deviation. Likewise, the trends for the update data rate for both MACS and ATG show that as the aircraft load increases, so does the standard deviation and mean of the update rates which can be attributed to the performance of MACS and ATG applications. The analysis of the results of this study have proven that the overall system performance is dependent on the individual performance of each system component that is connected to TestBed, which subsequently propagates into the system. All TestBed characterization tests were conducted in SimLabs at NASA Ames Research Center in November 2019. This study addresses the need for a baseline TestBed characterization, and the results will serve as a reference for more complex simulation systems.

Air Traffic Management simulations↗

Milwaukee Urban Development: Assessing the Drivers of Urban Flooding Vulnerability in Milwaukee Using NASA Earth Observations

Milwaukee County has experienced an increase in flooding due to climate change and urbanization. The frequency and severity of flooding vary spatially due to differences in land cover, surface permeability, and infrastructure. Marginalized communities tend to experience disproportionately high flooding and damage due to infrastructural inequalities and limited access to resources. To quantify these differences, we used the Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model to calculate and create maps of runoff retention, nominal flood depth, and economic damage to buildings in Milwaukee. Our model inputs included land cover, surface permeability, and rainfall. To inform our precipitation inputs, we used NASA’s Integrated Multi-satellite Retrievals for Global Precipitation Measurement (GPM IMERG) and National Weather Service (NWS) data. We assessed the relationship between flood risk and social and environmental spatial data including redlining, racial demographics, greenspace, and community resilience. The data demonstrate that flood risk is higher in historically redlined neighborhoods, majority Hispanic and Black census block groups, areas that lack parks and trees, and areas of low community resilience as measured by the Census Bureau’s Community Resilience Estimates (CRE). These findings will support our partners, Groundwork Milwaukee and Groundwork USA, in their efforts to promote the equitable distribution of resources and support environmental health in urban spaces. The end products of this project provide our partners with tools to assess urban flooding vulnerability, guide future intervention projects, quantify the effects of environmental injustice, and improve stakeholder access to data.

Madeleine Tango↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, a fleet of unmanned ground vehicles (UGVs) was developed as a test and evaluation (T\&E) platform to reduce system integration gaps between simulation and live flight hardware. While simulation and hardware-in-the-loop bench testing provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure increase the risks to safety, property, and the project. Given ATTRACTOR’s goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, bridging these gaps was critical to successful project execution and feasibility assessment. In this paper we present the UGV fleet and its role in speeding up system integration, smoothing the transition from simulation to flight, and providing researchers an easy-to-use hardware test bed. An overview of the hardware and software on-board the vehicles is provided along with supporting infrastructure. The system integration process is documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted since the creation of the fleet. Finally, we discuss the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P. Vaughan↗

Assessing C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

air traffic control↗

Analytical Techniques for Assessing Gateway and Other Spacecraft Antenna Line-of-Sight

NASA’s Artemis program is committed to landing the next man and the first woman on the Moon by 2024. A critical piece of infrastructure for the mission, the Gateway will inaugurate a sustainable crewed presence beyond low-Earth orbit in cis-lunar space and serve as a staging point for a lunar landing system. The Near Rectilinear Halo Orbit of the Gateway offers numerous operational benefits in terms of its Earth access via the Orion Multipurpose Crew Vehicle, the degree of lunar visibility and surface access it provides, and favorable conditions for station-keeping. To minimize burns during station-keeping and conserve propellant, the Gateway will continually align itself to a solar pressure equilibrium attitude with the Sun; this is convenient for solar array orientation and power generation, but causes difficulties in terms of communication line-of-sight with the Earth, Moon, and visiting vehicles, which appear to be continually rotating about the Gateway’s local frame. A fixed antenna on the Gateway is continually subject to a moving target and can find itself obstructed by the Gateway’s own geometry frequently if not placed carefully. To understand the performance of either Earth-pointing or Moon-pointing antenna placements for a given Gateway geometry, a transient solar system simulation of the Gateway is used to step through orbital ephemeris data and determine the periods in which line-of-sight to a chosen target is achieved and lost. Antenna placements can be tested in the simulation and optimized to increase the average line-of-sight exposure to the target, while also minimizing the maximum duration cut-out in line-of-sight communication experienced; long durations without a successful communication link could pose threats to operations, safety, and mission success. It may be necessary to deviate from the Gateway’s solar pressure equilibrium attitude for short periods of time in order to continue a successful line-of-sight link to a chosen target. Communication coverage spheres can offer insight into what these necessary attitude adjustments may be and are generated by using a 3D mesh of the Gateway and an implementation of the Möller-Trumbore intersection algorithm. This paper outlines the analytical techniques used to perform such antenna placements on the Gateway, offering examples of how line-of-sight strength can be enhanced with an understanding of the Gateway geometry and attitude constraints. These techniques have had direct impact on the writing of communication requirements for NASA and international partner-owned Gateway elements.

Kennedy, William J.↗

Analytical Techniques for Assessing Gateway and Other Spacecraft Antenna Line-of-Sight

NASA’s Artemis program is committed to landing the next man and the first woman on the Moon by 2024. A critical piece of infrastructure for the mission, the Gateway will inaugurate a sustainable crewed presence beyond low-Earth orbit in cis-lunar space and serve as a staging point for a lunar landing system. The Near Rectilinear Halo Orbit of the Gateway offers numerous operational benefits in terms of its Earth access via the Orion Multipurpose Crew Vehicle, the degree of lunar visibility and surface access it provides, and favorable conditions for station-keeping. To minimize burns during station-keeping and conserve propellant, the Gateway will continually align itself to a solar pressure equilibrium attitude with the Sun; this is convenient for solar array orientation and power generation, but causes difficulties in terms of communication line-of-sight with the Earth, Moon, and visiting vehicles, which appear to be continually rotating about the Gateway’s local frame. A fixed antenna on the Gateway is continually subject to a moving target and can find itself obstructed by the Gateway’s own geometry frequently if not placed carefully. To understand the performance of either Earth-pointing or Moon-pointing antenna placements for a given Gateway geometry, a transient solar system simulation of the Gateway is used to step through orbital ephemeris data and determine the periods in which line-of-sight to a chosen target is achieved and lost. Antenna placements can be tested in the simulation and optimized to increase the average line-of-sight exposure to the target, while also minimizing the maximum duration cut-out in line-of-sight communication experienced; long durations without a successful communication link could pose threats to operations, safety, and mission success. It may be necessary to deviate from the Gateway’s solar pressure equilibrium attitude for short periods of time in order to continue a successful line-of-sight link to a chosen target. Communication coverage spheres can offer insight into what these necessary attitude adjustments may be and are generated by using a 3D mesh of the Gateway and an implementation of the Möller-Trumbore intersection algorithm. This paper outlines the analytical techniques used to perform such antenna placements on the Gateway, offering examples of how line-of-sight strength can be enhanced with an understanding of the Gateway geometry and attitude constraints. These techniques have had direct impact on the writing of communication requirements for NASA and international partner-owned Gateway elements.

Kennedy, William J.↗

Space station accommodations for lunar base elements: A study

The results of a study conducted at NASA-LaRC to assess the impact on the space station of accommodating a Manned Lunar Base are documented. Included in the study are assembly activities for all infrastructure components, resupply and operations support for lunar base elements, crew activity requirements, the effect of lunar activities on Cape Kennedy operations, and the effect on space station science missions. Technology needs to prepare for such missions are also defined. Results of the study indicate that the space station can support the manned lunar base missions with the addition of a Fuel Depot Facility and a heavy lift launch vehicle to support the large launch requirements.

Weidman, Deene J.↗

Remote Sensing Information Science Research

This document is the final report summarizing research conducted by the Remote Sensing Research Unit, Department of Geography, University of California, Santa Barbara under National Aeronautics and Space Administration Research Grant NAG5-10457. This document describes work performed during the period of 1 March 2001 thorough 30 September 2002. This report includes a survey of research proposed and performed within RSRU and the UCSB Geography Department during the past 25 years. A broad suite of RSRU research conducted under NAG5-10457 is also described under themes of Applied Research Activities and Information Science Research. This research includes: 1. NASA ESA Research Grant Performance Metrics Reporting. 2. Global Data Set Thematic Accuracy Analysis. 3. ISCGM/Global Map Project Support. 4. Cooperative International Activities. 5. User Model Study of Global Environmental Data Sets. 6. Global Spatial Data Infrastructure. 7. CIESIN Collaboration. 8. On the Value of Coordinating Landsat Operations. 10. The California Marine Protected Areas Database: Compilation and Accuracy Issues. 11. Assessing Landslide Hazard Over a 130-Year Period for La Conchita, California Remote Sensing and Spatial Metrics for Applied Urban Area Analysis, including: (1) IKONOS Data Processing for Urban Analysis. (2) Image Segmentation and Object Oriented Classification. (3) Spectral Properties of Urban Materials. (4) Spatial Scale in Urban Mapping. (5) Variable Scale Spatial and Temporal Urban Growth Signatures. (6) Interpretation and Verification of SLEUTH Modeling Results. (7) Spatial Land Cover Pattern Analysis for Representing Urban Land Use and Socioeconomic Structures. 12. Colorado River Flood Plain Remote Sensing Study Support. 13. African Rainfall Modeling and Assessment. 14. Remote Sensing and GIS Integration.

Clarke, Keith C.↗

Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

Korth, David↗

Integrated Human-Robotic Missions to the Moon and Mars: Mission Operations Design Implications

For most of the history of space exploration, human and robotic programs have been independent, and have responded to distinct requirements. The NASA Vision for Space Exploration calls for the return of humans to the Moon, and the eventual human exploration of Mars; the complexity of this range of missions will require an unprecedented use of automation and robotics in support of human crews. The challenges of human Mars missions, including roundtrip communications time delays of 6 to 40 minutes, interplanetary transit times of many months, and the need to manage lifecycle costs, will require the evolution of a new mission operations paradigm far less dependent on real-time monitoring and response by an Earthbound operations team. Robotic systems and automation will augment human capability, increase human safety by providing means to perform many tasks without requiring immediate human presence, and enable the transfer of traditional mission control tasks from the ground to crews. Developing and validating the new paradigm and its associated infrastructure may place requirements on operations design for nearer-term lunar missions. The authors, representing both the human and robotic mission operations communities, assess human lunar and Mars mission challenges, and consider how human-robot operations may be integrated to enable efficient joint operations, with the eventual emergence of a unified exploration operations culture.

human robotic missions↗

Design and Development of a Flight Route Modification, Logging, and Communication Network

There is an overwhelming desire to create and enhance communication mechanisms between entities that operate within the National Airspace System. Furthermore, airlines are always extremely interested in increasing the efficiency of their flights. An innovative system prototype was developed and tested that improves collaborative decision making without modifying existing infrastructure or operational procedures within the current Air Traffic Management System. This system enables collaboration between flight crew and airline dispatchers to share and assess optimized flight routes through an Internet connection. Using a sophisticated medium-fidelity flight simulation environment, a rapid-prototyping development, and a unified modeling language, the software was designed to ensure reliability and scalability for future growth and applications. Ensuring safety and security were primary design goals, therefore the software does not interact or interfere with major flight control or safety systems. The system prototype demonstrated an unprecedented use of in-flight Internet to facilitate effective communication with Airline Operations Centers, which may contribute to increased flight efficiency for airlines.

Merlino, Daniel K.↗