Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

Programmable Automated Welding System (PAWS)

An ambitious project to develop an advanced, automated welding system is being funded as part of the Navy Joining Center with Babcock & Wilcox as the prime integrator. This program, the Programmable Automated Welding System (PAWS), involves the integration of both planning and real-time control activities. Planning functions include the development of a graphical decision support system within a standard, portable environment. Real-time control functions include the development of a modular, intelligent, real-time control system and the integration of a number of welding process sensors. This paper presents each of these components of the PAWS and discusses how they can be utilized to automate the welding operation.

Kline, Martin D.↗

Safety inputs to development program plans

Safety engineers integration into overall system through basic development programs, involving management, manufacturing, testing and integrated logistic support

Ball, L. W.↗

Development of shuttle payloads

The development of payloads for the Shuttle is described in terms of two activities - one is oriented towards development of payload hardware, while the other is oriented towards the development of payload/Space Transportation System (STS) planning, scheduling, and integration techniques. This second activity is called STS Utilization Planning (SUP). In addition to describing the major aspects of SUP, a discussion of development activities on three payloads that typify direct Shuttle placement missions is included. These payloads are the First Spacelab Mission, the Atmospheric, Magnetospheric, and Plasmas in Space (AMPS) payload, and the Large Space Telescope (LST).

Murphy, J. T.↗

Planned flight test of a mercury ion auxiliary propulsion system. II - Integration with host spacecraft

This is part II of a three-part paper describing the approved flight test of a mercury ion auxiliary propulsion system. The objectives of the flight test are summarized with reference to user application. The approach to accomplishment is presented as it applies to integrating the propulsion system with the host spacecraft, USAF's STP P80-1. A number of known interface design considerations which affect the propulsion system and the spacecraft are discussed. Finally, analogies are drawn comparing the relationship of the organizations involved with this flight test with those anticipated for future operational missions. Attention is given to the viewpoint of the project office

Knight, R. M.↗

The case for a centralized repair depot for Space Shuttle

The first priority of the NSTS program is to make the Space Shuttle system fully operational and cost effective in providing routine access to space. In support of this priority an integrated logistics support system was planned, structured and is being implemented to support a launch-on-time goal of 95 percent. In achieving a 95 percent spares 'fill rate' in an environment of small fleet size, highly unique and high cost assets, significant spares cost can be incurred. A major portion of these costs are for the additional spares required when repair or acquisition times are lengthy. This paper provides a fundamental analysis of the costs and other factors involved in the spare and repair process and provides an optimized cost and process solution for the Space Shuttle program - a centralized repair depot located at KSC.

Enlow, R. D.↗

Scheduling Spitzer: The SIRPASS Story

NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

flight systems↗

Recommendation for a Medical System Concept of Operations for Gateway Missions

NASA’s exploration missions to cis-lunar space will establish a permanent gateway to future transport missions to Mars. These missions mandate a significant paradigm change for mission planning, spacecraft design, human systems integration, and in-flight medical care due to constraints on mass, volume, power, resupply, and medical evacuation capability. These constraints require medical system development to be tightly integrated with mission and habitat design to provide a sufficient medical infrastructure and enable mission success. This concept of operations provides a vision of medical care needs that will be used to guide the development of a medical system for the cis-lunar Gateway Habitat. This medical system will serve as the precursor to what is implemented in future exploration missions to Mars. This concept of operations documents an overview of the stakeholder needs and system goals of a medical system and provides examples of the types of activities for which the system will be used during the mission. This concept of operations informs the ExMC systems engineering effort to define the Gateway Habitat Medical System by documenting the medical activities and capabilities relevant to Gateway missions, as identified by the ExMC clinician community. In addition, this concept of operations will inform the subsequent systems engineering process of developing technical requirements, system architectures, interfaces, and verification and validation approaches for the medical system. This document supports the closure of ExMC Gap Med01: We do not have a concept of operations for medical care during exploration missions, corresponding to the ExMC-managed human system risk: Risk of Adverse Health Outcomes & Decrements in Performance due to Inflight Medical Conditions.

Rubin, David↗

IMPACT Concept of Operations

NASA’s future exploration missions mandate a significant paradigm change for mission planning, spacecraft design, human systems integration, and in-flight medical care due to constraints on mass, volume, power, resupply missions, and medical evacuation capabilities. These constraints require further development of the human health and performance system, which includes the medical, task performance, wellness, data, human and other systems necessary to keep the crew healthy and functioning optimally. The human health and performance system will be tightly integrated with mission and habitat design to provide a sufficient human health and performance infrastructure to enable mission success. A suite of systems engineering tools will aid in the decision making process for the development of such a human health and performance system. This Concept of Operations provides a vision for a tool suite to conduct evaluations of human health and performance system options, inform research prioritization, and provide trade study support, based on evidence, risks, and systems engineering principles. The integrated tool suite under development is IMPACT.

Lumpkins, Sara↗

Medical System Concept of Operations for Mars Exploration Mission-11: Exploration Medical Capability (ExMC) Element - Human Research Program

NASA’s exploration missions to Mars will have durations of 2-3 years and will take humans farther away from Earth than ever before. This will result in a paradigm shift for mission planning, spacecraft design, human systems integration, and in-flight medical care. Constraints on real-time communication, resupply, and medical evacuation are major architectural drivers. These constraints require medical system development to be tightly integrated with mission and vehicle design to provide crew autonomy and enable mission success. This concept of operations provides a common vision of medical care for developing a medical system for Mars exploration missions. It documents an overview of the stakeholder needs and goals of a medical system and provides examples of the types of activities the system will be used for during the mission. Development of the concept of operations considers mission variables such as distance from Earth, duration of mission, time to definitive medical care, communication protocols between crewmembers and ground support, personnel capabilities and skill sets, medical hardware and software, and medical data management. The information provided in this document informs the ExMC Systems Engineering effort to define the functions to be provided by the medical system. In addition, this concept of operations will inform the subsequent systems engineering process of developing technical requirements, system architectures, interfaces, and verification and validation approaches for the medical system. This document supports the closure of ExMC Gap Med01: We do not have a concept of operations for medical care during exploration missions, corresponding to the ExMC-managed human system risk: Risk of Adverse Health Outcomes & Decrements in Performance due to Inflight Medical Conditions. This document is applicable to the ExMC Element Systems Engineering process and may be used for collaboration within the Human Research Program.

Urbina, Michelle↗

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS↗

Onboard planning for geological investigations using a rover team

This paper describes an integrated system for coordinating multiple rover behavior with the overall goal of collecting planetary surface data. The Multi-Rover Integrated Science Understanding System (MISUS) combines techniques from planning and scheduling with machine learning to perform autonomous scientific exploration with cooperating rovers.

scheduling↗

The Habitat Demonstration Unit Project Overview

This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.

Kennedy, Kriss J.↗

Surface contamination analysis technology team overview

A team was established which consisted of representatives from NASA (Marshall Space Flight Center and Langley Research Center), Thiokol Corporation, the University of Alabama in Huntsville, AC Engineering, SAIC, Martin Marietta, and Aerojet. The team's purpose was to bring together the appropriate personnel to determine what surface inspection techniques were applicable to multiprogram bonding surface cleanliness inspection. In order to identify appropriate techniques and their sensitivity to various contaminant families, calibration standards were developed. Producing standards included development of consistent low level contamination application techniques. Oxidation was also considered for effect on inspection equipment response. Ellipsometry was used for oxidation characterization. Verification testing was then accomplished to show that selected inspection techniques could detect subject contaminants at levels found to be detrimental to critical bond systems of interest. Once feasibility of identified techniques was shown, selected techniques and instrumentation could then be incorporated into a multipurpose inspection head and integrated with a robot for critical surface inspection. Inspection techniques currently being evaluated include optically stimulated electron emission (OSEE); near infrared (NIR) spectroscopy utilizing fiber optics; Fourier transform infrared (FTIR) spectroscopy; and ultraviolet (UV) fluorescence. Current plans are to demonstrate an integrated system in MSFC's Productivity Enhancement Complex within five years from initiation of this effort in 1992 assuming appropriate funding levels are maintained. This paper gives an overview of work accomplished by the team and future plans.

Burns, H. Dewitt↗

Scalable Risk Assessment of Rare Events in Power Systems With Uncertain Wind Generation and Loads

Risk assessment of rare events has become increasingly important in power system planning and operation with the increasing integration of renewable energy and the presence of system uncertainties. However, quantifying the risk posed by rare events via the traditional method, i.e., Monte Carlo sampling (MCS), incurs substantial computational expense stemming from the vast ensemble of power flow simulations. To accelerate the assessment, this paper proposes a Deep Neural Network (DNN)-kernelized vector-valued Gaussian Process (VVGP) approach with excellent computational efficiency while maintaining high accuracy. Consequently, serving as a surrogate model for the power flow solver, the DNN-kernelized VVGP enables significantly faster but accurate risk assessment compared to the power flow solver. The developed surrogate model evaluates low-order N - k events that contain more than 90% instances by adeptly capturing the topological features while the high-order N - k events are assessed via a power flow solver, thereby striking a balance between computational efficiency and uncertainty quantification accuracy. Moreover, the model incorporates a Support Vector Machine (SVM) classifier to resample concerning low-probability tail events to counteract the biases potentially introduced during the DNN-kernelized VVGP evaluations. Simulations conducted on the modified IEEE 24-bus, 118-bus, and European 1354-bus systems demonstrate that the proposed method maintains the accuracy benchmark set by MCS while significantly reducing computational demands in large-scale power systems as compared to other state-of-the-art methods.

17 WIND ENERGY↗

Planning the future of JPL's management and administrative support systems around an integrated database

JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.

Ebersole, M. M.↗

Roman Space Telescope Optical System: Status and Test

A conference presentation providing an overview of the Roman Space Telescope optical system. Details on the optical system verification plan and Spacecraft Bus + Integrated Payload Assembly (SCIPA) thermal vacuum optical test program are provided.

space telescope↗

Flow direction measurement criteria and techniques planned for the 40- by 80-/80- x 120-foot wind tunnel integrated systems tests

A study was performed in order to develop the criteria for the selection of flow direction indicators for use in the Integrated Systems Tests (ISTs) of the 40 by 80/80 by 120 Foot Wind Tunnel System. The problems, requirements, and limitations of flow direction measurement in the wind tunnel were investigated. The locations and types of flow direction measurements planned in the facility were discussed. A review of current methods of flow direction measurement was made and the most suitable technique for each location was chosen. A flow direction vane for each location was chosen. A flow direction vane that employs a Hall Effect Transducer was then developed and evaluated for application during the ISTs.

Zell, P. T.↗