Search NASA⌕ Search

SEARCH · Search NASA

Results for “managing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Managing Spacecraft Risk with Space Environments Testing via Process Safety Management at the NASA Neil A. Armstrong Test Facility (GRC-ATF)

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

Methods of forming thermal management systems and thermal management methods

A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

25 ENERGY STORAGE↗

Transformer power management controllers and transformer power management methods

Transformer power management controllers and transformer power management methods are described. According to one aspect, a transformer power management controller includes processing circuitry configured to monitor an electrical characteristic of electrical energy which is received from a secondary of a transformer of an electric power system, use the monitored electrical characteristic to determine transformer loading information which is indicative of an amount of power which is being supplied by the secondary of the transformer to a plurality of loads which are coupled with the secondary of the transformer, and use the transformer loading information to adjust an amount of the electrical energy which is supplied by the secondary of the transformer to at least one of the loads which is coupled with the secondary of the transformer.

Pratt, Richard M.↗

A modeling framework for designing and evaluating curbside traffic management policies at Dallas-Fort Worth International Airport

Emerging mobility technologies are changing the transportation system landscape. This is especially evident at airports, such as the Dallas-Fort Worth International Airport (DFW). Without careful analysis, these changes could lead to inefficient and costly airport operations. This paper presents a modeling framework that integrates travel mode encoding, demand projection, and microsimulation to enable airports to develop, simulate, and evaluate curbside traffic managements policies and measure their impact. Here, the framework is utilized to analyze several traffic scenarios and policies for DFW: a baseline scenario which represents DFW traffic pattern as observed in 2018 and projected to 2045, a transit network company (TNC) electrification policy, a TNC queuing policy, a policy that increased transit ridership, a bus-only policy which considers the use of only buses inside DFW, an autonomous vehicle (AV) policy which investigates the impact of autonomous vehicle (AV) adoption on airport operations, and an example COVID-19 scenario which models the impact of the COVID19 pandemic. The simulations’ results demonstrate that: increasing the DFW transit ridership postpones the need for airport curbside expansion the most; encouraging shared-mobility with the bus-only policy produces the most savings in curbside congestion delays; automation and electrification for all passenger vehicle trips to/from DFW generates the most saving in fuel consumption and emissions; and uncontrolled AV adoption incurs the highest increase in fuel consumption, delay, and emissions and could require immediate airport capacity extension. Without policy intervention or investment in additional infrastructure capacity, these results predict the current operations would face significant congestion on high demand days starting as early as 2028. While derived in close partnership with DFW, the methodology presented here can be generalized to any airport.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ADP-Based Home Energy Management System: A Case Study Using Dynamo: Preprint

This paper explores Home Energy Management System (HEMS) algorithms to minimize household cost while maintaining comfort when faced with uncertain weather, and demand. Specifically, we consider a HEMS that optimizes forward looking schedules for a home's heating, ventilation, and air conditioning (HVAC); water heater (WH); and electric vehicle (EV) charging while considering uncertainty in outside temperature, hot water usage, and non-controllable load (NCL). We adopt a Dynamic Programming (DP) formulation and utilize the Dynamic programming for Adaptive Modeling and Optimization (DYNAMO) toolkit to implement DP and approximate dynamic programming (ADP) algorithms. Simulation results under a single tariff plan compare the quality of the solution generated by ADP to that of DP, and show significant improvement in computation time while maintaining acceptable solution accuracy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Environmental Management Waste Management Facility Waste Lot Profile 155.5 for K-1015-A Laundry Pit, East Tennessee Technology Park Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).

09 BIOMASS FUELS↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

Transmittal of the Calculation Package that Supports the Analysis of Performance of the Environmental Management Waste Management Facility Oak Ridge, Tennessee (Based 5-Cell Design Issued 8/14/09)

This document presents the results of an assessment of the performance of a build-out of the Environmental Management Waste Management Facility (EMWMF). The EMWMF configuration that was assessed includes the as-constructed Cells 1 through 4, with a groundwater underdrain that was installed beneath Cell 3 during the winter of 2003-2004, and Cell 5, whose proposed design is an Addendum to Remedial Design Report for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee, DOE/OR/01-1873&D2/A5/R1. The total capacity of the EMWMF with 5 cells is about 1.7 million cubic yards. This assessment was conducted to determine the conditions under which the approved Waste Acceptance Criteria (WAC) for the EMWMF found in the Attainment Plan for Risk/Toxicity-Based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee [U.S. Department of Energy (DOE) 2001a], as revised for constituents added up to October 2008, would remain protective of public health and safety for a five-cell disposal facility. For consistency, the methods of analyses and the exposure scenario used to predict the performance of a five-cell disposal facility were identical to those used in the Remedial Investigation and Feasibility Study (RI/FS) and its addendum (DOE 1998a, DOE 1998b) to develop the approved WAC. To take advantage of new information and design changes departing from the conceptual design, the modeling domain and model calibration were upaded from those used in the RI/FS and its addendum. It should be noted that this analysis is not intended to justify or propose a change in the approved WAC.

54 ENVIRONMENTAL SCIENCES↗

Calculation Package for the Analysis of Performance of Cells 1-6, with Underdrain, of the Environmental Management Waste Management Facility Oak Ridge, Tennessee

This calculation package presents the results of an assessment of the performance of the 6 cell design of the Environmental Management Waste Management Facility (EMWMF). The calculations show that the new cell 6 design at the EMWMF meets the current WAC requirement. QA/QC steps were taken to verify the input/output data for the risk model and data transfer from modeling output files to tables and calculation.

54 ENVIRONMENTAL SCIENCES↗

Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee

This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including short descriptions of the facility, the hydrogeologic setting, CERCLA decision document requirements for environmental monitoring, and a summary of the EMWMF monitoring history to date. Sect. 3 identifies the respective groundwater, surface water, stormwater, and air monitoring locations at the EMWMF and outlines the associated sampling frequencies, field measurements, and laboratory analytes. Sect. 4 presents a concise technical evaluation of the groundwater, surface water, stormwater, and air monitoring data. Sect. 5 summarizes key monitoring results and data evaluation conclusions along with any recommended changes to groundwater, surface water, stormwater, or air monitoring at the EMWMF. Sect. 6 lists the documents and other technical reports referenced in the preceding narrative sections. Maps and other illustrations referenced in the narrative sections of this annual EMR are in Appendix A. Referenced summary tables of FY 2009 environmental monitoring data are in Appendix B (Groundwater), Appendix C (Surface Water), Appendix D (Stormwater), and Appendix E (Ambient Air).

54 ENVIRONMENTAL SCIENCES↗

MATLAB/Simulink Framework for Modeling Complex Coolant Flow Configurations of Advanced Automotive Thermal Management Systems

The National Renewable Energy Laboratory's (NREL's) CoolSim MATLAB/Simulink modeling framework was extended by including a newly developed coolant loop solution method aimed at reducing the simulation effort for arbitrarily complex thermal management systems. The new approach does not require the user to identify specific coolant loops and their flow. The user only needs to connect the fluid network elements in a manner consistent with the desired schematic. Using the new solution method, a model of NREL's advanced combined coolant loop system for electric vehicles was created that reflected the test system architecture. This system was built using components provided by the MAHLE Group and included both air conditioning and heat pump modes. Validation with test bench data and verification with the previous solution method were performed for 10 operating points spanning a range of ambient temperatures between -2 degrees C and 43 degrees C. The largest root mean square difference between pressure, temperature, energy and mass flow rate data and simulation results was less than 7%.

30 DIRECT ENERGY CONVERSION↗

When management gets serious about managing software

This paper describes JPL's approach to improving the management of software. It discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several 'lessons learned' about changing how software is managed, developed and acquired.

software management↗

A Vision for Coupling Operation of US Fusion Facilities with HPC Systems and the Implications for Workflows and Data Management

The operation of large US Department of Energy (DOE) research facilities, like the DIII-D National Fusion Facility, results in the collection of complex multi-dimensional scientific datasets, both experimental and model-generated. In the future, it is envisioned that integrated data analysis coupled with large-scale high performance computing (HPC) simulations will be used to improve experimental planning and operation. Practically, massive data sets from these simulations provide the physics basis for generation of both reduced semi-analytic and machine-learning-based models. Storage of both HPC simulation datasets (generated from US DOE leadership computing facilities) and experimental datasets presents significant challenges. In this paper, we present a vision for a DOE-wide data management workflow that integrates US DOE fusion facilities with leadership computing facilities. Data persistence and long-term availability beyond the length of allocated projects is essential, particularly for verification and recalibration of artificial intelligence and machine learning (AI/ML) models. Because these data sets are often generated and shared among hundreds of users across multiple leadership computing facility centers, they would benefit from cross-platform accessibility, persistent identifiers (e.g. DOI, or digital object identifier), and provenance tracking. Here, the ability to handle different data access patterns suggests that a combination of low cost, high latency (e.g. for storing ML training sets) and high cost, low latency systems (e.g. for real-time, integrated machine control feedback) may be needed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Managing EHS of PV-Related Equipment at the National Renewable Energy Laboratory: Preprint

Managing environment, health, and safety (EHS) risks at a national laboratory, or university, can be intimidating to a researcher who is focused on research results. Laboratory research and development (R&D) operations are often driven by scientists with limited engineering support and lack well-refined equipment development resources. To add to the burden for a researcher, there is a plethora ofcodes, standards, and regulations that govern the safe installation and operation of photovoltaic-related R&D equipment -- especially those involving hazardous production materials. To help guide the researcher through the vast list of requirements, the EHS office at NREL has taken a variety of steps. Organizationally, the office has developed hazard-specific laboratory-level procedures togovern particular activities. These procedures are a distillation of appropriate international codes, fire agencies, SEMI standards, U.S. Department of Energy orders, and other industry standards to those necessary and sufficient to govern the safe operation of a given activity. The EHS office works proactively with researchers after a concept for a new R&D capability is conceived to help guidethe safe design, acquisition, installation, and operation of the equipment. It starts with a safety assessment at the early stages such that requirements are implemented to determine the level of risk and degree of complexity presented by the activity so appropriate controls can be put in place to manage the risk. As the equipment requirements and design are refined, appropriate equipmentstandards are applied. Before the 'to-build' specifications are finalized, a process hazard analysis is performed to ensure that no single-point failure presents an unacceptable risk. Finally, as the tool goes through construction and installation stages, reviews are performed at logical times to ensure that the requisite engineering controls and design are in place and operational.Authorization to operate is not given until adherence to these requirements is fully verified and documented. Operations continue under the conditions defined through this process and are reviewed with changing processes.

14 SOLAR ENERGY↗

Program Management at the National Nuclear Security Administration Office of Defense Nuclear Security: A Review of Program Management Documents and Underlying Processes

The scope of this paper is to review the National Nuclear Security Administration Office of Defense Nuclear Security (DNS) program management documents and to examine the underlying processes. The purpose is to identify recommendations for improvement and to influence the rewrite of the DNS Program Management Plan (PMP) and the documentation supporting it. As a part of this process, over 40 documents required by DNS or its stakeholders were reviewed. In addition, approximately 12 other documents produced outside of DNS and its stakeholders were reviewed in an effort to identify best practices. The complete list of documents reviewed is provided as an attachment to this paper.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗