Resistojet systems manned spacecraft applications.
Resistojet control system combined with control moment gyro payload capability for long duration manned orbital spacecraft missions
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Resistojet control system combined with control moment gyro payload capability for long duration manned orbital spacecraft missions
Description of simulation and training facilities for gemini and apollo manned spaceflights
Future manned space missions will travel beyond low Earth orbit with more stringent navigation requirements and fewer navigation resources than used for the Apollo Program of the 1960s. A study has been performed to assess radiometric and optical tracking capabilities necessary to meet nominal and contingency Earth entry flight path angle requirements. Results indicate that 3 tracking stations will be insufficient for meeting nominal entry requirements, while the performance of a 6 station architecture is dependent on the entry geometry. Optical tracking results indicate that a narrow-angle camera is required for satisfying contingency Earth return requirements.
Computer directed display and control requirements for manned space flight
Crew survival ensurance under emergency situations during manned space flight, discussing Apollo abort system refinements
Nutation dampers are examined from the standpoint of application to manned space stations with artificial gravity. Typical spacecraft concepts and associated control requirements are considered, and examples of the dampers proposed for these spacecraft are discussed.
Water cascade heat pump system design and developed for continuous operation in thermal control systems of space vehicles for lunar missions
This paper is concerned with our present state of knowledge on the procedures and effectiveness of aborts from manned orbital and lunar missions. By abort is meant a deliberate or unintentional termination of the primary mission followed by an expedient return to earth of the payload (spacecraft and crew). A deliberate abort may be initiated if a critical component failed and thus impaired the probability of mission success or the crew's safety. Examples of this kind of abort are failure of the launch guidance system or the oxygen and cabin pressure system. Also, an unintentional abort may occur during the launch phase due to the complete or partial failure of one of the launch-vehicle stages to operate. For each mission every conceivable set of circumstances must be considered and evaluated to see if an abort of the mission is called for and to determine what sequence of events should occur to bring the spacecraft and crew safely back to earth with the highest probability of success. Factors which must be considered are: how to specify and sense an abort condition, how much fuel should be put onboard the vehicle for abort purposes, what size and kind of rocket engines are best suited for each mission, and what compromise is incurred due to other mission requirements? If an abort occurs, the optimum time of application as well as the magnitude and direction of the velocity changes must be determined beforehand and the crew must be clearly informed of what action is required or what the situation is so that they can decide the proper action.
This paper is concerned with a review of available energy absorbing materials and devices, and the results of an example evaluation of specific techniques applied to a vertical landing system. Many of the energy absorbers discussed have been investigated by Northrop Ventura for use in lunar as well as earth landing systems.
Solar simulation system requirements and design, comparing solar parameters with manned space center specifications for simulation
Programs and plans for optical communications in manned deep space missions and laser radar for Lunar Excursion Module
Graphic arts and reproduction services role in supporting postflight analysis of manned space flights
Reliability and quality control requirements for manned space flight - designs, procedures, and schedules
A number of medically oriented research and hardware development programs in support of manned space flights have been sponsored by NASA. Blood pressure measuring systems for use in spacecraft are considered. In some cases, complete new bioinstrumentation systems were necessary to accomplish a specific physiological study. Plans for medical research during the Skylab program are discussed along with general questions regarding space-borne health service systems and details concerning the Health Services Support Control Center.
For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.
Regenerative amino acid salt sorber and other means to control carbon dioxide and reclaim oxygen during manned missions up to 180 days
A brief history of the development of electrical power systems from the earliest manned space flights illustrates a natural trend toward a growth of electrical power requirements and operational lifetimes with each succeeding space program. A review of the design philosophy and development experience associated with the Space Shuttle Orbiter electrical power system is presented, beginning with the state of technology at the conclusion of the Apollo Program. A discussion of prototype, verification, and qualification hardware is included, and several design improvements following the first Orbiter flight are described. The problems encountered, the scientific and engineering approaches used to meet the technological challenges, and the results obtained are stressed. Major technology barriers and their solutions are discussed, and a brief Orbiter flight experience summary of early Space Shuttle missions is included. A description of projected Space Station power requirements and candidate system concepts which could satisfy these anticipated needs is presented. Significant challenges different from Space Shuttle, innovative concepts and ideas, and station growth considerations are discussed. The Phase B Advanced Development hardware program is summarized and a status of Phase B preliminary tradeoff studies is presented.
NASA has determined that the parachute portion of the Landing System for the Crew Exploration Vehicle (CEV) will be Government Furnished Equipment (GFE). The Earth Landing System has been designated CEV Parachute Assembly System (CPAS). Thus a program team was developed consisting of NASA Johnson Space Center (JSC) and Jacobs Engineering through their Engineering and Science Contract Group (ESCG). Following a rigorous competitive phase, Airborne Systems North America was selected to provide the parachute design, testing and manufacturing role to support this team. The development program has begun with some early flight testing of a Generation 1 parachute system. Future testing will continue to refine the design and complete a qualification phase prior to manned flight of the spacecraft. The program team will also support early spacecraft system testing, including a Pad Abort Flight Test in the Fall of 2008