Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

128 records · Page 8

Autonomous System Subversion Tactics: Prototypes and Recommended Countermeasures

One of the fielding requirements for Advanced and Small Modular Reactors (AR/SMR) is the ability to support remote and autonomous operations. Autonomous Control Systems (ACS) are found on platforms such as Autonomous Space Vehicles, Cruise Missiles, and advanced driver-assistance systems. Each of these ACS implementations depends upon a set of decision support subsystems responsible for supporting Autonomous Mission Managers (names vary based upon field and author preferences). These Autonomous Mission Managers receive inputs from system sensors (e.g., LIDAR collection from an automobile travelling down a street; transients from a nuclear reactor), and perform a set of classifications (e.g., Red Traffic Light; Small Pedestrian at 10m; Load Rejection; Single Coolant Pump Trip), and then use these classifications in combination with recommendation algorithms to achieve platform goals (e.g., Stop the Vehicle at the Traffic Light, Avoid the Small Pedestrian; Trip the Reactor to prevent a Safety Event). The design, implementation, and fielding of an ACS capability will alter the cyber-attack surface such that existing risk management plans will need to be updated to include how to protect and defend against data-science and decision-support-system attack classes. These attack classes would include protection of the design and training environments where algorithm selection and testing and training data would be obvious attack vectors. These attack classes would also require an informed set of detection and response procedures to identify anomalous behaviors and document best practices for anomaly assessment and vulnerability mitigation and remediation. Last year we published a Cyber Threat Assessment Methodology for Autonomous and Remote Operations for AR/SMRs along with a companion publication on Cyber Attack and Defense Use Cases. The focus of the methodology was on describing and enumerating ACS processes, components, and functions such that security engineers could: evaluate subversion options against the target; identify threat actor attributes and capabilities derived from each subversion option; and identify security controls and response countermeasures. The Use Cases document offered detailed methodology examples including an assessment of a Military Base SMR, an Autonomous System Decision Loop, and implementation of AR/SMR Machine Learning algorithms. Our proposal at the end of last year was to focus on implementation of subversion prototypes related to the last Use Case area: AR/SMR Machine Learning (ML) Algorithms. We included six attack scenarios in our Use Cases paper: a Poisoning Attack against ML functions implemented using an FPGA; a Trojaning Attack against ML classifiers exploiting the excitability of Nuclear Engineers; a Backdooring Attack against ML Training environments to ensure persistence of an attack vector; a False Positive Evasion Attack against multi-factor Access Control Systems using clever inputs; an Inference Attack against ML models by an Insider with access to the Operational environment; and an Adversarial Reprogramming Attack against a Material Access Control Video Surveillance System. At the beginning of this year these six attack scenarios were provided to our research teams at Georgia Tech and Idaho State University and each team successfully implemented a subversion attack against a ML implementation to include transient misclassifications. While this is a notable outcome from this type of research, this paper offers the reader insight into not only how to structure and execute these types of attacks, but into the thought process behind how the researcher investigated the problem space, performed initial algorithm implementation, and the trial-and-error behind arriving at the successful subversion prototypes. We include in this paper a set of associated Scenarios on how these subversion prototypes could be implemented and an initial set of guidance for AR/SMR architects, Nuclear Regulators, and Cyber Defenders to implement awareness and defense capabilities into their current operational portfolios.

42 ENGINEERING↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗