Search NASA⌕ Search

SEARCH · Search NASA

Results for “modular assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Modular heat-pipe-radiator panel

Heat-Pipe panel assembled by joining series of Heat-Pipe modules is presented. Each module is identical and includes own radiator Fin and Fluid-Header section. Arrangement gives high turn-down ratio permitting ammonia heat pipes to freeze under low conditions.

Alario, J.↗

AXAF - A major spaceborne X-ray observatory

Attention is given to the design configuration and performance requirements of the Advanced X-ray Astrophysics Facility, as established by Phase A study results, noting the conceptual apprach to instrument accommodation by means of a focal plane assembly. Conceptually, the various instruments incorporated are modular in design, so that they may be replaced in orbit using standard interfaces. The instruments in question are high and moderate resolution imagers, a high resolution dispersive spectrometer, a moderate resolution spectrometer, and a focal plane polarimeter.

Wyman, C. L.↗

Space Station Based Microacceleration Experiment Platform

Normal Space Station Freedom activities, such as docking, astronauts' movement, equipment vibrations, and space station reboosts, exert forces on the structure, resulting in static or transient accelerations greater than many microgravity experiments can tolerate. A solution to this problem is to isolate experiments on a separate platform free from such disturbances. The Space Station Based Microacceleration Experiment Platform, a proposed solution to the Space Station microgravity experiment problem is described. It is modular in design and can be telerobotically assembled and operated. The Microacceleration Experiment Platform (MEP) consists of a minimum configuration platform to which power, propulsion, propellant, and experiment modules are added. The platform's layout is designed to take maximum advantage of the microgravity field structure in orbit.

Barber, Katy↗

High-pressure protective systems technology

Space suit assemblies developed in the past provide candidate concepts to meet future extravehicular-activity requirements. The paper is concerned with the development of the modular 8-psi Ames AX-3 high-pressure suit assembly on the basis of a review of existing suit assemblies, component developments, and mobility exercises. The discussion covers description of the AX-3 suit, its performance, and technology developments. In conclusion, high-pressure space suit technology is demonstrated with the development of the Ames AX-3 suit assembly. Several photographs and diagrams supplement the text.

Vykukal, H. C.↗

Preliminary design approach for large high precision segmented reflectors

A simplified preliminary design capability for erectable precision segmented reflectors is presented. This design capability permits a rapid assessment of a wide range of reflector parameters as well as new structural concepts and materials. The preliminary design approach was applied to a range of precision reflectors from 10 meters to 100 meters in diameter while considering standard design drivers. The design drivers considered were: weight, fundamental frequency, launch packaging volume, part count, and on-orbit assembly time. For the range of parameters considered, on-orbit assembly time was identified as the major design driver. A family of modular panels is introduced which can significantly reduce the number of reflector parts and the on-orbit assembly time.

Mikulas, Martin M., Jr.↗

Preliminary design considerations for 10 to 40 meter-diameter precision truss reflectors

A simplified preliminary design capability for erectable precision segmented reflectors is presented. This design capability permits a rapid assessment of a wide range of reflector parameters as well as new structural concepts and materials. The preliminary design approach was applied to a range of precision reflectors from 10 meters to 100 meters in diameter while considering standard design drivers. The design drivers considered were: weight, fundamental frequency, launch packaging volume, part count, and on-orbit assembly time. For the range of parameters considered, on-orbit assembly time was identified as the major design driver. A family of modular panels is introduced which can significantly reduce the number of reflector parts and the on-orbit assembly time.

Mikulas, Martin M., Jr.↗

Persistent Assets in Zero-G and on Planetary Surfaces: Enabled by Modular Technology and Robotic Operations

Space operations are on the cusp of a revolutionary new operational paradigm that leverages modular systems and recurring robotic visits to “Persistent Assets” enabling asset maintenance, repair, and enhancement. A “Persistent Asset” is defined here as any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. This term is an extension of the term “Persistent Platform” used by Ms. Pam Melroy at the Defense Advanced Research Projects Agency to describe the vision of the Agency for a geosynchronous Earth orbiting platform. In this paper, the term “Persistent Asset” is introduced to encompass not only zero-g systems; such as telecommunication platforms, Earth observing science platform, Department of Defense platforms, and scientific telescope systems, but also planetary surface systems that support missions such as human outposts, science stations, and in-situ resource utilization systems. In contrast to the current state of the art, where space systems are typically launched as a single unit and operated without any further physical intervention after launch; future systems will be maintained, enhanced and reconfigured in-situ as new technology becomes available or mission needs change. Visits to the persistent asset can be regularly scheduled or dictated by funding constraints enabling a pay-as-you-go approach, which is largely independent of time-constraints and able to exploit launches of opportunity. In this paper, historical in-space assembly activities which relied heavily on astronaut extra-vehicular activity will be reviewed as well as early robotic assembly activities. These approaches will be contrasted with emerging modular approaches supporting realization of a new Persistent Asset operational paradigm. The paper will define attributes of the Persistent Asset paradigm and illustrate advantages by applying the paradigm to two relevant applications: 1) a large space telescope backing structure and 2) the backbone structure for a solar electric transport vehicle. Finally, recently developed unique Persistent Asset elements (modules, and interface approaches) will be described.

Doggett, William R.↗

Persistent Assets in Zero-G and on Planetary Surfaces: Enabled by Modular Technology and Robotic Operations

Space operations are on the cusp of a revolutionary new operational paradigm that leverages modular systems and recurring robotic visits to “Persistent Assets” enabling asset maintenance, repair, and enhancement. A “Persistent Asset” is defined here as any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. This term is an extension of the term “Persistent Platform” used by Ms. Pam Melroy at the Defense Advanced Research Projects Agency to describe the vision of the Agency for a geosynchronous Earth orbiting platform. In this paper, the term “Persistent Asset” is introduced to encompass not only zero-g systems; such as telecommunication platforms, Earth observing science platform, Department of Defense platforms, and scientific telescope systems, but also planetary surface systems that support missions such as human outposts, science stations, and in-situ resource utilization systems. In contrast to the current state of the art, where space systems are typically launched as a single unit and operated without any further physical intervention after launch; future systems will be maintained, enhanced and reconfigured in-situ as new technology becomes available or mission needs change. Visits to the persistent asset can be regularly scheduled or dictated by funding constraints enabling a pay-as-you-go approach, which is largely independent of time-constraints and able to exploit launches of opportunity. In this paper, historical in-space assembly activities which relied heavily on astronaut extra-vehicular activity will be reviewed as well as early robotic assembly activities. These approaches will be contrasted with emerging modular approaches supporting realization of a new Persistent Asset operational paradigm. The paper will define attributes of the Persistent Asset paradigm and illustrate advantages by applying the paradigm to two relevant applications: 1) a large space telescope backing structure and 2) the backbone structure for a solar electric transport vehicle. Finally, recently developed unique Persistent Asset elements (modules, and interface approaches) will be described.

William R Doggett↗

A 100 kW-Class Technology Demonstrator for Space Solar Power

A first step in the development of solar power from space is the flight demonstration of critical technologies. These fundamental technologies include efficient solar power collection and generation, power management and distribution, and thermal management. In addition, the integration and utilization of these technologies into a viable satellite bus could provide an energy-rich platform for a portfolio of payload experiments such as wireless power transmission (WPT). This paper presents the preliminary design of a concept for a 100 kW-class free-flying platform suitable for flight demonstration of technology experiments. Recent space solar power (SSP) studies by NASA have taken a stepping stones approach that lead to the gigawatt systems necessary to cost-effectively deliver power from space. These steps start with a 100 kW-class satellite, leading to a 500 kW and then a 1 MW-class platform. Later steps develop a 100 MW bus that could eventually lead to a 1-2 GW pilot plant for SSP. Our studies have shown that a modular approach is cost effective. Modular designs include individual laser-power-beaming satellites that fly in constellations or that are autonomously assembled into larger structures at geosynchronous orbit (GEO). Microwave power-beamed approaches are also modularized into large numbers of identical units of solar arrays, power converters, or supporting structures for arrays and microwave transmitting antennas. A cost-effective approach to launching these modular units is to use existing Earth-to-orbit (ETO) launch systems, in which the modules are dropped into low Earth orbit (LEO) and then the modules perform their own orbit transfer to GEO using expendable solar arrays to power solar electric thrusters. At GEO, the modules either rendezvous and are assembled robotically into larger platforms, or are deployed into constellations of identical laser power-beaming satellites. Since solar electric propulsion by the modules is cost-effective for both self-transport of the modules from LEO to GEO, and for on-orbit stationkeeping and repositioning capability during the satellite’s lifetime, this technology is also critical in technology development for SSP. The 100 kW-class technology demonstrator will utilize advanced solar power collection and generation technologies, power management and distribution, advanced thermal management, and solar electric propulsion. State-of-the-art solar concentrators, highly efficient multi-junction solar cells, integrated thermal management on the arrays, and innovative deployable structure design and packaging make the 100 kW satellite feasible for launch on one existing launch vehicle. Early SSP studies showed that a major percentage of the on-orbit mass for power-beaming satellites was from massive power converters at the solar arrays, at the bus, at the power transmitter, or at combinations of these locations. Higher voltage mays and power management and distribution (PMAD) systems reduce or eliminate the need for many of these massive power converters, and could enable direct-drive of high-voltage solar electric thrusters. Lightweight, highly efficient thermal management systems are a critical technology that must be developed and flown for SSP feasibility. Large amounts of power on satellites imply that large amounts of waste heat will need to be managed. In addition, several of the more innovative lightweight configurations proposed for SSP satellites take advantage of solar concentrators that are intractable without advanced thermal management technologies for the solar arrays. These thermal management systems include efficient interfaces with the WPT systems or other high-power technology experiments, lightweight deployable radiators that can be easily integrated into satellite buses, and efficient reliable thermal distribution systems that can pipe heat from the technology experiments to the radiators. In addition to demonstrating the integration and use of these mission-critical technologies, the 100 kw-class satellite will provide a large experiment deck for a portfolio of technology experiments. Current plans for this technology demonstrator allow 2000 kg of payload capability and up to 100 kW of power. The technology experiments could include one or more wireless power transmission demonstrations, either to the Earth’s surface or to a suitable space-based receiver. Technology experiments to quantify the on-orbit performance of critical technologies for SSP or space exploration are welcomed. In addition, the technology experiments provide an opportunity for international cooperation, to advance technology readiness levels of SSP technologies that require flight demonstration. This paper will present the preliminary design for a 100 kW solar-powered satellite and a variety of technology experiments that may be suitable for flight demonstration. In addition, a space-to-Earth-surface WPT experiment will be discussed.

Connie Carrington↗

TriTruss Packaging and Deployment Trade Study

A trade study was conducted that evaluated viable concepts of operation for the packaging and deployment (P&D) of novel deployable modular truss modules, called TriTruss modules, that can be assembled to form a large aperture In-Space Assembled Telescopes (iSAT). In this first phase of an ongoing more comprehensive trade study, concepts were proposed and then evaluated based on initial metrics representing features of an ideal P&D concept. The ideal TriTruss P&D concept is defined as one that: allows for efficient packaging, has sufficient geometric versatility to be launch vehicle independent, provides a stiff and lightweight structure, has low mechanical complexity, and has component modularity. The P&D concept should allow for prelaunch subsystem or utility integration if required. The concept should be kinematically simple and be robotically deployed using a minimum number of specialized tools. The P&D concepts evaluated are categorized as: core collapse, face collapse, and erectable structures. Sub-scale models were constructed to help understand the kinematics and mechanical complexity required to enable P&D. Based on a weighting scale, the most promising candidate P&D concepts have been selected and will undergo more rigorous structural design, analysis, and testing in the study’s next phase. The ultimate goal of the comprehensive trade study will be to recommend a single TriTruss design and associated P&D concept that will be built and evaluated at NASA Langley Research Center’s In-Space Assembly Laboratory.

in-space assembly (ISA)↗

Autonomous Robotic Manipulator Software

Autonomous robotic manipulation requires a deep and wide stack of supporting software. This paper presents Autonomous Robotic Manipulator Software (ARMS), a software suite designed at NASA Langley Research Center to support research and development of different algorithms for In-space Servicing, Assembly and Manufacturing (ISAM). ARMS solves common challenges along the autonomous manipulation software stack. Various challenges, such as integration with commercial hardware, simulation, and path planning, are solved through the use of Robot Operating System 2 and its community-developed packages. Other challenges, such as configuration management and task definition, and execution are solved in software built on those tools. The result is a modular approach to robotic system definition, agent actions, and assembly task definitions. ARMS has been used in two ISAM projects at NASA Langley Research Center, the Precision Assembled Space Structures project and the Built On-orbit Robotically assembled Gigatruss project.

Collin J Cresta↗

Autonomous Robotic Manipulator Software (ARMS)

Autonomous robotic manipulation requires a deep and wide stack of supporting software. This paper presents Autonomous Robotic Manipulator Software (ARMS), a software suite designed at NASA Langley Research Center to support research and development of different algorithms for In-space Servicing, Assembly and Manufacturing (ISAM). ARMS solves common challenges along the autonomous manipulation software stack. Various challenges, such as integration with commercial hardware, simulation, and path planning, are solved through the use of Robot Operating System 2 and its community-developed packages. Other challenges, such as configuration management and task definition, and execution are solved in software built on those tools. The result is a modular approach to robotic system definition, agent actions, and assembly task definitions. ARMS has been used in two ISAM projects at NASA Langley Research Center, the Precision Assembled Space Structures project and the Built On-orbit Robotically assembled Gigatruss project.

Collin J Cresta↗

Investigating techniques in the generation of support software

The performance of the Meta assembler processor software package previously provided for the Space Ultrareliable Modular Computer (SUMC) at the Marshall Space Flight Center (MSFC) was verified. A number of adjustments were made to the processor following the rehosting of the SUMC software development facility (S4) on a newly acquired IBM 360/65. The assembler was configured to provide cross assembly capability for various target computers.

Edwards, A. J.↗

SUMC-DV hardware manual

The assembly, the physical and electrical characteristics, and the basic electrical tests of the Space Ultrareliable Modular Computer Demonstration Vehicle (SUMC-DV), are described. The descriptions include: (1) the packaging concepts, physical assembly, design and fabrication using design automation techniques of 10 different types of custom CMOS LSI arrays; (2) the fabrication and testing of the various components including the LSI arrays; (3) the hierarchy of the memory complement and the clock generation and distribution system; (4) system testing techniques; and (5) the procedure employed in the electrical checkout of the system.

Feller, A.↗

A manned-machine space station construction concept

A design concept for the construction of a permanent manned space station is developed and discussed. The main considerations examined in developing the design concept are: (1) the support structure of the station be stiff enough to preclude the need for an elaborate on-orbit system to control structural response, (2) the station support structure and solar power system be compatible with existing technology, and (3) the station be capable of growing in a systematic modular fashion. The concept is developed around the assembly of truss platforms by pressure-suited astronauts operating in extravehicular activity (EVA), assisted by a machine (Assembly and Transport Vehicle, ATV) to position the astronauts at joint locations where they latch truss members in place. The ATV is a mobile platform that is attached to and moves on the station support structure using pegs attached to each truss joint. The operation of the ATV is described and a number of conceptual configurations for potential space stations are developed.

Mikulas, M. M., Jr.↗

Floating-point function generation routines for 16-bit microcomputers

Several computer subroutines have been developed that interpolate three types of nonanalytic functions: univariate, bivariate, and map. The routines use data in floating-point form. However, because they are written for use on a 16-bit Intel 8086 system with an 8087 mathematical coprocessor, they execute as fast as routines using data in scaled integer form. Although all of the routines are written in assembly language, they have been implemented in a modular fashion so as to facilitate their use with high-level languages.

Mackin, M. A.↗

Antarctic Planetary Testbed (APT): A facility in the Antarctic for research, planning and simulation of manned planetary missions and to provide a testbed for technological development

The notion of using Antarctica as a planetary analog is not new. Ever since the manned space program gained serious respect in the 1950's, futurists have envisioned manned exploration and ultimate colonization of the moon and other extraterrestrial bodies. In recent years, much attention has been focused on a permanently manned U.S. space station, a manned Lunar outpost and a manned mission to Mars and its vicinity. When such lofty goals are set, it is only prudent to research, plan and rehearse as many aspects of such a mission as possible. The concept of the Antarctic Planetary Testbed (APT) project is intended to be a facility that will provide a location to train and observe potential mission crews under conditions of isolation and severity, attempting to simulate an extraterrestrial environment. Antarctica has been considered as an analog by NASA for Lunar missions and has also been considered by many experts to be an excellent Mars analog. Antarctica contains areas where the environment and terrain are more similar to regions on the Moon and Mars than any other place on Earth. These features offer opportunities for simulations to determine performance capabilities of people and machines in harsh, isolated environments. The initial APT facility, conceived to be operational by the year 1991, will be constructed during the summer months by a crew of approximately twelve. Between six and eight of these people will remain through the winter. As in space, structures and equipment systems will be modular to facilitate efficient transport to the site, assembly, and evolutionary expansion. State of the art waste recovery/recycling systems are also emphasized due to their importance in space.

Ahmadi, Mashid↗

Earth-to-orbit launch system alternatives

A robust earth-to-orbit (ETO) transportation system, designed to facilitate the continuing human exploration of space, is discussed. The concept stresses larger lift capability and minimized on-orbit operations, of which the assembly and refueling operations are given priority. The modularity of the system is based on the required compatibility with the Space Shuttle vehicle, and it offers resiliency and reduced development costs. The support of lunar and Mars missions is interrelated with the mission logistics, the design of a transfer vehicle, the extent of reusability, and the required on-orbit operations. The transfer systems, the magnitude and frequency of propellant deliveries, and some human transportation requirements are considered with respect to vehicle concepts and flight rate strategies.

Teixeira, Charles↗