Search NASA⌕ Search

SEARCH · Search NASA

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Survey of ISS and Visiting Vehicle Returned Surfaces for Environmental Characterization and Computer Model Development

The Orbital Debris Engineering Model (ORDEM) developed by the NASA Orbital Debris Program Office (ODPO) is a data-driven model — extensive radar, optical, laboratory, and in situ measurement data sets have been used to build the model since its earliest versions. A salient aspect of professional software development is the verification and validation (V&V) process. Verification answers the question “Is the model built correctly?” while validation addresses the question “Did we build the correct model?” Less extensive, reserved, or independent data sets serve the validation requirement. Due to the dynamic nature of the orbital debris environment, it is critical to use contemporaneous data sources that represent the current environment to support ORDEM development and validation. ORDEM has utilized in situ data collected from Space Shuttle and Hubble Space Telescope surface inspections, now over a decade old. This historical dataset is fundamental for providing baseline in situ measurement data for sizes between 10 to 300 microns, but new data sources are being evaluated using returned surfaces from or near the International Space Station (ISS). This paper reviews a general microscopic survey of ISS soft goods, the Pressurized Mating Adapter 2 (PMA-2) blanket, and a limited-scope feasibility study conducted on the Space Exploration Technologies Corporation (SpaceX) Dragon capsule’s Thermal Protection System (TPS) material. The PMA-2 blanket, exposed to the space environment between 09 July 2013 and 25 February 2015, is an approximately 3.7 m2-area blanket composed of a betacloth outer layer and multiple ballistic fabric inner layers. The SpaceX Cargo Dragon capsule regularly visited the ISS from 2012 through 2020 and potentially provides a timely and well-characterized source of data for modeling purposes. The capsule’s lateral surfaces use SpaceX Proprietary Ablative Material (SPAM) TPS material, a syntactic foam, for thermal management during all mission phases. Seven SPAM extracted samples have been analyzed to date. This paper will provide an overview of the characterization completed for impact features by size, depth, impactor diameter, and the impactor residues chemical analyses, allowing a differentiation between micrometeoroids and orbital debris and a categorization by mass density and density class. Impactor diameter is estimated using damage equations generated from ground-based hypervelocity impact testing. The orbital debris impactors are compared to the current ORDEM 3.2 model of the environment at ISS altitudes. We briefly discuss the meteoroid impactors, including constituents and mass densities, in the general context of current models.

Phillip Anz-meador↗

A Survey of ISS and Visiting Vehicle Returned Surfaces for Environmental Characterization and Computer Model Development

The Orbital Debris Engineering Model (ORDEM) developed by the NASA Orbital Debris Program Office (ODPO) is a data-driven model — extensive radar, optical, laboratory, and in situ measurement data sets have been used to build the model since its earliest versions. A salient aspect of professional software development is the verification and validation (V&V) process. Verification answers the question “Is the model built correctly?” while validation addresses the question “Did we build the correct model?” Less extensive, reserved, or independent data sets serve the validation requirement. Due to the dynamic nature of the orbital debris environment, it is critical to use contemporaneous data sources that represent the current environment to support ORDEM development and validation. ORDEM has utilized in situ data collected from Space Shuttle and Hubble Space Telescope surface inspections, now over a decade old. This historical dataset is fundamental for providing baseline in situ measurement data for sizes between 10 to 300 microns, but new data sources are being evaluated using returned surfaces from or near the International Space Station (ISS). This paper reviews a general microscopic survey of ISS soft goods, the Pressurized Mating Adapter 2 (PMA-2) blanket, and a limited-scope feasibility study conducted on the Space Exploration Technologies Corporation (SpaceX) Dragon capsule’s Thermal Protection System (TPS) material. The PMA-2 blanket, exposed to the space environment between 09 July 2013 and 25 February 2015, is an approximately 3.7 m2-area blanket composed of a betacloth outer layer and multiple ballistic fabric inner layers. The SpaceX Cargo Dragon capsule regularly visited the ISS from 2012 through 2020 and potentially provides a timely and well-characterized source of data for modeling purposes. The capsule’s lateral surfaces use SpaceX Proprietary Ablative Material (SPAM) TPS material, a syntactic foam, for thermal management during all mission phases. Seven SPAM extracted samples have been analyzed to date. This paper will provide an overview of the characterization completed for impact features by size, depth, impactor diameter, and the impactor residues chemical analyses, allowing a differentiation between micrometeoroids and orbital debris and a categorization by mass density and density class. Impactor diameter is estimated using damage equations generated from ground-based hypervelocity impact testing. The orbital debris impactors are compared to the current ORDEM 3.2 model of the environment at ISS altitudes. We briefly discuss the meteoroid impactors, including constituents and mass densities, in the general context of current models.

Phillip Anz-Meador↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

Kidd, Luanne↗

My Summer Internship at Kennedy Space Center

During my summer internship at Kennedy Space Center, I worked on several projects with my mentor Grace Johnson in the Education Programs Office. My primary project was the CubeSat project in which my job was to help mentor Merritt Island High School students in the building of a CubeSat. CubeSats are picosatellites that are used to carry out auxiliary missions; they "piggy back" into orbit on launch vehicles launching primary missions. CubeSats come in the sizes of 1U (10 by 10 by 10 cm) 2U (1Ux2) and 3U (1Ux3). The Cube Sats are housed in a protective deploying device called a Poly Picosatellite Orbital Deplored (P-POD). I also participated in a Balloon Workshop with the MIHS students. This was an intense 4-day project in which we constructed a balloon satellite equipped with a camera whose main goal was to obtain video images of the curvature of the earth at high altitudes and relay it back down to our ground station. I also began developing my own science research program for minority serving institutions to be implemented when funding becomes available. In addition to the projects that I completed during my internship, I got the opportunity to go on various tours of the technological facilities here at Kennedy Space Center.

Philpott, Hobert Leon↗

NASA Undergraduate Student Instrument (USIP) Project--Lessons Learned

NASA offers real-world experiences, with the goal of developing students’ skills and capabilities in science, technology, engineering and math, skills critical to building a STEM-literate workforce and achieving the nation's exploration goals. In 2016, the NASA Science Mission Directorate (SMD) and the Office of Education National Space Grant Program (OE Space Grant) awarded $8 million through the Undergraduate Student Instrument Project (USIP) to 47 student teams to conduct hands-on research with 23 of the projects being CubeSat projects. The USIP student teams proposed science or technology experiments that are relevant to NASA missions, and the platform to fly their payload. The platforms include sounding rockets, scientific and hand-held balloons, aircraft, suborbital reusable and commercial launch vehicles, and CubeSats launched as a secondary payload on an orbital vehicle. The mission management for USIP was the responsibility of NASA Goddard Space Flight Centers Wallops Flight Facility (WFF) in Virginia. The university faculty supporting USIP attest to the benefits students are receiving in the hands-on aspects of the projects, as well as the real-world problem resolution. The USIP university teams are receiving an authentic NASA educational experience that will encourage the students to be part of NASA’s or the Nations’ future workforce and leaders.

Winterton, Joyce L.↗

Infrared scanners detect thermal gradients in building walls

Presents study on ability of infrared scanner used to detect thermal gradients in outside walls of two homes in Virginia Beach, Virginia under joint effort of Langley Research Center, Virginia Energy Office and Virginia Beach Energy Conservation Pilot Project. Details how study can be used to help minimize energy loss.

Kantsios, A. G.↗

The Space Shuttle Decision: NASA's Search for a Reusable Space Vehicle

This significant new study of the decision to build the Space Shuttle explains the Shuttle's origins and early development. In addition to internal NASA discussions, this work details the debates in the late 1960s and early 1970s among policymakers in Congress, the Air Force, and the Office of Management and Budget over the roles and technical designs of the Shuttle. Examining the interplay of these organizations with sometimes conflicting goals, the author not only explains how the world's premier space launch vehicle came into being, but also how politics can interact with science, technology, national security, and economics in national government. The weighty policy decision to build the Shuttle represents the first component of the broader story: future NASA volumes will cover the Shuttle's development and operational histories.

Heppenheimer, T. A.↗

Advanced Information Systems Technology for NASA Earth System Digital Twins (ESDT)

ESA and NASA have both started programs to design and develop Digital Twins of the Earth and/or Earth systems. Organized around interconnected, multi-domain, high-scale modeling capabilities, the three major components of an Earth System Digital Twin are a continuously updated Digital Replica of the Earth System of interest, dynamic Forecasting models, and Impact Assessment capabilities. Earth System Digital Twins integrate diverse Earth and human activity models, continuous observations, and information system capabilities to provide unified, comprehensive representations and predictions that can be utilized for monitoring the health of the Planet, as well as for developing actionable information to support decision making. More generally, Digital Twins will help researchers better understand the fundamental Earth systems that impact everything from wildfires to climate change. This Townhall will first provide a short description of ESA’s, NASA’s and CNES’s current efforts in Digital Twins: • Destination Earth (DestinE) is the first initiative of the European Union to create a Digital Twin of the Earth, particularly focused on weather and climate, and as a coordinated effort between the European Centre for Medium-Range Weather Forecasts (ECMWF), ESA and the European Organization for the Exploitation of Meteorological Satellites (EUMETSAT). • Additionally, ESA is developing several Digital Twin Earth Precursor Activities to study some of the key scientific and technical challenges associated with building a “Digital Twin Earth”. These include forests, hydrology, Antarctica, food systems, oceans, and climate hot spots Digital Twin prototypes. • NASA Earth Science Technology Office (ESTO)’s Advanced Information Systems Technology (AIST) Program has started an initiative in Earth System Digital Twins (ESDT), with 14 current projects in this area, developing various information systems technologies and prototypes that will help prepare the development of future NASA Digital Twins. • CNES is currently developing the concept of a Digital Twin Factory (DTF), which relies on a data lake, a high computing capability using clouds and/or HPC and has thematic algorithms and methodologies able to generate registered and coherent layers of information in order to enrich a datacube from which physical indicators can be computed spatially. NASA, ESA and CNES are also currently defining science use cases that will be presented during the townhall; those and a few short discussions of current projects will serve as a starting point to engage a dialogue about Digital Twins of the Earth with the IGARSS community.

earth science remote sensing; Information systems↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Building the Next Generation Technology Transfer Information System

The Defense Technology Transfer Information System (DTTIS) is a scalable data system built to grow and adapt to changing conditions. It collects information from each technology transfer offices, patent attorneys, innovators, and more. It automates workflows to standardize and streamline technology transfer business rules. This resulting in improved efficiency, standardized processes and reducing errors. DTTIS is a search and reporting engine built on patented NASA's Technology Transfer System (NTTS) core software platform.

Tran, Peter B.↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

HDU Deep Space Habitat (DSH) Overview

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project Deep Space Habitat (DSH) analog that will be field-tested during the 2011 Desert Research and Technologies Studies (D-RATS) field tests. The HDU project is a technology pull project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU Pressurized Excursion Module (PEM) that was field tested in the 2010 D-RATS, adding habitation functionality to the prototype unit. The 2010 configuration of the HDU-PEM consisted of a lunar surface laboratory module that was used to bring over 20 habitation-related technologies together in a single platform that could be tested as an advanced habitation analog in the context of mission architectures and surface operations. The 2011 HDU-DSH configuration will build upon the PEM work, and emphasize validity of crew operations (habitation and living, etc), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The HDU project consists of a multi-center team brought together in a skunkworks approach to quickly build and validate hardware in analog environments. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 analog field test will include Multi Mission Space Exploration Vehicles (MMSEV) and the DSH among other demonstration elements to be brought together in a mission architecture context. This paper will describe overall objectives, various habitat configurations, strategic plan, and technology integration as it pertains to the 2011 field tests.

Kennedy, Kriss J.↗

NASA DEVELOP’s Approach to Co-Production and Collaborative STEM Engagement

The NASA DEVELOP Program conducts 50-60 projects each year with the goal of bringing the benefits of NASA Earth science to local decision-making challenges. DEVELOP, part of NASA’s Applied Sciences’ Capacity Building Program, connects end users with students, recent graduates, and early and transitioning career professionals through 10-week rapid feasibility studies. These projects are a collaboration between NASA, DEVELOP office host locations (universities and other federal installations), project partners (federal agencies, state and local governments, non-profit and for-profit organizations, and international organizations), and the project teams who conduct them. The projects take place under the guidance of science advisors from NASA, academia, and partner organizations, and introduces communities to new applications of NASA Earth observations data with the desired outcome of informed decision-making. This presentation will highlight the DEVELOP model of co-production and programmatic collaboration, lessons learned in partnering, and evaluation activities that look at the impact of the program’s efforts.

Capacity Building↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗

Launching a dream: A teachers guide to a simulated space shuttle mission

Two simulated shuttle missions cosponsored by the NASA Lewis Research Center and Cleveland, Ohio, area schools are highlighted in this manual for teachers. A simulated space shuttle mission is an opportunity for students of all ages to plan, train for, and conduct a shuttle mission. Some students are selected to be astronauts, flight planners, and flight controllers. Other students build and test the experiments that the astronauts will conduct. Some set up mission control, while others design the mission patch. Students also serve as security officers or carry out public relations activities. For the simulated shuttle mission, school buses or recreation vehicles are converted to represent shuttle orbiters. All aspects of a shuttle mission are included. During preflight activities the shuttle is prepared, and experiments and a flight plan are made ready for launch day. The flight itself includes lifting off, conducting experiments on orbit, and rendezvousing with the crew from the sister school. After landing back at the home school, the student astronauts are debriefed and hold press conferences. The astronauts celebrate their successful missions with their fellow students at school and with the community at an evening postflight recognition program. To date, approximately 6,000 students have been involved in simulated shuttle missions with the Lewis Research Center. A list of participating schools, along with the names of their space shuttles, is included. Educations outcomes and other positive effects for the students are described.

Source record↗

X-33, Stepping Stone ot Low Cost Access to Space

In response to the Access to Space Study, which was conducted in 1993 through the Office of Space Systems Development, an advanced technology Reusable Launch Vehicle (RLV) was selected for demonstration. The X-33 was advanced as an demonstration project, to build and test a 53-percent scale prototype of an operational RLV, it would also demonstrate new technologies which would be required to assure the operation of the new RLV. This presentation reviews the progress of the X-33 development and supporting sites. The X-33 design has been completed and fabrication and assembly is progressing well. The X-33 launch site has been completed. The first LH2 tank and engine is in testing. This will lead to the full scale development of VentureStar(tm).

Naftel, J. Chris↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

Field Camp for Astronauts: NASA's Geoscience Training Program for Planetary Exploration

Fifty years ago Apollo astronauts walked on the Moon to explore the geology and collect samples for Earth return. Several authors have discussed the strategic planning and training that enabled the Apollo successes, and assembled recommendations regarding today’s lunar science objectives and astronaut training required to achieve those science goals. Since the 1980s, geoscience training for astronauts focused on observing the Earth from orbit. Today, we are building a geoscience training program to support informed Earth observations as well as the exploration culture for future human missions to the Moon and Mars. Our team partnered with JSC’s crew training and astronaut offices to develop our 4-week geoscience program for the 2017 astronaut class. Because the astronauts have a variety of professional backgrounds, we provide a broad introduction to Earth and planetary sciences. But our prime focus is 2 weeks of intensive field work, a methodology introduced with the 2013 astronaut class. We completed the first half of the training – a field trip to observe hurricane deposits along Galveston Bay; keynotes by Apollo colleagues highlighting Apollo experiences; a tightly-integrated week of introductory geology in the classroom followed by a week of fieldwork in the Rio Grande del Norte National Monument. The classroom included interactive map exercises that allowed the students to progressively build a base map of the field area that they used as a starting point for their week-long mapping exercise. We divided the class into small mapping groups to conduct their observations, mapping and interpretation of the geology. In addition to learning geological field work, our field training provided the platform for practicing expeditionary leadership, a key skill set valued by NASA for astronaut crews. Next summer the capstone fieldwork for the 2017 astronauts will include both mapping and rock sampling. Throughout the mapping, the class will collect additional data to help inform field and sampling decisions using diagnostic field instruments that are being tested in analog settings for their operational efficacy for future planetary exploration.

Evans, Cynthia A.↗