Search NASA⌕ Search

SEARCH · Search NASA

Results for “on orbit validation and verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Real-Time Culture-Independent Microbial Profiling Onboard the International Space Station using Nanopore Sequencing

For the past two decades, microbial monitoring of the International Space Station (ISS) has relied on culture-dependent methods that require return to Earth for analysis. This has a number of limitations, with the most significant being bias towards the detection of culturable organisms and the inherent delay between sample collection and ground-based analysis. In recent years, portable and easy-to-use molecular-based tools, such as Oxford Nanopore Technologies’ MinION™ sequencer and miniPCR bio’s miniPCR™ thermal cycler, have been validated onboard the ISS. Here, we report on the development, validation, and implementation of a swab-to-sequencer method that provides a culture-independent solution to real-time microbial profiling onboard the ISS. Method development focused on analysis of swabs collected in a low-biomass environment with limited facility resources and stringent controls on allowed processes and reagents. ISS-optimized procedures included enzymatic DNA extraction from a swab tip, bead-based purifications, altered buffers, and the use of miniPCR and the MinION. Validation was conducted through extensive ground-based assessments comparing current standard culture-dependent and newly developed culture-independent methods. Similar microbial distributions were observed between the two methods; however, as expected, the culture-independent data revealed microbial profiles with greater diversity. Protocol optimization and verification was established during NASA Extreme Environment Mission Operations (NEEMO) analog missions 21 and 22, respectively. Unique microbial profiles obtained from analog testing validated the swab-to-sequencer method in an extreme environment. Finally, four independent swab-to-sequencer experiments were conducted onboard the ISS by two crewmembers. Microorganisms identified from ISS swabs were consistent with historical culture-based data, and primarily consisted of commonly observed human-associated microbes. This simplified method has been streamlined for high ease-of-use for a non-trained crew to complete in an extreme environment, thereby enabling environmental and human health diagnostics in real-time as future missions take us beyond low-Earth orbit.

microbiology↗

Onboard Navigation Error Analysis for Aerocapture at Uranus

Capturing into an orbit around Uranus using aerocapture allows one to design a mission with faster interplanetary trajectories and less propellant requirements. Such an aerocapture mission would rely on the onboard Guidance, Navigation, and Control (GNC) subsystems to successfully capture into an orbit around Uranus. Uncertainty in the state information and the noise in the sensor measurements induce navigation errors in the guidance and control subsystems, which can affect the overall performance of the aerocapture mission at Uranus. Understanding the effect of these navigation errors on mission performance is essential. To this end, this work considers different sensors with varying quality to understand their impact on the overall mission performance. In addition, this paper studies the impact of the uncertainty in the initial states used to initialize the onboard navigation filter and understands their effect on mission performance. This paper also shows the onboard navigation errors obtained from the Linear Covariance (LinCov) analysis and uses them for verification and validation (V&V) of the results from Program to Optimize and Simulate Trajectories-II (POST2).

Pardha Sai Chadalavada↗

Onboard Navigation Error Analysis for Aerocapture at Uranus

Capturing into an orbit around Uranus using aerocapture allows one to design a mission with faster interplanetary trajectories and less propellant requirements. Such an aerocapture mission would rely on the onboard Guidance, Navigation, and Control (GNC) subsystems to successfully capture into an orbit around Uranus. Uncertainty in the state information and the noise in the sensor measurements induce navigation errors in the guidance and control subsystems, which can affect the overall performance of the aerocapture mission at Uranus. Understanding the effect of these navigation errors on mission performance is essential. To this end, this work considers different sensors with varying quality to understand their impact on the overall mission performance. In addition, this paper studies the impact of the uncertainty in the initial states used to initialize the onboard navigation filter and understands their effect on mission performance. This paper also shows the onboard navigation errors obtained from the Linear Covariance (LinCov) analysis and uses them for verification and validation (V\&V) of the results from Program to Optimize and Simulate Trajectories-II (POST2).

Aerocapture↗

HRP's Healthcare Spin-Offs Through Computational Modeling and Simulation Practice Methodologies

Spaceflight missions expose astronauts to novel operational and environmental conditions that pose health risks that are currently not well understood, and perhaps unanticipated. Furthermore, given the limited number of humans that have flown in long duration missions and beyond low Earth-orbit, the amount of research and clinical data necessary to predict and mitigate these health and performance risks are limited. Consequently, NASA's Human Research Program (HRP) conducts research and develops advanced methods and tools to predict, assess, and mitigate potential hazards to the health of astronauts. In this light, NASA has explored the possibility of leveraging computational modeling since the 1970s as a means to elucidate the physiologic risks of spaceflight and develop countermeasures. Since that time, substantial progress has been realized in this arena through a number of HRP funded activates such as the Digital Astronaut Project (DAP) and the Integrated Medical Model (IMM). Much of this success can be attributed to HRP's endeavor to establish rigorous verification, validation, and credibility (VV&C) processes that ensure computational models and simulations (M&S) are sufficiently credible to address issues within their intended scope. This presentation summarizes HRP's activities in credibility of modeling and simulation, in particular through its outreach to the community of modeling and simulation practitioners. METHODS: The HRP requires all M&S that can have moderate to high impact on crew health or mission success must be vetted in accordance to NASA Standard for Models and Simulations, NASA-STD-7009 (7009) [5]. As this standard mostly focuses on engineering systems, the IMM and DAP have invested substantial efforts to adapt the processes established in this standard for their application to biological M&S, which is more prevalent in human health and performance (HHP) and space biomedical research and operations [6,7]. These methods have also generated substantial interest by the broader medical community though institutions like the National Institutes of Health (NIH) and the Food and Drug Administration (FDA) to develop similar standards and guidelines applicable to the larger medical operations and research community. DISCUSSION: Similar to NASA, many leading government agencies, health institutions and medical product developers around the world are recognizing the potential of computational M&S to support clinical research and decision making. In this light, substantial investments are being made in computational medicine and notable discoveries are being realized [8]. However, there is a lack of broadly applicable practice guidance for the development and implementation of M&S in clinical care and research in a manner that instills confidence among medical practitioners and biological researchers [9,10]. In this presentation, we will give an overview on how HRP is working with the NIH's Interagency Modeling and Analysis Group (IMAG), the FDA and the American Society of Mechanical Engineers (ASME) to leverage NASA's biomedical VV&C processes to establish a new regulatory standard for Verification and Validation in Computational Modeling of Medical Devices, and Guidelines for Credible Practice of Computational Modeling and Simulation in Healthcare.

Mulugeta, Lealem↗

System Validation on the Europa Clipper mission in Early Implementation Phase

NASA’s next flag-ship mission - Europa Clipper, will embark on a journey to Jupiter’s icy moon Europa in 2024 to assess its environment and habitability with a highly capable spacecraft. Post Jupiter-Orbit-Insertion, the spacecraft will be commanded to perform intricate, yet meticulously planned Europa flybys to perform science investigations using a suite of instruments, while withstanding Jupiter’s harsh radiation environment. The success of this mission is dependent on a well-coordinated project and its elements such as the flight hardware and software, the ground support and mission operations teams, procedures and other cross-cutting elements. The Europa Clipper project needs to ensure that these elements are realized at a reasonable confidence level prior to launch and other mission critical events. System Validation test and analysis activities exercise and confirm the integrity of the system of all project elements in the expected flight environment with reasonable stressing conditions. These activities go beyond system design requirements verification and are driven by validation objectives that describe the end-to-end functional and operational capabilities required during nominal and off-nominal flight-like scenarios and critical events. The challenges associated with validating that the Europa Clipper project as a whole can function and perform correctly to meet the intended mission objectives with the as-delivered capabilities of all of its elements are daunting. This paper discusses the systematic methodology established in the early implementation phase of the Europa Clipper project for developing System Validation activities and their validation objectives, and addressing any validation-related challenges on the project. Approaches include decomposition of mission objectives using activity timelines in the Mission Design plan for developing nominal scenarios, use of fault trees for exploring off-nominal cases and system boundaries, and use of Model-based Systems Engineering (MBSE) tools for planning and prioritizing these activities.

Wang, Xu↗

Geometry and Joint Systems for Lattice-Based Reconfigurable Space Structures

We describe analytical methods for the design of the discrete elements of ultralight lattice structures. This modular, building block strategy allows for relatively simple element manufacturing, as well as relatively simple robotic assembly of low mass density structures on orbit, with potential for disassembly and reassembly into highly varying and large structures. This method also results in a structure that is easily navigable by relatively small mobile robots. The geometry of the cell can allow for high packing efficiency to minimize wasted payload volume while maximizing structural performance and constructability. We describe the effect of geometry choices on the final system mechanical properties, manufacturability of the components, and automated robotic constructability of a final system. Geometry choices considered include building block complexity, symmetry of the unit cell, and effects of vertex, edge, and face connectivity of the unit cell. Mechanical properties considered include strength scaling, modulus scaling, and structural performance of the joint, including proof load, shear load, mass, and loading area; as well as validation and verification opportunities. Manufacturability metrics include cost and time, manufacturing method (COTS versus custom), and tolerances required. Automated constructability metrics include local effects of loads imparted to the structure by the robot and assembly complexity, encompassing the ability of the robot to clamp and number of placement motions needed for assembly.

Ochalek, Megan E.↗

A space station Structures and Assembly Verification Experiment, SAVE

The Space Station structure has been baselined to be a 5 M (16.4 ft) erectable truss. This structure will provide the overall framework to attach laboratory modules and other systems, subsystems and utilities. The assembly of this structure represents a formidable EVA challenge. To validate this capability the Space Station Structures/Dynamics Technical Integration Panel (TIP) met to develop the necessary data for an integrated STS structures flight experiment. As a result of this meeting, the Langley Research Center initiated a joint Langley/Boeing Aerospace Company study which supported the structures/dynamics TIP in developing the preliminary definition and design of a 5 M erectable space station truss and the resources required for a proposed flight experiment. The purpose of the study was to: (1) devise methods of truss assembly by astronauts; (2) define a specific test matrix for dynamic characterization; (3) identify instrumentation and data system requirements; (4) determine the power, propulsion and control requirements for the truss on-orbit for 3 years; (5) study the packaging of the experiment in the orbiter cargo bay; (6) prepare a preliminary cost estimate and schedule for the experiment; and (7) provide a list of potential follow-on experiments using the structure as a free flyer. The results of this three month study are presented.

Russell, R. A.↗

Experimental Space Shuttle Orbiter Studies to Acquire Data for Code and Flight Heating Model Validation

In an experimental study to obtain detailed heating data over the Space Shuttle Orbiter, CUBRC has completed an extensive matrix of experiments using three distinct models and two unique hypervelocity wind tunnel facilities. This detailed data will be employed to assess heating augmentation due to boundary layer transition on the Orbiter wing leading edge and wind side acreage with comparisons to computational methods and flight data obtained during the Orbiter Entry Boundary Layer Flight Experiment and HYTHIRM during STS-119 reentry. These comparisons will facilitate critical updates to be made to the engineering tools employed to make assessments about natural and tripped boundary layer transition during Orbiter reentry. To achieve the goals of this study data was obtained over a range of Mach numbers from 10 to 18, with flight scaled Reynolds numbers and model attitudes representing key points on the Orbiter reentry trajectory. The first of these studies were performed as an integral part of Return to Flight activities following the accident that occurred during the reentry of the Space Shuttle Columbia (STS-107) in February of 2003. This accident was caused by debris, which originated from the foam covering the external tank bipod fitting ramps, striking and damaging critical wing leading edge heating tiles that reside in the Orbiter bow shock/wing interaction region. During investigation of the accident aeroheating team members discovered that only a limited amount of experimental wing leading edge data existed in this critical peak heating area and a need arose to acquire a detailed dataset of heating in this region. This new dataset was acquired in three phases consisting of a risk mitigation phase employing a 1.8% scale Orbiter model with special temperature sensitive paint covering the wing leading edge, a 0.9% scale Orbiter model with high resolution thin-film instrumentation in the span direction, and the primary 1.8% scale Orbiter model with detailed thin-film resolution in both the span and chord direction in the area of peak heating. Additional objectives of this first study included: obtaining natural or tripped turbulent wing leading edge heating levels, assessing the effectiveness of protuberances and cavities placed at specified locations on the orbiter over a range of Mach numbers and Reynolds numbers to evaluate and compare to existing engineering and computational tools, obtaining cavity floor heating to aid in the verification of cavity heating correlations, acquiring control surface deflection heating data on both the main body flap and elevons, and obtain high speed schlieren videos of the interaction of the orbiter nose bow shock with the wing leading edge. To support these objectives, the stainless steel 1.8% scale orbiter model in addition to the sensors on the wing leading edge was instrumented down the windward centerline, over the wing acreage on the port side, and painted with temperature sensitive paint on the starboard side wing acreage. In all, the stainless steel 1.8% scale Orbiter model was instrumented with over three-hundred highly sensitive thin-film heating sensors, two-hundred of which were located in the wing leading edge shock interaction region. Further experimental studies will also be performed following the successful acquisition of flight data during the Orbiter Entry Boundary Layer Flight Experiment and HYTHIRM on STS-119 at specific data points simulating flight conditions and geometries. Additional instrumentation and a protuberance matching the layout present during the STS-119 boundary layer transition flight experiment were added with testing performed at Mach number and Reynolds number conditions simulating conditions experienced in flight. In addition to the experimental studies, CUBRC also performed a large amount of CFD analysis to confirm and validate not only the tunnel freestream conditions, but also 3D flows over the orbiter acreage, wing leading edge, and controlurfaces to assess data quality, shock interaction locations, and control surface separation regions. This analysis is a standard part of any experimental program at CUBRC, and this information was of key importance for post-test data quality analysis and understanding particular phenomena seen in the data. All work during this effort was sponsored and paid for by the NASA Space Shuttle Program Office at the Johnson Space Center in Houston, Texas.

Wadhams, T. P.↗

SAVANT: Solar Array Verification and Analysis Tool Demonstrated

The photovoltaics (PV) industry is now being held to strict specifications, such as end-oflife power requirements, that force them to overengineer their products to avoid contractual penalties. Such overengineering has been the only reliable way to meet such specifications. Unfortunately, it also results in a more costly process than is probably necessary. In our conversations with the PV industry, the issue of cost has been raised again and again. Consequently, the Photovoltaics and Space Environment Effects branch at the NASA Glenn Research Center at Lewis Field has been developing a software tool to address this problem. SAVANT, Glenn's tool for solar array verification and analysis is in the technology demonstration phase. Ongoing work has proven that more efficient and less costly PV designs should be possible by using SAVANT to predict the on-orbit life-cycle performance. The ultimate goal of the SAVANT project is to provide a user-friendly computer tool to predict PV on-orbit life-cycle performance. This should greatly simplify the tasks of scaling and designing the PV power component of any given flight or mission. By being able to predict how a particular PV article will perform, designers will be able to balance mission power requirements (both beginning-of-life and end-of-life) with survivability concerns such as power degradation due to radiation and/or contamination. Recent comparisons with actual flight data from the Photovoltaic Array Space Power Plus Diagnostics (PASP Plus) mission validate this approach.

Chock, Ricaurte↗

Advanced Health Management Algorithms for Crew Exploration Applications

Achieving the goals of the President's Vision for Exploration will require new and innovative ways to achieve reliability increases of key systems and sub-systems. The most prominent approach used in current systems is to maintain hardware redundancy. This imposes constraints to the system and utilizes weight that could be used for payload for extended lunar, Martian, or other deep space missions. A technique to improve reliability while reducing the system weight and constraints is through the use of an Advanced Health Management System (AHMS). This system contains diagnostic algorithms and decision logic to mitigate or minimize the impact of system anomalies on propulsion system performance throughout the powered flight regime. The purposes of the AHMS are to increase the probability of successfully placing the vehicle into the intended orbit (Earth, Lunar, or Martian escape trajectory), increase the probability of being able to safely execute an abort after it has developed anomalous performance during launch or ascent phases of the mission, and to minimize or mitigate anomalies during the cruise portion of the mission. This is accomplished by improving the knowledge of the state of the propulsion system operation at any given turbomachinery vibration protection logic and an overall system analysis algorithm that utilizes an underlying physical model and a wide array of engine system operational parameters to detect and mitigate predefined engine anomalies. These algorithms are generic enough to be utilized on any propulsion system yet can be easily tailored to each application by changing input data and engine specific parameters. The key to the advancement of such a system is the verification of the algorithms. These algorithms will be validated through the use of a database of nominal and anomalous performance from a large propulsion system where data exists for catastrophic and noncatastrophic propulsion sytem failures.

Davidson, Matt↗

Systems engingeering for the Kepler Mission : a search for terrestrial planets

The Kepler mission will launch in 2007 and determine the distribution of earth-size planets (0.5 to 10 earth masses) in the habitable zones (HZs) of solar-like stars. The mission will monitor > 100,000 dwarf stars simultaneously for at least 4 years. Precision differential photometry will be used to detect the periodic signals of transiting planets. Kepler will also support asteroseismology by measuring the pressure-mode (p-mode) oscillations of selected stars. Key mission elements include a spacecraft bus and 0.95 meter, wide-field, CCD-based photometer injected into an earth-trailing heliocentric orbit by a 3-stage Delta II launch vehicle as well as a distributed Ground Segment and Follow-up Observing Program. The project is currently preparing for Preliminary Design Review (October 2004) and is proceeding with detailed design and procurement of long-lead components. In order to meet the unprecedented photometric precision requirement and to ensure a statistically significant result, the Kepler mission involves technical challenges in the areas of photometric noise and systematic error reduction, stability, and false-positive rejection. Programmatic and logistical challenges include the collaborative design, modeling, integration, test, and operation of a geographically and functionally distributed project. A very rigorous systems engineering program has evolved to address these challenges. This paper provides an overview of the Kepler systems engineering program, including some examples of our processes and techniques in areas such as requirements synthesis, validation & verification, system robustness design, and end-to-end performance modeling.

systems engineering↗

Development and Use of the SPACE Computer Code for Analyzing the Space Station Electrical Power System

This special publication tells the story of the dedicated efforts of very talented individuals to create a preeminent space electrical power system modeling and simulation tool called SPACE, short for System Power Analysis for Capability Evaluation. This computer model has evolved for 30 years, withstanding the test of time and obsolescence, and garnering international recognition for its ability to simulate complex space electrical power systems. The analytical results from this model have saved millions of dollars in hardware redesign, testing, and verification for NASA's International Space Station (ISS) and its European and Russian partners. SPACE has played a pivotal role in the station's design and development and continues to support its ongoing operation. It has also extended its reach beyond the ISS to other key NASA programs, where it guides the design and planned operation of NASA's Multi-Purpose Crew Vehicle Orion and simulates electric power system operation in a dusty atmosphere on Mars' surface. The SPACE lineage was created by a core civil servant staff, supplemented by a cadre of interns and other temporary helpers. They created a tightly integrated tool that includes all phenomena that impact a solar array and battery space power system performance. SPACE is self-contained, requiring no other software modules and associated license fees. SPACE "rings true" in that is has been extensively validated with ISS on-orbit telemetry data. This report is being released as the generation of engineers who created it are nearing retirement, passing the baton to a new generation. This next generation will carry the code into the future, no doubt further evolving it to be able to assure mission planners that newly conceived systems will successfully power NASA's next endeavors. As a previous SPACE code developer and analyst, I have worked alongside many of the people mentioned in this report. The engineers who created the code, along with those just now learning it, are among the best and brightest at NASA. It is an honor to write this foreword as the present Branch Chief under which the legacy of SPACE continues to thrive.

Electrical Power System↗

Formulation and verification of frequency response system identification techniques for large space structures

For the past several years much effort has been given to the development of techniques for designing control systems for large space structures (LSS's). The main objective of these efforts has been to develop a LSS control methodology that produces designs that meet strenuous performance requirements and are robust to model inaccuracies. Unfortunately, performance and robustness are conflicting requirements. Because LSS's can not be fully tested on ground, it has become an accepted fact that the design of LSS control systems to meet performance requirements can not be completed until the LSS is placed on-orbit and tested and an accurate model is extracted from on-orbit test results. Modern MIMO sampled-data frequency response design techniques are viable candidates for designing LSS control systems. First, this paper presents techniques for performing MIMO system identification (ID) from test data. Then, techniques for improving the performance of the system ID process in the presence of noise are presented. Finally, practical utility of the system ID approaches are validated by the presentation of results obtained from application on the LSS Ground Test Facility at Marshall Space Flight Center.

Mitchell, Jerrel R.↗

Europa Clipper Mission: Onward to Implementation!

Europa, the fourth largest moon of Jupiter, is believed to be one of the best places in the solar system to look for extant life beyond Earth, and the Europa Clipper Mission is preparing to investigate. Now entering the fifth year of life as a formal project, the Europa Clipper Mission has completed its major design phase and is preparing for implementation. The mission envisions sending a flight system, consisting of a spacecraft equipped with a payload of NASA-selected scientific instruments, to execute numerous flybys of Europa while in Jupiter orbit. The mission is being formulated and implemented by a joint Jet Propulsion Laboratory (JPL) and Applied Physics Laboratory (APL) Project team. At the Project Preliminary Design Review (PDR) in August 2018, it was determined that the unique integration of the REASON instrument’s antennas with the spacecraft’s solar arrays required additional time for maturity and review. The required maturity was demonstrated, and in June 2019 the Clipper Mission passed its Delta Preliminary Design Review, and formal confirmation for entry into Phase C was announced by NASA in August 2019. The earliest launch opportunity is now in July 2023, one year later than originally planned. The Project is now working toward its Critical Design Review in May 2020. This paper will describe the progress of the Europa Clipper Mission since January 2019, including maturation of the spacecraft, subsystem and instrument designs, the beginning of fabrication of engineering models and the first flight models, planning for the verification & validation phase, and planning for operations.

Jackson, Maddalena↗

Analytical Approach Validation for the Spin-Stabilized Satellite Attitude

An analytical approach for spin-stabilized spacecraft attitude prediction is presented for the influence of the residual magnetic torques and the satellite in an elliptical orbit. Assuming a quadripole model for the Earth s magnetic field, an analytical averaging method is applied to obtain the mean residual torque in every orbital period. The orbit mean anomaly is used to compute the average components of residual torque in the spacecraft body frame reference system. The theory is developed for time variations in the orbital elements, giving rise to many curvature integrals. It is observed that the residual magnetic torque does not have component along the spin axis. The inclusion of this torque on the rotational motion differential equations of a spin stabilized spacecraft yields conditions to derive an analytical solution. The solution shows that the residual torque does not affect the spin velocity magnitude, contributing only for the precession and the drift of the spin axis of the spacecraft. The theory developed has been applied to the Brazilian s spin stabilized satellites, which are quite appropriated for verification and comparison of the theory with the data generated and processed by the Satellite Control Center of Brazil National Research Institute. The results show the period that the analytical solution can be used to the attitude propagation, within the dispersion range of the attitude determination system performance of Satellite Control Center of Brazil National Research Institute.

Zanardi, Maria Cecilia F. P. S.↗

Demonstrating autonomous controls on hardware test beds is a necessity for successful missions to Mars and beyond

NASA and the Department of Defense are planning for a mission to Mars in the 2030s–2040s using nuclear thermal propulsion (NTP). NTP uses a nuclear reactor to heat flowing hydrogen and create thrust. A serious concern for crewed and uncrewed missions to Mars is the loss of reactor control. The reactor startup and initial rocket impulse are initiated in cislunar or near-earth orbital regions; therefore, radio communications between ground control and the NTP engine should occur in real time. However, radio communications can take more than 20 min, depending on planet positions, to reach Mars orbiters from ground control. To address this delay, local autonomous controls are implemented onboard the NTP engine to ensure acceptable operation. However, autonomous controls have not been demonstrated or implemented in research or power reactor contexts because of safety and reliability concerns. To enable autonomous controls development, demonstration, and validation, Oak Ridge National Laboratory has created a nonnuclear hardware-in-the-loop test bed. Sensors throughout the test bed relay system status and hardware response to the user control algorithm, including measurements of temperature, flow, pressure of a loop, control drum position, and drum speed. This paper discusses the development of this facility and user accessibility.

33 ADVANCED PROPULSION SYSTEMS↗

J-2X Abort System Development

The J-2X is an expendable liquid hydrogen (LH2)/liquid oxygen (LOX) gas generator cycle rocket engine that is currently being designed as the primary upper stage propulsion element for the new NASA Ares vehicle family. The J-2X engine will contain abort logic that functions as an integral component of the Ares vehicle abort system. This system is responsible for detecting and responding to conditions indicative of impending Loss of Mission (LOM), Loss of Vehicle (LOV), and/or catastrophic Loss of Crew (LOC) failure events. As an earth orbit ascent phase engine, the J-2X is a high power density propulsion element with non-negligible risk of fast propagation rate failures that can quickly lead to LOM, LOV, and/or LOC events. Aggressive reliability requirements for manned Ares missions and the risk of fast propagating J-2X failures dictate the need for on-engine abort condition monitoring and autonomous response capability as well as traditional abort agents such as the vehicle computer, flight crew, and ground control not located on the engine. This paper describes the baseline J-2X abort subsystem concept of operations, as well as the development process for this subsystem. A strategy that leverages heritage system experience and responds to an evolving engine design as well as J-2X specific test data to support abort system development is described. The utilization of performance and failure simulation models to support abort system sensor selection, failure detectability and discrimination studies, decision threshold definition, and abort system performance verification and validation is outlined. The basis for abort false positive and false negative performance constraints is described. Development challenges associated with information shortfalls in the design cycle, abort condition coverage and response assessment, engine-vehicle interface definition, and abort system performance verification and validation are also discussed.

Santi, Louis M.↗

HVI Ballistic Performance Characterization of Non-Parallel Walls

The Double-Wall, "Whipple" Shield [1] has been the subject of many hypervelocity impact studies and has proven to be an effective shield system for Micro-Meteoroid and Orbital Debris (MMOD) impacts for spacecraft. The US modules of the International Space Station (ISS), with their "bumper shields" offset from their pressure holding rear walls provide good examples of effective on-orbit use of the double wall shield. The concentric cylinder shield configuration with its large radius of curvature relative to separation distance is easily and effectively represented for testing and analysis as a system of two parallel plates. The parallel plate double wall configuration has been heavily tested and characterized for shield performance for normal and oblique impacts for the ISS and other programs. The double wall shield and principally similar Stuffed Whipple Shield are very common shield types for MMOD protection. However, in some locations with many spacecraft designs, the rear wall cannot be modeled as being parallel or concentric with the outer bumper wall. As represented in Figure 1, there is an included angle between the two walls. And, with a cylindrical outer wall, the effective included angle constantly changes. This complicates assessment of critical spacecraft components located within outer spacecraft walls when using software tools such as NASA's BumperII. In addition, the validity of the risk assessment comes into question when using the standard double wall shield equations, especially since verification testing of every set of double wall included angles is impossible.

Bohl, William↗