Search NASA⌕ Search

SEARCH · Search NASA

Results for “operations spacecraft control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Navigation Challenges of the Mars Phoenix Lander Mission

The Mars Phoenix Lander mission was launched on August 4th, 2007. To land safely at the desired landing location on the Mars surface, the spacecraft trajectory had to be controlled to a set of stringent atmospheric entry and landing conditions. The landing location needed to be controlled to an elliptical area with dimensions of 100km by 20km. The two corresponding critical components of the atmospheric entry conditions are the entry flight path angle (target: -13.0 deg +/-0.21 deg) and the entry time (within +/-30 seconds). The purpose of this paper is to describe the navigation strategies used to overcome the challenges posed during spacecraft operations, which included an attitude control thruster calibration campaign, a trajectory control strategy, and a trajectory reconstruction strategy. Overcoming the navigation challenges resulted in final Mars atmospheric entry conditions just 0.007 deg off in entry flight path angle and 14.9 sec early in entry time. These entry dispersions in addition to the entry, descent, and landing trajectory dispersion through the atmosphere, lead to a final landing location just 7 km away from the desired landing target.

Portock, Brian M.↗

Loop Heat Pipe Operation Using Heat Source Temperature for Set Point Control

Loop heat pipes (LHPs) have been used for thermal control of several NASA and commercial orbiting spacecraft. The LHP operating temperature is governed by the saturation temperature of its compensation chamber (CC). Most LHPs use the CC temperature for feedback control of its operating temperature. There exists a thermal resistance between the heat source to be cooled by the LHP and the LHP's CC. Even if the CC set point temperature is controlled precisely, the heat source temperature will still vary with its heat output. For most applications, controlling the heat source temperature is of most interest. A logical question to ask is: "Can the heat source temperature be used for feedback control of the LHP operation?" A test program has been implemented to answer the above question. Objective is to investigate the LHP performance using the CC temperature and the heat source temperature for feedback control

Ku, Jentung↗

In-flight utilization of the Mariner 10 spacecraft computer

Mariner 10 in its mission to Venus and Mercury used an onboard control computer with a 512-word memory. An outline is presented of the general philosophy adopted with respect to the utilization of the available memory and a description is given of the actual in-flight operation of the machine. The onboard computer system provided automatic stored-program sequence control of all spacecraft scientific, engineering, and propulsive maneuver operations. The system consisted of the special purpose digital computer and a fixed hard-wired sequencer. Attention is given to the programming architecture, aspects of mission design, and computer performance.

Hooke, A. J.↗

Crew-station design and operation.

Control, instrument and accommodation arrangements in spacecraft crew stations to insure safety and enable optimum performance

SPACE CABIN↗

NASA Deep Space Network Operations Scheduling

The functioning of the Deep Space Network Operations Scheduling, Jet Propulsion Laboratory, CA is reviewed. The primary objectives of the Operations Scheduling are: to schedule the worldwide global allocation of ground communications, tracking facilities, and equipment; and to provide deep space telecommunications for command, tracking, telemetry, and control in support of flight mission operations and tests. Elements of the earth set are Deep Space Stations (DSS) which provide the telecommunications link between the earth and spacecraft; NASA Communications Network; Network Data Processing Area; Network Operations Control Area which provides operational direction to the DSS; Mission Control and Computing systems; and Mission Support areas which provide flight control of the spacecraft. Elements of the space set include mission priorities and requirements which determine the spacecraft queue for allocating network resources. Scheduling is discussed in terms of long-range (3 years), mid-range (8 weeks), and short-range (2 weeks).

Enari, D. M.↗

Stable adaptive neurocontrollers for spacecraft and space robots

This paper reviews recently developed techniques of adaptive nonlinear control using neural networks, and demonstrates their application to two important practical problems in orbital operations. An adaptive neurocontroller is first developed for spacecraft attitude control applications, and then the same design, slightly modified, is shown to be effective in the control of free-floating orbital manipulators. The algorithms discussed have guaranteed stability and convergence properties, and thus constitute viable alternatives to existing control methodologies. Simulation results are presented demonstrating the performance of each algorithm with representative dynamic models.

Sanner, Robert M.↗

ESSOPE: Towards S/C operations with reactive schedule planning

The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

Wheadon, J.↗

Guidance, Navigation, and Control Performance for the GOES-R Spacecraft

The Geostationary Operational Environmental Satellite-R Series (GOES-R) is the first of the next generation geostationary weather satellites. The series represents a dramatic increase in Earth observation capabilities, with 4 times the resolution, 5 times the observation rate, and 3 times the number of spectral bands. GOES-R also provides unprecedented availability, with less than 120 minutes per year of lost observation time. This paper presents the Guidance Navigation & Control (GN&C) requirements necessary to realize the ambitious pointing, knowledge, and Image Navigation and Registration (INR) objectives of GOES-R. Because the suite of instruments is sensitive to disturbances over a broad spectral range, a high fidelity simulation of the vehicle has been created with modal content over 500 Hz to assess the pointing stability requirements. Simulation results are presented showing acceleration, shock response spectra (SRS), and line of sight (LOS) responses for various disturbances from 0 Hz to 512 Hz. Simulation results demonstrate excellent performance relative to the pointing and pointing stability requirements, with LOS jitter for the isolated instrument platform of approximately 1 micro-rad. Attitude and attitude rate knowledge are provided directly to the instrument with an accuracy defined by the Integrated Rate Error (IRE) requirements. The data are used internally for motion compensation. The final piece of the INR performance is orbit knowledge, which GOES-R achieves with GPS navigation. Performance results are shown demonstrating compliance with the 50 to 75 m orbit position accuracy requirements. As presented in this paper, the GN&C performance supports the challenging mission objectives of GOES-R.

Control↗

Mechanisms test bed math model modification and simulation support

This report summarizes the work performed under contract NAS8-38771 in support of the Marshall Space Flight Center Six Degree of Freedom Motion Facility and Flight Robotics Laboratory. The contract activities included the development of the two flexible body and Remote Manipulator System simulations, Dynamic Overhead Target Simulator control system and operating software, Global Positioning System simulation, and Manipulator Coupled Spacecraft Controls Testbed. Technical support was also provided for the Lightning Imaging Sensor and Solar X-Ray Imaging programs. The cover sheets and introductory sections for the documentation written under this contract are provided as an appendix.

Gilchrist, Andrea C.↗

Guidance, Navigation, and Control Performance for the GOES-R Spacecraft

The Geostationary Operational Environmental Satellite-R Series (GOES-R) is the first of the next generation geostationary weather satellites, scheduled for delivery in late 2015 and launch in early 2016. Relative to the current generation of GOES satellites, GOES-R represents a dramatic increase in Earth and solar weather observation capabilities, with 4 times the resolution, 5 times the observation rate, and 3 times the number of spectral bands for Earth observations. GOES-R will also provide unprecedented availability, with less than 120 minutes per year of lost observation time. The Guidance Navigation & Control (GN&C) design requirements to achieve these expanded capabilities are extremely demanding. This paper first presents the pointing control, pointing stability, attitude knowledge, and orbit knowledge requirements necessary to realize the ambitious Image Navigation and Registration (INR) objectives of GOES-R. Because the GOES-R suite of instruments is sensitive to disturbances over a broad spectral range, a high fidelity simulation of the vehicle has been created with modal content over 500 Hz to assess the pointing stability requirements. Simulation results are presented showing acceleration, shock response spectrum (SRS), and line of sight responses for various disturbances from 0 Hz to 512 Hz. These disturbances include gimbal motion, reaction wheel disturbances, thruster firings for station keeping and momentum management, and internal instrument disturbances. Simulation results demonstrate excellent performance relative to the pointing and pointing stability requirements, with line of sight jitter of the isolated instrument platform of approximately 1 micro-rad. Low frequency motion of the isolated instrument platform is internally compensated within the primary instrument. Attitude knowledge and rate are provided directly to the instrument with an accuracy defined by the Integrated Rate Error (IRE) requirements. The allowable IRE ranges from 1 to 18.5 micro-rad, depending upon the time window of interest. The final piece of the INR performance is orbit knowledge. Extremely accurate orbital position is achieved by GPS navigation at Geosynchronous Earth Orbit (GEO). Performance results are shown demonstrating compliance with the 50 to 75 m orbit position accuracy requirements of GOES-R, including during station-keeping and momentum management maneuvers. As shown in this paper, the GN&C performance for the GOES-R series of spacecraft supports the challenging mission objectives of the next generation GEO Earth-observation satellites.

Guidance↗

Statistical modeling of software reliability

This working paper discusses the statistical simulation part of a controlled software development experiment being conducted under the direction of the System Validation Methods Branch, Information Systems Division, NASA Langley Research Center. The experiment uses guidance and control software (GCS) aboard a fictitious planetary landing spacecraft: real-time control software operating on a transient mission. Software execution is simulated to study the statistical aspects of reliability and other failure characteristics of the software during development, testing, and random usage. Quantification of software reliability is a major goal. Various reliability concepts are discussed. Experiments are described for performing simulations and collecting appropriate simulated software performance and failure data. This data is then used to make statistical inferences about the quality of the software development and verification processes as well as inferences about the reliability of software versions and reliability growth under random testing and debugging.

Miller, Douglas R.↗

Customizing the JPL Multimission Ground Data System: Lessons learned

The Multimission Ground Data System (MGDS) at NASA's Jet Propulsion Laboratory has brought improvements and new technologies to mission operations. It was designed as a generic data system to meet the needs of multiple missions and avoid re-inventing capabilities for each new mission and thus reduce costs. It is based on adaptable tools that can be customized to support different missions and operations scenarios. The MGDS is based on a distributed client/server architecture, with powerful Unix workstations, incorporating standards and open system architectures. The distributed architecture allows remote operations and user science data exchange, while also providing capabilities for centralized ground system monitor and control. The MGDS has proved its capabilities in supporting multiple large-class missions simultaneously, including the Voyager, Galileo, Magellan, Ulysses, and Mars Observer missions. The Operations Engineering Lab (OEL) at JPL has been leading Customer Adaptation Training (CAT) teams for adapting and customizing MGDS for the various operations and engineering teams. These CAT teams have typically consisted of only a few engineers who are familiar with operations and with the MGDS software and architecture. Our experience has provided a unique opportunity to work directly with the spacecraft and instrument operations teams and understand their requirements and how the MGDS can be adapted and customized to minimize their operations costs. As part of this work, we have developed workstation configurations, automation tools, and integrated user interfaces at minimal cost that have significantly improved productivity. We have also proved that these customized data systems are most successful if they are focused on the people and the tasks they perform and if they are based upon user confidence in the development team resulting from daily interactions. This paper will describe lessons learned in adapting JPL's MGDS to fly the Voyager, Galileo, and Mars Observer missions. We will explain how powerful, existing ground data systems can be adapted and packaged in a cost effective way for operations of small and large planetary missions. We will also describe how the MGDS was adapted to support operations within the Galileo Spacecraft Testbed. The Galileo testbed provided a unique opportunity to adapt MGDS to support command and control operations for a small autonomous operations team of a handful of engineers flying the Galileo Spacecraft flight system model.

Murphy, Susan C.↗

An Open Specification for Space Project Mission Operations Control Architectures

An 'open specification' for Space Project Mission Operations Control Architectures is under development in the Spacecraft Control Working Group of the American Institute for Aeronautics and Astro- nautics. This architecture identifies 5 basic elements incorporated in the design of similar operations systems: Data, System Management, Control Interface, Decision Support Engine, & Space Messaging Service.

spacecraft ground systems↗

FERMI/GLAST Integrated Trending and Plotting System Release 5.0

An Integrated Trending and Plotting System (ITPS) is a trending, analysis, and plotting system used by space missions to determine performance and status of spacecraft and its instruments. ITPS supports several NASA mission operational control centers providing engineers, ground controllers, and scientists with access to the entire spacecraft telemetry data archive for the life of the mission, and includes a secure Web component for remote access. FERMI/GLAST ITPS Release 5.0 features include the option to display dates (yyyy/ddd) instead of orbit numbers along orbital Long-Term Trend (LTT) plot axis, the ability to save statistics from daily production plots as image files, and removal of redundant edit/create Input Definition File (IDF) screens. Other features are a fix to address invalid packet lengths, a change in naming convention of image files in order to use in script, the ability to save all ITPS plot images (from Windows or the Web) as GIF or PNG format, the ability to specify ymin and ymax on plots where previously only the desired range could be specified, Web interface capability to plot IDFs that contain out-oforder page and plot numbers, and a fix to change all default file names to show yyyydddhhmmss time stamps instead of hhmmssdddyyyy. A Web interface capability sorts files based on modification date (with newest one at top), and the statistics block can be displayed via a Web interface. Via the Web, users can graphically view the volume of telemetry data from each day contained in the ITPS archive in the Web digest. The ITPS could be also used in nonspace fields that need to plot data or trend data, including financial and banking systems, aviation and transportation systems, healthcare and educational systems, sales and marketing, and housing and construction.

Ritter, Sheila↗

Economics of Automation in Space: Implications of Automated Versus Manned Operations on the High Cost of On-Orbit Assembly, Control and Servicing of Spacecraft

The continued high cost and risk of placing astronauts in space has placed considerable burden on NASA to cut costs and consider other means of achieving mission goals both effectively and safely. Additionally, future science missions which might place a tremendous burden on Shuttle availability, or require extended vehicle duty cycles on the Lunar surface and Mars surface, might preclude the presence of astronauts altogether.

Mars surface↗