Search NASA⌕ Search

SEARCH · Search NASA

Results for “package delivery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Design of a Second Generation Electrostatic Precipitator for Martian Atmospheric Dust Mitigation of ISRU Intakes

A second generation electrostatic precipitator for use in the Martian environment has been developed by the Electrostatics and Surface Physics Laboratory (ESPL) at NASA Kennedy Space Center (KSC). This new system was designed to be modular and has three interchangeable test sections, each with a variety of replaceable high voltage electrodes, enabling optimization of the dust collection efficiency of the precipitator. It has the ability to maintain an increased atmospheric flow rate and provide more accurate dust delivery into the test section than was available in the previous prototypes. A majority of the controls for the system are provided by a software package developed to maintain a constant flow rate, low pressure, and electrode current to enable long duration performance characterization. This allows for testing of the technology in a relevant environment similar to those expected to be found in an atmospheric In-Situ Resource Utilization (ISRU) plant on Mars.

Precipitator↗

Support for Advanced Fuel Fabrication MC&A Approaches

This report summarizes the key activities of the Material Protection, Accounting, and Control Technologies (MPACT) program’s safeguards training work package for FY25. The work focused on two main areas: domestic safeguards training and the development of new technologies for nuclear material accounting and control (NMAC). A key development during this FY was the delivery of NMAC statistics for US Nuclear Regulatory Commission requirements refresher course. The course objective was to assist industry in meeting the MC&A program requirements for fuel cycle facilities; this training focused on front-end bulk fuel cycle processes. At the same time, a report was prepared on the research output of an effort that focused on the benefits of commercial fuel debundling for NMAC and waste management. The MPACT team evaluated various technologies and proposed a fuel debundling detector that integrates gamma spectroscopy and neutron detection as the most practical solution. The scope of activities under this work package for FY26 focuses on developing a fundamental nuclear material control plan, also known as MC&A plan, for tristructural isotropic (TRISO) fuel fabrication facilities. This plan will address the various NMAC requirements for facilities that handle Category II.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Interplanetary Overlay Network Bundle Protocol Implementation

The Interplanetary Overlay Network (ION) system's BP package, an implementation of the Delay-Tolerant Networking (DTN) Bundle Protocol (BP) and supporting services, has been specifically designed to be suitable for use on deep-space robotic vehicles. Although the ION BP implementation is unique in its use of zero-copy objects for high performance, and in its use of resource-sensitive rate control, it is fully interoperable with other implementations of the BP specification (Internet RFC 5050). The ION BP implementation is built using the same software infrastructure that underlies the implementation of the CCSDS (Consultative Committee for Space Data Systems) File Delivery Protocol (CFDP) built into the flight software of Deep Impact. It is designed to minimize resource consumption, while maximizing operational robustness. For example, no dynamic allocation of system memory is required. Like all the other ION packages, ION's BP implementation is designed to port readily between Linux and Solaris (for easy development and for ground system operations) and VxWorks (for flight systems operations). The exact same source code is exercised in both environments. Initially included in the ION BP implementations are the following: libraries of functions used in constructing bundle forwarders and convergence-layer (CL) input and output adapters; a simple prototype bundle forwarder and associated CL adapters designed to run over an IPbased local area network; administrative tools for managing a simple DTN infrastructure built from these components; a background daemon process that silently destroys bundles whose time-to-live intervals have expired; a library of functions exposed to applications, enabling them to issue and receive data encapsulated in DTN bundles; and some simple applications that can be used for system checkout and benchmarking.

Burleigh, Scott C.↗

Buoyant station mission comcepts for titan exploration

An advanced mission to this unique satellite of Saturn appropriate to the turn-of-the-century time period is described. The mission concept evolves about one or more buoyant stations (balloons and/or airship) operating at varying altitudes in Titan's atmosphere. An orbiter of Titan provides communications link support and accomplishes remote sensing science objectives. Use of buoyant stations are favored over a fixed site lander for two reasons: (1) adaptable to several possible surface physical states and topographies; and (2) capable of exploring both the atmosphere and surface with regional and possibly global mobility. Auxiliary payload concepts investigated include tethered packages and sounding rockets deployed from the buoyant station, and haze probes and surface penetrators deployed from the orbiter. The paper describes science objectives and payloads, propulsion system/mass delivery trades, balloon design requirements and deployment/motion characteristics, and communications link geometry and data characteristics.

Friedlander, A. L.↗

Evaluation of propellent tank insulation concepts for low-thrust chemical propulsion systems: Executive summary

Cryogenic propellant tank insulations or liquid oxygen/liquid hydrogen low-thrust 2224N (500 lbf) propulsion systems (LTPS) were assessed. The insulation studied consisted of combinations of N2-purged foam and multilayer insulation (MLI) as well as He-purged MLI-only. Heat leak and payload performance predictions were made for three shuttle-launched LTPS designed for shuttle bay packaged payload densities of 56 kg cu/m (3.5 lbm/cu ft), 40 kg/cu m (2.5 lbm/cu ft) and 24 kg/cu m (1.5 lbm/cu ft). Foam/MLI insulations were found to increase LTPS payload delivery capability when compared with He-purged MLI-only. An additional benefit of foam/MLI was reduced operational complexity because orbiter cargo bay N2 purge gas could be used for MLI purging. Maximum payload mass benefit occurred when an enhanced convection, rather than natural convection, heat transfer was specified for the insulation purge enclosure. The enhanced convection environment allowed minimum insulation thickness to be used for the foam/MLI interface temperature selected to correspond to the moisture dew point in the N2 purge gas. Experimental verification of foam/MLI benefits was recommended. A conservative program cost estimate for testing a MLI-foam insulated tank was 2.1 million dollars. This cost could be reduced significantly without increasing program risk.

Kramer, T.↗

Mississippi Company Using NASA Software Program to Provide Unique Imaging Service: DATASTAR Success Story

DATASTAR, Inc., of Picayune, Miss., has taken NASA's award-winning Earth Resources Laboratory Applications (ELAS) software program and evolved it to the point that the company is now providing a unique, spatial imagery service over the Internet. ELAS was developed in the early 80's to process satellite and airborne sensor imagery data of the Earth's surface into readable and useable information. While there are several software packages on the market that allow the manipulation of spatial data into useable products, this is usually a laborious task. The new program, called the DATASTAR Image Processing Exploitation, or DIPX, Delivery Service, is a subscription service available over the Internet that takes the work out of the equation and provides normalized geo-spatial data in the form of decision products.

Source record↗

Design, development, fabrication and delivery of register and multiplexer units

Several approaches for implementing the register and multiplexer unit into two CMOS monolithic chip types were evaluated. The CMOS standard cell array technique was selected and implemented. Using this design automation technology, two LSI CMOS arrays were designed, fabricated, packaged, and tested for proper static, functional, and dynamic operation. One of the chip types, multiplexer register type 1, is fabricated on a 0.143 x 0.123 inch chip. It uses nine standard cell types for a total of 54 standard cells. This involves more than 350 transistors and has the functional equivalent of 111 gates. The second chip, multiplexer register type 2, is housed on a 0.12 x 0.12 inch die. It uses 13 standard cell types, for a total of 42 standard cells. It contains more than 300 transistors, the functional equivalent of 112 gates. All of the hermetically sealed units were initially screened for proper functional operation. The static leakage and the dynamic leakage were measured. Dynamic measurements were made and recorded. At 10 V, 14 megabit shifting rates were measured on multiplexer register type 1. At 5 V these units shifted data at a 6.6 MHz rate. The units were designed to operate over the 3 to 15 V operating range and over a temperature range of -55 to 125 C.

Feller, A.↗

Design, development, fabrication and delivery of register and multiplexer units

Two complementary MOS monolithic chip types were developed, which contain a register and multiplexer unit to be used in the central processing unit of a digital computer. The partition of the logic into a chip size consistent with the characteristics of the packages is discussed. The logic was implemented by specially configured circuitry designed to layout, as well as to optimize, performance by taking advantage of the properties of CMOS logic. Of several approaches considered for generating LSI CMOS arrays, the CMOS standard cell array design technique was selected. These design automation techniques were used to generate the chip layout, art work and working master plates, followed by the fabrication and testing of the two chip types. Sixty functional LSI arrays were delivered.

Feller, A.↗

Computational design of non-porous pH-responsive antibody nanoparticles

Abstract Programming protein nanomaterials to respond to changes in environmental conditions is a current challenge for protein design and is important for targeted delivery of biologics. Here we describe the design of octahedral non-porous nanoparticles with a targeting antibody on the two-fold symmetry axis, a designed trimer programmed to disassemble below a tunable pH transition point on the three-fold axis, and a designed tetramer on the four-fold symmetry axis. Designed non-covalent interfaces guide cooperative nanoparticle assembly from independently purified components, and a cryo-EM density map closely matches the computational design model. The designed nanoparticles can package protein and nucleic acid payloads, are endocytosed following antibody-mediated targeting of cell surface receptors, and undergo tunable pH-dependent disassembly at pH values ranging between 5.9 and 6.7. The ability to incorporate almost any antibody into a non-porous pH-dependent nanoparticle opens up new routes to antibody-directed targeted delivery.

Biochemistry & Molecular Biology↗

Analyses of Technology for Solid State Coherent Lidar

Over past few years, considerable advances have been made in the areas of the diode-pumped, eye-safe, solid state lasers and room temperature, wide bandwidth, semiconductor detectors operating in the near-infrared region. These advances have created new possibilities for the development of reliable and compact coherent lidar systems for a wide range of applications. This research effort is aimed at further developing solid state coherent lidar technology for remote sensing of atmospheric processes such as wind, turbulence and aerosol concentration. The work performed by the UAH personnel under this Delivery Order concentrated on design and analyses of laboratory experiments and measurements, and development of advanced lidar optical subsystems in support of solid state laser radar remote sensing systems which are to be designed, deployed, and used to measure atmospheric processes and constituents. Under this delivery order, a lidar breadboard system was designed and analyzed by considering the major aircraft and space operational requirements. The lidar optical system was analyzed in detail using SYNOPSIS and Code V optical design packages. The lidar optical system include a wedge scanner and the compact telescope designed by the UAH personnel. The other major optical components included in the design and analyses were: polarizing beam splitter, routing mirrors, wave plates, signal beam derotator, and lag angle compensator. This lidar system is to be used for demonstrating all the critical technologies for the development of a reliable and low-cost space-based instrument capable of measuring global wind fields. A number of laboratory experiments and measurements were performed at the NASA/MSFC Detector Characterization Facility, previously developed by the UAH personnel. These laboratory measurements include the characterization of a 2-micron InGaAs detectors suitable for use in coherent lidars and characterization of Holographic Optical Element Scanners. UAH personnel actively participated in the development of performance and operational requirements for the development of the high pulse energy transmitter laser and frequency-agile local oscillator laser, that are in-progress at NASA Langley Research Center and Jet Propulsion Laboratory.

Amzajerdian, Farzin↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 4: PEP functional specification

The functional, performance, design, and test requirements for the Orbiter power extension package and its associated ground support equipment are defined. Both government and nongovernment standards and specifications are cited for the following subsystems: electrical power, structural/mechanical, avionics, and thermal control. Quality control assurance provisions and preparation for delivery are also discussed.

Source record↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report

This Corrective Measures Implementation (CMI) Progress Report, Revision 1, for Contractor's Road Heavy Equipment (CRHE) Area Solid Waste Management Unit (SWMU) Number 055 was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B, Delivery Order NNK09CA62D and Project Number PCN ENV-2324. This CMI Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site.

Dorman, Lane↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Echo's Legacy

The Echo 1 Satellite is simply a very large balloon, the diameter of a 10 story building. Metallized Products, Inc. developed a special material for NASA used for the balloons's skin. For "bouncing signals," material had to be reflective, lightweight, and thin enough to be folded into a beach ball size canister for delivery into orbit, where it would automatically inflate. Material selected was mylar polyester, with a reflective layer of tiny aluminum particles so fine that Echo's skin had a thickness half that of cellophane on a cigarette package.

Source record↗

Delivery of Colloid Micro-Newton Thrusters for the Space Technology 7 Mission

Two flight-qualified clusters of four Colloid Micro-Newton Thruster (CMNT) systems have been delivered to the Jet Propulsion Laboratory (JPL). The clusters will provide precise spacecraft control for the drag-free technology demonstration mission, Space Technology 7 (ST7). The ST7 mission is sponsored by the NASA New Millennium Program and will demonstrate precision formation flying technologies for future missions such as the Laser Interferometer Space Antenna (LISA) mission. The ST7 disturbance reduction system (DRS) will be on the ESA LISA Pathfinder spacecraft using the European gravitational reference sensor (GRS) as part of the ESA LISA Technology Package (LTP). Developed by Busek Co. Inc., with support from JPL in design and testing, the CMNT has been developed over the last six years into a flight-ready and flight-qualified microthruster system, the first of its kind. Recent flight-unit qualification tests have included vibration and thermal vacuum environmental testing, as well as performance verification and acceptance tests. All tests have been completed successfully prior to delivery to JPL. Delivery of the first flight unit occurred in February of 2008 with the second unit following in May of 2008. Since arrival at JPL, the units have successfully passed through mass distribution, magnetic, and EMI/EMC measurements and tests as part of the integration and test (I&T) activities including the integrated avionics unit (IAU). Flight software sequences have been tested and validated with the full flight DRS instrument successfully to the extent possible in ground testing, including full functional and 72 hour autonomous operations tests. Delivery of the cluster assemblies along with the IAU to ESA for integration into the LISA Pathfinder spacecraft is planned for the summer of 2008 with a planned launch and flight demonstration in late 2010.

Precision Formation Flying↗

Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site, together with quantitative information on material mineralogy, chemistry, and physical properties (rock textures; soil grain size and shape distributions; degree and nature of soil induration; soil magnetic properties). The calibration targets provide radiometric and mineralogical control surfaces. The magnets allow observations of magnetic phases. Patch plates are imaged to determine adhesive and abrasive properties of soils. Coordinated mission planning is crucial for optimizing the measurement synergy among the packages included on the lander. This planning has already begun through generation of multi-sol detailed operations activities. One focus has been to develop a scenario to use the arm to dig a soil trench to a depth of tens of centimeters. The activity will be monitored through use of Pancam and RAC to ensure nominal operations and to acquire data to determine subsurface physical properties (e.g., angle of repose of trench walls). Pancam and Mini-TES observations would also provide constraints on mineralogy and texture for the walls and bottom of the trench during excavation. If desired, soils excavated at depth could be deposited on the surface and Mossbauer and APXS measurements could be acquired for these materials. Soil samples from various depths would be delivered to MECA for characterization of aqueous geochemistry and physical properties of soil grains, particularly size, shape, and hardness. These physical properties would be determined by optical and atomic force microscopy. When completed, detailed information of soil properties as a function of depth would be obtained. These various data sets would constrain our understanding of whether or not there are systematic variations in soil characteristics as a function of depth. These variations might be related, for example, to evaporative moisture losses and formation of salt deposits, thereby indicating water transport processes occurred fairly recently. Many other value-added measurement scenarios are being developed. For example, characterizing the nature and dynamics of dust deposition will be done using MIP/DART to provide deposition rates, Pancam and RAC imaging of lander and rover surfaces to extrapolate these measurements to other areas, and a variety of measurements to determine if the bulk loose soil has the same characteristics as dust that accumulates during the mission. Bedrock geology of the site is primarily an APEX-focus setting, mineralogy, and texture, and APXS data to be we interest will be to determine the extent to which rock hydrothermal processes, given that APEX is the precursor 4 and 2005 rover missions. Additional information is contained in the original.

Arvidson, R.↗

The 'sample experiment' on the Mars Rover/Sample Return mission

Sample Experiment denotes the set of all operations that include collection, analysis, packaging, and environmental control of atmospheric and geologic samples of Mars. Various functions may be distributed among surface roving vehicles, stationary landers, and spacecraft but the Sample Experiment remains an integrated mission activity that extends from Mars landing through delivery of the sample payload to the recieving facility on Earth. Technological challenges not faced in previous planetary missions include development of robotic systems to manipulate and characterize samples and to reliably seal them in containers with minimal contamination or degradation.

Gooding, James L.↗

Shuttle and ISS Food Systems Management

Russia and the U.S. provide the current International Space Station (ISS) food system. Each country contributes half of the food supply in their respective flight food packaging. All of the packaged flight food is stowed in Russian provided containers, which interface with the Service Module galley. Each country accepts the other's flight worthiness inspections and qualifications. Some of the food for the first ISS crew was launched to ISS inside the Service Module in July of 2000, and STS-106 in September 2000 delivered more food to the ISS. All subsequent food deliveries will be made by Progress, the Russian re-supply vehicle. The U.S. will ship their portion of food to Moscow for loading onto the Progress. Delivery schedules vary, but the goal is to maintain at least a 45-day supply onboard ISS at all times. The shelf life for ISS food must be at least one year, in order to accommodate the long delivery cycle and onboard storage. Preservation techniques utilized in the US food system include dehydration, thermo stabilization, intermediate moisture, and irradiation. Additional fresh fruits and vegetables will be sent with each Progress and Shuttle flights as permitted by volume allotments. There is limited refrigeration available on the Service Module to store fresh fruits and vegetables. Astronauts and cosmonauts eat half U.S. and half Russian food. Menu planning begins 1 year before a planned launch. The flight crews taste food in the U.S. and in Russia and rate the acceptability. A preliminary menu is planned, based on these ratings and the nutritional requirements. The preliminary menu is then evaluated by the crews while training in Russia. Inputs from this evaluation are used to finalize the menu and flight packaging is initiated. Flight food is delivered 6 weeks before launch. The current challenge for the food system is meeting the nutritional requirements, especially no more than 10 mg iron, and 3500 mg sodium. Experience from Shuttle[Mir also indicated insufficient caloric intake for many crewmembers. Additional thermostabilized and irradiated foods have been developed for ISS to improve the ease of preparation and overall acceptability. Dehydrated foods offer limited advantage, since water must be delivered to ISS. An effort is underway to introduce other International Partner's food into the ISS food system. At first this will be one or two selected foods with the potential for more as the program matures. An increase in the variety of available foods would improve the overall acceptability. Additional galley capability will be required when the crew size increases on ISS. Anticipated improvements include freezers, refrigerators and microwave ovens. All of the ISS food development efforts are devoted to improving the food acceptability and subsequent consumption and mission success

Kloeris, Vickie↗