At least 145 records · Page 8

Space Station Data Systems development

The content and status of the evolving Space Station Data System (SSDS) development program are presented. High level system requirements and schedules are reviewed, and the challenges of SSDS development are discussed. Present content of the program consists of three major activities: (1) two contracted parallel Space Station Data System architecture studies; (2) the space station phase B definition studies to be awarded in early 1985; and (3) a test bed project for the evaluation and proof-of-concept of data systems technology for space station applications and for the advanced development of long-lead hardware and software for the initial and growth space station configurations. An overview of the present SSDS concept is provided, and the roles of NASA centers in this activity are summarized.

Bigham, J. P., Jr.↗

Operations automation

This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

Boreham, Charles Thomas↗

NPSS on NASA's IPG: Using CORBA and Globus to Coordinate Multidisciplinary Aeroscience Applications

Within NASA's High Performance Computing and Communication (HPCC) program, the NASA Glenn Research Center is developing an environment for the analysis/design of aircraft engines called the Numerical Propulsion System Simulation (NPSS). The vision for NPSS is to create a "numerical test cell" enabling full engine simulations overnight on cost-effective computing platforms. To this end, NPSS integrates multiple disciplines such as aerodynamics, structures, and heat transfer and supports "numerical zooming" between O-dimensional to 1-, 2-, and 3-dimensional component engine codes. In order to facilitate the timely and cost-effective capture of complex physical processes, NPSS uses object-oriented technologies such as C++ objects to encapsulate individual engine components and CORBA ORBs for object communication and deployment across heterogeneous computing platforms. Recently, the HPCC program has initiated a concept called the Information Power Grid (IPG), a virtual computing environment that integrates computers and other resources at different sites. IPG implements a range of Grid services such as resource discovery, scheduling, security, instrumentation, and data access, many of which are provided by the Globus toolkit. IPG facilities have the potential to benefit NPSS considerably. For example, NPSS should in principle be able to use Grid services to discover dynamically and then co-schedule the resources required for a particular engine simulation, rather than relying on manual placement of ORBs as at present. Grid services can also be used to initiate simulation components on parallel computers (MPPs) and to address inter-site security issues that currently hinder the coupling of components across multiple sites. These considerations led NASA Glenn and Globus project personnel to formulate a collaborative project designed to evaluate whether and how benefits such as those just listed can be achieved in practice. This project involves firstly development of the basic techniques required to achieve co-existence of commodity object technologies and Grid technologies; and secondly the evaluation of these techniques in the context of NPSS-oriented challenge problems. The work on basic techniques seeks to understand how "commodity" technologies (CORBA, DCOM, Excel, etc.) can be used in concert with specialized "Grid" technologies (for security, MPP scheduling, etc.). In principle, this coordinated use should be straightforward because of the Globus and IPG philosophy of providing low-level Grid mechanisms that can be used to implement a wide variety of application-level programming models. (Globus technologies have previously been used to implement Grid-enabled message-passing libraries, collaborative environments, and parameter study tools, among others.) Results obtained to date are encouraging: we have successfully demonstrated a CORBA to Globus resource manager gateway that allows the use of CORBA RPCs to control submission and execution of programs on workstations and MPPs; a gateway from the CORBA Trader service to the Grid information service; and a preliminary integration of CORBA and Grid security mechanisms. The two challenge problems that we consider are the following: 1) Desktop-controlled parameter study. Here, an Excel spreadsheet is used to define and control a CFD parameter study, via a CORBA interface to a high throughput broker that runs individual cases on different IPG resources. 2) Aviation safety. Here, about 100 near real time jobs running NPSS need to be submitted, run and data returned in near real time. Evaluation will address such issues as time to port, execution time, potential scalability of simulation, and reliability of resources. The full paper will present the following information: 1. A detailed analysis of the requirements that NPSS applications place on IPG. 2. A description of the techniques used to meet these requirements via the coordinated use of CORBA and Globus. 3. A description of results obtained to date in the first two challenge problems.

Lopez, Isaac↗

NiH2 Reliability Impact Upon Hubble Space Telescope Battery Replacement

The NASA Hubble Space Telescope (HST) was designed to be deployed and later serviced for maintenance and upgrades, as required, by the space shuttle fleet, with a Goodyear mission life for the batteries. HST was deployed 380 miles above the Earth, from Space Shuttle Discovery, on April 25, 1990. Four servicing missions, (SM1, SM2, SM3A, AND SM3B) have been performed. Astronauts have replaced or modified optics, solar arrays, a power control unit, and various science packages. A fifth Servicing Mission, SM4 scheduled for early 2004, is planned to replace the batteries for the first time. The HST is powered by solar array wings and nickel hydrogen (NiH2) Duracell batteries, which are grouped into two parallel battery modules of three parallel batteries each. With a design life of 7 years at launch, these batteries have surpassed 12 years in orbit, which gives HST the highest number of charge/discharge cycles of any NiH2 battery currently in low earth orbit (LEO) application. Being in a LEO orbit, HST has a 45-minute umbra period, during which spacecraft power requirements normally force the batteries into discharge, and a 60-minute sun period, which is available for battery recharge. The intent of this paper is to address the issue of NiH2 battery reliability and how battery capacity degradation can impact scheduling of a Servicing Mission to bring replacement batteries to HST, and extend mission life till deployment of Next Generation Space Telescope (NGST), planned for 2008 at the earliest.

Rao, Gopalakrishna M.↗

Comparisons of some large scientific computers

In 1975, the National Aeronautics and Space Administration (NASA) began studies to assess the technical and economic feasibility of developing a computer having sustained computational speed of one billion floating point operations per second and a working memory of at least 240 million words. Such a powerful computer would allow computational aerodynamics to play a major role in aeronautical design and advanced fluid dynamics research. Based on favorable results from these studies, NASA proceeded with developmental plans. The computer was named the Numerical Aerodynamic Simulator (NAS). To help insure that the estimated cost, schedule, and technical scope were realistic, a brief study was made of past large scientific computers. Large discrepancies between inception and operation in scope, cost, or schedule were studied so that they could be minimized with NASA's proposed new compter. The main computers studied were the ILLIAC IV, STAR 100, Parallel Element Processor Ensemble (PEPE), and Shuttle Mission Simulator (SMS) computer. Comparison data on memory and speed were also obtained on the IBM 650, 704, 7090, 360-50, 360-67, 360-91, and 370-195; the CDC 6400, 6600, 7600, CYBER 203, and CYBER 205; CRAY 1; and the Advanced Scientific Computer (ASC). A few lessons learned conclude the report.

Credeur, K. R.↗

Performance bounds on parallel self-initiating discrete-event

The use is considered of massively parallel architectures to execute discrete-event simulations of what is termed self-initiating models. A logical process in a self-initiating model schedules its own state re-evaluation times, independently of any other logical process, and sends its new state to other logical processes following the re-evaluation. The interest is in the effects of that communication on synchronization. The performance is considered of various synchronization protocols by deriving upper and lower bounds on optimal performance, upper bounds on Time Warp's performance, and lower bounds on the performance of a new conservative protocol. The analysis of Time Warp includes the overhead costs of state-saving and rollback. The analysis points out sufficient conditions for the conservative protocol to outperform Time Warp. The analysis also quantifies the sensitivity of performance to message fan-out, lookahead ability, and the probability distributions underlying the simulation.

Nicol, David M.↗

Aerodynamic Shape Optimization Using A Combined Distributed/Shared Memory Paradigm

Current parallel computational approaches involve distributed and shared memory paradigms. In the distributed memory paradigm, each processor has its own independent memory. Message passing typically uses a function library such as MPI or PVM. In the shared memory paradigm, such as that used on the SGI Origin 2000 machine, compiler directives are used to instruct the compiler to schedule multiple threads to perform calculations. In this paradigm, it must be assured that processors (threads) do not simultaneously access regions of memory in such away that errors would occur. This paper utilizes the latest version of the SGI MPI function library to combine the two parallelization paradigms to perform aerodynamic shape optimization of a generic wing/body.

Cheung, Samson↗

A Cognitive-System Model for En Route Air Traffic Management

NASA Ames Research Center has been engaged in the development of advanced air traffic management technologies whose basic form is cognitive aiding systems for air traffic controller and flight deck operations. In the design and evaluation of such systems the dynamic interaction between the airborne aiding system and the ground-based aiding systems forms a critical coupling for control. The human operator is an integral control element in the system and the optimal integration of human decision and performance parameters with those of the automation aiding systems offers a significant challenge to cognitive engineering. This paper presents a study in full mission simulation and the development of a predictive computational model of human performance. We have found that this combination of methodologies provide a powerful design-aiding process. We have extended the computational model Man Machine Integrated Design and Analysis System (N13DAS) to include representation of multiple cognitive agents (both human operators and intelligent aiding systems), operating aircraft airline operations centers and air traffic control centers in the evolving airspace. The demands of this application require the representation of many intelligent agents sharing world-models, and coordinating action/intention with cooperative scheduling of goals and actions in a potentially unpredictable world of operations. The operator's activity structures have been developed to include prioritization and interruption of multiple parallel activities among multiple operators, to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. We have exercised this model in a multi-air traffic sector scenario with potential conflict among aircraft at and across sector boundaries. We have modeled the control situation as a multiple closed loop system. The inner and outer loop alerting structure of air traffic management has many implications that need to be investigated to assure adequate design. First, there are control and stability factors implicit in the design. As the inner loop response time approaches that of the outer loop, system stability may be compromised in that controllers may be solving a problem the nature of which has already been changed by pilot action. Second, information exchange and information presentation for both air and ground must be designed to complement as opposed to compete with each other. Third, the level of individual and shared awareness in trajectory modification and flight conformance needs to be defined. Fourth, the level of required awareness and performance impact of mixed fleet operations and failed-mode recovery must be explored.

Corker, Kevin M.↗

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

Retargeting of existing FORTRAN program and development of parallel compilers

The software models used in implementing the parallelizing compiler for the B-HIVE multiprocessor system are described. The various models and strategies used in the compiler development are: flexible granularity model, which allows a compromise between two extreme granularity models; communication model, which is capable of precisely describing the interprocessor communication timings and patterns; loop type detection strategy, which identifies different types of loops; critical path with coloring scheme, which is a versatile scheduling strategy for any multicomputer with some associated communication costs; and loop allocation strategy, which realizes optimum overlapped operations between computation and communication of the system. Using these models, several sample routines of the AIR3D package are examined and tested. It may be noted that automatically generated codes are highly parallelized to provide the maximized degree of parallelism, obtaining the speedup up to a 28 to 32-processor system. A comparison of parallel codes for both the existing and proposed communication model, is performed and the corresponding expected speedup factors are obtained. The experimentation shows that the B-HIVE compiler produces more efficient codes than existing techniques. Work is progressing well in completing the final phase of the compiler. Numerous enhancements are needed to improve the capabilities of the parallelizing compiler.

Agrawal, Dharma P.↗

A parallel data management system for large-scale NASA datasets

The past decade has experienced a phenomenal growth in the amount of data and resultant information generated by NASA's operations and research projects. A key application is the reprocessing problem which has been identified to require data management capabilities beyond those available today (PRAT93). The Intelligent Information Fusion (IIF) system (ROEL91) is an ongoing NASA project which has similar requirements. Deriving our understanding of NASA's future data management needs based on the above, this paper describes an approach to using parallel computer systems (processor and I/O architectures) to develop an efficient parallel database management system to address the needs. Specifically, we propose to investigate issues in low-level record organizations and management, complex query processing, and query compilation and scheduling.

Srivastava, Jaideep↗

Reconfigurable Hardware for Compressing Hyperspectral Image Data

High-speed, low-power, reconfigurable electronic hardware has been developed to implement ICER-3D, an algorithm for compressing hyperspectral-image data. The algorithm and parts thereof have been the topics of several NASA Tech Briefs articles, including Context Modeler for Wavelet Compression of Hyperspectral Images (NPO-43239) and ICER-3D Hyperspectral Image Compression Software (NPO-43238), which appear elsewhere in this issue of NASA Tech Briefs. As described in more detail in those articles, the algorithm includes three main subalgorithms: one for computing wavelet transforms, one for context modeling, and one for entropy encoding. For the purpose of designing the hardware, these subalgorithms are treated as modules to be implemented efficiently in field-programmable gate arrays (FPGAs). The design takes advantage of industry- standard, commercially available FPGAs. The implementation targets the Xilinx Virtex II pro architecture, which has embedded PowerPC processor cores with flexible on-chip bus architecture. It incorporates an efficient parallel and pipelined architecture to compress the three-dimensional image data. The design provides for internal buffering to minimize intensive input/output operations while making efficient use of offchip memory. The design is scalable in that the subalgorithms are implemented as independent hardware modules that can be combined in parallel to increase throughput. The on-chip processor manages the overall operation of the compression system, including execution of the top-level control functions as well as scheduling, initiating, and monitoring processes. The design prototype has been demonstrated to be capable of compressing hyperspectral data at a rate of 4.5 megasamples per second at a conservative clock frequency of 50 MHz, with a potential for substantially greater throughput at a higher clock frequency. The power consumption of the prototype is less than 6.5 W. The reconfigurability (by means of reprogramming) of the FPGAs makes it possible to effectively alter the design to some extent to satisfy different requirements without adding hardware. The implementation could be easily propagated to future FPGA generations and/or to custom application-specific integrated circuits.

Aranki, Nazeeh↗

Multiprogramming and the performance of parallel programs

A programming methodology is introduced that utilizes computational synchronization and avoids tight control flow synchronization in parallel programs. In this methodology, each phase of the computation is assigned a status that can be ready, blocked, or completed, and tasks in each computational phase are self-scheduled to ensure computational progress by the available executing processes. Results indicate that this methodology avoids the catastrophic performance losses resulting from the swapping of processes in multiprogrammed multiprocessors.

Benten, Muhammad S.↗

Space applications of artificial intelligence; Proceedings of the Annual Goddard Conference, Greenbelt, MD, May 16, 17, 1989

Theoretical and implementation aspects of AI systems for space applications are discussed in reviews and reports. Sections are devoted to planning and scheduling, fault isolation and diagnosis, data management, modeling and simulation, and development tools and methods. Particular attention is given to a situated reasoning architecture for space repair and replace tasks, parallel plan execution with self-processing networks, the electrical diagnostics expert system for Spacelab life-sciences experiments, diagnostic tolerance for missing sensor data, the integration of perception and reasoning in fast neural modules, a connectionist model for dynamic control, and applications of fuzzy sets to the development of rule-based expert systems.

Rash, James L.↗

Construction of a parallel processor for simulating manipulators and other mechanical systems

This report summarizes the results of NASA Contract NAS5-30905, awarded under phase 2 of the SBIR Program, for a demonstration of the feasibility of a new high-speed parallel simulation processor, called the Real-Time Accelerator (RTA). The principal goals were met, and EAI is now proceeding with phase 3: development of a commercial product. This product is scheduled for commercial introduction in the second quarter of 1992.

Hannauer, George↗

Modeling of flow systems for implementation under KATE

The modeling of flow systems is a task currently being investigated at Kennedy Space Center in parallel with the development of the KATE artificial intelligence system used for monitoring diagnosis and control. Various aspects of the modeling issues are focussed on with particular emphasis on a water system scheduled for demonstration within the KATE environment in September of this year. LISP procedures were written to solve the continuity equations for three internal pressure nodes using Newton's method for simultaneous nonlinear equations.

Whitlow, Jonathan E.↗

Developer Tools for Evaluating Multi-Objective Algorithms

Multi-objective algorithms for scheduling offer many advantages over the more conventional single objective approach. By keeping user objectives separate instead of combined, more information is available to the end user to make trade-offs between competing objectives. Unlike single objective algorithms, which produce a single solution, multi-objective algorithms produce a set of solutions, called a Pareto surface, where no solution is strictly dominated by another solution for all objectives. From the end-user perspective a Pareto-surface provides a tool for reasoning about trade-offs between competing objectives. From the perspective of a software developer multi-objective algorithms provide an additional challenge. How can you tell if one multi-objective algorithm is better than another? This paper presents formal and visual tools for evaluating multi-objective algorithms and shows how the developer process of selecting an algorithm parallels the end-user process of selecting a solution for execution out of the Pareto-Surface.

multi-objective optimization↗

The Lawrence Berkeley Laboratory geothermal program in northern Nevada

The Lawrence Berkeley Laboratory's geothermal program began with consideration of regions where fluids in the temperature range of 150 to 230 C may be economically accessible. Three valleys, located in an area of high regional heat flow in north central Nevada, were selected for geological, geophysical, and geochemical field studies. The objective of these ongoing field activities is to select a site for a 10-MW demonstration plant. Field activities (which started in September 1973) are described. A parallel effort has been directed toward the conceptual design of a 10-MW isobutane binary plant which is planned for construction at the selected site. Design details of the plant are described. Project schedule with milestones is shown together with a cost summary of the project.

Mirk, K. F.↗