Search NASA⌕ Search

SEARCH · Search NASA

Results for “permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

AOI [1] Advanced Manufacturing of Ceramic Anchors with Embedded Sensors for Process and Health Monitoring of Coal Boilers

Researchers at West Virginia University (WVU) developed methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processing conditions within pulverized coal (PC) and fluidized-bed combustion (FBC) boiler systems. The technology included the development of advanced manufacturing processes for 2D/3D printing electroceramic (conductive ceramic) sensor designs within the ceramic anchor microstructure during the manufacturing process. This advanced manufacturing process would allow for the precise control of local microstructure and composition in order to engineer layer-by-layer any protective and electrically active materials within the refractory anchor. This 3D printing technology would permit the rapid and controlled design of the refractory microstructure and embedded sensor design throughout the volume of the ceramic anchor. The work also included a method to interconnect the sensors to boiler shell through the anchor clamp, where the sensor signals will be processed by low-power electronics and transmitted wirelessly to a central processing hub. The end-goal of the program was to produce a ceramic anchor sensor system which would be ready for implementation within a coal boiler, and/or other similar refractory liner systems (such as that in the glass and metal manufacturing areas). The project objectives were to: 1) Define the chemical and microstructural stability, in addition to the electrical properties, of oxide and non-oxide ceramic composites to be embedded within the ceramic anchor compositions that may operate up to 1400ºC; 2) Develop and implement the 2D/3D printing technology to pattern and control the microstructure of the ceramic anchor and embedded sensor circuits; 3) Develop an interconnect technology which will permit easy installation of the ceramic anchors and signal collection at the boiler shell; 4) Develop low power analog electronics and wireless communication hardware to efficiently collect the sensor signal at each processing unit and transmit data to a central hub for data analysis; 5) Demonstrate the smart ceramic anchor system for temperature and liner fracture within a high-temperature processing unit, such as a boiler furnace or glass melting furnace floor/wall liner.

20 FOSSIL-FUELED POWER PLANTS↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reinforced AEM Separators Based on Triblock Copolymers for Electrode-decoupled RFBs

Washington University in St. Louis (WUSTL), in collaboration with The University of Texas at San Antonio (UTSA) and Giner Inc. developed highly selective anion exchange membranes (AEMs) and a novel electrode-decoupled redox flow battery (RFB) for grid scale energy storage as part of the ARPA-E IONICS program (with connections to the DAYS program in the later part of the project). RFBs exhibit the crucial characteristic of system-level decoupled scaling of energy and power which makes them cost effective for the multi-GWh scales envisioned for grid-scale energy storage solutions. This has led to extensive (and deserved) research interest and attention. This project aimed to enhance the design space available for redox-flow batteries (RFBs) by enabling the long-term separation of disparate cationic (elemental) actives using a highly selective membrane separator, while concurrently permitting the transport of anions to balance charge. The approach proposed was to design and develop a highly selective anion-exchange membrane (AEM), which would in turn permit the design and development of electrode-decoupled RFBs. Pairs of (different element) cationic species with redox reactions exhibiting a large difference in their standard electrode potentials were identified to develop high voltage, high power RFBs while disrupting the existing paradigm of using a single element which can ionize to more than two soluble oxidation states (e.g.: Vanadium).

25 ENERGY STORAGE↗

NEPATEC v2.0: Standardized Metadata and Text Corpus of National Environmental Policy Act Documents

The National Environmental Policy Act of 1969, as amended (NEPA), is a major environmental law in the United States, requiring Federal agencies to consider and document potential environmental impacts before deciding on a proposed action. Modernization of NEPA and permitting processes faces significant challenges due to the lack of standardized formats and interoperable systems for organizing and sharing NEPA-related information across agencies. Much of the information gathered during NEPA reviews is written into documents such as categorical exclusions, environmental assessments, and environmental impact statements, then filed in predominately independent agency file stores that may or may not be publicly accessible. The application of metadata and data standards, such as those recommended by the Council on Environmental Quality (CEQ), to NEPA documents offers a shared vocabulary and structure for key entities like projects, processes, and documents that can streamline information exchange and enhance collaboration across systems. In this work, we publicly release NEPATEC2.0, an expanded corpus of NEPA documents with associated metadata. NEPATEC2.0 encompasses approximately 120,000 documents from 60,000 projects prepared by more than 60 different agencies. Modeled to align with CEQ metadata standards, NEPATEC2.0 promotes consistency in environmental reviews and supports the ongoing effort to modernize permitting technologies by facilitating more transparent, efficient, and data-driven decision-making. Importantly, NEPATEC2.0 demonstrates the possibilities and limitations of large language model-based prompting to extract information from NEPA documents at scale.

54 ENVIRONMENTAL SCIENCES↗

Y-12 National Security Complex Biological Monitoring and Abatement Program—2024 Calendar Year Report

This report provides the results of the CY 2024 sampling of East Fork Poplar Creek (EFPC) as part of the Y-12 National Security Complex (Y-12) Biological Monitoring and Abatement Program (BMAP). The results are presented in the context of historical trends. The Y-12 BMAP was developed in 1985 to demonstrate that the effluent limits established for Y-12 protected the classified uses of the receiving stream, particularly the growth and propagation of aquatic life (Loar et al. 1989). Over the years, the BMAP has become an important and valuable long-term measure of stream conditions resulting from actions and activities at the Y-12 Complex. The BMAP currently consists of three tasks: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. The benthic macroinvertebrate community monitoring task includes studies to evaluate the receiving stream’s biological integrity annually in comparison with Tennessee Water Quality Criteria following Tennessee Department of Environment and Conservation (TDEC) protocols. In addition to presenting the EFPC biological monitoring results, this report includes results from Comprehensive Environmental Response, Compensation, and Liability Act–funded BMAP programs in Bear Creek and McCoy Branch (presented in Appendixes A and B, respectively), as required in the Y-12 National Pollutant Discharge Elimination System (NPDES) permit. Additional biological testing at the Y-12 Complex includes toxicity testing of select storm drains as required in the NPDES permit. Although toxicity testing is not formally part of the BMAP, toxicity testing results from 2024 are provided in Appendix C.

54 ENVIRONMENTAL SCIENCES↗

Summary of Analytical Services for the Hanford Site Radionuclide NESHAP Program

This document is a summary of the point source analytical requirements used to demonstrate compliance for the Department of Energy (DOE) Hanford Site operations with 40 Code of Federal Regulations (CFR) Part 61, “National Emission Standards for Hazardous Air Pollutants,” (NESHAP) Subpart H, “National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities,” and the Washington Administrative Code (WAC) 246-247, “Radiation Protection – Air Emissions.” This reference collects information from multiple source documents and is not intended to create, supersede, replace or over-ride any existing contractual, DOE, federal or state statutes, regulations, compliance agreements, orders, permits, licenses or other requirements. The requirement source document governs where any difference may exist. The Hanford Mission Integration Solutions (HMIS) Environmental organization has been contracted by DOE to manage and report data collected from the sampling and monitoring of radioactive air emissions point sources, colloquially called stacks. The Environmental organization coordinates the analyses and reporting of samples collected at various facilities across the Hanford Site. These facilities operate approximately 52 stacks that require sampling, monitoring or estimating radioactive air emissions. The stacks are operated by Bechtel National, Inc. (BNI), Central Plateau Cleanup Company (CPCCo), Hanford Tank Waste Operations & Closure (H2C), Hanford Laboratory Management and Integration (HLMI), and Pacific Northwest National Laboratory (PNNL). Stack samples from CPCCo, HLMI and H2C facilities are collected by the operating contractor staff, delivered to HMIS, and then shipped to an offsite contracted laboratory for analyses. The field and laboratory sample data uploaded into the Sample Management and Analytical Results Tracking (SMART) database are used to calculate sample volumes and concentrations. Sample concentrations are evaluated for compliance with federal and state regulations, permits, and license requirements. The SMART database also calculates total curies released for sampled point sources and stacks. Point source effluent concentrations and releases are published annually in publicly available reports. The BNI and PNNL operate several DOE-Hanford Field Office (HFO) stacks subject to the requirements of 40 CFR 61, Subpart H and WAC 246-247. The concentrations, curies released and dose modeling evaluation for these stacks are included in the DOE-HFO annual radionuclide NESHAP report. The sample collection, analyses and emissions estimates for these stacks are outside the scope of HMIS contracted responsibilities and not addressed further in this document.

54 ENVIRONMENTAL SCIENCES↗

One Earth Energy Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, 2D seismic data was acquired at both sites. This report summarizes the findings from the 2D and 3D seismic interpretation at the One Earth Energy site near Gibson City, Illinois. The seismic data confirms the stratigraphic continuity of the Mt. Simon Arkose Zone storage interval and the Eau Claire confining unit across the project area. The seismic data also indicates that there are faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir within the modeled CO 2 plume (for more detailed information, see Faults and Fractures section of One Earth Energy Class VI Permit applications). However, the seismic data also shows that there are no faults within the modeled CO 2 plume that transect the confining unit Eau Claire Formation. The faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir all tip out in the Lower Mt. Simon Formation and do not reach the overlying Eau Claire confining unit. A small 3D survey acquired around the One Earth Energy #1 characterization well confirms these findings.

20 FOSSIL-FUELED POWER PLANTS↗

Principles and Options for Designing Battery Energy Storage Zoning Ordinances

Deployment of battery energy storage (BESS) systems, both standalone and as part of hybrid systems paired with generation, has rapidly increased in the United States in recent years as utilities and communities have deployed storage to improve electric grid reliability and act as a cost-effective alternative to larger grid infrastructure. The modular nature of BESS technologies means systems may be built near other existing land uses, creating the potential for conflicts with neighboring landowners that can be managed and mitigated through zoning and permitting requirements established by local jurisdictions. While many cities and counties have adopted ordinances specific to BESS into their local zoning codes, these ordinances vary significantly in their requirements and level of detail. Meanwhile, many other jurisdictions, including those home to proposed or existing BESS projects, lack any specific language related to BESS in their zoning codes. Local planning and zoning officials have limited capacity and may lack the familiarity with BESS technologies needed to develop ordinances or otherwise make reasonable zoning decisions that balance safety, community impacts, and other goals. The resulting uncertainty at the local zoning level has led developers to withdraw projects in some areas and has spurred moratoria or bans on energy storage projects in others. This report intends to provide practical resources for practitioners interested in reasonable and effective local regulation of battery energy storage. It does not present a model zoning ordinance, but rather is intended to complement model ordinances developed by others by providing additional context and analysis regarding the structure of energy storage zoning ordinances and the decision points for local officials. Zoning ordinances at the city, town, and county level across the U.S. were surveyed alongside two template model ordinances to identify common elements and options for regulating the zoning and siting of BESS. Common elements identified and analyzed include definitions and general requirements, including cutoffs or tiers used to apply regulations to different system sizes and the permitted zones where jurisdictions allow BESS to be sited; visual, noise, and aesthetic requirements, including property line setbacks, fencing and visual screening, noise, and lighting requirements; and safety and planning requirements, such as site plans, decommissioning plans or funds, and requirements for access by emergency services. The report also summarizes some of the more unique regulations, including those that place additional restrictions on BESS at the local level.

25 ENERGY STORAGE↗

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS↗

HydroFish: freshwater fish co-occurrence with hydropower plants and non-powered dams in conterminous United States sub-basins

The HydroFish dataset lists all existing hydropower plants (EHAs) and non-powered dams (NPDs; ≥ 0.001 MW potential nominal capacity), delineates the hydrologic sub-basins in which they are situated, and then lists all freshwater fish species reported to occur in those sub-basins. This dataset was compiled using the HydroBio dataset (https://hydrosource.ornl.gov/data/datasets/hydrobio/) and contains 24 total variables that describe hydrologic sub-basins, each unique EHA (plant ID and name, geographic coordinates, permit type, capacity, etc.) and NPD (ID value, known names, geographic coordinates, and estimated potential nominal capacity), and freshwater fish species in the sub-basin (common and scientific name, origin, and migratory and threat status). The HydroBio dataset was built using Oak Ridge National Laboratory’s Existing Hydropower Assets Dataset (2024 version) and Non-powered Dam Technical Potential Dataset (2024 version), and NatureServe’s fish species distribution dataset (2023 version). The dataset also contains summary variables that report the unique number of EHAs, NPDs, and freshwater fish species per sub-basin. The HydroFish dataset contains two unique data files: 1) a .csv metadata file describing the dataset variables, and 2) a .csv data file containing the actual dataset. Note that there may be many rows per unique existing hydropower plant or non-powered dam given that distinct species are listed per existing plant or NPD per sub-basin. The dataset is downloadable as a zip file containing the metadata and dataset files.

Bozeman, Bryan [Oak Ridge National Laboratory (ORN↗

AMICE2 measurements of lab-generated and ambient aerosols at BNL from 2025-07-21 to 2025-08-22

From July 21 through August 22, 2025 the Absorption Measurement Inter-Comparison Experiment phase 2 (AMICE2) was conducted at Brookhaven National Laboratory. The experiment included concurrent operation of several filter-based instruments and in situ instruments sampling from a common sample line. The common sample line provided all instruments with either lab-generated aerosols composed of external mixtures of nigrosin, cabojet, and ammonium sulfate, or with ambient aerosol drawn through an external stack. This data set contains measurements from the CAPS PMssa instrument taken as a reference instrument at 532 nm and against which the effectiveness of the filter corrections may be assessed. It also contains attenuation coefficients from all filter-based instruments and filter transmittances in order to permit correction for filter loading, and the SSA and COA to permit corrections for aerosol darkness. Finally, two sets of multiplicative corrections are provided for the AE-33, TAP, and MA-350 instruments: the first one, Corr1, corrects for filter amplification factor and loading, the second one, Corr2, corrects for the aerosol darkness in terms of the natural log of COA.

Aerosol Extinction↗

SUBTASK 1.6 – BASIN ELECTRIC CARBON STORAGE RESEARCH PROJECT: NOVEL MONITORING TECHNIQUES

The Energy & Environmental Research Center (EERC) conducted baseline activities associated with an applied research project at Basin Electric Power Cooperative’s (Basin’s) carbon capture and storage (CCS) site in Beulah, North Dakota, to establish novel carbon storage-monitoring techniques as commercial methods under Cooperative Agreement No. DE-FE0024233, Subtask 1.6. The following report summarizes the baseline activities performed and briefly describes the subsequent (operational monitoring) activities that have been proposed to the U.S. Department of Energy (DOE) as part of the overall project to develop and demonstrate novel monitoring techniques at North America’s largest permitted CCS operation. Dakota Gasification Company (DGC), a wholly owned subsidiary of Basin, owns and operates the Great Plains Synfuels Plant (GPSP) approximately 5 miles northwest of the town of Beulah, North Dakota (Figure 1). In 2023, DGC received approval from the North Dakota Industrial Commission (NDIC) to develop a storage facility on-site for injecting a stream of carbon dioxide (CO2) captured from GPSP. DGC will transport the captured CO2 stream with approximately 6.8 miles of transmission lines that extend north of GPSP and inject >1 million tonnes (MMt) of CO2 annually (>1 MMt/yr) over a 12-year period with up to six underground injection control (UIC) Class VI-compliant injection wells completed in the Broom Creek Formation, a predominantly sandstone reservoir and saline aquifer underlying GPSP. The Broom Creek Formation lies approximately 5900 feet (ft) below ground surface (bgs) at GPSP. The commercial scale (i.e., >1 MMt/yr) of DGC’s permitted carbon storage project is ideal for developing and testing the novel monitoring techniques included within Subtask 1.6. The goals of this project are to demonstrate 1) the cost-effectiveness of novel monitoring technologies included as part of this research, 2) technology capability for tracking the CO2 plume and/or associated pressure response in the subsurface and monitoring out-of-zone migration, and 3) compliance with UIC Class VI program requirements. The research activities proposed for the overall project include 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; 5) advanced wellbore-monitoring methods; 6) deployment of an AIM monitoring network; 7) EM monitoring of CO2 with real-time data processing; 8) continued seasonal drone-based surveillance studies; 9) seismic monitoring with passive and active surveys; and 10) wellbore monitoring with nuclear magnetic resonance (NMR) for near-surface characterization. Completion of Activities 1.0–5.0 (baseline activities) are described in this report. Upon authorization of funding by DOE, the EERC will initiate Activities 6.0– 10.0 (operational monitoring activities). Current state-of-the-art (SOA) carbon storage-monitoring techniques require countless labor hours dedicated to the acquisition of data. Once data are gathered, these SOA techniques often rely on commercial facilities to process raw data from the field. However, it is anticipated that next-generation monitoring techniques, such as those being demonstrated, will lower acquisition footprints, be less operationally intensive, and improve data acquisition efficiencies. These new techniques are more conducive to the application of machine learning, artificial intelligence, and automation, thus providing a pathway for integration into active control systems, informing site operability, and improving the integration of data for future CCS projects across the United States. Additionally, reclaimed and active mining lands are present within the project site, creating a unique opportunity to demonstrate the effectiveness of remote sensing and surface-based geophysics monitoring techniques at similar project sites that may include disturbed, unconsolidated, or actively excavated near-surface environments. The efforts included in the overall project will produce necessary designs, learnings, and data acquired during the baseline and operational monitoring periods that are necessary for time-lapse demonstration and validation of the described monitoring techniques. In addition, it is anticipated that the monitoring technologies included in this study will be compliant with UIC Class VI requirements to enable the potential for implementation at other CCS sites across the United States.

42 ENGINEERING↗

Confinement and String Breaking in the Compact Abelian Higgs Model

While real-time simulation of Quantum Chromodynamics remains technologically out of reach, simplified models for studying elements of QCD phenomenology abound. This work presents a simple model, a spin-1 truncation of the Compact Abelian Higgs Model simulated on qutrit sites, in which confinement and string breaking is accessible to current simulation methods. In the low-energy regime of 1+1D scalar electrodynamics, the heavy modes are integrated out, producing a spin chain effective Hamiltonian in which Gauss' law is implicitly satisfied. We study the spectrum of string-like excitations using DMRG methods on the order of 100 sites. We demonstrate that an added, local chemical potential, playing a role analogous to external charges, permits parameter-dependent measurements of physical features of interest like the string tension and effective meson mass. Varying the chemical potential also permits a characterization of string stability not assessed in prior studies of confining lattice models.

Senseman, Blake [Iowa U.]↗

Influence of Soil Moisture on the Development of Organized Convective Systems in South America

Abstract This study investigates the role of soil moisture (SM) on the initiation and organization of convective systems using the convection‐permitting ICOsahedral Non‐hydrostatic (ICON) model. We conduct two sets of experiments: a Control experiment with interactive SM and a fixed SM experiment (FixedSM) with invariable SM conditions. We focus on two regions in South America: the Amazon and southeastern South America (SESA). Larger organized convective systems are associated with greater SM heterogeneity in both regions, though other large‐scale synoptic influences affect the robustness of this relationship in SESA. These results remain largely unaffected by disabling the effects of precipitation on SM in the FixedSM experiment, and complementary analyses using satellite‐based estimates of SM and precipitation support these findings. Spatial compositing of mesoscale environments in the Amazon shows the presence of well‐defined SM gradients, at a length scale of a few hundred kilometers, many hours before convective system detection. Larger SM gradients correspond to larger gradients in thermodynamic variables, particularly surface temperature and sensible heat flux, and are associated with larger convective systems. Overall, our findings suggest that surface heterogeneities such as SM gradients not only affect deep convection initiation, as previously suggested, but they can also encourage the growth and organization of convective systems into larger clusters, particularly in the absence of significant synoptic influences.

54 ENVIRONMENTAL SCIENCES↗