Search NASA⌕ Search

SEARCH · Search NASA

Results for “phase object approximation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

129 records · Page 8

Wide Bandgap Generation (WBGen): Developing the Future Wide Bandgap Power Electronics Engineering Workforce

This Final Technical Report (FTR) summarizes the work conducted at the Center for Power Electronics Systems (CPES) under the Wide-Bandgap Generation (WBGen) fellowship and traineeship program established by the Advanced Manufacturing and Technologies Office (AMMTO) of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) at Virginia Tech, which had as main objective to train the next generation of U.S. citizen power engineers with wide-bandgap (WBG) power semiconductor expertise, with the intent to aid in fulfilling the future workforce needs in this field. The latter was deemed of strategic importance given the fast-paced growth observed—and predicted—in the demand of this technical expertise, whose practitioners have become the enablers and executioners of the electrification transformation process that not just the U.S., but the whole world, is currently undergoing as it seeks for more effective and efficient ways to use energy. As such, the WBGen program set forth to achieve its educational goals, which in addition sought to broaden the range of WBG-based power electronics by conducting research and development on high-efficiency grid apparatus and high-efficiency electrical power systems, and to also enhance the power engineering curriculum by formalizing WBG-oriented design procedures replacing existent yet now obsolete design procedures developed for Silicon (Si) based power electronics. This effort led CPES to spearhead the development of a new major within The Bradley Electrical and Computer Engineering (ECE) Department at Virginia Tech, namely Electronic Power and Energy Systems (EPES), which coalesced power electronics and power systems courses to provide undergraduate students with a strong formation in the power engineering field, while creating a pipeline of graduate students that could pursue the WBG-based curriculum and conduct research at CPES. In all, in what is considered a true success, eight of the twenty WBGen fellows that graduated program were recruited from the ECE department undergraduate cohort. The traineeship emphasized as well, from its beginning, the partnership with industry and national laboratories, which took advantage of the successful industry consortium at CPES that has historically been formed by 80–90 power and energy companies working in close collaboration with the center. This gave WBGen fellows the accessibility and possibility to conduct internships at partner facilities during the summer months, focused solely on the evaluation, testing, and adoption of WBG devices, which were many times tightly related to their respective research work and plans. In addition, WBGen fellows conducted their main research work within the confines of research programs at CPES conducted with these industry partners, providing them with a unique opportunity to develop not just their technical expertise—while advancing their knowledge, but to also learn and practice a slew of skills needed for their professional growth. As such, the fellows tackled a variety of WBG-related research topics, from device reliability and capability aspects as well as packaging and integration, encompassing the use of advanced materials and new structures, current sharing challenges, and insulation systems, to advanced gate-drivers with integrated sensors and protection mechanisms and active current- and voltage-based control, to optimized layouts seeking to maximize the switching and power processing performance of these devices, to power processing solutions adopting Gallium-Nitride (GaN) and Silicon-Carbide (SiC) power semiconductors for a variety of applications; including radiation-hardened converters for space dc distribution systems, direct three-phase ac-to-ac power converters for aerospace systems, dc-ac inverters for automotive traction drives, high-frequency isolated dc-dc battery chargers also for heavy transportation systems, and medium-voltage dc-dc and dc-ac converters for distribution systems and future power grids. The WBGen program ultimately graduated a total of 20 power engineers, all experts on WBG-based power electronics, awarding 18 M.S. and 2 PhD degrees in the process. These fellows, all U.S. citizens, allowed CPES to increase the number of citizens students to 33 % at the peak of the program, as the traineeship made possible the recruitment of talent with more attractive graduate research assistantship (GRA) contracts. Unfortunately, the present U.S. citizen enrollment at CPES has declined back to historic levels—approximately 10 %, as the regular GRA rates are not competitive enough when compared with entry-level industry jobs. In all, WBGen fellows published a total of 7 peer-reviewed journal articles, 44 papers at international technical conferences, made 42 presentations at international technical conferences, and filed 4 invention disclosures and patent applications, which have since then been granted by the U.S. Patent and Trademark Office (USPTO). Their contribution to CPES, Virginia Tech, the United States, and the world, has been significant, and continues to yield results thanks to the exemplary career that the fellows have initiated at many of the partners of the program, which include Wolfspeed, Raytheon Technologies, Infineon, Lockheed Martin, Dominion Energy, Northrop Grumman, Rivian, Aerospace Corporation, Sandia National Laboratory, National Renewable Energy Laboratory, John Hopkins University, and Virginia Tech.

14 SOLAR ENERGY↗

Mid-Atlantic U.S. Offshore Carbon Storage Resource Assessment Project (Final Technical Report)

The greatest potential for carbon storage in the northeastern United States lies in the offshore geologic formations comprising the outer continental shelf (Monteverde et al., 2011). Offshore storage can be linked to large point-sources of carbon dioxide (CO 2 ) while avoiding many of the logistical difficulties and potential risks encountered when siting onshore projects, especially in densely populated areas of the East Coast. Offshore CO 2 storage assessment and research in the United States is underway to address uncertainty in potential storage resources, particularly in the mid- and north-Atlantic offshore area. Given the current knowledge base and access to publicly available data, the objectives of the Mid-Atlantic U.S. Offshore Carbon Storage Resource Assessment Project (MAOCSRAP) were fourfold: (1) complete a systematic carbon storage resource assessment of the mid-Atlantic offshore coastal region from the Georges Bank Basin (GBB) through the Long Island Platform (LIP) to the southern Baltimore Canyon Trough (BCT); (2) define key input parameters to reduce uncertainty for offshore storage resource and efficiency estimates; (3) perform a preliminary assessment of risk factors, uncertainties, and data gaps; and (4) engage industry and regulatory stakeholders through development of a Road Map to assist future project planning and implementation. The MAOCSRAP project has compiled, inventoried, and assimilated various publicly available data sets to provide a strong technical basis on which future carbon storage studies and applications can be built. The knowledge infrastructure necessary to support the development of full-scale offshore carbon storage include: Defining the geologic characteristics of candidate storage sites (Chapter 2). Using existing seismic data to better define the continuity of the storage zones and seals (Chapter 3). Cataloguing the hydrogeologic properties of mid-Atlantic offshore storage sites (Chapter 4). Calculating prospective CO 2 storage resources using net effective pore volumes and fluid displacement properties specific to offshore lithologies (Chapter 5). Examining risk factors related to offshore storage (Chapter 6). Communicating with industry and other stakeholders about the future prospects for offshore storage (Chapter 7). Ensuring technology transfer to industry and other stakeholders (Chapter 8). Led by Battelle, this project was conducted by public and private entities with expertise in offshore geology and resources for the study region, including state geological surveys of Delaware, Maryland, and Pennsylvania; United States Geological Survey-Woods Hole Coastal and Marine Science Center and Haifa University; Rutgers University; Harvard University; and Lamont-Doherty Earth Observatory (LDEO) at Columbia University. The storage resource assessment was completed for a broad region offshore of the U.S. East Coast, from Massachusetts to Virginia. The results include high-level storage resource estimates for areas not previously characterized and improved storage resource estimates for geographically expansive portions of offshore geologic units. Results of the project provide a foundation for developing CO 2 storage along offshore areas of the mid-Atlantic United States. A combination of information was used to provide confidence in project results. Key findings of the major project tasks are summarized as follows. Subsurface Data Analysis: Legacy seismic, well-log, core, and biostratigraphic data were digitized, reprocessed, and analyzed using modern techniques, augmenting previous characterization efforts. The sequence stratigraphic framework for the Cretaceous and Jurassic strata was developed by correlating well-log depositional sequences to seismic reflectors identified in the BCT, LIP, and GBB. The integration of well-log stratigraphy with seismic stratigraphy and petrophysical analysis helped to identify and map potential storage zones within sequences of the Logan Canyon (LC), Missisauga, and Mohawk formations, as well as the regionally extensive caprock comprised of the Dawson Canyon shale. Approximately 4,000 kilometers (km) of seismic data was reprocessed to create a structural framework that was used to tie together all available well data, constrain sequence stratigraphic interpretations, and make regional assessments of offshore carbon storage resources. Prospective storage resource estimates were 150 to 1136 megatons (Mt) for the combined storage zones. This suggests mid-Atlantic U.S. offshore formations can store decades of CO 2 from industrial sources in the region. Preliminary local reservoir simulations suggest that injection rates of 1 Mt CO 2 /year may be sustained for 30 years in single injection wells in the BCT. Advanced geologic modeling and new data acquisition are needed to address data gaps and advance carbon capture and storage (CCS) in key offshore areas selected for further investigation. Offshore Risk Factors: Offshore geologic risk factors include soft sediment deformation, unit continuity, sedimentological and structural features, seismicity and hydrates. CO 2 storage risks include inadequate seals, migration/leakage, and chemical interactions leading to decreased storage. Sensitive habitats, environmental impacts, disturbance to seafloor, and other risks need to be identified in advance of project activities and integrated into detailed mitigation plans for all project phases. Stakeholder Engagement: Input and participation from government, industry, and environmental groups provided input into the Road Map and address next steps needed for project deployment. Early engagement and ongoing communication, as well as policy framework development, is key to large-scale deployment of CCS. Next Steps: This project represents an important first step by completing a high-level CO 2 storage resource assessment and building the knowledge infrastructure necessary to improve quantitative storage resource estimates. The data sets that have been curated under this project provide an opportunity to conduct research and development (R&D) needed to address data gaps and reduce risk and uncertainty. Offshore characterization and validation strategies that are systematically designed to provide data and infrastructure that can be upscaled to meet commercial requirements could be developed off of this foundation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗