Search NASA⌕ Search

SEARCH · Search NASA

Results for “planetary missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A versatile silver oxide-zinc battery for synchronous orbit and planetary missions

A new kind of silver-zinc cell was developed and tested under NASA support which can withstand severe heat sterilization requirements and does not display the traditional life limiting aspect of sinc electrodes i.e. shape change. These cells could be used on planetary lander mission which require wet-stand periods of over a year, a modest number of cycles (400 to 500) and may require dry heat sterilization. The weight advantage of these cells over the traditional nickel cadmium batteries also makes it an attractive alternative for synchronous orbit service where 400 to 500 cycles would be required over a 5 year period.

Schwartz, H. J.↗

A versatile silver oxide-zinc battery for synchronous orbit and planetary missions

A new kind of silver-zinc cell has been developed and tested under NASA support which can withstand severe heat sterilization requirements and does not display the traditional life limiting aspect of zinc electrodes - i.e., shape change. These cells could be used on a planetary lander mission which requires wet-stand periods of over a year, a modest number of cycles (400 to 500) and may require dry heat sterilization. The weight advantage of these cells over the traditional nickel-cadmium batteries makes them also an attractive alternative for synchronous orbit service where 400 to 500 cycles would be required over a five-year period.

Schwartz, H. J.↗

The Potassium-Argon Laser Experiment (karle): In Situ Geochronology for Planetary Missions

Isotopic dating is an essential tool to establish an absolute chronology for geological events. It enables a planet's crystallization history, magmatic evolution, and alteration to be placed into the framework of solar system history. The capability for in situ geochronology will open up the ability for this crucial measurement to be accomplished as part of lander or rover complement. An in situ geochronology package can also complement sample return missions by identifying the most interesting rocks to cache or return to Earth. Appropriate application of in situ dating will enable geochronology on more terrains than can be reached with sample-return missions to the Moon, Mars, asteroids, outer planetary satellites, and other bodies that contain rocky components. The capability of flight instruments to conduct in situ geochronology is called out in the NASA Planetary Science Decadal Survey and the NASA Technology Roadmap as needing development to serve the community's needs. Beagle 2 is the only mission launched to date with the explicit aim to perform in situ K-Ar isotopic dating [1], but it failed to communicate and was lost. The first in situ K-Ar date on Mars, using SAM and APXS measurements on the Cumberland mudstone [2], yielded an age of 4.21 +/- 0.35 Ga and validated the idea of K-Ar dating on other planets, though the Curiosity method is not purpose-built for dating and requires many assumptions that degrade its precision. To get more precise and meaningful ages, multiple groups are developing dedicated in situ dating instruments.

planetary↗

Upcoming planetary missions and the applicability of high temperature superconductor bolometers

Past and present planetary exploration is briefly reviewed, and the planned 1996 Cassini mission to Saturn and Titan is examined. The CIRS experiment aboard Cassini, which will retrieve information on the atmospheres of Titan and Saturn, is discussed. Ongoing efforts to build a high-sensitivity, high-Tc bolometer that would greatly improve detection in Titan's atmosphere are addressed.

Brasunas, J.↗

Small planetary mission plan: Report to Congress

This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.

Source record↗

Support requirements for remote sensor systems on unmanned planetary missions, phase 3

The results of a study to determine the support requirements for remote sensor systems on unmanned planetary flyby and orbiter missions are presented. Sensors and experiment groupings for selected missions are also established. Computer programs were developed to relate measurement requirements to support requirements. Support requirements were determined for sensors capable of performing required measurements at various points along the trajectories of specific selected missions.

Source record↗

Distributed science operations for JPL planetary missions

Advances in spacecraft, flight instruments, and ground systems provide an impetus and an opportunity for scientific investigation teams to take direct control of their instruments' operations and data collection while at the same time, providing a cost effective and flexible approach in support of increasingly complex science missions. Operations of science instruments have generally been integrated into planetary flight and ground systems at a very detailed level. That approach has been successful, but the cost of incorporating instrument expertise into the central mission operations system has been high. This paper discusses an approach to simplify planetary science operations by distributing instrument computing and data management tasks from the central mission operations system to each investigator's home center of observational expertise. Some early results of this operations concept will be presented based on the Mars Observer (MO) Project experience and Cassini Project plans.

Benson, Richard D.↗

AMOS: Generic Planetary Mission Ops

The spacecraft control community is focusing increasing attention on various forms of architectures. Studies on software architectures and related technologies have been commissioned by DOD programs. The purpose of planning a series of annual workshops is to bring together participants working in the Spacecraft Ground System (SGS) domain. The overall intent of these workshops is to expedite the transition to common consensus-based open software architectures for SGSs.

workshops SGS technologies↗

Antarctic Planetary Testbed (APT): A facility in the Antarctic for research, planning and simulation of manned planetary missions and to provide a testbed for technological development

The notion of using Antarctica as a planetary analog is not new. Ever since the manned space program gained serious respect in the 1950's, futurists have envisioned manned exploration and ultimate colonization of the moon and other extraterrestrial bodies. In recent years, much attention has been focused on a permanently manned U.S. space station, a manned Lunar outpost and a manned mission to Mars and its vicinity. When such lofty goals are set, it is only prudent to research, plan and rehearse as many aspects of such a mission as possible. The concept of the Antarctic Planetary Testbed (APT) project is intended to be a facility that will provide a location to train and observe potential mission crews under conditions of isolation and severity, attempting to simulate an extraterrestrial environment. Antarctica has been considered as an analog by NASA for Lunar missions and has also been considered by many experts to be an excellent Mars analog. Antarctica contains areas where the environment and terrain are more similar to regions on the Moon and Mars than any other place on Earth. These features offer opportunities for simulations to determine performance capabilities of people and machines in harsh, isolated environments. The initial APT facility, conceived to be operational by the year 1991, will be constructed during the summer months by a crew of approximately twelve. Between six and eight of these people will remain through the winter. As in space, structures and equipment systems will be modular to facilitate efficient transport to the site, assembly, and evolutionary expansion. State of the art waste recovery/recycling systems are also emphasized due to their importance in space.

Ahmadi, Mashid↗

Planetary missions in the Shuttle era

A conservative fifteen-year plan for planetary exploration is presented in which the Space Shuttle is considered as just a basic transportation system that should be quite economical and have excellent reliability. It is noted that these planned missions are limited by the out-of-orbit escape capability of the Shuttle's Interim Upper Stage (IUS), rather than by the orbital payload capability of the Shuttle itself. A mission model is provided in which a rather even balance is maintained among missions to the inner planets, the outer planets, the comets and asteroids, and interplanetary missions out of the ecliptic plane; the cost estimate for this model is plotted. Launch requirements for the various missions are compared with the performance available from various IUS candidates under evaluation, and it is shown that even the lower-performance candidates can be brought up to the capability of the current Titan IIIE/Centaur/TE-364 expendable launch vehicle, which is adequate for most of the missions in the program. Missions which require higher-performance IUS options are noted, including the Mariner Jupiter and Saturn Orbiters.

Kraemer, R. S.↗

Adopting an Objectives-Driven Assurance Case Approach for Achieving Space Flight Mission Planetary Protection Objectives

Traditionally, NASA has utilized prescriptive technical and process requirements to ensure safety and mission assurance performance objectives for space flight missions are achieved. While prescriptive re-quirements may be easier to communicate and manage throughout the systems engineering process, the highly-constrained nature of prescriptive requirements can limit the ability to take advantage of cost-saving opportunities and offer limited ability to explore other options or alternative designs, processes, and methods. It can also be difficult to develop prescriptive requirements for objectives that are prob-abilistic in nature or that cannot be satisfied by direct verification. In contrast, the development of an assurance case allows for a compelling, comprehensible, and valid argument to be developed with support-ing evidence that shows safety and mission assurance objectives have been satisfied. Analogous to how patent applications are constructed for inventions, an assurance case has a high-level claim of meeting a safety and mission assurance objective, followed by a more specific set of sub-claims and technical evidence which supports the claims. The objectives-driven assurance case approach allows for a better understand-ing and exploration of the trade space, more flexibility to balance trades, and the ability to realize and implement technical and process innovations for resource, time, and cost savings. The assurance case is a living case that evolves over the entire program life cycle. Recently, NASA’s Office of Planetary Pro-tection (OPP) has adopted the assurance case approach as an acceptable methodology for demonstrating avoidance of contamination of target solar system bodies explored by NASA space flight missions. This methodology has been incorporated into NASA’s new technical standard for planetary protection and is currently being utilized by the Mars Sample Return campaign for safe sample containment during sample return. This presentation will explore the development and implementation of an assurance case approach in the context of planetary protection, the shift from prescriptive requirements and the ongoing culture change in the technical community, and the support and guidance from NASA’s OPP in adopting the assurance case approach for achieving planetary protection objectives on NASA’s space flight missions.

Elaine Seasly↗