Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Load Test of Alum-a-Lift Serial No. 33053261

An Alum-A-Lift A800CSPD-60 (Lift) was procured to support mechanical testing of programmatic equipment. This testing will take place within the Bldg. 131 Hi Bay. The design of the Lift procured for the purposes at LLNL was a modification of a machine that had previously been engineered and sold by Alum-a-Lift, see Fig. 1. The modification was to shorten the boom from a 56 in. length to a 28 in. length. The modified design is illustrated in Fig. 2. The Lift was fabricated and shipped to LLNL, received ~ June 2022. Upon arrival, it was successfully evaluated for “no-load” performance capability. Upon inspection of the documentation provided by Alum-a-Lift, it was noted that the load test was performed to qualify the machine for a lifting capacity of 200 lb. The LLNL requirement was that the capacity of the machine be 400 lb. Conversations with the vendor, Alum-A-Lift, followed this discovery. Rather than send the machine back to the vendor for load testing, discussions concurred that LLNL would load test the machine and Alum-A-Lift would provide the relevant load test placard to be placed on the machine subsequent to the successful load test. This MESN provides documentation of the load test to qualify the Alum-a-Lift to its’ rated capacity of 400 lb.

42 ENGINEERING↗

Probing Emissions of Military Cargo Aircraft: Description of a Joint Field Measurement Program

Direct emissions of NOx, volatile organic compounds, and particulate matter (PM) by aircraft contribute to the pollutant levels found in the atmosphere. Aircraft emissions can be injected at the ground level or directly at the high altitude in flight. Conversion of the precursor gases into secondary PM is one of the pathways for the increased atmospheric PM. Atmospheric PM interacts with solar radiation altering atmospheric radiation balance and potentially contributing to global and regional climate changes. Also, direct emissions of air toxics, ozone precursors and PM from aircraft in and around civilian airports and military air bases can worsen local air quality in non-attainment and/or maintenance areas. These emissions need to be quantified. However, the current EPA methods for particle emission measurements from such sources, modified Method 5 and Conditional Test Method 039, are gravimetric-based, and it is anticipated that these methods will not be suitable for current and future generations of aircraft turbine engines, whose particle mass emissions are low. To evaluate measurement approaches for military aircraft emissions, two complementary projects were initiated in 2005. A joint field campaign between these two programs was executed during the first week of October 2005 at the Kentucky Air National Guard (KYANG) base in Louisville, KY. This campaign represented the first in a series of field studies for each program funded by the DoD Strategic Environmental Research and Development Program (SERDP) and provided the basis for cross-comparison of the sampling approaches and measurement techniques employed by the respective program teams. This paper describes the overall programmatic of the multi-year SERDP aircraft emissions research and presents a summary of the results from the joint field campaign.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of the 2007 Toyota Camry Hybrid Synergy Drive System

The U.S. Department of Energy (DOE) and American automotive manufacturers General Motors, Ford, and DaimlerChrysler began a five-year, cost-shared partnership in 1993. Currently, hybrid electric vehicle (HEV) research and development is conducted by DOE through its FreedomCAR and Vehicle Technologies (FCVT) program. The mission of the FCVT program is to develop more energy efficient and environmentally friendly highway transportation technologies. Program activities include research, development, demonstration, testing, technology validation, and technology transfer. These activities are aimed at developing technologies that can be domestically produced in a clean and cost-competitive manner. Under the FCVT program, support is provided through a three-phase approach [1] which is intended to: • Identify overall propulsion and vehicle-related needs by analyzing programmatic goals and reviewing industry’s recommendations and requirements, then develop the appropriate technical targets for systems, subsystems, and component research and development activities; • Develop and validate individual subsystems and components, including electric motors, emission control devices, battery systems, power electronics, accessories, and devices to reduce parasitic losses; and • Determine how well the components and subassemblies work together in a vehicle environment or as a complete propulsion system and whether the efficiency and performance targets at the vehicle level have been achieved. The research performed in this area will help remove technical and cost barriers to enable technology for use in such advanced vehicles as hybrid electric, plug-in hybrid electric, electric, and fuel-cell-powered vehicles.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Carbon Capture (30 September 2012) (Annual Report)

Capture of carbon dioxide (CO 2 ) is a critical component in reducing greenhouse gas emissions from fossil fuel-based processes. The Carbon Capture research to be performed is aimed at accelerating the development of efficient, cost-effective technologies which meet the post-combustion programmatic goal of capture of 90% of the CO 2 produced from an existing coal-fired power plant with less than a 35% increase in the cost of electricity (COE), and the pre-combustion goal of 90% CO 2 capture with less than a 10% increase in COE. The specific objective of this work is to develop innovative materials and approaches for the economic and efficient capture of CO 2 from coal-based processes, and ultimately assess the performance of promising technologies at conditions representative of field application (i.e., slip stream evaluation).

20 FOSSIL-FUELED POWER PLANTS↗

Quality Assurance Protocol for AFCI Advanced Structural Materials Testing

The objective of this letter is to inform you of recent progress on the development of advanced structural materials in support of advanced fast reactors and AFCI. As you know, the alloy development effort has been initiated in recent months with the procurement of adequate quantities of the NF616 and HT-UPS alloys. As the test alloys become available in the coming days, mechanical testing, evaluation of optimizing treatments, and screening of environmental effects will be possible at a larger scale. It is therefore important to establish proper quality assurance protocols for this testing effort in a timely manner to ensure high technical quality throughout testing. A properly implemented quality assurance effort will also enable preliminary data taken in this effort to be qualified as NQA-1 during any subsequent licensing discussions for an advanced design or actual prototype. The objective of this report is to describe the quality assurance protocols that will be used for this effort. An essential first step in evaluating quality protocols is assessing the end use of the data. Currently, the advanced structural materials effort is part of a long-range, basic research and development effort and not, as yet, involved in licensing discussions for a specific reactor design. After consultation with Mark Vance (an ORNL QA expert) and based on the recently-issued AFCI QA requirements, the application of NQA-1 quality requirements will follow the guidance provided in Part IV, Subpart 4.2 of the NQA-1 standard (Guidance on Graded Application of QA for Nuclear-Related Research and Development). This guidance mandates the application of sound scientific methodology and a robust peer review process in all phases, allowing for the data to be qualified for use even if the programmatic mission changes to include licensing discussions of a specific design or prototype. ORNL has previously implemented a QA program dedicated to GNEP activities and based on an appropriately graded application of NQA-1 requirements at the site. The current program is being revised to incorporate changes imposed through the recently revised AFCI Technical Integration Office QA requirements. Testing conducted under the AFCI QA program for the advanced structural materials effort shall incorporate the following quality assurance expectations: (1) personnel are adequately trained to perform assigned work; (2) activities are controlled to ensure consistency of results; (3) records necessary to substantiate how the work was performed are maintained (dedicated laboratory notebooks will be used); (4) the pedigree and traceability of the various tested materials are maintained throughout the described processes using consistent sample numbering and adequate record keeping; (5) equipment with the potential to affect the quality of the planned work is calibrated and maintained in accordance with applicable operating requirements. In addition, all reporting or related dissemination by ORNL personnel of the results of the work described in this subcontract shall be conducted in accordance with the requirements described or referenced in the ORNL Standards Based Management System subject area entitled Scientific and Technical Information. Reporting or publications at other institutions will be conducted in accordance with the requirements of that institution. Successful implementation of these protocols will provide a sound basis for future decisions and research. In addition, these steps will also help ensure that results can also be applied to licensing discussions at a future date.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Machine Learning for Real-time Fusion Plasma Behavior Prediction and Manipulation (Final Report)

The goal of this project is to implement real-time analysis of 2D Beam Emission Spectroscopy (BES) data to predict and control transient and high-bandwidth events at DIII-D. In essence, we wish to bring high-bandwidth fluctuation diagnostics into the realm of real-time measurements and control. The BES ML models will necessarily be deep neural networks (DNN) with a “data flow” architecture for compatibility with high-throughput, low-latency evaluation on a field-programmable gate array (FPGA) or other emerging processor technologies. The real-time output will be fed to the plasma control system (PCS) for real-time control tasks, specifically for ELM control and avoidance and for QH-mode access and sustainment. We anticipate that the real-time analysis of fluctuation diagnostics will create new enabling technologies to predict and control transient events such as confinement mode transitions, edge-localized modes, Alfven eigenmode events, and disruptions. The proposed research is aligned with ITER research needs and DIII-D programmatic goals. For instance, the prediction and avoidance of ELM events is critical for ITER machine safety. Also, H-mode access with RMP ELM suppression in ITER is an active research area due to high separatrix density, narrow SOL width, and elevated LH transition power threshold.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Integrated Commercial Carbon Capture and Storage (CCS) Prefeasibility Study at Rock Springs Uplift, Wyoming (Final Report)

To establish the potential of safe, long-term commercial-scale carbon capture & storage (CCS) in southwestern Wyoming, the University of Wyoming formed a CCS coordination team (CCT) to complete a Phase I CarbonSAFE pre-feasibility study adjacent to the region’s largest coal-fired power plant, the Jim Bridger Plant (JBP). The study’s primary objective was to evaluate the potential of storing 50+ million metric tons of anthropogenic carbon dioxide (CO 2 ) in stacked reservoirs over a period of 25 years. In addition, this integrated study evaluated related aspects of carbon capture utilization & storage (CCUS) at the study site, including: (1) the CO 2 character of post-combustion flue gas from JBP and the technical capacity for retrofitting proven commercial-scale CO 2 capture technology relative to CO 2 source character and technological constraints; (2) utilization of the existing CO 2 pipeline network in the immediate vicinity of JBP for enhanced oil recovery (CO 2 -EOR) and utilizing that network as part of a regional hub for CO 2 storage from other anthropogenic sources; (3) assessment of the challenges and benefits of meeting all of CarbonSAFE programmatic Phase I goals relative to Wyoming’s carbon management regulatory framework; and (4) assessment of the community and environmental factors that may impact CCS at JBP. With respect to storage, we analyzed the potential of stacked Mesozoic reservoirs at the study site, focusing on the Entrada and Nugget sandstones. The reservoir response to injection simulations varied greatly between formations, though they both were capable of CO 2 storage. The Entrada Sandstone is relative thin (~40’) and heterogeneous; storage using one injection and production well was limited to 1.2 Mt over 25 years at the study site. The Nugget Sandstone is much thicker (> 400’) and generally homogeneous; storage using one injection and production well approached 15.0 Mt over 25 years; this scenario suggests that the storage potential in the Nugget Sandstone is close to the estimated P90 calculation of 9.6 Mt/mi 2 as models indicate a storage potential of 8.3 Mt/mi 2 at saturation. Both reservoirs’ storage capacity benefited greatly from coupling an injection well with an offset production well; total storage capacity increased and reservoir pressure stayed below critical thresholds. This indicates that implementing a pressure management strategy at the study site would optimize storage and decrease risk. Seals associated with the targeted reservoirs were shown to be capable of retaining the potential storage volumes, and the site benefits from multiple seal redundancies (i.e. > 7,000’ of seal formations). Furthermore, assessment of different reservoir variables (e.g., fluid composition, pressure, etc.) indicates all reservoirs at the study site are isolated. Storage assessments from Mesozoic reservoirs were coupled with simulations from the site’s Paleozoic reservoirs (the Weber Sandstone and Madison Limestone), which were the focus of previous study. The fully integrated stacked reservoir pre-feasibility studies suggest that the Nugget and Madison formations alone could safely store 50 million metric tons of CO 2 within the study site. Furthermore, both formations are true saline reservoirs near JBP, making them ideal target reservoirs for CO 2 sequestration. Analysis of Wyoming’s laws and regulations confirm that the State has a favorable policy environment for CCS/CCUS. The project’s economic models estimated that the following revenues collectively are sufficient to finance the project over its lifespan if CO 2 utilization is coupled with CCS via the following strategies: (1) sales of CO 2 for EOR (approximately $69 million/year); (2) use of CO 2 tax credits such as amended §45Q and §48A (approximately $484 million total); and (3) sales of low-carbon electricity and marketable carbon offset/credits into carbon-constrained markets (approximately $11-$17 million/year) to West Coast consumers. These revenue estimates are broadly consistent with other studies that concluded arbitrage in JBP retail electricity sales between California and Wyoming could help to support the cost of deploying CCS at JBP. The models also indicate that maintaining a successful business case for long-term CCS -- wherein associated capture, transportation and operational costs are fully addressed at JBP -- is reliant on numerous external factors that complicate predictions. This study suggests that this site meets the CarbonSAFE program’s requirements of being able to feasibly store 50+ million metric tons of CO 2 over 25 years within the site’s stacked reservoirs, especially if coupled with pressure management strategies. This study suggests that the Nugget Sandstone and the Madison Limestone are two of the best reservoirs in the State with respect to overall storage capacity. In addition, the site’s proximity to existing CO 2 transportation networks, CO 2 -EOR opportunities, ability to sell to markets that value low-carbon electricity, Wyoming’s existing carbon regulatory framework, and a public that is well-educated with respect to energy markets and issues collectively increase the potential for implementing commercial-scale CCS adjacent to the JBP. With respect to the available technical and non-technical site data, and the reservoir quality at the study site, we suggest that this site is capable of moving directly into Phase III of the CarbonSAFE program.

01 COAL, LIGNITE, AND PEAT↗

Internal Collaboration on Recent Nuclear Criticality Safety Assessments

Prevention of inadvertent criticality at facilities with large quantities of fissionable materials is one of the most important requirements those facilities grapple with. Given that criticality cannot be mitigated, only eliminated, a hard line must be taken on this requirement. The facilities and sites with the possibility of such an event must abide by a plethora of requirements, most stemming from the ANSI/ANS-8 series of consensus standards. One such standard, ANSI/ANS-8.19, Administrative Practices for Nuclear Criticality Safety, gives requirements and recommendations necessary for establishing a nuclear criticality safety program for a given facility or site. One of those requirements includes periodic assessments of the NCS program. To meet the assessment requirement, Los Alamos National Laboratory (LANL) conducts periodic assessments on individual facilities and overall programmatic health aspects. The teams developed to perform these assessments include people both inside and outside the LANL NCS program. Recently, the Nuclear Criticality Safety Division and the Critical Experiments Team of the Advanced Nuclear Technology Group established a collaboration to aid in fulfilling the assessment requirement.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Simulating Energy and Security Interactions in Semiconductor Manufacturing: Insights from the Intel Minifab Model

Semiconductor manufacturing is a highly complex. Fabrication plants must deal with re-entrant flows to support multiple types of wafers being produced simultaneously, each with their own deadlines and specifications. The manufacturing process itself depends upon the ability to control and programmatically adjust a variety of environmental conditions including temperature, humidity, and air quality. In addition, wafer fabrication consumes large amounts of electricity. Emerging technologies may help reduce the energy footprint of such facilities but can introduce cybersecurity risks. Therefore, this paper presents a modeling and simulation framework to quantify tradeoffs between operational measures of performance, energy consumption, and cybersecurity controls. We augment the Intel Minifab model, with the Purdue Enterprise Reference Architecture (PERA) for cybersecurity as well as tool-level energy consumption data from a real-world semiconductor manufacturing testbed. In this manner, we intend to provide stakeholders with a systematic, data-driven approach to evaluate emerging risks within the manufacturing process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Aluminum Clad SNF: Technical Considerations and Challenges for Extended (>50 years) Dry Storage - 1900y

The U.S. Department of Energy (DOE) manages a significant inventory (>13 MTHM) of aluminum clad spent nuclear fuel (ASNF) using a combination of wet and dry storage at three primary sites; Hanford, Idaho National Laboratory (INL), and Savannah River Site (SRS). The majority of this ASNF is generated from U.S. and international research test reactors (RTR), examples include Advanced Test Reactor (ATR) at INL and High-Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL). The Obama Administration suspension of the Yucca Mountain repository, issuance of the January 2013 DOE 'Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste,' delays in implementing the 'regionalization' SNF approach recommended in the 1995 'Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement,' and limited ASNF processing capability at SRS H-Canyon means that interim storage has become the de-facto strategy for managing ASNF. The 1995 Idaho Settlement Agreement requires the DOE to transfer all SNF stored at INL to interim dry storage prior to December 31, 2023 and wet storage capacity at the SRS is nearing capacity. This situation was recognized by the DOE Spent Nuclear Fuel Working Group (SNFWG) and at its June 2016 meeting formed a ASNF sub-working group comprised subject matter experts to evaluate this area and provide a report of findings. The ASNF sub-working group met many times over several month period to review the engineering and technical basis of existing and planned DOE ASNF dry storage facilities and additional studies on the behavior of ASNF under different conditions, including during reactor service. The ASNF sub-working group focused its review on RTR SNF. Based on these reviews, the ASNF sub-working group identified five knowledge gaps and technical data needs that should be addressed to ensure viability and safety of extended, greater than 50 years, sealed or vented interim dry storage of ASNF. These five areas include; behavior/chemistry of aluminum oxyhydroxide layer in dry storage, radiolytic gas generation properties of aluminum oxyhydroxide layers, effect of episodic breathing and radiolytic generation of corrosive gases during storage, performance of ASNF in existing dry storage systems, and effects of high temperature (>1000 C) drying on chemistry and behavior of aluminum oxyhydroxide layers. The ASNF sub-working group also recommended development of an action plan to identify technical and engineering activities needed to address the knowledge gaps and technical data needs. Results of the ASNF sub-working group are documented in 2017 report 'Aluminum Clad Spent Nuclear Fuel: Technical Considerations and Challenges for Extended (>50 years) Dry Storage,' DOE-ID/RPT-1575. The INL assembled a team comprised of twenty INL and Savannah River National Laboratory SNF management and subject matter experts to develop this action plan. Over the course of 2 months the team worked to develop the action plan. The plan identified and recommended six technical and engineering tasks needed to address the previously identified knowledge gaps and technical data needs. DOE Environmental Management Office of Technology Development is providing funding to the INL to execute these tasks. This paper will present and discuss the results of the ASNF sub-working group, tasks identified in the action plan, and experimental activities underway at INL and SRNL to address the action plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Ligand Geometry in Protein Data Bank Structures Computationally

Information about the three‐dimensional structures of complex biological molecules is an indispensable research tool for many fields of study, including biology, chemistry, pharmacology, and computer science. The Protein Data Bank (PDB) is an public digital archive providing access to structures of nucleic acids, proteins, and large macromolecular machines determined experimentally by X‐ray crystallography, nuclear magnetic resonance (NMR) spectroscopy, and 3‐dimensional electron microscopy (3DEM). PDB structures undergo validation for structural plausibility upon their deposition into the PDB using the program Mogul, which cross references each deposited structure against similar data in the Cambridge Structural Database (CSD). Ligands associated with PDB structures are a common source of structural inaccuracy. In this study, a programmatic pipeline was developed to determine if ligand geometric accuracy could be improved using known computational tools. Ligands with dubious geometry were identified through a Python mining code. A sample set of the identified structures was remodeled into minimum energy conformations using the molecular dynamics program AMBER and then fit to the original experimental density maps using the molecular modeling program Coot. The refined models were compared to the original models in the PDB as well as to similar structures in the CSD using the deposition statistical validation server. Preliminary results suggest that the pipeline effectively identifies and improves ligand structures that possess inaccurate geometry. This method can be used to evaluate and improve the accuracy of specific ligands in structures both archived and pending deposition. Support or Funding Information This work was supported by an NSF REU and the RCSB PDB [NSF (DBI‐1338415), NIH, and DOE.] This abstract is from the Experimental Biology 2019 Meeting. There is no full text article associated with this abstract published in The FASEB Journal .

Miller, Beck↗

Site-Wide Integrated Water Monitoring -- Defining and Implementing Sampling Objectives to Support Site Closure

The Underground Test Area (UGTA) activity is responsible for assessing and evaluating the effects of the underground nuclear weapons tests on groundwater at the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), and implementing a corrective action closure strategy. The UGTA strategy is based on a combination of characterization, modeling studies, monitoring, and institutional controls (i.e., monitored natural attenuation). The closure strategy verifies through appropriate monitoring activities that contaminants of concern do not exceed the SDWA at the regulatory boundary and that adequate institutional controls are established and administered to ensure protection of the public. Other programs conducted at the NNSS supporting the environmental mission include the Routine Radiological Environmental Monitoring Program (RREMP), Waste Management, and the Infrastructure Program. Given the current programmatic and operational demands for various water-monitoring activities at the same locations, and the ever-increasing resource challenges, cooperative and collaborative approaches to conducting the work are necessary. For this reason, an integrated sampling plan is being developed by the UGTA activity to define sampling and analysis objectives, reduce duplication, eliminate unnecessary activities, and minimize costs. The sampling plan will ensure the right data sets are developed to support closure and efficient transition to long-term monitoring. The plan will include an integrated reporting mechanism for communicating results and integrating process improvements within the UGTA activity as well as between other U.S. Department of Energy (DOE) Programs.

54 ENVIRONMENTAL SCIENCES↗

Site-Wide Integrated Water Monitoring - Defining and Implementing Sampling Objectives to Support Site Closure - 13060

The Underground Test Area (UGTA) activity is responsible for assessing and evaluating the effects of the underground nuclear weapons tests on groundwater at the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), and implementing a corrective action closure strategy. The UGTA strategy is based on a combination of characterization, modeling studies, monitoring, and institutional controls (i.e., monitored natural attenuation). The closure strategy verifies through appropriate monitoring activities that contaminants of concern do not exceed the SDWA at the regulatory boundary and that adequate institutional controls are established and administered to ensure protection of the public. Other programs conducted at the NNSS supporting the environmental mission include the Routine Radiological Environmental Monitoring Program (RREMP), Waste Management, and the Infrastructure Program. Given the current programmatic and operational demands for various water-monitoring activities at the same locations, and the ever-increasing resource challenges, cooperative and collaborative approaches to conducting the work are necessary. For this reason, an integrated sampling plan is being developed by the UGTA activity to define sampling and analysis objectives, reduce duplication, eliminate unnecessary activities, and minimize costs. The sampling plan will ensure the right data sets are developed to support closure and efficient transition to long-term monitoring. The plan will include an integrated reporting mechanism for communicating results and integrating process improvements within the UGTA activity as well as between other U.S. Department of Energy (DOE) Programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pre-conceptual Evaluation of DOD Pele Microreactor Sites at Idaho National Laboratory

Members of the INL Land Use Committee met to discuss potential options and make recommendations for siting the Pele microreactor demonstration and testing projects at INL. The Pele microreactor prototype will be a DOE authorized reactor. The evaluation team of subject matter experts (SME) was asked to consider both indoor sites and outdoor sites. A preliminary evaluation was performed by the SME team and based on those discussions the following recommendations were made: (1) Present EBR-II as the most suitable indoor site, and (2) Utilize CITRC Pads A-D as a system of outdoor demonstration and testing sites. Each pad has its own set of attributes that have been established to enable equipment testing and can provide options for various configurations when the group of pads are used as a system of testing sites. Utilizing CITRC Pads A-D as a system of sites offers flexibility in scheduling activities at CITRC to meet existing program schedules and future Pele program demonstration and testing needs with the least programmatic impact.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Efficiencies and Optimization of Weak Base Anion Ion-Exchange Resin for Groundwater Hexavalent Chromium Removal at Hanford

The U.S. Department of Energy’s (DOE’s) contractor, CH2M HILL Plateau Remediation Company, has successfully converted a series of groundwater treatment facilities to use a new treatment resin that is delivering more than $3 million in annual cost savings and efficiency in treating groundwater contamination at the DOE Hanford Site in southeastern Washington State. During the production era, the nuclear reactors at the Hanford Site required a continuous supply of high-quality cooling water during operations. Cooling water consumption ranged from about 151,417 to 378,541 L/min (40,000 to 100,000 gal/min) per reactor, depending on specific operating conditions. Water from the Columbia River was filtered and treated chemically prior to use as cooling water, including the addition of sodium dichromate as a corrosion inhibitor. Hexavalent chromium was the primary component of the sodium dichromate and was introduced into the groundwater at the Hanford Site as a result of planned and unplanned discharges from the reactors starting in 1944. Groundwater contamination by hexavalent chromium and other contaminants related to nuclear reactor operations resulted in the need for groundwater remedial actions within the Hanford Site reactor areas. Beginning in 1995, groundwater treatment methods were evaluated, leading to the use of pump-and-treat facilities with ion exchange using Dowex™ 21K, a regenerable, strong-base anion exchange resin. This required regeneration of the resin, which was performed offsite. In 2008, DOE recognized that regulatory agreements would require significant expansion for the groundwater chromium treatment capacity. As a result, CH2M HILL performed testing at the Hanford Site in 2009 and 2010 to demonstrate resin performance in the specific groundwater chemistry at different waste sites. The testing demonstrated that a weak-base anion, single-use resin, specifically ResinTech SIR-700 ®, was effective at removing chromium, had a significantly higher capacity, could be disposed of efficiently onsite, and would eliminate the complexities and programmatic risks from sampling, packaging, transportation, and return of resin for regeneration.

54 ENVIRONMENTAL SCIENCES↗

Considerations for NDA in Waste and D and D Applications

Non Destructive Assay (NDA) is a common tool for waste characterization, decontamination and decommissioning (D and D) applications. However there are many things which must be considered in order to set up and run an efficient, cost effective, and successful NDA program for these applications. This paper covers some of these issues and points out examples of how they can affect the programmatic decisions. Most NDA programs were established initially based on measurements performed in a fixed geometry in a laboratory or process work environment. When the process is moved into the rugged environment of the D and D world, issues such as temperature variations, significant changes in background radiation levels, difficulties in operating the equipment when working in personal protective equipment (PPE), difficulties in setting up equipment in appropriate locations for performing measurements, all contribute to the possibility of additional measurement uncertainties or significant measurement errors which may not have been initially considered. For this reason, a good NDA program should have a strong technical lead, who is out in the field performing walk downs of the area and items to be measured, evaluating the problems which the operators are experiencing in performing field measurements, and writing easy to use measurement plans for upcoming measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding Material Strength Variabilities and Uncertainties for Component Qualification (2020 LDRD Final Report)

At its core, material specification and materials qualification require an understanding of the uncertainties in relation to a given performance metric. When simulations are used to inform the design and evaluation of these metrics, it is essential to understand the uncertainties in the underlying models and parameters that feed into those simulations. In this work, we have created a statistical framework to address uncertainties in the materials strength modeling used in integrated simulations. The framework is based on the Bayesian methodology, which allows for uncertainties to be updated as new data become available. The results of this work show how model parameters and their uncertainties can be updated as new and different types of strength data are added, as well as methods for determining which future experiment has the greatest potential to reduce the uncertainty. The statistical framework developed in this project will be utilized to assess and propagate the uncertainties in the strength models used in the programmatic simulations and to create a way to formally update those uncertainties as new data become available.

36 MATERIALS SCIENCE↗