Search NASA⌕ Search

SEARCH · Search NASA

Results for “project managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

DBMS as a Tool for Project Management

Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

Linder, H.↗

Conclusions of A Mini Technical Interchange Meeting on New Cross Risk Integration Projects Managed By the NASA Space Radiation Element

To enable deep space exploration and sustained human presence in space, the NASA Human Research Program’s (HRP) Space Radiation Element (SRE) funds research to characterize and mitigate adverse health outcomes from exposure to space radiation. Recently, the Space Radiation Element was tasked with supporting multiple HRP Elements with innovative and enabling projects to inform risk characterization, facilitate mitigation activities, and support crew health and performance. These projects, such as precision health initiative, NASA Omics Archive (NOA) and human sample repositories, are agnostic to any HRP Element, hence the name, Cross Risk Integration Projects (CRIP). CRIP serves three broad purposes: Services: Generate samples/data or manage the receipt, inventory, archive and ultimate redistribution of biospecimens created in HRP-funded spaceflight and analog research activities – includes NASA Omics Archive (NOA) project and various human and animal sample repositories. Method Development: Identify and evaluate, new-to-NASA research or analysis methods or techniques – includes TRRaC (Translational Radiation Research and Countermeasures) Project. Enabling Capabilities: Demonstrate real world application by adapting, adopting and/or developing capabilities to benefit crew health & performance and improve risk – includes Precision Health Initiative (Pharmacogenomics) and advanced biological systems and engineered tissue microsystems initiative (tissue chips, organ-on-a-chip). To identify new technologies, future work, and solicitations, the SRE organizes themed sessions at annual HRP Investigators’ Workshops (IWS). These technical interchange meetings (TIMs) provide a venue for the scientific community to present ongoing work and engage in open discussion, limitations of current approaches, and incorporation of novel experimental strategies and other innovative techniques. Here a summary and lessons learned from the SRE-sponsored mini-TIM titled “Space Radiation Cross Risk Integrations Projects” at HRP IWS 2024 will be communicated. The 90-min TIM had 6 speakers who presented impressive novel ideas and work This poster presents the outcomes of the session along with proposed future workshops and other SRE initiatives.

Janapriya Saha↗

Conclusions of a Mini Technical Interchange Meeting on New Cross Risk Integration Projects Managed by the NASA Space Radiation Element

To enable deep space exploration and sustained human presence in space, the NASA Human Research Program’s (HRP) Space Radiation Element (SRE) funds research to characterize and mitigate adverse health outcomes from exposure to space radiation that include risks of carcinogenesis, cardiovascular disease, and central nervous system decrements. Recently, the SRE was tasked with supporting multiple HRP Elements with innovative and enabling projects to inform risk characterization, facilitate mitigation activities, and support crew health and performance. These projects, such as precision health initiative, NASA Omics Archive (NOA) and human sample repositories, are agnostic to any HRP Element, hence the name, Cross-Risk Integration Projects (CRIP). CRIP serves 3 broad purposes: - Services: Generate samples and data and manage the receipt, inventory, archive, and ultimate redistribution of biospecimens created in HRP-funded spaceflight and analog research activities—includes NASA Omics Archive project and various human and animal sample repositories. - Method Development: Identify and evaluate new-to-NASA research or analysis methods or techniques that could fundamentally improve existing or planned research efforts—includes the Translational Radiation Research and Countermeasures Project. - Enabling Capabilities: Demonstrate real-world application by adapting, adopting, and/or developing capabilities to benefit crew health and performance and improve risk mitigation—includes Precision Health Initiative (Pharmacogenomics) and advanced biological systems and engineered tissue microsystems initiative (tissue chips, organ-on-a-chip). To identify new technologies, future work, and solicitations, the SRE organizes themed sessions at annual HRP Investigators’ Workshops (IWS). These technical interchange meetings (TIMs) provide a venue for the scientific community to present ongoing work and engage in open discussion of results, limitations of current approaches, and incorporation of novel experimental strategies, model systems, and other innovative techniques. Here, a summary of the studies presented at the SRE-sponsored mini-TIM at the HRP IWS along with the goals and objectives of the CRIP projects is communicated. The 90-min TIM had 6 speakers who presented impressive novel ideas and work, some of which are funded under CRIP by the Space Radiation Element.

Janapriya Saha↗

Project management - Factors leading to success or failure

This paper presents initial findings of a study designed to detail the relationships among situational, structural, and process variables as they relate to project effectiveness. In the paper, emphasis is placed on delineating those variables which tend to improve and those which tend to impede project effectiveness.

Kelley, A. J.↗

How Formal Methods Impels Discovery: A Short History of an Air Traffic Management Project

In this paper we describe a process of algorithmic discovery that was driven by our goal of achieving complete, mechanically verified algorithms that compute conflict prevention bands for use in en route air traffic management. The algorithms were originally defined in the PVS specification language and subsequently have been implemented in Java and C++. We do not present the proofs in this paper: instead, we describe the process of discovery and the key ideas that enabled the final formal proof of correctness

Butler, Ricky W.↗

Project Management of the Capsule Parachute Assembly System (CPAS)

Since the time of contract award of the Orion Crew Exploration Vehicle in 2006, NASA has spearheaded the design, development, test and evaluation of the Orion aerodynamic decelerator system through a Government Furnished Equipment project in the Engineering Directorate of the Johnson Space Center. This paper will describe the Project structure and organization, the interfaces to the major stakeholders, the processes applied, and a few major budget, schedule and technical challenges overcome.

Johnson, Chris J.↗

WISE: Automated support for software project management and measurement

One important aspect of software development and IV&V is measurement. Unless a software development effort is measured in some way, it is difficult to judge the effectiveness of current efforts and predict future performances. Collection of metrics and adherence to a process are difficult tasks in a software project. Change activity is a powerful indicator of project status. Automated systems that can handle change requests, issues, and other process documents provide an excellent platform for tracking the status of the project. A World Wide Web based architecture is developed for (a) making metrics collection an implicit part of the software process, (b) providing metric analysis dynamically, (c) supporting automated tools that can complement current practices of in-process improvement, and (d) overcoming geographical barrier. An operational system (WISE) instantiates this architecture allowing for the improvement of software process in a realistic environment. The tool tracks issues in software development process, provides informal communication between the users with different roles, supports to-do lists (TDL), and helps in software process improvement. WISE minimizes the time devoted to metrics collection, analysis, and captures software change data. Automated tools like WISE focus on understanding and managing the software process. The goal is improvement through measurement.

Ramakrishnan, Sudhakar↗

The work breakdown structure in software project management

A work breakdown structure (WBS) is defined as an enumeration of all work activities in hierarchic refinement of detail which organizes work to be done into short manageable tasks with quantifiable inputs, outputs, schedules, and assigned responsibilities. Some of the characteristics and benefits of the WBS are reviewed, and ways in which these can be developed and applied in software implementation projects are discussed. Although the material is oriented principally toward new-software production tasks, many of the concepts are applicable to continuing maintenance and operations tasks.

Tausworthe, R. C.↗

AgRISTARS: Foreign commodity production forecasting. Minutes of the annual formal project manager's review, including preliminary technical review reports of FY80 experiments

The U.S./Canada wheat/barley exploratory experiment is discussed with emphasis on labeling, machine processing using P1A, and the crop calendar. Classification and the simulated aggregation test used in the U.S. corn/soybean exploratory experiment are also considered. Topics covered regarding the foreign commodity production forecasting project include: (1) the acquisition, handling, and processing of both U.S. and foreign agricultural data, as well as meteorological data. The accuracy assessment methodology, multicrop sampling and aggregation technology development, frame development, the yield project interface, and classification for area estimation are also examined.

Source record↗

Artificial intelligence - New tools for aerospace project managers

Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.

Moja, D. C.↗

ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

DellaCorte, Christopher↗

Gas Dynamic Spray Technology Demonstration Project Management

The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

Lewis, Pattie↗

Agile Project Management for Research Software [Slides]

Scrum is an agile process that allows us to focus on delivering the highest business value in the shortest time. It allows us to rapidly and repeatedly inspect actual working software (every two weeks to one month). The business sets the priorities. Teams self-organize to determine the best way to deliver the highest priority features. Every two weeks to a month anyone can see real working software and decide to release it as is or continue to enhance it for another sprint.

97 MATHEMATICS AND COMPUTING↗