Search NASA⌕ Search

SEARCH · Search NASA

Results for “propagation delay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

HydroCube Mission Concept: P-Band Signals of Opportunity for Remote Sensing of Snow and Root Zone Soil Moisture

We have developed the HydroCube mission concept with a constellation of small satellites to remotely sense Snow Water Equivalent (SWE) and Root Zone Soil Moisture (RZSM). The HydroCube satellites would operate at sun-synchronous 3-day repeat polar orbits with a spatial resolution of about 1-3 Km. The mission goals would be to improve the estimation of terrestrial water storage and weather forecasts. Root-zone soil moisture and snow water storage in land are critical parameters of the water cycle. The HydroCube Signals of Opportunity (SoOp) concept utilizes passive receivers to detect the reflection of strong existing P-band radio signals from geostationary Mobile Use Objective System (MUOS) communication satellites. The SWE remote sensing measurement principle using the P-band SoOp is based on the propagation delay (or phase change) of radio signals through the snowpack. The time delay of the reflected signal due to the snowpack with respect to snow-free conditions is directly proportional to the snowpack SWE. To address the ionospheric delay at P-band frequencies, the signals from both MUOS bands (360-380 MHz and 250-270 MHz) would be used. We have conducted an analysis to trade off the spatial resolution for a space-based sensor and measurement accuracy. Through modeling analysis, we find that the dual-band MUOS signals would allow estimation of soil moisture and surface roughness together. From the two MUOS frequencies at 260 MHz and 370 MHz, we can retrieve the soil moisture from the reflectivity ratio scaled by wavenumbers using the two P-band frequencies for MUOS. A modeling analysis using layered stratified model has been completed to determine the sensitivity requirements of HydroCube measurements. For mission concept demonstration, a field campaign has been conducted at the Fraser Experimental Forest in Colorado since February 2016. The data acquired has provided support to the HydroCube concept.

Derksen, Chris↗

UAS-Based P-Band Signals of Opportunity for Remote Sensing of Snow and Root Zone Soil Moisture

We have developed the P-band Signals of Opportunity (SoOp) sensor based on the Unmanned Aircraft System (UAS) to remotely sense Snow Water Equivalent (SWE) and Root Zone Soil Moisture (RZSM). The P-band UAS SoOp sensor for Hydrology (UASHydro) would operate on the S2 aircraft developed by Black Swift Technologies for sensing of SWE and RZSM with a spatial resolution of about 10m. Root-zone soil moisture and snow water storage in land are critical parameters of the water cycle. The long-term goal of our development would be to use small UAS to perform regional high resolution observation of two key hydrological measurements to improve the estimation of terrestrial water storage for water management, crop production and forecasts of natural hazard. The UASHydro concept utilizes passive receivers to detect the reflection of strong existing P-band radio signals at the 360-380 MHz band from geostationary Mobile Use Objective System (MUOS) communication satellites launched by the US Navy. The SWE remote sensing measurement principle using the P-band SoOp is based on the propagation delay (or phase change) of radio signals through the snowpack. The time delay of the reflected signal due to the snowpack with respect to snow-free conditions is directly proportional to the snowpack SWE, while the soil moisture can be retrieved from the reflectivity at the P-band frequencies for MUOS. We have been conducting ground-based campaigns to test the instrumentation and data processing methods at the Fraser Experimental Forest in Colorado since February 2016. The field campaign data has provided support to the measurement concept. To install the SoOp technologies on the UAS, a lightweight antenna has been built and interfaces with the S2 built by Black Swift Technologies have been completed. A set of flights have been planned starting April 2018 through the end of 2018 in Colorado.

Elston, Jack↗

Analysis of Impacts of Terminal Restrictions on Departures in D10 TRACON

The D10 – Dallas-Fort Worth Terminal Radar Approach CONtrol (TRACON) is an air traffic facility that controls and manages aircraft and airspace that consists of multiple airports located in the North Texas area. From an air traffic management standpoint, one of the main challenges in the D10 TRACON is the departure fix capacity as multiple airports compete for resources. This problem is magnified when en route demand/capacity imbalance and inclement weather around the TRACON reduce the capacity at the terminal fixes. This leads to multiple, dynamic Traffic Management Initiative (TMI) restrictions being issued by the Air Traffic Control (ATC) on departing flights. This, in turn, propagates delay to the surface of each airport within the metroplex. The NASA Airspace Technology Demonstration 2 (ATD-2) Phase 3 is deployed in D10 to demonstrate new technologies developed to manage the Integrated Arrival, Departure, and Surface (IADS) traffic in a metroplex environment where multiple airports are interacting and sharing resources at the terminal boundary. This paper uses the ATD-2 terminal restriction data collected in the D10 TRACON to quantify the impact of restrictions on the demand, analyze the relation between terminal restrictions and departure taxi time on airport surface, and establish relationships between restrictions and surface delay. We found that the restrictions on departure flights have a direct adverse effect on departure excess taxi time on the airport surface.

ATD-2↗

Analysis of Impacts of Terminal Restrictions on Departures in D10 TRACON

The D10 – Dallas-Fort Worth Terminal Radar Approach CONtrol (TRACON) is an air traffic facility that controls and manages aircraft and airspace that consists of multiple airports located in the North Texas area. From an air traffic management standpoint, one of the main challenges in the D10 TRACON is the departure fix capacity as multiple airports compete for resources. This problem is magnified when en route demand/capacity imbalance and inclement weather around the TRACON reduce the capacity at the terminal fixes. This leads to multiple, dynamic Traffic Management Initiative (TMI) restrictions being issued by the Air Traffic Control (ATC) on departing flights. This, in turn, propagates delay to the surface of each airport within the metroplex. The NASA Airspace Technology Demonstration 2 (ATD-2) Phase 3 is deployed in D10 to demonstrate new technologies developed to manage the Integrated Arrival, Departure, and Surface (IADS) traffic in a metroplex environment where multiple airports are interacting and sharing resources at the terminal boundary. This paper uses the ATD-2 terminal restriction data collected in the D10 TRACON to quantify the impact of restrictions on the demand, analyze the relation between terminal restrictions and departure taxi time on airport surface, and establish relationships between restrictions and surface delay. We found that the restrictions on departure flights have a direct adverse effect on departure excess taxi time on the airport surface.

ATD-2↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Urban Air Mobility (UAM) is a new transportation concept that enables highly automated, cooperative, passenger or cargo-carrying air transportation services in and around urban areas. To achieve the high level of operational density and complexity desired by the UAM community, an airspace system that allows UAM operators to readily access and operate safely and efficiently in the airspace is needed. This airspace system will require air traffic management designed to reduce the risk of conflicts and loss of separation between UAM flights. In general, strategic conflict management is considered as the first layer of conflict management for safe flight operations to condition the traffic to reduce the need for airborne separation provision, the second layer of conflict management. Demand Capacity Balancing (DCB) is one of the concept components to achieve strategic conflict management. DCB strategically evaluates traffic demand and resource capacities to allow UAM operators to determine when, where and how they operate, while mitigating conflicting needs for airspace and vertiport capacity. DCB can be applied whenever UAM demand exceeds the capacity in airspace or at vertiports. As the UAM ecosystem evolves with advanced technologies and matured operational procedures, more complicated conflict management will likely be needed. In the current UAM ‘Concept of Operation (ConOps) 1.0’ operational stage defined by FAA, however, it will be meaningful to explore the demand capacity balancing at vertiports only, as an initial strategic conflict management approach for UAM operations because vertiport capacity seems to be a bottleneck of UAM traffic. For this research, we developed a demand-capacity imbalance detection and resolution service for UAM. This DCB service identifies the demand from operators and compares the demand to a given capacity at the shared resources (i.e., vertiports) over the upcoming time horizon which is divided into time bins having a constant interval. When a new flight plan is submitted, the algorithm embedded in the DCB service checks the available time bins based on the desired departure time and estimated arrival time at origin and destination vertiports, respectively. If the time bins for the originally desired times are already occupied by other flights (i.e., demand is at or above capacity), the algorithm finds the next available time bins for takeoff and landing and shifts the conflicting departure time to the earliest time that satisfies the capacity constraints at both origin and destination vertiports. The details of the algorithm will be described in the final manuscript. Figure 1 shows that the proposed DCB algorithm works well for a sample traffic scenario. In this example, a total of 144 flights, split between two operators, are planned over 2 hours, traveling 10 routes between five vertiports. In the heatmaps, the horizontal axis shows 12 time bins where each bin represents a 12-minute interval, and the vertical axis shows five vertiports. The number in each cell shows the number of operations, counting both departures and arrivals, at a specific vertiport in each time bin. For the given capacity of 2 operations/vertiport/bin, Figure 1 shows that the original demand sometimes exceeds the capacity, but the modified demand is reduced to the given capacity after resolving demand-capacity imbalances. When UAM flights are operated, it is expected that many practical issues would arise in the federated system architecture with multiple operators. UAM operators may experience a time synchronization issue due to communication delay between operator and vehicle. UAM vehicles would fly at different flight speeds, depending on vehicle models. Actual departure and arrival times can have large variations, compared to the schedule. The lead time from flight plan submission to desired departure time can vary by service type (e.g., regular shuttle service vs. on-demand service). Using the proposed DCB algorithm, we also investigated how the actual flight schedule and DCB performance are affected by these uncertainties such as unsynchronized times between operators, flight speed differences, lead time differences, and departure time errors. The final manuscript will include the background of this research work, the description of the DCB algorithm and its use cases with traffic scenarios. It will also provide the analytical results about the impact of various uncertainties that can occur in actual UAM operations on the DCB at vertiports, in terms of demand distribution changes, number of simultaneous operations, and delay propagation.

Urban Air Mobility↗

Extending the Licklider Transmission Protocol to Multi-Band Links

Most deep space missions return data to Earth using links operating at a single frequency band. Indeed, their data requirements are low enough that bandwidth regulations do not constrain the system. In contrast, spacecraft such as Kepler or Europa Clipper are transitioning to a new operational paradigm where engineering and science data are transmitted through simultaneous links operating at different frequency bands (henceforth termed multi-band links). This ensures, for instance, that critical data is correctly received using a well characterized X-band link, while science data at a much larger data rate can be returned efficiently (both in terms of bandwidth and energy) through a Ka-band link.Having a spacecraft establish two simultaneous links with a ground station opens a large span of potential improvements for space communications and mission operations. In this paper, we consider the problem of running a Licklider Transmission Protocol (LTP) session over a multi-band link. LTP is an implementation of a selective Automatic Repeat reQuest (ARQ) protocol, i.e. it ensures correct delivery of data over an error prone link with potentially long propagation delays. To maximize its efficiency in deep space environments, LTP operates in deferred-ACK mode and is typically included as one of the core protocols in the Delay Tolerant Networking (DTN) suite.The contributions of this paper are as follows: First, we propose an extension to LTP for multi-band links (denoted MBLTP) and sketch how it can be implemented without modifying the current definition of LTP data units. Next, we develop bounds on the performance of MBLTP when transmitting a single data file over a multi-band link. Three metrics are considered, file expected delivery time, total energy spent and bundle jitter. The results of the analytic model are first benchmarked against simulations to ensure validity, and then compared against the performance of both traditional LTP and Parallel LTP (PLTP).We demonstrate that MBLTP can significantly reduce the latency and jitter with which data products are delivered to destination over a deep space link compared to LTP at moderate energy cost. Similarly, we also demonstrate that MBLTP outperforms PLTP in all considered metrics.

Sanchez Net, Marc↗

Precision Synchronization for Free-Space Quantum Networking

Precision synchronization is vital for robust long-distance quantum networking over fiber and free-space channels for which high-fidelity entanglement swapping between separate sources via an optical Bell state measurement requires temporal overlap of photonic qubits arriving from either source. This challenge is particularly distinct in satellite-based entanglement distribution in which relative motion, channel effects, and propagation delay must be addressed. This work presents a precision synchronization method for free space entanglement distribution, and reports on risk reduction testing in a quantum networking testbed at MIT Lincoln Laboratory. Primary consideration is for a dual-uplink architecture in which photons from entanglement sources at two ground locations interact in an optical Bell-state measurement implemented on a satellite in a low-earth orbit. The control approach uses independent entanglement sources at each ground location supplemented with a synchronization signal for feedback control from a timing discriminant measured at the spacecraft. The approach is being implemented in a laboratory testbed using 1-GHz repetition rate 1550-nm band entanglement sources generating ~10-MHz source entanglement rates with few-ps photon pulse lengths. The paper describes both fundamental architectural considerations and practical implementation details.

quantum↗

Emulated Spacecraft Communication Testbed for Evaluating Cognitive Networking Technology

The ability to emulate the full space protocol stack is an essential aspect required to evaluate and mature cognitive communication capabilities. The interaction between the physical layer and network layers is key to developing network optimizations for a dynamic and complex environment. We present a laboratory testbed for the evaluation of cognitive radio and networking techniques applied to space communications. The testbed is a high fidelity, flight-like hardware testbed consisting of software-defined radios, channel emulators, modems, and orbital analysis and scheduling software. The testbed uses RF links with signal quality, propagation delay, and Doppler effects driven by orbital mechanics simulations of emulated spacecraft. Our framework enables control of link bidirectionality, data rates, and interference sources. In addition to hardware radio nodes, the testbed can incorporate virtualized emulated nodes for larger and more challenging network scenarios. Our approach to a cognitive communication system uses delay tolerant networking (DTN) to mitigate the challenges of the space environment. While many DTN networks use only preplanned schedules, our system uses User-Initiated Service (UIS) to dynamically schedule service providers. Software-defined radio allows the system to adapt to a variety of service providers. Integration of DTN, UIS, and software-defined radio technologies provides a framework for the implementation of a cognitive communication system. This paper describes the testbed capabilities, network emulation approach, component integration, and initial end-to-end testing results.

cognitive radio↗

Evaluating a Cognitive Extension for the Licklider Transmission Protocol in a Spacecraft Emulation Testbed

In space communications, particularly when involving regions beyond cislunar space, the development of advanced networking solutions is essential to address the challenges posed by limited connectivity, substantial propagation delays, and radio signal variations. This study explores a data-driven approach to the Licklider Transmission Protocol (LTP), specifically focusing on dynamically adjusting the maximum payload size of segments. Prior research has emphasized the potential benefits of dynamically adjusting this parameter, introducing the concept of Cognitive LTP. This paper presents a software implementation of Cognitive LTP (CLTP) within an open-source Delay Tolerant Networking (DTN) framework, specifically the High-rate Delay Tolerant Networking (HDTN), and experimentally evaluates its performance under realistic space conditions. Leveraging the Cognitive Ground Testbed (CGT), developed by NASA GRC for spacecraft communication emulation, this study effectively bridges the gap between theoretical advancements and practical applications. By thoroughly analyzing CLTP’s functionality within the CGT, this research offers insights into the practical implications of adaptive networking strategies, emphasizing the importance of conducting tests in relevant environments for the maturation of space communication technologies.

Delay Tolerant Networking↗

Obtaining Reliable Predictions of Terrestrial Energy Coupling From Real-Time Solar Wind Measurement

The first draft of a manuscript titled "Variable time delays in the propagation of the interplanetary magnetic field" has been completed, for submission to the Journal of Geophysical Research. In the preparation of this manuscript all data and analysis programs had been updated to the highest temporal resolution possible, at 16 seconds or better. The program which computes the "measured" IMF propagation time delays from these data has also undergone another improvement. In another significant development, a technique has been developed in order to predict IMF phase plane orientations, and the resulting time delays, using only measurements from a single satellite at L1. The "minimum variance" method is used for this computation. Further work will be done on optimizing the choice of several parameters for the minimum variance calculation.

Weimer, Daniel R.↗

Accuracy of wet troposphere radio path delay estimated from infrared emission

Several radio science applications require determination of the excess radio-propagation path delay caused by the Earth's atmosphere. These include very long baseline interferometry, spacecraft tracking, and potentially, detection of gravitational waves utilizing a link to a distant interplanetary spacecraft. At Ka band, the major source of variability of path delay is the fluctuations in the moisture content of the troposphere. The path delay characterization requirements for a planned gravitational wave experiment are novel and challenging. the error contribution to the phase observations due to path delay variation must be reduced by nearly two orders of magnitude over that occurring naturally on time scales of 100 to 10,000 seconds. Current approaches relying on microwave water vapor radiometry with ancillary data can deliver one order of magnitude calibration of these fluctuations, and more advanced systems are under development within the 2001-2002 time frame of the Cassini Mission to Saturn. The current work evaluates the potential for an alternative observational approach, using a ground-based Fourier transform spectrometer.

Parker, J. W.↗

Microwave delay characteristics of Cassegrainian antennas

A technique is presented in which the time an RF signal is delayed in propagating through a Cassegrain antenna is determined. The technique utilizes the group delay time and the envelope delay time as found from the antenna transfer function. The calculations show that a focused antenna is basically a nondispersive device whose delay time may be found from an optics formula. Small subreflector displacements result in significant delay changes requiring calibrations for many applications.

Cha, A. G.↗

Optimum strategies and performance for the remote sensing of path-delay using ground-based microwave radiometers

Computer simulations were used to study the accuracy of remotely sensed microwave radiometer measurements of excess radio propagation path delay due to atmospheric water vapor. A number of strategies were investigated for remote sensing of path delay in order to define baseline parameters for the design of water vapor radiometers (WVRs) in geodetic applications. Strategies were judged according to their retrieval performance in a variety of climatological regions. An observing approach using the frequency 20.7/22.2/31.4 Gz was found to be close to optimum. A statistical retrieval approach using retrieval coefficients stratified for clear and cloudy weather was identified as a substantial improvement over conventional single-set all-weather retrieval strategies. It is shown that a reasonably well optimized WVR with an estimated calibration uncetainty of 0.5 K can achieve an overall retrieval performance of 0.27 cm in clear weather; and 0.51 cm in cloudy weather. The weather-averaged retrieval performance for individual locations was found to vary by no more than 14 percent from the average for all locations despite a mean path delay of 5 to 26 cm.

Gary, B. L.↗

Control Software for a High-Performance Telerobot

A computer program for controlling a high-performance, force-reflecting telerobot has been developed. The goal in designing a telerobot-control system is to make the velocity of the slave match the master velocity, and the environmental force on the master match the force on the slave. Instability can arise from even small delays in propagation of signals between master and slave units. The present software, based on an impedance-shaping algorithm, ensures stability even in the presence of long delays. It implements a real-time algorithm that processes position and force measurements from the master and slave and represents the master/slave communication link as a transmission line. The algorithm also uses the history of the control force and the slave motion to estimate the impedance of the environment. The estimate of the impedance of the environment is used to shape the controlled slave impedance to match the transmission-line impedance. The estimate of the environmental impedance is used to match the master and transmission-line impedances and to estimate the slave/environment force in order to present that force immediately to the operator via the master unit.

Kline-Schoder, Robert J.↗

Improved Estimation Of Delays In Radio Interferometry

Report describes status of mathematical model of delays in propagation of radio signals that originate at extra-galactic or other distant sources and received at widely separated terrestrial antennas engaged in very-long-baseline interferometry. Implemented in multiparameter estimation computer program MODEST. Needed, in applications as geodynamics and astronomy, to extract significant parameters from observed signal delays. Program and present report are updated versions of MASTERFIT program and accompanying report.

Sovers, Ojars J.↗

Delay time measurements of the propagation of radio waves in the atmosphere

The characteristics and operation of the Geodetic Secor System are described. The precision of the ionospheric radiation measurements was determined by a collocation experiment. The EGRS-13 satellite, which was used in the experiment, is discussed. The geodetic network is shown in a diagram form. Conclusions resulting from the experiments are reported.

Rohde, F.↗