Search NASA⌕ Search

SEARCH · Search NASA

Results for “pumping test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Specimen for evaluating pressure pulse cavitation in rock formations

An apparatus 300 for simulating a pulsed pressure induced cavitation technique (PPCT) from a pressurized working fluid (F) provides laboratory research and development for enhanced geothermal systems (EGS), oil, and gas wells. A pump 304 is configured to deliver a pressurized working fluid (F) to a control valve 306, which produces a pulsed pressure wave in a test chamber 308. The pulsed pressure wave parameters are defined by the pump 304 pressure and control valve 306 cycle rate. When a working fluid (F) and a rock specimen 312 are included in the apparatus, the pulsed pressure wave causes cavitation to occur at the surface of the specimen 312, thus initiating an extensive network of fracturing surfaces and micro fissures, which are examined by researchers.

03 NATURAL GAS↗

Fast-airflow tumble clothes dryer with small thermoelectric heat pump: Experimental evaluation

Residential clothes drying accounts for about 5% of the total residential-sector energy consumption in the United States. Most dryers use electric resistance heaters to dry clothes and have low efficiencies. Higher-efficiency dryers that use vapor compression heat pumps are expensive and complex and have not gained a large market share in the United States. A novel tumble clothes dryer using a small thermoelectric heat pump with faster airflow than typical dryers is presented in this work. The benchtop performance of the thermoelectric heat pump and high-speed blower are presented, and the development of the prototype dryer is described. The dryer was tested for efficiency and dry time for a range of airflow rates and applied currents to the thermoelectric heat pump. The combined efficiency factor was 5.09–6.29 lb BDW /kWh (specific moisture extraction rate of 1.23–1.53 kg w /kWh) with 100–138 min dry times for these tests. The measured efficiency was 36 %–68 % greater than the minimum efficiency standard in the United States, and compared with vapor compression heat pump–based clothes dryers, the prototype dryer had less expensive, less complex components and did not use refrigerants. Finally, the performance of this small thermoelectric heat pump clothes dryer is also compared with previous iterations of the thermoelectric tumble clothes dryer described in the literature.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Test and Thermal Performance Comparison of a Novel Underground Thermal Battery with a Single U-tube Borehole Heat Exchanger for Geothermal Heat Pump Application

Geothermal Heat Pumps (GHP) are a proven technology to electrify and decarbonize space heating and cooling by utilizing the thermally consistent underground as a heat sink or source. However, the high drilling costs of conventional borehole heat exchangers (BHEs) associated with GHP systems and subsurface heterogeneity have been two major challenges to their widespread adoption. In this paper, we present results from a field-scale pilot of an Underground Thermal Battery (UTB) as a potential alternative to a conventional BHE. To benchmark the UTB performance, a side-by-side field test was conducted to compare the UTB with a conventional BHE installed at the same site. The UTB was installed in a 7.01-meter-deep borehole having a diameter of 0.9 meter, whereas the conventional BHE (with single U-tube loop) is in a borehole with 36.6-meter depth and 0.15-meter diameter. Both are integrated into a GHP system to meet the thermal energy demands of office space at the Illinois Energy Farm on the University of Illinois Urbana-Champaign campus. The system’s performance is compared in terms of heat transfer rate, outlet temperatures, and contributions to the overall thermal power of the GHP system under varying thermal demands and in different heat pump operation modes: heating only, cooling only, and hybrid (alternative, diurnal heating and cooling). Results to date indicate that the UTB delivers a more consistent response under during a time period of varying thermal demands. Its operational performance is better during short-term with higher thermal demands, while the conventional BHE performs better under continuous, long-term thermal demands.

Pokhrel, Sajjan [ORNL] (ORCID:0000000228523749)↗

Deep learning–based digital twins for heat pumps

Heat pumps are effective cooling and heating appliances to save energy in buildings. However, traditional heat pump models are challenging to integrate with building demands in a co-simulation environment because of the nonlinear thermodynamics of refrigerants. Developing digital twin representatives for heat pumps capable of faster calculations with good accuracy is desirable. This study aimed to establish a generic deep learning–based digital twin for heat pumps with a large amount of high-fidelity data. Two refrigerants for two different heat pumps were considered: an air source heat pump with refrigerant R-410A, an air source heat pump with refrigerant CO 2 , a water source heat pump with refrigerant R-410A, and a water source heat pump with refrigerant CO 2 . Furthermore, results showed that the deep learning (long short-term memory) models effectively represented these four heat pumps as a digital twin: (a) accuracy for training and testing showed smaller than 0.02 for heating electricity and heating demands, and (b) the digital twins showed good consistency with original data for heating electricity and heating demands (root mean square errors of less than 0.12 W and 0.19 W, respectively). Therefore, deep learning–based heat pump models can be used in the co-simulation of building mechanical systems.

Air source heat pump↗

Three-Photon Optical Pumping for Trapped Ion Quantum Computing

In this report we describe the testing of a novel scheme for state preparation of trapped ions in a quantum computing setup. This technique optimally would allow for similar precision and speed of state preparation while allowing for individual addressability of single ions in a chain using technology already available in a trapped ion experiment. As quantum computing experiments become more complicated, mid-experiment measurements will become necessary to achieve algorithms such as quantum error correction. Any mid-experiment measurement then requires the measured qubit to be re-prepared to a known quantum state. Currently this involves the protected qubits to be moved a sizeable distance away from the qubit being re-prepared which can be costly in terms of experiment length as well as introducing errors. Theoretical calculations predict that a three-photon process would allow for state preparation without qubit movement with similar efficiencies to current state preparation methods.

97 MATHEMATICS AND COMPUTING↗

PARTICULATE STUDY OF NEG PUMPS IRRADIATED IN THE CEBAF TUNNEL

Non-evaporable getter (NEG) pumps are being used to maintain ultra-high vacuum in the beamline of superconducting radio-frequency (SRF) accelerators, such as the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Because of the sensitivity of the performance of SRF cavities to particulate contamination, it is important to evaluate the integrity of the NEG material after exposure to high radiation during beam operation. The particulate from two NEG pumps based on ZAO® getter alloy was measured with a particle counter in a clean-room. The pumps were assembled onto a hermetically sealed setup which was placed in the CEBAF tunnel. The setup was exposed to 24 h beam operation for ~ 230 days. The total gamma-rays dose measured on the test setup was ~ 1.6 Mrad. The total neutron dose measured at ~ 75 cm of the test setup was ~ 11 krad. The particulate count from the two pumps was measured again in the clean-room after irradiation. Whereas an increase of particulate counts was measured, compared to before irradiation, subsequent measurements indicate the absence of systematically loose particulate. The pumping speed of one of the irradiated pumps was also measured to be consistent with that of a non-irradiated one, corroborating the absence of significant damage to the ZAO® NEG material due to irradiation.

Ciovati, G. [Thomas Jefferson National Accelerator↗

PARTICULATE STUDY OF NEG PUMPS IRRADIATED IN THE CEBAF TUNNEL

Non-evaporable getter (NEG) pumps are being used to maintain ultra-high vacuum in the beamline of superconducting radio-frequency (SRF) accelerators, such as the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Because of the sensitivity of the performance of SRF cavities to particulate contamination, it is important to evaluate the integrity of the NEG material after exposure to high radiation during beam operation. The particulate from two NEG pumps based on ZAO® getter alloy was measured with a particle counter in a clean-room. The pumps were assembled onto a hermetically sealed setup which was placed in the CEBAF tunnel. The setup was exposed to 24 h beam operation for ~ 230 days. The total gamma-rays dose measured on the test setup was ~ 1.6 Mrad. The total neutron dose measured at ~ 75 cm of the test setup was ~ 11 krad. The particulate count from the two pumps was measured again in the clean-room after irradiation. Whereas an increase of particulate counts was measured, compared to before irradiation, subsequent measurements indicate the absence of systematically loose particulate. The pumping speed of one of the irradiated pumps was also measured to be consistent with that of a non-irradiated one, corroborating the absence of significant damage to the ZAO® NEG material due to irradiation.

Ciovati, Gianluigi [Thomas Jefferson National Acce↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of EM Pump Modeling Capability for VTR

SAS4A/SASSYS-1 is a simulation tool used to perform deterministic analyses of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. Most recently, SAS4A/SASSYS-1 has been selected as the safety analysis software for the Versatile Test Reactor (VTR), a new materials testing Sodium Fast Reactor (SFR) to be built by the Department of Energy. In order to support analysis of the VTR, which will utilize ElectroMagnetic (EM) pumps as the primary coolant pumps, the development of new EM pump modeling capabilities has been initiated for SAS4/SASSYS-1. The new physics-based EM pump model captures systems-level transient performance based on equivalent circuit theory and is highly flexible to model a wide range of electromagnetic pumps of the three-phase linear induction type subject to changes in power supply and plant conditions. Within the equivalent circuit framework, two sub-models are developed to provide options for analysts both with and without a detailed geometric characterization of their pump such that minimal information is required to achieve a realistic working model, but specific details of a particular pump design may be captured if sufficient information is provided. In addition, heat generated from pump operation and its transport through the plant system can be modeled to better capture the behavior of certain transients. This paper will outline the model and derive the governing equations of the new EM pump model. An initial comparison between the simple EM pump model and experimental data is made. This comparison shows that the equivalent circuit model can capture pump performance, with greater accuracy near the rated conditions. In order to demonstrate the transient behavior of the new model, a simple transient with an EM pump replacing the centrifugal pumps in the Advanced Burner Test Reactor is included.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status of EM Pump Modeling Capability for VTR

SAS4A/SASSYS-1 is a simulation tool used to perform deterministic analyses of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. Most recently, SAS4A/SASSYS-1 has been selected as the safety analysis software for the Versatile Test Reactor (VTR), a new materials testing Sodium Fast Reactor (SFR) to be built by the Department of Energy. In order to support analysis of the VTR, which will utilize ElectroMagnetic (EM) pumps as the primary coolant pumps, the development of new EM pump modeling capabilities has been initiated for SAS4/SASSYS-1. The new physics-based EM pump model captures systems-level transient performance based on equivalent circuit theory and is highly flexible to model a wide range of electromagnetic pumps of the three-phase linear induction type subject to changes in power supply and plant conditions. Within the equivalent circuit framework, two sub-models are developed to provide options for analysts both with and without a detailed geometric characterization of their pump such that minimal information is required to achieve a realistic working model, but specific details of a particular pump design may be captured if sufficient information is provided. In addition, heat generated from pump operation and its transport through the plant system can be modeled to better capture the behavior of certain transients. This paper will outline the model and derive the governing equations of the new EM pump model. An initial comparison between the simple EM pump model and experimental data is made. This comparison shows that the equivalent circuit model can capture pump performance, with greater accuracy near the rated conditions. In order to demonstrate the transient behavior of the new model, a simple transient with an EM pump replacing the centrifugal pumps in the Advanced Burner Test Reactor is included.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developments on two lithium vapor-box linear test-stand experiments

The lithium vapor-box divertor is a possible fusion power exhaust solution.It uses condensation pumping to create a gradient of vapor density in a divertor slot; this should allow a stable detachment front without active feedback.As initial explorations of the concept, two test stands which take the form of three connected cylindrical stainless steel boxes are being developed: one without plasma at PPPL, to test models of lithium evaporation and flow; and one for the linear plasma device Magnum-PSI (at DIFFER in Eindhoven, The Netherlands) to test the ability of a lithium vapor cloud to induce volumetric detachment and redistribute the plasma power.The first experiment uses boxes with diameters of 6 cm, joined by apertures with diameters of 2.2 cm. Up to 1 g of Li is placed in one box, which is heated to up to 600 degrees C. The Li evaporates, then flows to and condenses in the two other, cooler boxes over several minutes. The quantity of Li transported is assessed by weighing the boxes before and after the heating cycle, and is compared to the quantity predicted to flow for the box at its measured temperature using a Direct Simulation Monte Carlo code, SPARTA. With good experimental conditions, the two values agree to within 15%.The experiment on Magnum-PSI is in the conceptual design stage.The design is assessed by simulations using the code B2.5-Eunomia.They show that when the hydrogen-ion plasma beam, with n_e = 4e20 per cubic meter, T_e = 1.5 eV, and r = 1 cm, is passed through a 16 cm long, 12 Pa, 625 degree C Li vapor cloud, the plasma heat flux and pressure on the target are significantly reduced compared to the case without Li.With the Li present, the plasma is cooled by excitation of Li neutrals followed by radiation until it volumetrically recombines, lowering the heat flux from 3.7 MW/m^2 to 0.13 MW/m^2, and the pressure is reduced by 93%, largely by collisions of hydrogen ions with neutral Li.

divertor↗

Experimental Evaluation of Refrigerant Leak Characteristics for Different HVAC&R Equipment Types–Phase 2

The US Department of Energy (DOE) Building Technology Office (BTO) and the Air-conditioning, Heating & Refrigeration Technology Institute (AHRTI) collaborated to sponsor an experimental study of refrigerant leak characteristics at Oak Ridge National Laboratory (ORNL); AHRTI project 9012. The project has been conducted in two phases with objectives to conduct refrigerant leak tests on several heating, ventilating, air-conditioning and refrigeration (HVAC&R) systems under operating conditions representative of actual applications to document the pressure decay rate and the mass flow rate of leaked refrigerant as a function of time. Phase 1 of the project ran from late 2017 to late 2018 with refrigerant leaks imposed on five systems and the collection of data to meet the project objectives. Systems chosen covered three air-conditioning (AC) applications (packaged terminal AC or PTAC, 3-ton residential split system AC, and 5-ton packaged rooftop AC) and two refrigeration applications (split system unit cooler, and standalone display case). AHRTI members donated the test systems used for the project. The systems were tested at two different leak rates (catastrophic high rate simulating full line break and a lower flow rate), two leak locations (high-pressure side and low-pressure side), and two operating conditions (compressor ON or OFF). Phase 1 results were summarized in a project report by Baxter, et al. (2019)1. The leak rates imposed in Phase 1 led to much more rapid charge releases than the more typical much slower rates seen in practice that would take days, weeks, or months to empty a system of its entire charge. For Phase 2, the project sponsors asked that the “higher” leak rate target a total charge release time of about 4 min. This was intended to represent a “reasonable” worst case release scenario to match the refrigerant leak rate assumption used in the International Electrotechnical Commission (IEC) standard IEC 60335-2-40 (2016 version [IEC 2016]. A charge release time of about 20–40 min (leak release rate 5 to 10 times lower than higher rate) was targeted for the “lower” leak rate. This report provides a summary of the Phase 2 effort. Two additional HVAC systems were selected for testing in this phase. First was a multi-split air-conditioning (MS-AC) system with one outdoor section and two indoor units and a nameplate refrigerant charge of 1.75 kg (3.86 lb.) of R-410A. The MS-AC was tested in cooling only or AC operation. Second was a split system heat pump coupled to two different representative supply duct systems (HP-duct) and a nameplate charge of 3.83 kg (8.44 lb.) of R-410A. This system was tested in both space heating and AC modes. As in Phase 1 of the project, all tests were conducted using R-410A.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Rapid prediction of fuel research octane number and octane sensitivity using the AFIDA constant-volume combustion chamber

Current research octane number (RON) and motor octane number (MON) gasoline performance characterization techniques use dated, complex engine testing methodology and limit researchers’ ability to easily characterize small volumes of experimental fuels. A novel methodology is presented that correlates measured ignition delay (ID) time to RON in an Advanced Fuel Ignition Delay Analyzer (AFIDA) constant-volume combustion chamber device at a single pressure/temperature condition, with an r2 of 0.99 and standard error (SE) of 1.0. The correlation of the slope of the ID time between two additional temperature points to octane sensitivity (S) produces an r2 of 0.97 and SE of 0.69; however, fuels with S>12 are indistinguishable. These results are based on methodology calibration using 31 primary and toluene reference fuels containing 0%-40% ethanol with RON values ranging from 85 to 113. Validation of these methods using a 102-sample fuel matrix spanning an array of base fuels and additive chemistry designed to test the robust applicability of the method, along with pump gasoline and high-octane surrogate blend samples, demonstrates an r2 of 0.94 and SE of 1.3 for the RON correlation over all samples, whereas the equivalent S correlation produces an r2 of 0.78 and SE of 1.2 by excluding two additives, 3-pentanone and diisobutylene, which displayed poor S correlation results. This novel AFIDA analysis method can be performed in 1 h and with 40 mL of fuel, offering significant improvements in time and volume requirements over traditional techniques.

33 ADVANCED PROPULSION SYSTEMS↗

RELAP-7 Application and Enhancement for FLEX Strategies and ATF Behavior under Extended Loss of AC Power Conditions

This report summarizes the results of a three-year research project sponsored by the U.S. Department of Energy (DOE) Nuclear Energy University Program (NEUP) to enhance and apply the RELAP-7 code by adding and improving several important components (e.g., a mechanistic Reactor Core Isolation Cooling (RCIC) system model) for thermal hydraulic studies of LWRs under ELAP conditions and evaluating the time available for transition to portable FLEX equipment. The project team included University of Massachusetts–Lowell, The Ohio State University, Texas A&M University, Idaho National Laboratory and Oak Ridge National Laboratory. In the Fukushima accident, it was found that the RCIC system played a crucial role in delaying core meltdown by almost three days in Fukushima Daiichi Unit 2, because of self-regulated operation of the steam driven RCIC turbine-pump injection system. Steam flow in the convergent-divergent nozzles of the RCIC Terry turbine is two-phase non-equilibrium transonic flow with homogenous nucleation condensation. To more accurately predict the dynamic process and behavior of the transonic compressible steam flow, a one-dimensional transient two-phase analytical model is presented. A simplified four-fluid model was employed in the present work with the consideration of four separate fluid fields: vapor, liquid film, entrained droplets and condensed droplets. The mass, momentum and energy interactions between the fluids were considered and modeled. An extended seven-equation non-equilibrium critical flow model was developed to obtain the critical pressure and velocities of each phase at the nozzle throat. To predict the wetness in the divergent section, a mechanistic nucleation condensation model was integrated in the nozzle analysis model, considering the generation and consequent growth of droplets. The governing differential equations on a staggered grid were discretized using the second-order Lax-Wendroff scheme with a flux limiter, and the Semi-Implicit Method for Pressure-Linked Equation (SIMPLE) algorithm was employed to solve the discrete linear system. To demonstrate the predictability and reliability of the physical models and the numerical method proposed in the present work, three representative nozzles were modeled and simulated. The results show good agreement with the available experimental data, even for condensation shock. Then, the 1D nozzle model was employed to obtain nozzle flow tables of the Terry turbine nozzle for different working pressures which can cover the operation pressure range of the RCIC system. A mechanistic RCIC turbine-pump system model was developed and implemented in the system code TRACE to simulate dynamic responses of the RCIC system under Beyond Design Basis Accident (BDBA) conditions. The turbine-pump governing equations are based on the control volume approach of the angular momentum balance. The physics based mechanistic RCIC model was developed using the TRACE control system components (i.e., signal variables, control blocks, and tables), and incorporated into a TRACE boiling water reactor (BWR) model. The TRACE model in this report has a detailed nodalization of the reactor pressure vessel (RPV), and all of the major flow paths and system components, including the safety relief valves (SRVs) and the containment suppression pool and drywell. Based on the nozzle flow tables generated from the 1D nozzle model developed, the turbine drive torque can be calculated from table lookup. Since the detailed specifications of the RCIC pump are unavailable, the homologous curves for a Bingham pump were used in the current pump component. A station black-out (SBO) accident test problem was selected to demonstrate the TRACE RCIC model. The short-term SBO simulations were performed for two cladding materials: Zircaloy and FeCrAl, to demonstrate the effect of the accident tolerant fuel cladding on fuel heat-up under BDBA accident conditions. The wetwell plays a vital safety role in SBO and other BWR accident scenarios in that it can reduce containment pressure and supply additional core make-up water. The suppression pool temperature distribution has a very large impact on both RPV and containment pressure. Thus, another novel contribution of the project comes mainly from an improved, systems-level wetwell model which can capture buoyancy-induced thermal stratification effects due to steam injection and condensation. A two-zone stratified wetwell model has been implemented in RELAP-7 and some results from that model are presented. This wetwell model is capable of simulating thermal stratification due to a low steam mass injection rate. With a low mass flow rate, the model assumes that all the steam condenses within the pipe and the resulting plume can be approximated with a purely buoyant, heat-source driven model. The wetwell model developed with these assumptions is adequate to simulate slow transients such as extended SBO transients.

42 ENGINEERING↗

Evaluation of a Potential Groundwater Tracer Test in the Ringold Upper Mud Aquifer at the 100-H Area of the Hanford Site

This document presents an evaluation of a potential groundwater tracer test in the uppermost RUM (Ringold Formation member of Wooded Island – upper mud unit) aquifer in the 100-H Area of the Hanford Site. The results from field electrical resistivity tomography (ERT) investigations, numerical flow and transport (F&T) modeling, coupled ERT-F&T model simulations, and laboratory resin experiments provide the technical basis for evaluating tracer test scenarios that minimize impacts to the 100-HX pump and treat (HX P&T) operations, and maximize hydrologic data acquisitions including the use of advanced surface geophysical techniques for monitoring tracer transport.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Power, Load-Balancing Whole Home Electrification Solution: Cooperative Research and Development (Final Report)

Testing was conducted at the Systems Performance Laboratory in NREL’s Energy Systems Integration Facility to test the performance of 120V wall-mounted heat pumps, 120V heat pump water heaters (HPWH), Electric Vehicle Supply Equipment (EVSE), and other plug-in loads, using NeoCharge Smart Splitters and whole home energy software as appropriate. Four different simulated occupancy scenarios were used to evaluate the package of technology and controls.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Membrane lipid and expression responses of Saccharolobus islandicus REY15A to acid and cold stress

Archaea adjust the number of cyclopentane rings in their glycerol dibiphytanyl glycerol tetraether (GDGT) membrane lipids as a homeostatic response to environmental stressors such as temperature, pH, and energy availability shifts. However, archaeal expression patterns that correspond with changes in GDGT composition are less understood. Here we characterize the acid and cold stress responses of the thermoacidophilic crenarchaeon Saccharolobus islandicus REY15A using growth rates, core GDGT lipid profiles, transcriptomics and proteomics. We show that both stressors result in impaired growth, lower average GDGT cyclization, and differences in gene and protein expression. Transcription data revealed differential expression of the GDGT ring synthase grsB in response to both acid stress and cold stress. Although the GDGT ring synthase encoded by grsB forms highly cyclized GDGTs with ≥5 ring moieties, S. islandicus grsB upregulation under acidic pH conditions did not correspond with increased abundances of highly cyclized GDGTs. Our observations highlight the inability to predict GDGT changes from transcription data alone. Broader analysis of transcriptomic data revealed that S. islandicus differentially expresses many of the same transcripts in response to both acid and cold stress. These included upregulation of several biosynthetic pathways and downregulation of oxidative phosphorylation and motility. Transcript responses specific to either of the two stressors tested here included upregulation of genes related to proton pumping and molecular turnover in acid stress conditions and upregulation of transposases in cold stress conditions. Overall, our study provides a comprehensive understanding of the GDGT modifications and differential expression characteristic of the acid stress and cold stress responses in S. islandicus.

59 BASIC BIOLOGICAL SCIENCES↗