Search NASA⌕ Search

SEARCH · Search NASA

Results for “reference site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Site A1 - Atmospheric Sensor / Reviewed Data

This dataset contains meteorological measurements including temperature, pressure, and relative humidity at multiple heights deployed on tethered balloon system at AWAKEN site A1. Z01 refers to the first height position of the iMet-XQ2 mounted on the tethered balloon.

17 WIND ENERGY↗

Site A1 - Atmospheric Sensor / Reviewed Data

This dataset contains meteorological measurements including temperature, pressure, and relative humidity at multiple heights deployed on tethered balloon system at AWAKEN site A1. Z04 refers to the fourth height position of the iMet-XQ2 mounted on the tethered balloon.

17 WIND ENERGY↗

Site A1 - Atmospheric Sensor / Reviewed Data

This dataset contains meteorological measurements including temperature, pressure, and relative humidity at multiple heights deployed on tethered balloon system at AWAKEN site A1. Z05 refers to the fifth height position of the iMet-XQ2 mounted on the tethered balloon.

17 WIND ENERGY↗

Site A1 - Atmospheric Sensor / Reviewed Data

This dataset contains meteorological measurements including temperature, pressure, and relative humidity at multiple heights deployed on tethered balloon system at AWAKEN site A1. Z03 refers to the third height position of the iMet-XQ2 mounted on the tethered balloon.

17 WIND ENERGY↗

Site A1 - Atmospheric Sensor / Reviewed Data

This dataset contains meteorological measurements including temperature, pressure, and relative humidity at multiple heights deployed on tethered balloon system at AWAKEN site A1. Z02 refers to the second height position of the iMet-XQ2 mounted on the tethered balloon.

17 WIND ENERGY↗

Solar heating and domestic hot water system installed at North Dallas High School

The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

Source record↗

Solar-Cooled Classroom Building--Columbus, Ohio

Advanced, evacuated tubular collectors supply energy for heating and cooling of a university building. Report includes site files, specification references, drawings, and installation, operation and maintenance instructions.

Source record↗

Solar heating, cooling, and domestic hot water system installed at Kaw Valley State Bank and Trust Company, Topeka, Kansas

The building has approximately 5600 square feet of conditioned space. Solar energy was used for space heating, space cooling, and preheating domestic hot water (DHW). The solar energy system had an array of evacuated tube-type collectors with an area of 1068 square feet. A 50/50 solution of ethylene glycol and water was the transfer medium that delivered solar energy to a tube-in-shell heat exchanger that in turn delivered solar heated water to a 1100 gallon pressurized hot water storage tank. When solar energy was insufficient to satisfy the space heating and/or cooling demand, a natural gas-fired boiler provided auxiliary energy to the fan coil loops and/or the absorption chillers. Extracts from the site files, specification references, drawings, and installation, operation and maintenance instructions are presented.

Source record↗

Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

Source record↗

Solar domestic hot water system installed at Texas City, Texas

This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.

Source record↗

Solar heating and hot water system installed at Arlington Raquetball Club, Arlington, Virginia

A solar space and water heating system is described. The solar energy system consists of 2,520 sq. ft. of flat plate solar collectors and a 4,000 gallon solar storage tank. The transfer medium in the forced closed loop is a nontoxic antifreeze solution (50 percent water, 50 percent propylene glycol). The service hot water system consists of a preheat coil (60 ft. of 1 1/4 in copper tubing) located in the upper third of the solar storage tank and a recirculation loop between the preheat coil and the existing electric water heaters. The space heating system consists of two separate water to air heat exchangers located in the ducts of the existing space heating/cooling systems. The heating water is supplied from the solar storage tank. Extracts from site files, specification references for solar modifications to existing building heating and hot water systems, and installation, operation and maintenance instructions are included.

Source record↗

Fission Surface Power Technology Development Testing at NASA's Early Flight Fission Test Facility

Fission surface power (FSP) systems could be used to provide power anytime, anywhere on the surface of the Moon or Mars. FSP systems could be used at polar locations, at locations away from the poles, or in permanently shaded regions, with excellent performance at all sites. A potential reference 40 kWe option has been devised that is cost-competitive with alternatives while providing more power for less mass anywhere on the lunar surface. The reference FSP system (FSPS) is also readily extensible for use on Mars. At Mars the system would be capable of operating through global dust storms and providing year-round power at any Martian latitude. Under the NASA Exploration Technology Development Program (ETDP), NASA and the Department of Energy (DOE) have begun technology development on Fission Surface Power (FSP). The primary customer for this technology is the NASA Constellation Program which is responsible for the development of surface systems to support human exploration on the moon and Mars. The objectives of the FSP technology project are: 1) Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FSP design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow Agency decision-makers to consider FSP as a viable option for flight development. To be mass efficient, FSP systems must operate at higher coolant temperatures and use different types of power conversion than typical terrestrial systems. The primary reason is the difficulty in rejecting excess heat to space. Although many options exist, NASA s current reference FSP system uses a fast spectrum, pumped-NaK cooled reactor coupled to a Stirling power conversion subsystem. The reference system uses technology with significant terrestrial heritage while still providing excellent performance on the surface of the moon or Mars. Recent testing at NASA s Early Flight Fission Test Facility (EFF-TF) has helped assess the viability of the reference FSP system, and has helped evaluate methods for system integration. In June, 2009, a representative pumped NaK loop (provided by Marshall Space Flight Center) was coupled to a Stirling power converter (provided by Glenn Research Center) and tested at various conditions representative of those that would be seen during actual FSP system operation. In all areas, performance of the integrated system exceeded project goals. High-temperature NaK pump testing has also been performed at the EFF-TF, as has testing of methods for providing long-duration NaK purity.

Houts. Michael G.↗

Analysis of Dust Samples Collected from a Near-Marine East Coast ISFSI Site ("Site C")

In June of 2022, dust samples were collected from the surface of an in-service spent nuclear fuel dry storage canister during an inspection at an Independent Spent Fuel Storage Installation. The site is anonymous but is a near-marine or brackish water east coast location referred to here as "Site C". The purpose of the sampling was to assess the composition and abundance of the soluble salts present on the canister surface, information that provides a metric for potential corrosion risks. Following collection, the samples were delivered to Sandia National Laboratories for analysis. At Sandia, the soluble salts were leached from the dust and quantified by ion chromatography. In addition, subsamples of the dust were taken for scanning electron microscopy to determine the particle sizes, morphology, and mineralogy of the dust and salts. The results of those analyses are presented in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Absolute Radiometric Calibration of Narrow-Swath Imaging Sensors with Reference to Non-Coincident Wide-Swath Sensors

An inter-calibration method is developed to provide absolute radiometric calibration of narrow-swath imaging sensors with reference to non-coincident wide-swath sensors. The method predicts at-sensor radiance using non-coincident imagery from the reference sensor and knowledge of spectral reflectance of the test site. The imagery of the reference sensor is restricted to acquisitions that provide similar view and solar illumination geometry to reduce uncertainties due to directional reflectance effects. Spectral reflectance of the test site is found with a simple iterative radiative transfer method using radiance values of a well-understood wide-swath sensor and spectral shape information based on historical ground-based measurements. At-sensor radiance is calculated for the narrow-swath sensor using this spectral reflectance and atmospheric parameters that are also based on historical in situ measurements. Results of the inter-calibration method show agreement on the 2 5 percent level in most spectral regions with the vicarious calibration technique relying on coincident ground-based measurements referred to as the reflectance-based approach. While the variability of the inter-calibration method based on non-coincident image pairs is significantly larger, results are consistent with techniques relying on in situ measurements. The method is also insensitive to spectral differences between the sensors by transferring to surface spectral reflectance prior to prediction of at-sensor radiance. The utility of this inter-calibration method is made clear by its flexibility to utilize image pairings with acquisition dates differing in excess of 30 days allowing frequent absolute calibration comparisons between wide- and narrow-swath sensors.

McCorkel, Joel↗

Distribution of Infiltration in the 216-U-10 and 216-B-3 Pond Systems 1944-1997

A modeling system to simulate fate and transport of contaminant plumes in groundwater beneath the Central Plateau to support the Cumulative Impact Evaluation (CIE) and Composite Analysis (CA) is being developed. The CIE will evaluate the cumulative effect of multiple Central Plateau radiological and chemical sources on groundwater quality (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document ). This will enable cleanup decisions to be evaluated in the context of all Central Plateau waste sites and existing groundwater conditions. The CA evaluates the cumulative effect of all sources of radioactive materials on radiological dose to future members of the public (DOE/RL-2018-60, Annual Status Report (FY 2018): Composite Analysis of Low Level Waste Disposal in the Central Plateau of the Hanford Site ). Fate and transport modeling will be used to forecast future groundwater concentrations for both the CIE and CA. The CIE/CA subsurface modeling system is divided into source (inventory), vadose zone, and saturated zone facets. Source inventory is a necessary input to the vadose zone facet, and releases from the vadose zone to groundwater are inputs to the saturated zone facet. The vadose zone facet simulates historical and future releases from the vadose zone to groundwater for both liquid waste and solid waste disposal sites. Effluent release volumes and radionuclide inventory estimates for liquid waste sites are contained in ECFHANFORD- 17-0079, Hanford Soil Inventory Model (SIM-v2) Calculated Radionuclide Inventory of Direct Liquid Discharges to Soil in the Hanford Site’s 200 Areas , herein referred to as SIM-v2. The liquid waste sites in SIM-v2 include the 216-B-3 Pond near 200 East Area and the 216-U-10 Pond in 200 West Area. The 216-B-3 Pond system consisted of a main pond and 3 expansion lobes that were operational during overlapping time periods. It also included influent ditches, but these are not listed as liquid waste sources in SIM-v2 and are not included in the CIE/CA modeling. The total effluent volume released to the pond system was measured, but the partitioning of this volume to the various expansion lobes was not determined and is not accounted for in SIM-v2. Regarding the 216-U-10 Pond, it received water from several influent ditches. The pond and the influent ditches are listed as liquid waste sites in SIM-v2 and are included as sources in the CIE/CA modeling. Because water in the ditches flowed into the pond, only a portion of the effluent volumes and contaminant inventories assigned to the ditches in SIM-v2 infiltrated from the ditches. Thus, partitioning of infiltration and contaminant inventories between the ditches and the pond is not fully accounted for in SIM-v2. Further, some of the water in the 216-U-10 Pond entered overflow ditches and the amount of this overflow was not recorded and is not accounted for in SIM-v2. Thus, the purpose of this Environmental Calculation File (ECF) is to partition the infiltration of wastewater and contaminant inventory between the main pond and each expansion lobe of the 216-B-3 Pond system, and to partition the infiltration of wastewater and contaminant inventory between the ditches and pond of the 216-U-10 Pond system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low-Level Waste Disposal in the Central Plateau of the Hanford Site (Annual Summary Report (FY 2023))

In accordance with DOE M 435.1-1 requirements and as implemented by DOE/RL-2000-29, the U.S. Department of Energy (DOE), Richland Operations Office has prepared this annual summary for fiscal year (FY) 2023 for maintenance of the Hanford Site Composite Analysis reported in DOE/RL-2019-52 (hereinafter referred to as the updated Hanford Site Composite Analysis). This is the first annual summary report to transition from maintenance of the initial Hanford Site Composite Analysis reported in PNNL-11800 and PNNL-11800, Addendum 1 to maintenance of the updated Hanford Site Composite Analysis following DOE approval of that update.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site and endmember spectra of terrestrial vegetation and soils for the Colorado Headwaters Ecological Spectroscopy Study, June-July 2025

This dataset provides site and endmember spectra collected during the 2025 Colorado Headwaters Ecological Spectroscopy Study (CHESS) campaign. The site spectra were collected to help validate airborne hyperspectral data acquired by the National Ecological Observatory Network's aerial observation platform (NEON AOP). Endmember spectra were collected to augment existing spectral libraries with additional samples of bare surfaces and non-photosynthetic vegetation. All measurements were acquired with an Analytical Spectral Devices (ASD) FieldSpec4 Hi-Res NG (Next Generation) spectroradiometer, which records radiance at 1nm (nanometer) intervals from the ultraviolet to the short-wave infrared (350-2500 nm). The dataset includes spectra measured at meadow sites where the CHESS team also collected vegetation samples for trait analyses. The site spectra were collected with the ASD FieldSpec4 palm grip attachment using an 8° field-of-view foreoptic. Site spectra are integrated measurements of the entire surface within the foreoptic’s field of view. For site-level spectra, the sun is the illumination source. A Spectralon panel mounted on a tripod was used for instrument optimization and white reference measurements for all site spectra. Site spectra were acquired within two hours of solar noon and within 48 hours of a NEON AOP overflight. Site spectra are labeled by date, sampling area, and site number according to the naming conventions of the CHESS campaign’s data management plan. The dataset also contains endmember spectra in the following categories: photosynthetic vegetation (PV), non-photosynthetic vegetation (NPV), bare (soil/rock), and flowers. Endmember measurements were acquired using either the contact probe or the leaf clip attachments of the ASD FieldSpec4. In these configurations, the bulb inside the spectrometer provides the light source for the measurements. The spectrometer was optimized and white reference measurements were recorded using the circular white pucks attached to the contact probe and leaf clip. Because they do not rely on solar illumination, contact probe and leaf clip measurements were collected during a broader time frame than the palm grip site spectra. Some endmembers were measured at CHESS meadow sites, while others were collected within the larger sampling area or in nearby locations (e.g. Gothic Townsite) with similar characteristics. Radiance, reflectance, and metadata files are split into three subfolders according to measurement type: proximal/palm grip (prx), contact probe (cp), and leaf clip (lc). Radiance spectra are provided in ASD file format (.asd file extension). All ASD files can be opened using the provided scripts. Metadata is provided in two formats: CSV file format (no geolocation) and GEOJSON file format (includes geolocation for each spectra). The dataset includes a set of pre-processed reflectance spectra as CSV files (yyyymmdd_rfl.csv). The python scripts and jupyter notebook used to calculate reflectance spectra from the ASD radiance data is included here and was previously published at: https://doi.org/10.3334/ORNLDAAC/2446. There is also a folder of JPEG photographs corresponding to selected spectra. We include a protocol document with detailed steps for ASD FieldSpec4 assembly and operations. This data additionally contains a file level metadata (flmd.csv) and data dictionary (dd.csv) file. Geospatial information: Geospatial data for mapping measurement site locations are in the files CHESS_polygons_lai_UTM.geojson, CHESS_polygons_shrub_UTM.geojson, and CHESS_polygons_meadow_UTM.geojson in the companion geospatial package for the 2025 CHESS campaign, ‘CHESS 2025: Location data for field observations and sampling’ (Henderson et al., 2026). CHESS Project Description: The Colorado Headwaters Ecological Spectroscopy Study (CHESS) comprised a multi-week airborne remote sensing and field observation campaign in the Upper Gunnison Basin, Colorado, conducted in June and July of 2025. Airborne remote sensing was conducted by the National Ecological Observatory Network Airborne Observation Platform (NEON AOP), concurrent with a field campaign run by the Rocky Mountain Biological Laboratory (RMBL), the Lawrence Berkeley National Laboratory (LBNL) and SLAC National Accelerator Laboratory Watershed Function Science Focus Area (SFA), and NASA-JPL (Jet Propulsion Laboratory) Earth Surface Mineral Dust Source Investigation (EMIT) program. Between June 10 and July 18, 2025, the NEON AOP flight team collected high-resolution aerial imaging spectroscopy and Light Detection and Ranging (LiDAR) data over three domains: the Upper East River (CRBU), Almont Triangle (ALMO), and the Upper Taylor Basin (UPTA). In coordination with the flights, a field campaign acquired ground-truth observations, including observations of vegetation composition, foliar traits, forest demography, and subsurface properties in 18 core sampling areas within the domains. Additional surface water observations were taken at over 380 point locations. All CHESS campaign datasets can be found within the CHESS ESS-DIVE data portal: https://data.ess-dive.lbl.gov/portals/chess. Funding Acknowledgment: This research was carried out at the Jet Propulsion Laboratory, California Institute of Technology, under a contract with the National Aeronautics and Space Administration (80NM0018D0004) and was funded by EMIT Extended Mission Phase E Science.

2018 NEON and 2025 CHESS Campaigns↗