Search NASA⌕ Search

SEARCH · Search NASA

Results for “regulatory framework”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Are Some Technologies Beyond Regulatory Regimes?

Regulatory frameworks are a common tool in governance to incent and coerce behaviors supporting national or strategic stability. This includes domestic regulations and international agreements. Though regulation is always a challenge, the domain of fast evolving threats, like cyber, are proving much more difficult to control. Many discussions are underway searching for approaches that can provide national security in these domains. We use game theoretic learning models to explore the question of strategic stability with respect to the democratization of certain technologies (such as cyber). We suggest that such many-player games could inherently be chaotic with no corresponding (Nash) equilibria. In the absence of such equilibria, traditional approaches, as measures to achieve levels of overall security, may not be suitable approaches to support strategic stability in these domains. Altogether new paradigms may be needed for these issues. At the very least, regulatory regimes that fail to address the basic nature of the technology domains should not be pursued as a default solution, regardless of success in other domains. In addition, the very chaotic nature of these domains may hold the promise of novel approaches to regulation.

chaos↗

Development of Criteria for Hardware Descripted Language Programmed-Devices for Safety Systems in Nuclear Power Plants in the U.S

The U.S. Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory guide (RG) describing a method the staff of the NRC considers acceptable, for use in complying with NRC regulations with respect to the development of hardware description language-programmed device (HPD). Examples include: field programmable gate arrays (FPGAs), systems in the power, instrumentation, and control portions of safety systems for nuclear power plants. The regulatory framework that NRC is establishing for nuclear power plants consists of a number of regulations and supporting guidelines applicable to the development of HPD-based safety systems. The NRC issues RGs to describe to the public, methods that the NRC staff considers acceptable for use in implementing specific parts of the agency's regulations; to explain techniques that the NRC staff uses in evaluating specific problems or postulated accidents; and to provide guidance to applicants. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Andra's strategy and approach for operational safety of French underground facility Cigeo - 15127

According to the French Act on radioactive waste of 28 June 2006, Andra shall design a reversible repository. In response to this demand, Andra is developing the industrial project namely 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. The previous safety cases of 2005, 2009 and 2012 give a sound basis to assess Cigeo's safety both for the operational and post-closure periods. Regarding operational safety, in this new stage of the project, the challenging issues for the preparation of the safety case are the following: - To adapt the various regulatory frameworks (nuclear and non-nuclear) to the underground facility - To design the underground facility and handling equipment's to reduce at first risks in the underground facility as such radioactive particles release, gas explosion, fire and co-activity and limit their consequence. - To establish waste acceptance criteria to be fulfilled by waste producers in line with operational safety and design options. The objective of the paper is to present the experience of Andra in operation safety of the underground facility of Cigeo. Operational safety for Cigeo is assessed as much as possible according to the existing French regulations and guidance for nuclear facilities. Indeed, compared to existing nuclear facilities, a geological repository is a specific case due to the existence of underground facilities with particularities such as: - ventilation management in a large scale underground facility, - fire risk management. As an input for the industrial design of Cigeo for operation, Andra defined a fire guidance and a specific reference safety guidance, based on the adaptation of the French nuclear regulatory texts for and when feasible to mines and tunnels regulatory texts and on its own experience gained through safety operational reports since 2005 and their reviews by the Safety Authority. - underground co-activity of nuclear operation with construction works. According to the common 'defense-in depth' principle for nuclear facilities, these guidelines for the industrial design of Cigeo for operation consider the successive levels of defense of: - Preventing the risk and its spreading by design and construction; - Detecting incidents and early fighting by design and operation dispositions (detection and control systems, survey procedure); - Controlling incidents and limiting of their consequences by safeguarding systems, specific procedures. At that stage, design options for Cigeo constitute an adequate response to the operational safety functions and requirements: - Two levels of containment are set up: the first one is ensured by the waste package, the second one is ensured from the surface facility to the disposal vaults by the transfer cask during the transfer of waste packages in the disposal vaults by the disposal vault itself and a nuclear ventilation with HEPA filter; - Favorable options for fire risk prevention and mitigation: transport system minimizing heat load (cable car for the transfer from the surface, electric transfer engines), twin access tunnels to ease fire-fighting and evacuation...; - Permanent complete physical separation of nuclear zone and construction zone (including ventilation systems). In practice, operation safety assessment of Cigeo, designed following the aforesaid reference safety guidelines, follows a common risk analysis (internal aggressions such as auxiliary losses, chemical and toxic risks, fall or collision, fire, human factors and external aggressions such as earthquake, air traffic, flooding) with the following steps: - Identification of the major risks and the design basis scenarios that have to be considered for dimensioning of the installations and the safety devices; - On the basis of these different situations, those who will have to be quantified are identified; one or more representative and envelop situations are chosen in order to evaluate robustness of the installation. Quantitative evaluation of these situations permits to: - identify the consequences on man, environment and installation, and in particular to gain confidence in the maintaining of the safety functions; - identify or define the technic and/or organisational dispositions classified as 'important elements for protection' (IEP); - Situations beyond dimensioning permit to verify the robustness of the installation. They permit, on one hand to identify possible complementary material or organisational dispositions; on the other hand, to define the 'hard core' i.e. structures, systems and components that permit to maintain the confinement function of radioactive substance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Regulatory Considerations in the Development of Radiation-Drug Combinations

Radiation therapy remains a fundamental treatment for patients with cancer. Despite an increasing number of targeted molecular therapies that are US Food and Drug Administration (FDA)-approved for the treatment of patients with metastatic disease, there has been very little progress made in terms of drugs used concurrently with radiation. This article reviews the existing regulatory framework in which cancer drugs may be developed for use in combination with radiation therapy from the perspective of the FDA. To briefly summarize: (1) nonclinical studies are a critical first step to ensure that drugs are safe for use in humans; however, additional nonclinical studies of a drug with radiation may not be required before a clinical trial in combination with radiation as long as the safety profile of the drug has been characterized in humans. The FDA determines the quality of evidence required before studying a drug in combination with radiation on a case-by-case basis. (2) Although often impractical to consider late toxicities during dose-escalation, late adverse events should be captured and taken into consideration when determining the final dose and schedule to take forward during drug development. (3) There are a number of expedited programs for cancer drug development, including accelerated approval, a conditional approval that allows for use of earlier clinical endpoints when the data suggests a clinically meaningful improvement over available therapy. (4) The Agency encourages sponsors to discuss their development plan with the appropriate FDA review division in formal regulatory meetings.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-P-33: Combining Research and Professional Practice in the Clinical Setting: A Medical Physicist Personal Experience

Purpose: To initiate a discussion on the current and evolving role of Medical Physicists based on author’s professional and research experience in patient safety and quality control. Methods: Several professionals of the departments of Medical Physics and Radiation Oncology, chiefly devoted to clinical tasks, began a research program on patient safety and quality control in a framework provided by the implementation of intraoperative radiotherapy (IORT). We performed studies on virtual simulation for IORT, in vivo dosimetry, failure mode and effect analysis (FMEA), statistical process control (SPC), and receiver operating characteristics of dosimetric equipment. This was done with the support of our research foundation and different grants while continuing with our departmental clinical routine involving about 1600 annual treatments with two linacs and different brachytherapy techniques. Results: We published 5 papers in international journals in the last two years. This author conducted a doctoral research which resulted in a dissertation in 2015. The extra time spent after treatments was essential to succeed. Funding and support achieved via our foundation played a crucial role; but this would have not been possible without punctual external mentoring and partnership. FMEA conclusions were able to be implemented only with staff commitment; however, conclusions concerning equipment cannot be easily communicated to manufacturers. These tasks required extra training in the appropriated methods. Conclusion: Research needed the support of a dedicated foundation, which would have been very difficult to obtain with the sole participation of our departments. FMEA and SPC results may need engagement of staff and manufacturers, respectively, hard to achieve without strong recommendations or even a regulatory framework. All these fields need evolution of Medical Physicists’ roles and additional training. Devotion to both clinical tasks and research could be unfeasible for Medical Physicists in the clinical setting without the appropriate rearrangement of their schedules and tasks. Supported by grants IPT-300000-2010-3 and PI11/01659. ERDF funds and Spanish Government.

60 APPLIED LIFE SCIENCES↗

Next-Generation Performance-Based Regulation. Volume 1: Introduction - Global Lessons for Success; Volume 2: Primer - Essential Elements of Design and Implementation; Volume 3: Innovative Examples from Around the World

Performance-based regulations (PBRs) provide a regulatory framework to connect goals, targets, and measures to utility performance or executive compensation. Well-designed PBRs provide incentives for utility performance, benefiting consumers and utility owners alike. This report considers the role of both PBRs and more discrete performance incentive mechanisms (PIMs) in 21st century power sector transformation. Innovative technologies are transforming the way electricity is generated, delivered, and consumed. PBRs have the potential to realign utility, investor, and consumer incentives and mitigate emerging challenges to the utility business model, renewable integration, and even cyber security.The goals of PBRs in the form of multi-year rate plans are in many respects the same in terms of providing reasonably priced and reliable service to customers. However, today's technologies have changed, and there is more emphasis on clean energy. Thus, the pathways and the potential outcomes are different than they were in the 20th century when centralized generator stations and large infrastructure additions dominated the utility landscape. Given unprecedented changes underway in the electricity sector, PBRs - by specifying expectations of utility performance and outcomes for consumers, while staying agnostic to the exact means of delivery - constitute a form of prescient regulation that harnesses disruption. PBRs are one tool in a broader toolbox in the transition toward flexible regulatory and market structures that rewards utilities that adapt or evolve in reaction to market and technology change. PBRs and PIMs have great value for the electric industry when designed well and can be applied to many different situations. How exactly PBR mechanisms are most effectively enacted will vary based on the utility ownership model, institutional arrangements, and a variety of other local factors. PBRs should be tailored to the needs and goals of each jurisdiction, and perhaps each utility, to most effectively achieve the needs of a 21st century power grid in that jurisdiction. Presented in three volumes, this report highlights the lessons learned from their evolving history, explores essential elements of their design and implementation as well as considerations for how they may be best applied, and examines leading examples of PBRs from the United Kingdom, New York, Denmark, Mexico, and South Africa. The full report, 'Next-Generation Performance Based Regulation - Emphasizing Utility Performance to Unleash Power Sector Innovation,' published in September 2017, can be accessed at https://www.nrel.gov/docs/fy17osti/68512.pdf.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evolving the Design of a Volcanic Monitoring UAS over Several Flight Campaigns

A multi-organization effort has been underway for several years to develop and validate the use of small unmanned aircraft systems (UAS) for volcanic monitoring. The overall goal is to develop the aircraft, supporting systems, concept of operations, scientific payloads and regulatory framework to allow regular and reliable sampling in challenging and dynamic atmospheric conditions around volcanic summits. Central to this effort has been the development and refinement of the “S2” aircraft, which contains a tightly integrated system consisting of the airframe, avionics, and payload sensors specifically designed to measure atmospheric properties around volcanic plumes. The aircraft has a 3-meter wingspan and can carry a 2.3 kg payload for up to 100 km while operating at altitudes up to 6,000 m. To date, the system has been flown in Costa Rica to sample CO2 gases around Turrialba Volcano (Costa Rica), in Hawaii to assess the 2018 eruption of Kīlauea with several different sensors, and is currently planned for deployment in Alaska for gas sampling and photogrammetry at Makushin Volcano. Before and after each deployment, all aspects of the system and concept of operations (CONOPS) were extensively examined and modified to improve the safety and performance. This has culminated in the upcoming deployment which will fly up to 30 km - beyond visual line of sight for the first time. This expansion of the operational range through additional safety features and redundancy will pave the way for monitoring and accessing areas that were previously very difficult to reach from both a technical and regulatory perspective. These developments can be extended to a variety of missions requiring UAS for atmospheric sampling, specifically ones that would benefit from beyond visual line of sight operations or flights into harsh or difficult atmospheric environments.

UAS↗

International Coordination and Cooperation on LunaNet Spectrum

LunaNet is planned to be the network of networks operated by a set of cooperating organizations to provide interoperable Communications, networking, Position, Navigation, and Timing (CPNT) services to users on and around the Moon based on a framework of mutually agreed-upon standards, protocols, frequency bands and interface requirements. LunaNet follows a service-oriented architecture that is agnostic about the types of organizations that provide services, e.g., government, industry, or academia. LunaNet is open, scalable, resilient, secure, and extensible. To achieve these goals, LunaNet Service Providers (LNSP) must coordinate with each other to define and develop the architecture, to plan initial and evolved capabilities, and to operate their networks. One of the central LunaNet tenets is the use of shared spectrum. For example, the Lunar Augmented Navigation Service (LANS) acts like a Global Navigation Satellite System (GNSS) such as the US Global Positioning System (GPS) or European Galileo but the LNSPs’ contributions to LunaNet must use the same frequency band (2483.5 MHz-2500.0 MHz) and transmit the same waveform synchronized by highly accurate clocks so that Users ‘see’ one virtual network and use the same multilateration algorithm to determine their positions. This necessitates a high degree of spectrum coordination. NASA’s Lunar and Human Spaceflight Spectrum Management Team has been actively supporting development of the LunaNet Interoperability Specification (LNIS), soliciting inputs from spectrum policy and planning experts across NASA, ESA and JAXA. Cislunar spectrum use considerations have been studied and adjudicated within the Space Frequency Coordination Group (SFCG) and inform the ongoing discussion of a lunar communication and navigation architecture within the existing radio regulatory framework of the International Telecommunication Union, leading to the 2027 World Radiocommunication Conference (WRC-27). The frequency plan contained in the publicly released draft of the LunaNet Interoperability Specification reflects the initial phase of exploration (roughly to 2030) defining an optimal set of radio frequencies in appropriately allocated services consistent with WRC-23 decisions for use by known or planned CPNT applications, while striving to maximize coexistence and compatibility amongst cislunar systems and other systems within the near-Earth regime (< 2 million km from Earth). Important considerations include: protection of extremely sensitive receive-only radio astronomy systems on the lunar far side, known as the Shielded Zone of the Moon (SZM); compatibility between Direct with Earth (DWE) communications links and links needed to support relay satellites in lunar orbit with their customer systems on orbit or on the lunar surface; compatibility between multiple lunar surface communications systems and capabilities over varied and challenging terrain and distances; as well as ensuring compatibility and interoperability between navigation systems which either leverage Earth-based or in-situ lunar systems. In addition, the lunar CPNT architecture is envisioned to be the basis – with adjustments – of the future Mars CPNT architecture as we expand into the solar system using Interplanetary Networking (IPN). The second phase of lunar spectrum definition will address planned international capabilities for the next decade that will require action at WRC-27 and beyond. This paper will discuss each of these considerations in more depth and how the current LunaNet frequency plan addresses them.

LunaNet↗

Potential State Regulatory Pathways to Facilitate Low-Carbon Fuels

States and the federal government are increasingly engaged in the challenges around decarbonizing the electric grid. In particular, regulators, consumers, stakeholders, and utilities recognize the need to carefully consider the role natural gas will play in a decarbonized future. A variety of technology and policy options to reduce greenhouse gas emissions associated with natural gas use are available, including energy efficiency programs, demand reduction tools, strategic electrification, and strategies to reduce emissions from natural gas production, transportation, and consumption. Low-carbon fuels – mainly renewable natural gas (RNG) and clean hydrogen – are being considered an important component of decarbonization goals. RNG and hydrogen may be able to meaningfully reduce emissions from processes independent of geologic natural gas, displacing emissions of methane, a powerful greenhouse gas. Although RNG and hydrogen are not cost-competitive today with geologic natural gas and are smaller in scale and potential than other decarbonization options, they can be explored as potential critical tools to decarbonize sectors that are difficult to electrify or shift off of natural gas entirely, such as air travel, industrial processes, maritime transport, long-distance trucking, space heating on cold days, and railroads (Nadel, 2022). The role of this report is to provide informational context for state utility regulators to understand the impacts of and challenges associated with broader integration of low-carbon fuels, followed by examples of state regulatory actions taken to date to facilitate the development of low-carbon fuels. Setting clear guidance to calculate the environmental benefits of low-carbon fuels and continuing federal and state investments in research and development to reduce costs relative to fossil fuels will be important steps to take to signal the desire to grow the market for these fuels. State public utility commissions may play a key role in setting regulatory frameworks for low-carbon fuels and ensuring that ratepayer funds, if utilized, are done so to further the public interest. This report is intended to summarize decisions that states have made to date on low-carbon fuels. In the spirit of understanding the current market and sharing information, this report provides success stories, and lessons learned across states as regulators implement varying strategies to achieve decarbonization objectives while maintaining their focus on affordability, safety, and reliability of the energy system. The report begins with an introduction of the role of natural gas in the U.S. economy (Section I) and background information on natural gas use, decarbonization, and low-carbon fuels (Section II). Next, the report describes the current market by discussing the scale of current production, emissions intensity, resource potential, and costs of low-carbon fuels compared to geologic natural gas (Section III). Following these sections, the report describes four strategies states have employed to facilitate low-carbon fuels: opening exploratory dockets, approving voluntary tariffs for customers, approving interconnection tariffs for producers, and considering portfolio-wide procurement targets (Section IV). This section lists states that have taken actions in each category, citing utility filings, commission decisions, stakeholder comments, and other relevant sources. Finally, the report concludes with suggested questions regulators may wish to consider regarding low-carbon fuels, in the interest of preparing to make decisions in the future (Section V). These questions include: Are there existing regulatory or technical barriers to voluntary purchases of low-carbon fuels? Can customers work with utilities to procure low-carbon fuels; are producers able to interconnect projects without significant barriers to entry? Should the infrastructure and/or commodity costs of low-carbon fuels be socialized among all ratepayers, or borne solely by the large commercial and industrial (C&I) customers currently driving the market? Should regulated natural gas and/or electric utilities own and operate low-carbon fuel production? How should regulators consider the unique decarbonization potential of low-carbon fuels, particularly for hard-to-abate sectors, in decision-making? Is additional direction or clarity from state policymakers needed? What no-regrets approaches can help facilitate both near-term RNG development and long-term development of hydrogen and other zero-carbon fuels? We collectively wish to express our gratitude to the U.S. Department of Energy, Office of Fossil Energy and Carbon Management, for supporting this report and other technical assistance resources for state regulators on natural gas topics. State regulators operate under a variety of policy environments, and states have vastly different types of energy resources, infrastructure, and customers. While there is no optimal regulatory, policy, or technological solution that will be successful in every state, state regulators can benefit by exchanging lessons learned with their peers across the country. We look forward to continued engagement with our fellow commissioners, commission staff, NARUC, the U.S. Department of Energy, and other stakeholders to develop sound regulation in the public interest.

03 NATURAL GAS↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Renewable fuels from biomass: Technical hurdles and economic assessment of biological routes

Lignocellulosic biomass is an abundant, renewable source of polysaccharides that could be available in amounts sufficient to provide a source of sugars for carbon neutral biofuel production. We review the background to biofuels production in the US from corn sugars and subsequent R and D efforts to saccharify plant biomass to provide an alternative sugar source. Research efforts and programs have generally not addressed the key technical hurdles in providing a commodity‐scale supply of biomass and in developing biological routes to saccharify it at high yields. Techno‐economic analyses of proposed processes highlight the importance of biomass cost, the role of pretreatment on both inhibitor generation, and the contribution of enzyme costs to saccharification. Alternatives, such as the production of fatty acids by microalgae, have comparable technical hurdles. Although there is a regulatory framework for biofuels, which is discussed, a credible biological process for large‐scale, cost‐effective production of lignocellulosic biofuels remains elusive. © 2015 American Institute of Chemical Engineers AIChE J , 61: 2689–2701, 2015

Klein‐Marcuschamer, Daniel↗

Wilks’ formula applied to computational tools: A practical discussion and verification

Wilks’ non-parametric approach for setting tolerance limits using order statistics has recently become popular in the nuclear industry. The method allows analysts to predict a desired tolerance limit with some confidence that the estimate is conservative. The style is popular because it is simple and fits well into established regulatory frameworks. An essential analysis of the underlying statistics is presented in this work, including a derivation, analytical and statistical verification, and a broad discussion. Possible impacts of the underlying assumptions for application to computational tools are discussed. An in-depth discussion of the order statistic rank used in Wilks’ formula is provided, including when it might be necessary to use a higher rank estimate.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Coordinated microgrid investment and planning process considering the system operator

Nowadays, a significant number of distribution systems are facing problems to accommodate more photovoltaic (PV) capacity, namely due to the overvoltages during the daylight periods. This has an impact on the private investments in distributed energy resources (DER), since it occurs exactly when the PV prices are becoming attractive, and the opportunity to an energy transition based on solar technologies is being wasted. In particular, this limitation of the networks is a barrier for larger consumers, such as commercial and public buildings, aiming at investing in PV capacity and start operating as microgrids connected to the MV network. To address this challenge, this paper presents a coordinated approach to the microgrid investment and planning problem, where the system operator and the microgrid owner collaborate to improve the voltage control capabilities of the distribution network, increasing the PV potential. The results prove that this collaboration has the benefit of increasing the value of the microgrid investments while improving the quality of service of the system and it should be considered in the future regulatory framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microbial spies and bloggers: programming cells to convert environmental information into discernible signals

Microbes regulate their dynamic behaviors using the chemical and physical characteristics of their environment. The ability of microbes to continuously convert this physicochemical information into biochemical information and to use organic matter in the environment as a power source makes these organisms attractive as chassis for building sensors. However, most biosensors have severe limitations when considering applications in hard-to-image settings like soils, sediments, and wastewater. Emerging technologies at the interface of biomolecular design, microbiome engineering, and synthetic biology offer new tools to program cells and communities as biosensors for these settings. Here, in this review, we describe innovations in biosensor outputs that are enabling new applications in complex environments, including reporters that are read out using electrochemical, gas chromatography, hyperspectral imaging, and next-generation sequencing methods. We also discuss computational advances that are accelerating the diversification of sensing components by mining metagenomics data for new transcriptional regulators and by designing allosteric protein switches that directly regulate reporter outputs using analytes. We highlight emerging opportunities for programming undomesticated microbes in communities to function as distributed sensors in the environment. Finally, we discuss the need for responsible biosensor development and to modernize regulatory frameworks to support evidence-based assessment of environmental biosensors.

analyte↗

Improving cumulative effects assessment in Alberta: Regional strategic assessment

The Government of Alberta, Canada is developing a regulatory framework to better manage cumulative environmental effects from development in the province. A key component of this effort is regional planning, which will lay the primary foundation for cumulative effects management into the future. Alberta Environment has considered the information needs of regional planning and has concluded that Regional Strategic Assessment may offer significant advantages if integrated into the planning process, including the overall improvement of cumulative environmental effects assessment in the province.

54 ENVIRONMENTAL SCIENCES↗

Alchemy to reason: Effective use of Cumulative Effects Assessment in resource management

Cumulative Effects Assessment (CEA) is a tool that can be useful in making decisions about natural resource management and allocation. The decisions to be made include those (i) necessary to construct planning and regulatory frameworks to control development activity so that societal goals will be achieved and (ii) whether or not to approve individual development projects, with or without conditions. The evolution of CEA into a more successful tool cannot occur independently of the evolution of decision making processes. Currently progress is painfully slow on both fronts. This paper explores some opportunities to accelerate improvements in decision making in natural resource management and in the utility of CEA as a tool to assist in making such decisions. The focus of the paper is on how to define the public interest by determining what is acceptable.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing energy flexibility in clusters of buildings: A critical analysis of barriers from planning to operation

This paper examines building energy flexibility at an aggregated level and addresses the main barriers and research gaps for the development of this resource across three design and development phases: market and policy, early planning and design, and operation. We review methodologies and tools and discuss barriers, challenges, and opportunities, incorporating policy, economic, technical, professional, and social perspectives. Although various legal and regulatory frameworks exist to foster the development of energy flexibility for small buildings, financing mechanisms are limited with a significant number of perceived risks undermining private investment. For the early planning and design phase, planners and designers lack appropriate tools and face interoperability challenges, which often results in insufficient consideration of demand response programs. The review of the operational phase highlighted the socio-technical challenges related to both the complexity of deployment and communication, as well as privacy and acceptability issues. Finally, the paper proposes a number of targeted research directions to address challenges and promote greater energy flexibility deployments, including capturing building demand side dynamics, improving baseline estimations and developing seamless connectivity between buildings and districts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗