Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Comparison of Exploration Oxygen Recovery Technology Options Using ESM and LSMAC

In preparation for long duration manned space flight, numerous technology development efforts are ongoing in the area of environmental control and life support (ECLS). In cooperation with international, industry, and academic partners, NASA seeks to leverage the International Space Station as a testbed for technologies targeted for Exploration-class missions. In recent years, Equivalent Systems Mass (ESM) analyses have been conducted to evaluate the relative breakeven points and to compare technologies as part of ECLS architectural trades. While these studies have provided important data pertaining to key engineering metrics, additional considerations are important to more fully understand the potential impacts and costs associated with selecting a specific architecture. A tool, called the Life Support Multi-Dimensional Assessment Criteria (LSMAC), was recently proposed by Sierra Nevada Corporation in an attempt to incorporate influences of these additional considerations including Maintainability, Risk Analysis, Technology Readiness Level, Radiation Impacts, Manufacturing Costs, Reliability, Human Factors, and Un-Crewed Operations. As a first step toward evaluating and implementing this tool, LSMAC was used to revisit the ISS oxygen recovery trade from the 1990’s wherein Sabatier was selected over Bosch technology. Second, the tool was used to compare oxygen recovery developmental technologies currently in work. The results of these studies as well as a comparison with standalone ESM analyses are reported. Further, a discussion of the potential application of the tool across the ECLS portfolio and its potential use in future technology selection for ISS flight demonstrations is provided.

Morgan B Abney↗

Technical Basis Related to the Posture of NASA’s Office of Safety and Mission Assurance for the Launch of Radioactive Material Other than Space Nuclear Systems: Volume 1–Overview of Analysis and Results

NASA has launched and reentered payloads containing radioactive material for over 50 years. The isotopes, their quantity, and their form have varied significantly. The handling of this material prior to its integration into the spacecraft at the launch Center (and after its return to Earth after flight, if applicable) falls under the purview of the Office of the Chief Health and Medical Officer, while after the radioactive material is integrated into the spacecraft at the launch Center, it falls under the purview of the Office of Safety and Mission Assurance’s (OSMA) Nuclear Flight Safety Program. Historically, OSMA concurrence was required for any launch or reentry involving radioactive material. However, OSMA recently revisited this posture due to changes in the Federal policy in this area, and the significant accrued experience. The current report represents the more quantitative study envisioned in the recent change in posture. More specifically, this document addresses the potential risks and other considerations associated with launching small quantities of radioactive material (below the level requiring the Federally-mandated process in National Security Presidential Memorandum- (NSPM-) 20, “Presidential Memorandum on Launch of Spacecraft Containing Space Nuclear Systems” (USG, 2019) to provide the technical basis for when such activities require OSMA concurrence versus notification, as it relates to nuclear flight safety.

Don Helton↗

Managing Power Systems-Induced Wildfire Risks Using Optimal Scheduled Shutoffs: Preprint

The growing demands for electricity and the increase in extreme weather conditions are putting unprecedented pressure on our electrical grids. Oftentimes, this pressure leads to electrical components failures which might ignite wildfires. This work develops a novel model to balance the reliability of power networks operations and risks of wildfires ignition by optimizing the operational schedule of power transmission networks considering time-varying risk measures that consider exogenous and operational factors. Energy storage systems are considered to deliver power during peak wildfire hours and enable temporal load shifting. The problem is formulated as a mixed-integer linear program that maximizes a weighted sum of the served power demand and the reduction in grid-induced wildfires risk. The results demonstrate the ability of the model to reduce wildfires risks significantly without considerable load shedding.

energy scheduling↗

Preliminary risk assessment for the Black Brant XII

In order to provide the scientific community, as well as NASA management, with a preview of typical safety restrictions for the proposed Black Brant XII sounding rocket, a risk assessment for a typical payload has been performed. This paper details the considerations which ensure minimal risk for projects managed by Wallops Flight Facility and the safety criteria required to conduct an operation. Specifically, three launch scenarios for the Black Brant XII have been considered. The first case assumes a test launch from Wallops, and the other two cases analyze typical scientific missions from Poker Flat Research Range.

Underwood, B. E.↗

Prospective Architectures for Onboard vs Cloud-Based Decision Making for Unmanned Aerial Systems

This paper investigates propsective architectures for decision-making in unmanned aerial systems. When these unmanned vehicles operate in urban environments, there are several sources of uncertainty that affect their behavior, and decision-making algorithms need to be robust to account for these different sources of uncertainty. It is important to account for several risk-factors that affect the flight of these unmanned systems, and facilitate decision-making by taking into consideration these various risk-factors. In addition, there are several technical challenges related to autonomous flight of unmanned aerial systems; these challenges include sensing, obstacle detection, path planning and navigation, trajectory generation and selection, etc. Many of these activities require significant computational power and in many situations, all of these activities need to be performed in real-time. In order to efficiently integrate these activities, it is important to develop a systematic architecture that can facilitate real-time decision-making. Four prospective architectures are discussed in this paper; on one end of the spectrum, the first architecture considers all activities/computations being performed onboard the vehicle whereas on the other end of the spectrum, the fourth and final architecture considers all activities/computations being performed in the cloud, using a new service known as Prognostics as a Service that is being developed at NASA Ames Research Center. The four different architectures are compared, their advantages and disadvantages are explained and conclusions are presented.

Software engineering↗

Fabrication and Testing of CERMET Fuel Materials for Nuclear Thermal Propulsion

A first generation Nuclear Cryogenic Propulsion Stage (NCPS) based on Nuclear Thermal Propulsion (NTP) is currently being developed for Advanced Space Exploration Systems. The overall goal of the project is to address critical NTP technology challenges and programmatic issues to establish confidence in the affordability and viability of NTP systems. The current technology roadmap for NTP identifies the development of a robust fuel form as a critical near term need. The lack of a qualified nuclear fuel is a significant technical risk that will require a considerable fraction of program resources to mitigate. Due to these risks and the cost for qualification, the development and selection of a primary fuel must begin prior to Authority to Proceed (ATP) for a specific mission. The fuel development is a progressive approach to incrementally reduce risk, converge the fuel materials, and mature the design and fabrication process of the fuel element. A key objective of the current project is to advance the maturity of CERMET fuels. The work includes fuel processing development and characterization, fuel specimen hot hydrogen screening, and prototypic fuel element testing. Early fuel materials development is critical to help validate requirements and fuel performance. The purpose of this paper is to provide an overview and status of the work at Marshall Space Flight Center (MSFC).

Hickman, Robert↗

Radiation Effect on Human Tissue

Predicting the occurrence of human cancer following exposure of an epidemiologic population to any agent causing genetic damage is a difficult task. To an approximation, this is because the uncertainty of uniform exposure to the damaging agent, and the uncertainty of uniform processing of that damage within a complex set of biological variables, degrade the confidence of predicting the delayed expression of cancer as a relatively rare event within clinically normal individuals. This situation begs the need for alternate controlled experimental models that are predictive for the development of human cancer following exposures to agents causing genetic damage. Such models historically have not been of substantial proven value. It is more recently encouraging, however, that developments in molecular and cell biology have led to an expanded knowledge of human carcinogenesis, and of molecular markers associated with that process. It is therefore appropriate to consider new laboratory models developed to accomodate that expanded knowledge in order to assess the cancer risks associated with exposures to genotoxic agents. When ionizing radiation of space is the genotoxic agent, then a series of additional considerations for human cancer risk assessment must also be applied. These include the dose of radiation absorbed by tissue at different locations in the body, the quality of the absorbed radiation, the rate at which absorbed dose accumulates in tissue, the way in which absorbed dose is measured and calculated, and the alterations in incident radiation caused by shielding materials. It is clear that human cancer risk assessment for damage caused by ionizing radiation is a multidisciplinary responsibility, and that within this responsibility no single discipline can hold disproportionate sway if a risk assessment model of radiation-induced human cancer is to be developed that has proven value. Biomolecular and cellular markers from the work reported here are considered for use in assessing human cancer risk related to exposure to space radiation. This potential use must be integrated within the specified multidisciplinary context in order to create a new tool of molecular epidemiology that can hopefully then realistically assess this cancer risk.

Richmond, Robert C.↗

Risk Acceptance Personality Paradigm: How We View What We Don't Know We Don't Know

The purpose of integrated hazard analyses, probabilistic risk assessments, failure modes and effects analyses, fault trees and many other similar tools is to give managers of a program some idea of the risks associated with their program. All risk tools establish a set of undesired events and then try to evaluate the risk to the program by assessing the severity of the undesired event and the likelihood of that event occurring. Some tools provide qualitative results, some provide quantitative results and some do both. However, in the end the program manager and his/her team must decide which risks are acceptable and which are not. Even with a wide array of analysis tools available, risk acceptance is often a controversial and difficult decision making process. And yet, today's space exploration programs are moving toward more risk based design approaches. Thus, risk identification and good risk assessment is becoming even more vital to the engineering development process. This paper explores how known and unknown information influences risk-based decisions by looking at how the various parts of our personalities are affected by what they know and what they don't know. This paper then offers some criteria for consideration when making risk-based decisions.

Massie, Michael J.↗

Reference Station Risk Assessment for Refueling Heavy-Duty Vehicles Using HyRAM+

The deployment of heavy-duty (HD) hydrogen fuel cell vehicles that are entering the market now is driving the need for expanded HD hydrogen refueling station infrastructure to meet demand. This expansion must prioritize safety and reliability, necessitating careful consideration of the associated risks. In this study, we use a light-duty (LD) hydrogen refueling station as a comparative tool to quantify the risks for a HD station, which is essentially a scaled-up version of a LD station.

08 HYDROGEN↗

Delivery-Risk-Aware Flexibility Scheduling and Dispatch for Aggregated Flexible Loads

Flexible loads like smart thermostats and water heaters can shift energy consumption and provide flexibility to the grid. However, this flexibility is dependent on occupant behavior and can lead to delivery risk, which causes utilities and grid operations to consider them as unreliable for purposes of grid operation. To date, they have not been well integrated into wholesale electricity markets or ancillary service offerings. With proper consideration of uncertainty and risk, these resources can be one of the most cost-effective sources of flexibility. This work uses stochastic optimization to quantify and bid flexibility from a fleet of flexible resources while considering their delivery risk.

DER↗

Consideration of Collision "Consequence" in Satellite Conjunction Assessment and Risk Analysis

Classic risk management theory requires the assessment of both likelihood and consequence of deleterious events. Satellite conjunction risk assessment has produced a highly-developed theory for assessing collision likelihood but holds a completely static solution for collision consequence, treating all potential collisions as essentially equally worrisome. This may be true for the survival of the protected asset, but the amount of debris produced by the potential collision, and therefore the degree to which the orbital corridor may be compromised, can vary greatly among satellite conjunctions. This study leverages present work on satellite collision modeling to develop a method by which it can be estimated, to a particular confidence level, whether a particular collision is likely to produce a relatively large or relatively small amount of resultant debris and how this datum might alter conjunction remediation decisions. The more general question of orbital corridor protection is also addressed, and a preliminary framework presented by which both collision likelihood and consequence can be jointly considered in the risk assessment process.

Hejduk, M.↗

Risk Reduction on X-33/RLV Engines

Risk management has received considerable attention in the X-33 and Reusable Launch Vehicle (RLV) program due to aggressive schedules, limited funding. and planned private investment to develop the commercial VentureStar vehicle. As an X-33 and RLV team member and main propulsion supplier, Boeing Rocketdyn Propulsion and Power has addressed risk through a methodical application of systems engineering in identifying, assessing, and mitigating risks. The methods employed involve rigorous risk mitigation planning early in development, continuous risk monitoring and assessment during the course of development, and the systematic verification of compliance with technical requirements prior to delivery. In addition, an engine system reliability analysis was conducted to reduce risk. In July 1996, NASA selected Lockheed Martin's "Skunk Works" (LMSW) as the lead contractor for the X-33 and RLV program. The X-33 vehicle is a half-scale pathfinder for the full-scale RLV. The LMSW RLV design is a lifting body shaped vehicle employing linear aerospike engine provided propulsion. The initial X-33 flight is planned for the summer of 2000, and the initial VentureStar flight is planned for between 2005 and 2007.

Crowley, Tim↗

Availability of state-level climate change projection resources for use in site-level risk assessment

In recent years, incorporating climate change considerations has become an important focus of organizations’ resilience planning and risk assessment efforts, including United States federal agencies. This has led to an increasing demand for higher-resolution and higher-quality climate projection information that is easy to understand for non-expert users. In particular, there is a demand for information about how climate change may affect high-impact, low-frequency (HILF) hazards that are central to risk assessments focused on infrastructure. While national-level resources like the National Climate Assessment provide information on climate impacts for different sectors and regions in the United States, downscaled information with location-specific context is often required for site-level resilience planning. As higher-resolution and higher-quality climate resources continue to be developed at the state level, it is imperative to understand ongoing and planned efforts, as well as key drivers for developing these state-level resources. Based primarily on stakeholder input from climate experts from 31 states, we identify key state-level climate resources, as well as drivers accelerating the development of these resources. We assess the availability of climate change resources, specifically those with information about HILF events that have been developed at the state level and can support users in conducting site-level resilience planning. We identify three key drivers or predictors for the development of climate change resources at the state level: (1) existence of state laws, mandates, Executive Orders, and other state policies, (2) existence of university partnerships; and (3) the makeup of the stakeholder groups (in terms of dominant discipline/expertise) participating in the effort. The diverse state strategies and resources surveyed in this study could support the incorporation of higher-resolution climate information into site-level planning.

54 ENVIRONMENTAL SCIENCES↗

Risk Evaluation in the Pre-Phase A Conceptual Design of Spacecraft

Typically, the most important decisions in the design of a spacecraft are made in the earliest stages of its conceptual design the Pre-Phase A stages. It is in these stages that the greatest number of design alternatives is considered, and the greatest number of alternatives is rejected. The focus of Pre-Phase A conceptual development is on the evaluation and comparison of whole concepts and the larger-scale systems comprising those concepts. This comparison typically uses general Figures of Merit (FOMs) to quantify the comparative benefits of designs and alternative design features. Along with mass, performance, and cost, risk should be one of the major FOMs in evaluating design decisions during the conceptual design phases. However, risk is often given inadequate consideration in conceptual design practice. The reasons frequently given for this lack of attention to risk include: inadequate mission definition, lack of rigorous design requirements in early concept phases, lack of fidelity in risk assessment methods, and under-evaluation of risk as a viable FOM for design evaluation. In this paper, the role of risk evaluation in early conceptual design is discussed. The various requirements of a viable risk evaluation tool at the Pre-Phase A level are considered in light of the needs of a typical spacecraft design study. A technique for risk identification and evaluation is presented. The application of the risk identification and evaluation approach to the conceptual design process is discussed. Finally, a computational tool for risk profiling is presented and applied to assess the risk for an existing Pre-Phase A proposal. The resulting profile is compared to the risks identified for the proposal by other means.

Fabisinski, Leo L., III↗

Software engineering with application-specific languages

Application-Specific Languages (ASL's) are small, special-purpose languages that are targeted to solve a specific class of problems. Using ASL's on software development projects can provide considerable cost savings, reduce risk, and enhance quality and reliability. ASL's provide a platform for reuse within a project or across many projects and enable less-experienced programmers to tap into the expertise of application-area experts. ASL's have been used on several software development projects for the Space Shuttle Program. On these projects, the use of ASL's resulted in considerable cost savings over conventional development techniques. Two of these projects are described.

Campbell, David J.↗

Valuing Rigor in the Risk Management Process

NASA, as an organization, takes risk management (RM) seriously, and for most projects, the risk management process is exemplar. There can be challenges, though, with defining RM processes. For example, many different risk analysis methodologies are available, they can be applied with varying degrees of rigor, and they can have different value depending on how projects use them. In particular, risk analysis methodologies vary considerably in the level of quantitative detail, with more probabilistic techniques encouraged in some situations. We discussed these processes and methodologies with ten project managers (PM) at the NASA Goddard Space Flight Center (GSFC). Our intent was not to prove with some level of statistical significance that some are more helpful than others, but rather to obtain a general understanding of how projects are identifying, and thinking, about risks. This paper describes some of the available risk processes and methodologies, and provides some insights about the benefits that can gained from their use. We provide an in-depth discussion of one quantitative methodology, Probabilistic Risk Assessments (PRAs), and conclude with a few insights from observed best practices.

Dillon, Robin L.↗

An Integrated Assessment of a G3 GMD Event on Large-Scale Power Grids: From Magnetometer Data to Geomagnetically Induced Current Analysis

Solar activities can cause geomagnetic disturbances (GMDs) that give rise to geomagnetically induced currents (GICs) which may compromise the reliability of the power system. In order to build more reliable models representing GMD interactions with the power grid, the power system’s detailed electrical model must be considered along with fluctuations in the earth’s magnetic and induced surface electric fields. Here, this study investigates the impact of incorporating spatially varying magnetic fields into surface electric field models on GMD risk metrics. A spatially independent magnetic field model and a spatially varying model are compared through simulations. To perform this analysis, the earth’s magnetic field disturbances are transformed into surface electric fields using respective one-dimensional earth conductivity models. Then, the modeling impact of these electric fields is studied using a 2,000-bus grid for Texas and a 25,000-bus grid for the northeast and mid- Atlantic regions of the United States. Simulation results reveal that the inclusion of spatially varying magnetic fields results in considerable differences in GMD risk metrics, highlighting the importance of accounting for spatial variability when assessing GMD risks in the power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗