Search NASA⌕ Search

SEARCH · Search NASA

Results for “risk requirements architectures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A Communications Network for Cislunar Operations

Reliable and efficient communications will be critical to the success of commercial flight operations in cislunar space. The Internet is not well-suited to meeting this requirement. But the Delay-Tolerant Networking (DTN) architecture is. The DTN protocols are well-documented and implementations are mature. We think DTN will be ready to support low-cost, low-risk cislunar networking by the time the vehicles are in place.

network↗

End-to-End Trade-Space Analysis for Designing Constellation

Multipoint measurement missions can provide a significant advancement in science return and this science interest coupled with as many recent technological advances are driving a growing trend in exploring distributed architectures for future NASA missions. Distributed Spacecraft Missions (DSMs) leverage multiple spacecraft to achieve one or more common goals. In particular, a constellation is the most general form of DSM with two or more spacecraft placed into specific orbit(s) for the purpose of serving a common objective (e.g., CYGNSS). Because a DSM architectural trade-space includes both monolithic and distributed design variables, DSM optimization is a large and complex problem with multiple conflicting objectives. Over the last two years, our team has been developing a Trade-space Analysis Tool for Constellations (TAT-C), implemented in common programming languages for pre-Phase A constellation mission analysis. By evaluating alternative mission architectures, TAT-C seeks to minimize cost and maximize performance for pre-defined science goals. This presentation will describe the overall architecture of TAT-C including: a User Interface (UI) at several levels of details and user expertise; Trade-space Search Requests that are created from the Science requirements gathered by the UI and validated by a Knowledge Base; a Knowledge Base to compare the current requests to prior mission concepts to potentially prune the trade-space; a Trade-space Search Iterator which, with inputs from the Knowledge Base, and, in collaboration with the Orbit & Coverage, Reduction & Metrics, and Cost& Risk modules, generates multiple potential architectures and their associated characteristics. TAT-C leverages the use of the Goddard Mission Analysis Tool (GMAT) to compute coverage and ancillary data, modeling orbits to balance accuracy and performance. The current version includes uniform and non-uniform Walker constellations as well as Ad-Hoc and precessing constellations, and its cost model represents an aggregate model consisting of Cost Estimating Relationships (CERs) from widely accepted models. The current GUI automatically generates graphics representing metrics such as average revisit time or coverage as a function of cost. The end-to-end system will be demonstrated as part of the presentation.

Mission Desig↗

The Large UV/Optical/Infrared Surveyor Decadal Mission Concept Thermal System Architecture

The Large Ultraviolet/Optical/Infrared (LUVOIR) Surveyor is one of four large strategic mission concept studies commissioned by NASA for the 2020 Decadal Survey in Astronomy and Astrophysics. Slated for launch to the second Lagrange point (L2) in the mid-to-late 2030s, LUVOIR seeks to directly image habitable exoplanets around sun-like stars, characterize their atmospheric and surface composition, and search for biosignatures, as well as study a large array of astrophysics goals including galaxy formation and evolution. Two observatory architectures are currently being considered which bound the trade-off between cost, risk, and scientific return: a 15-meter diameter segmented aperture primary mirror in a three-mirror anastigmat configuration, and an 8-meter diameter unobscured segmented aperture design. To achieve its science objectives, both architectures require milli-Kelvin level thermal stability over the optics, structural components, and interfaces to attain picometer wavefront RMS stability. A 270 Kelvin operational temperature was chosen to balance the ability to perform science in the near-infrared band and the desire to maintain the structure at a temperature with favorable material properties and lower contamination accumulation. This paper will focus on the system-level thermal designs of both LUVOIR observatory architectures. It will detail the various thermal control methods used in each of the major components - the optical telescope assembly, the spacecraft bus, the sunshade, and the suite of accompanying instruments - as well as provide a comprehensive overview of the analysis and justification for each design decision. It will additionally discuss any critical thermal challenges faced by the engineering team should either architecture be prioritized by the Astro2020 Decadal Survey process to proceed as the next large strategic mission for development.

Yang, Kan↗

The Large UV/Optical/Infrared Surveyor Decadal Mission Concept Thermal System Architecture

The Large Ultraviolet/Optical/Infrared (LUVOIR) Surveyor is one of four large strategic mission concept studies commissioned by NASA for the 2020 Decadal Survey in Astronomy and Astrophysics. Slated for launch to the second Lagrange point (L2) in the mid-to-late 2030s, LUVOIR seeks to directly image habitable exoplanets around sun-like stars, characterize their atmospheric and surface composition, and search for biosignatures, as well as study a large array of astrophysics goals including galaxy formation and evolution. Two observatory architectures are currently being considered which bound the trade-off between cost, risk, and scientific return: a 15-meter diameter segmented aperture primary mirror in a three-mirror anastigmat configuration, and an 8-meter diameter unobscured segmented aperture design. To achieve its science objectives, both architectures require milli-Kelvin level thermal stability over the optics, structural components, and interfaces to attain picometer wavefront RMS stability. A 270 Kelvin operational temperature was chosen to balance the ability to perform science in the near-infrared band and the desire to maintain the structure at a temperature with favorable material properties and lower contamination accumulation. This paper will focus on the system-level thermal designs of both LUVOIR observatory architectures. It will detail the various thermal control methods used in each of the major components - the optical telescope assembly, the spacecraft bus, the sunshade, and the suite of accompanying instruments - as well as provide a comprehensive overview of the analysis and justification for each design decision. It will additionally discuss any critical thermal challenges faced by the engineering team should either architecture be prioritized by the Astro2020 Decadal Survey process to proceed as the next large strategic mission for development.

Yang, Kan↗

Space Mobile Network: A Near Earth Communications and Navigation Architecture

This paper shares key findings of NASA's Earth Regime Network Evolution Study (ERNESt) team resulting from its 18-month effort to define a wholly new architecture-level paradigm for the exploitation of space by civil space and commercial sector organizations. Since the launch of Sputnik in October 1957 spaceflight missions have remained highly scripted activities from launch through disposal. The utilization of computer technology has enabled dramatic increases in mission complexity; but, the underlying premise that the diverse actions necessary to meet mission goals requires minute-by-minute scripting, defined weeks in advance of execution, for the life of the mission has remained. This archetype was appropriate for a "new frontier" but now risks overtly constraining the potential market-based opportunities for the innovation considered necessary to efficiently address the complexities associated with meeting communications and navigation requirements projected to be characteristics of the next era of space exploration: a growing number of missions in simultaneous execution, increased variance of mission types and growth in location/orbital regime diversity. The resulting ERNESt architectural cornerstone - the Space Mobile Network (SMN) - was envisioned as critical to creating an environment essential to meeting these future challenges in political, programmatic, technological and budgetary terms. The SMN incorporates technologies such as: Disruption Tolerant Networking (DTN) and optical communications, as well as new operations concepts such as User Initiated Services (UIS) to provide user services analogous to today's terrestrial mobile network user. Results developed in collaboration with NASA's Space Communications and Navigation (SCaN) Division and field centers are reported on. Findings have been validated via briefings to external focus groups and initial ground-based demonstrations. The SMN opens new niches for exploitation by the marketplace of mission planners and service providers.

Space Communication Spacecraft↗

Alternating Between Software Models and Real Hardware in the System Integration Lab for theIncremental Development of the Space Launch System Program Avionics

The MSFC System Integration Lab (SIL) supports avionics development of NASA’s Space Launch System—a new U.S. heavy-lift launch vehicle for NASA’s next generation of human space exploration beyond low-Earth orbit. The SIL facility allows for the incremental development of system components by either hosting real hardware in the loop and/or software models of those components. Through this functionality test teams are able to evaluate overall system performance as components are designed, built and modified. Early hardware/software integration and testing reduces risks and saves overall cost and schedule throughout a program/project life cycle. By performing early hardware/software integration, potential architecture and interface-related problems can be identified, and thus reduce associated risk as early in the design cycle as possible when problems are the least expensive to resolve while also improving the design and requirements. This presentation will illustrate the power of employing a hardware in the loop simulation system for the development of novel spacecraft avionics.

Space Launch System↗

Radiation specification and testing of heterogenous microprocessor SOCs

Modern commercial microprocessor devices include multiple processor architectures, buses, basic peripherals, and application hardware such as Graphics Processing Units (GPUs) and Digital Signal Processors (DSPs) in one device. Developing RHBD versions of similar devices risks sacrificing processing performance for system-wide radiation requirements. The heterogenous structure of modern commercial system on a chip (SOC) devices, in design and performance goals for subsystems, suggests a similar approach to specifying Radiation Hardened by Design (RHBD) requirements.

Ballast, Jon↗

A risk-based approach to robotic mission requirements

A NASA Risk Team has developed a method for the application of risk management to the definition of robotic mission requirements for the Space Exploration Initiative. These requirements encompass environmental information, infrastructural emplacement in advance, and either technology testing or system/subsystems demonstration. Attention is presently given to a method for step-by-step consideration and analysis of the risk component inherent in mission architecture, followed by a calculation of the subjective risk level. Mitigation strategies are then applied with the same rules, and a comparison is made.

Dias, William C.↗

Reducing the Risk of Human Missions to Mars Through Testing

During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in order to put into context an updated Integrated Space Transportation Plan (post- Columbia) and guide Agency planning. NASA was on the verge of committing significant funding in programs that would be better served if longer term goals were better known including the Orbital Space Plane, research on the ISS, National Aerospace Initiative, Shuttle Life Extension Program, Project Prometheus, as well as a wide range of technology development throughout the Agency. Much of the focus during this period was on integrating the results from the previous studies into more concrete implementation strategies in order to understand the relationship between NASA programs, timing, and resulting budgetary implications. This resulted in an integrated approach including lunar surface operations to retire risk of human Mars missions, maximum use of common and modular systems including what was termed the exploration transfer vehicle, Earth orbit and lunar surface demonstrations of long-life systems, collaboration of human and robotic missions to vastly increase mission return, and high-efficiency transportation systems (nuclear) for deep-space transportation and power. The data provided in this summary viewgraph presentation was developed to begin to address one of the key elements of the emerging implementation strategy, namely how lunar missions help retire risk of human missions to Mars. During this process the scope of the activity broadened into the issue of how testing in general, in various venues including the Moon, can help reduce the risk for Mars missions.

Drake, Bret G.↗

2010 JPC Abstract: Ares I First Stage Propulsion System Status

In November 2005, NASA created the Constellation Program to develop an entirely new fleet of spacecraft to include the Ares I Crew Launch Vehicle and Ares V Cargo Launch vehicles. This mission architecture included the Orion capsule (which would be used to transport astronauts to low-Earth orbit and beyond), the Altair lunar lander, and an Earth departure stage. The Ares First Stage Team has made significant progress on the design of a propulsion system to meet the objectives of the Constellation Program. Work on a first stage element propulsion system capable of lofting a new fleet of spacecraft is well underway. To minimize technical risks and development costs, the Solid Rocket Boosters (SRBs) of Shuttle served as a starting point in the design of a new motor that would meet the requirements of those new vehicles. This new propulsive element will provide greater total impulse utilizing a fifth segment to loft a safer, more powerful fleet of space flight vehicles. Performance requirements, basic architecture, and obsolescence issues were all factors in determining the new first stage element design and configuration. Early efforts focused on creating designs that would be capable of supporting the requisite loads and environments. While the motor casings are Shuttle legacy, because of Ares I s unique in-line configuration, the first stage will require entirely new forward structures (forward skirt, forward skirt extension, aeroshell, and frustum) and a modified systems tunnel. The use of composites facilitated a change in the geometry, which in turn afforded the ability to focus strength where it was needed without additional mass. The Ares First Stage rocket motor casting tooling was designed and built to achieve a propellant grain geometry that produces the specific required ballistic profile. The new propellant formulation is a polybutadiene acrylonitrile (PBAN) copolymer, which has been modified to attain the desired burn rate and retain adequate tailoring capability.

Priskos, Alex S.↗

Real-time data system: Incorporating new technology in mission critical environments

If the Space Station Freedom is to remain viable over its 30-year life span, it must be able to incorporate new information systems technologies. These technologies are necessary to enhance mission effectiveness and to enable new NASA missions, such as supporting the Lunar-Mars Initiative. Hi-definition television (HDTV), neural nets, model-based reasoning, advanced languages, CPU designs, and computer networking standards are areas which have been forecasted to make major strides in the next 30 years. A major challenge to NASA is to bring these technologies online without compromising mission safety. In past programs, NASA managers have been understandably reluctant to rely on new technologies for mission critical activities until they are proven in noncritical areas. NASA must develop strategies to allow inflight confidence building and migration of technologies into the trusted tool base. NASA has successfully met this challenge and developed a winning strategy in the Space Shuttle Mission Control Center. This facility, which is clearly among NASA's most critical, is based on 1970's mainframe architecture. Changes to the mainframe are very expensive due to the extensive testing required to prove that changes do not have unanticipated impact on critical processes. Systematic improvement efforts in this facility have been delayed due to this 'risk to change.' In the real-time data system (RTDS) we have introduced a network of engineering computer workstations which run in parallel to the mainframe system. These workstations are located next to flight controller operating positions in mission control and, in some cases, the display units are mounted in the traditional mainframe consoles. This system incorporates several major improvements over the mainframe consoles including automated fault detection by real-time expert systems and color graphic animated schematics of subsystems driven by real-time telemetry. The workstations have the capability of recording telemetry data and providing 'instant replay' for flight controllers. RTDS also provides unique graphics animated by real-time telemetry such as workstation emulation of the shuttle's flight instruments and displays of the remote manipulator system (RMS) position. These systems have been used successfully as prime operational tools since STS-26 and have supported seven shuttle missions.

Muratore, John F.↗

22 N HPGP Thruster Life Testing

In the ever-changing paradigm of efficient and capable spacecraft design, scientific missions continue pushing the envelope enabling spacecraft subsystems to deliver effective solutions to meet challenging new mission/spacecraft needs. From an in-space storable liquid chemical propulsion perspective, monopropellant hydrazine has been, and continues to be, a dependable propellant with considerable flight heritage, a variety of engine thrust classes available from multiple vendors, with repeatable and reliable performance. Additionally, the space propulsion industry has learned to successfully handle hydrazine, its regulations, the safety protocols, the personnel protective equipment, and the unique training standards–all requisite for loading spacecraft propulsion systems with toxic hypergolic hydrazine. The question now arises as to “what is next for in-space chemical propulsion?” Further, with the evolution and concrete advancements in innovative in-space green propellant technologies, capable of providing realizable benefits to scientific missions, concern over the reliability and availability of this higher performing and safer to handle class of propellants is waning. As science missions move forward with the potential flight in fusion of High Performance Green Propulsion (HPGP), NASA and its industry partners are working to address any gaps in system reliability, performance, or unique operational considerations. Propellant technology that offers both higher performance and significant reduction in personnel hazards compared to hydrazine presents an attractive propulsion subsystem design opportunity. Increased propulsion subsystem performance can result in lower spacecraft launch mass, larger scientific payloads, or extended on-orbit lifetimes. Mission trades using green propulsion technologies have been documented on multiple NASA Goddard Space Flight Center (GSFC) mission classes, examining various parameters and requirements to support mission architectures in Low Earth Orbit (LEO), High Earth Orbit (HEO), geostationary, lunar, planetary, and Quasi-halo orbit around Sun-Earth Lagrange point (L2). The results of these trade studies show promising, attainable benefits. The perceived programmatic risk of flying a newer propulsion technology has, unfortunately, not outweighed the benefits to date. To take advantage of the improved performance and mitigate programmatic risk, HPGP engines must demonstrate life testing at higher propellant throughputs than have currently been demonstrated. In an effort to proactively address the challenges with technology infusion into a risk-averse community, NASA and the Swedish National Space Agency (SNSA) outlined a collaborative Implementing Arrangement (IA) for the respective agencies to pursue increased HPGP technology maturation. This initial IA effort began in 2013, fresh off the heels of the successful PRISMA HPGP technology demonstration mission. The IA targeted objective is to reduce risk to potential future HPGP missions and fully characterize the LMP-103S propellant and associated engine performance. Over the past eight years, HPGP has flown in propulsion systems on twenty-five(25) spacecraft from seven(7) different Launch Ranges around the globe and on seven (7) different Launch Vehicles. Six(6) of these launches involved multiple loading operations for multiple spacecraft. For U.S. Range operations, nine (9) HPGP systems have been processed at Vandenberg Space Force Base(VSFB):six(6) in 2017, and three (3) in 2018. Six (6) more have been processed at Cape Canaveral Air Force Station (CCAFS)in May 2020, with three (3) systems launched in June 2020 and the remaining three (3) system were left loaded and ready until their launch in August of 2020. Three (3) more systems have been processed at Wallops Flight Facility(WFF)and launched in June 2021. In addition, these propulsion subsystems employed heritage propulsion subsystem component such as valves, filters, and pressure transducers, and have further demonstrated nominal functionality in both diaphragm and Propellant Management Device (PDM) propellant tanks. Based on these successes, HPGP technology continues to be considered for NASA Science Mission Directorate missions at GSFC. The work presented herein represents many years of development and collaborative efforts to successfully align higher performance, low toxicity hydrazine alternatives into scientific missions. NASA GSFC Propulsion Engineering, in collaboration with Bradford ECAPS, has developed mission specific thruster design and testing requirements to establish GSFC’s desired test conditions and firing sequences.In2017, the first flight-like 22N HPGP thruster Engineering Qualification Model (EQM-1)was designed and built by Bradford ECAPS to prove out the thruster design, materials, build process, and test campaign with respect to NASA GSFC critical component and mission requirements. This test program was developed to comprehensively test the thruster, the technology, and ultimately increase the 22N HPGP Technology Readiness Level(TRL). EQM-1was tested to environmental qualification levels prior to hot fire performance testing to represent the relevant end-to-end environment (launch to on-orbit operation)with required margin. This thruster demonstrated steady-state and pulse mode operational capability with propellant thruster throughput up to~53kg.At this throughput level, the EQM-1 engine began to present off-nominal performance and the test campaign was halted to allow for non-destructive testing and identify the root cause for the an omalous performance. Capitalizing on the successful elements of the EQM-1 campaign, an upgraded 22N HPGP EQM-2 has been manufactured by Bradford ECAPS to meet the complete GSFC requirements. The EQM-2 thruster’s test campaign has further demonstrated the robustness of the HPGP propulsion technology and increased the Technology Readiness Level (TRL) by undergoing a full acceptance test program, then proceeding into qualification, including environmental testing (vibration and shock to qualification levels),as well as hot-fire life testing, operating at steady-state and pulse modes with increased propellant thruster throughput to~150kg. The HPGP thruster performance testing enables effective HPGP thruster readiness evaluation to meet NASA candidate mission requirements in the future.

High↗

The Value Proposition of Multi-Megawatt Electric Power/Propulsion for the Human Exploration of Mars

NASA and other space agencies have been offering stakeholders an architecture for the human exploration of Mars that has remained essentially unchanged since the 1960's. The mission duration and launch mass are the two first order figures of merit that drive the total cost of such an architecture. The options studied to date center on the "conjunction class" or "Long Stay" mission, in which surface infrastructure elements are sent ahead on uncrewed, slow trajectories requiring a minimum amount of propellant, and the crewed elements are sent at the synotic cycle's shortest trajectory, stay on Mars until the next close alignment, and then return to Earth. Total crewed mission durations for these architectures range from 900 to 1100 days, with variations driven primarily by trades between the amount of propellant launched and the effective specific mass of the propulsion technology assumed (e.g., chemical, nuclear thermal, solar electric, nuclear electric). Mars transit propulsion systems assumed in mission architectures studied to date have all resulted in architectural figures of merit that drive the cost to a level of "too much." However, nuclear electric propulsion (NEP) technology offers a "knob" that might be turned to enable a radically different Mars architecture, whose launch mass and mission duration may enable a value proposition more palatable to mission stakeholders. Mars architectures studied to date have assumed an NEP system providing 2.5 MWe at a specific mass of no less than 20 kg/kWe. This has often been seen as obtainable with a moderately high temperature fission reactor. An NEP system providing 15 MWe at specific mass of ~1 kg/kWe, though, could enable a short stay (30 days on surface) Mars mission, requiring only two or three SLS-class launch vehicles and a total mission duration of under one calendar year. However, turning this NEP "knob" would require a high risk development program driving innovation on the order of that delivered by the Manhattan Project, but for a fraction of the cost. Any technology option that might offer such a capability at such a development cost now stands at a low Technology Readiness Level (TRL) 3, would be based on a nuclear energy source (likely fusion), and would require an extremely high risk (and rapid) development effort. The aggressive, parallel path project management paradigm exemplified by the original Manhattan Project might have the best chance of success. An energy source developed in this manner may also have a major impact on the terrestrial power industry.

power↗

IPAD products and implications for the future

The betterment of productivity through the improvement of product quality and the reduction of cost is addressed. Productivity improvement is sought through (1) reduction of required resources, (2) improved ask results through the management of such saved resources, (3) reduced downstream costs through manufacturing-oriented engineering, and (4) lowered risks in the making of product design decisions. The IPAD products are both hardware architecture and software distributed over a number of heterogeneous computers in this architecture. These IPAD products are described in terms of capability and engineering usefulness. The future implications of state-of-the-art IPAD hardware and software architectures are discussed in terms of their impact on the functions and on structures of organizations concerned with creating products.

Miller, R. E., Jr.↗

Flat H Redundant Frangible Joint Development

Orion and Commercial Crew Program (CCP) Partners have chosen to use frangible joints for certain separation events. The joints currently available are zero failure tolerant and will be used in mission safety applications. The goal is to further develop a NASA designed redundant frangible joint that will lower flight risk and increase reliability. FY16 testing revealed a successful design in subscale straight test specimens that gained efficiency and supports Orion load requirements. Approach / Innovation A design constraint is that the redundant joint must fit within the current Orion architecture, without the need for additional vehicle modification. This limitation required a design that changed the orientation of the expanding tube assemblies (XTAs), by rotating them 90deg from the standard joint configuration. The change is not trivial and affects the fracture mechanism and structural load paths. To address these changes, the design incorporates cantilevered arms on the break plate. The shock transmission and expansion of the XTA applies force to these arms and creates a prying motion to push the plate walls outward to the point of structural failure at the notched section. The 2014 test design revealed that parts could slip during functioning wasting valuable energy needed to separate the structure with only a single XTA functioning. Dual XTA functioning fully separated the assembly showing a discrepancy can be backed up with redundancy. Work on other fully redundant systems outside NASA is limited to a few patents that have not been subjected to functionality testing Design changes to prevent unwanted slippage (with ICA funding in 2015) showed success with a single XTA. The main goal for FY 2016 was to send the new Flat H RFJ to WSTF where single XTA test failures occurred back in 2014. The plan was to gain efficiency in this design by separating the Flat H RFJ with thicker ligaments with dimensions baselined in 2014. Other modifications included geometry changes to better disperse loads paths and to minimize air gaps. The design additionally added more structural strength to enhance the structural limits in static loads testing. The design also implemented a smoother load line through the assembly. Results / Knowledge Gained The new Flat H RFJ successfully fractured at WSTF with thicker ligaments and lower cord size. Where failure to separate occurred earlier, there is now excessive energy available for structural separation. The new challenge to provide some structural support to prevent secondary fracturing of the break plate remains to be completed. This future work is being funded by the JSC Engineering Directorate in 2017 to elevate the TRL on curved Flat H RFJs that configure with the Orion Service Panel Separation. Additional funding from JSC Engineering will provide new design testing to avoid secondary fracturing.

Brown, Chris↗

Active Swarm Resiliency in the HelioSwarm Mission

Designed to observe plasma turbulence dynamics in solar wind over a distributed volume of space, the HelioSwarm mission comprises a primary chief spacecraft and eight smaller deputy satellites in uniquely assigned “loops” of periodic relative motion in a P/2 lunar resonant orbit. If one or more deputies fail, this multi-satellite architecture facilitates resiliency for science goals through repositioning of satellites to contingency loops. This strategy of Active Swarm Resiliency mitigates risk by modeling quantitative results ahead of time for mission operators to make informed decisions. Responsive actions meet minimum science objectives based on past and predicted system performance, an approach with applications to future missions with similar architecture and requirements.

Fault Management↗

Active Swarm Resiliency in the HelioSwarm Mission

Designed to observe plasma turbulence dynamics in solar wind over a distributed volume of space, the HelioSwarm mission comprises a primary chief spacecraft and eight smaller deputy satellites in uniquely assigned “loops” of periodic relative motion in a P/2 lunar resonant orbit. If one or more deputies fail, this multi-satellite architecture facilitates resiliency for science goals through repositioning of satellites to contingency loops. This strategy of Active Swarm Resiliency mitigates risk by modeling quantitative results ahead of time for mission operators to make informed decisions. Responsive actions meet minimum science objectives based on past and predicted system performance, an approach with applications to future missions with similar architecture and requirements.

Fault Management↗

NASAs Evolvable Mars Campaign: Mars Moons Robotic Precursor

Human exploration missions to the moons of Mars are being considered within NASA's Evolvable Mars Campaign (EMC) as an intermediate step for eventual human exploration and pioneering of the surface of Mars. A range of mission architectures is being evaluated in which human crews would explore one or both moons for as little as 14 days or for as long as 500 days with a variety of orbital and surface habitation and mobility options being considered. Relatively little is known about the orbital, surface, or subsurface characteristics of either moon. This makes them interesting but challenging destinations for human exploration missions during which crewmembers must be able to effectively conduct scientific exploration without being exposed to undue risks due to radiation, dust, micrometeoroids, or other hazards. A robotic precursor mission to one or both moons will be required to provide data necessary for the design and operation of subsequent human systems and for the identification and prioritization of scientific exploration objectives. This paper identifies and discusses considerations for the design of such a precursor mission based on current human mission architectures. Objectives of a Mars' moon precursor in support of human missions are expected to include: 1) identifying hazards on the surface and the orbital environment at up to 50-km distant retrograde orbits; 2) collecting data on physical characteristics for planning of detailed human proximity and surface operations; 3) performing remote sensing and in situ science investigations to refine and focus future human scientific activities; and 4) prospecting for in situ resource utilization. These precursor objectives can be met through a combination or remote sensing (orbital) and in-situ (surface) measurements. Analysis of spacecraft downlink signals using radio science techniques would measure the moon's mass, mass distribution, and gravity field, which will be necessary to enable trajectory planning. Laser altimetry would precisely measure the moon's shape and improve the accuracy of radio science measurements. A telescopic imaging camera would map the moon at submeter resolution and photograph selected areas of interest at subcentimeter resolution and a visible and near-infrared (0.4-3.0 mm) imaging spectrograph would produce a global map of mineral composition variations at a resolution of tens of meters and maps of selected areas of interest at meter resolution. Additional remote sensing capabilities could include a thermal infrared imager (heat flow, thermal inertia, and grain size distributions), a gamma-ray and neutron detector (atomic composition), a ground-penetrating radar (internal structure), and a magnetometer and Langmuir probe (magnetic properties and plasma field). Once on the surface of Phobos or Deimos, necessary instrumentation would include a penetrometer (regolith compressive strength), a motion-imagery camera (to observe the penetrometer tests before, during, and after contact), a dust-adhesion witness plate and camera (dust levitation), a microimager (dust particle sizes and shapes), and an alpha-proton-X-ray, X-ray fluorescence, Mossbauer, or Raman spectrometer (atomic and mineral composition of surface materials) and an optional temperature probe (regolith thermal properties). A variety of robotic mission design options to enable both orbital and surface measurements are being considered that include fully integrated and modular approaches. In-situ measurements from at least one surface location would be required, with additional measurement locations possible through use of multiple landers, through propulsive relocation of a single lander, or through electromechanical surface translation by a walking or hopping lander vehicle, which could also serve to evaluate such mobility capabilities for subsequent human missions. Preliminary orbital analysis suggests that remote sensing would likely be performed while in a distant retrograde orbit around the target moon. Mission design options to enable characterization of both Mars’ moons in a single mission are also being studied.

Gernhardt, Michael L.↗