Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Space Technology Experiments Platform (STEP) Status: an In-space Test Facility

Designed for utilization of the space transportation system for technology experiments in space, the space technology experiment platform (STEP) is a shuttle-borne experiment support facility for use primarily for structures, structural dynamics, and control flexible structures technology flight experiments. The STEP concept is discussed as well as shows its relationship to broad NASA goals and objectives. The development chronology is presented and the current system capability in block diagram format is described. The STEP development schedule is included.

Harris, J. E.↗

VESTA Project: Phase 0 report

This report presents the results of technical studies conducted at CNES/PMF/APS between October 1984 and September 1985 on the VESTA project. These preliminary studies were conducted to establish mission feasibility in terms ofthe trajectory and the scientific objectives, and to determine the type of interfaces which will be required with the Soviets and to measure the magnitude of French participation. A joint French-Soviet report recommends that the project enter phase A, and was approved by CNES and INTERCOSMOS in September, 1985. The mission analysis is made for a mid-1991 launch, and a development schedule for an end-1992 launch is suggested. The decision to postpone the mission was made during the course of the study.

Perret, A.↗

Technical aspects of the United States Space Station

The design and development of the Space Station are described. The proposed design of the Station is a dual keel configuration which will include manned facilities and unmanned free flying platforms. The Station is to be utilized as a space-based laboratory for basic research and observations, a depot for repair and servicing of spacecraft, a strorage area, and a manufacturing facility. International participation in the Space Station program and technological developments applicable for the Station are discussed. A diagram of the Space Station configuration and a Space Station development schedule are provided.

Herman, D. H.↗

Space Station initiates permanent space facility development

The proposed development of the Space Station is examined. The functions and advantages of the Space Station are described. The use of a solar array system for power generation on the Station is studied; the capabilities of various other generation systems are also evaluated. The Space Station's development schedule is discussed.

Loftus, Joseph P., Jr.↗

Earth resources instrumentation for the Space Station Polar Platform

The spacecraft and payloads of the Space Station Polar Platform program are described in a brief overview. Present plans call for one platform in a descending morning-equator-crossing orbit at 824 km and two or three platforms in ascending afternoon-crossing orbits at 542-824 km. The components of the NASA Earth Observing System (EOS) and NOAA payloads are listed in tables and briefly characterized, and data-distribution requirements and the mission development schedule are discussed. A drawing of the platform, a graph showing the spectral coverage of the EOS instruments, and a glossary of acronyms are provided.

Donohoe, Martin J.↗

Human Adaptation to Isolated and Confined Environments

A study was conducted over seven months in a winter Antarctic isolated and confined environment (ICE). Physiological and psychological data was collected several times a week. Information was collected on a monthly basis on behavior and the use of physical facilities. Adaptation and information indicated that there was a significant decrease in epinephrine and norepinephrine during the middle trimester of the winter. No vital changes were found for blood pressure. Self reports of hostility and anxiety show a linear increase. There were no significant changes in depression during ICE. The physiological and psychological data do not move in a synchronous fashion over time. The data also suggest that both ambient qualities of an ICE and discrete social environmental events, such as the arrival of the summer crew, have an impact on the outcome measures used. It may be most appropiate to develop a model for ICE's that incorporates not only global chronic stressors common to all ICE's but also the role of discrete environmental effects which can minimize or enhance the influence of more chronic stressors. Behavioral adjustment information highlight the importance of developing schedules which balance work and recreational activities.

Evans, Gary W.↗

Technology sensitivity studies for a Mach 3.0 civil transport

The level of technological sophistication required for the economic viability and environmental acceptability of a Mach 3.0-cruise SST is evaluated, with a view to the development schedule and initial operating date into which the maturity of various essential technologies will translate. Attention is given to the effect of advanced aerodynamic, propulsion, structural and subsystem technologies on takeoff gross weight. A dramatic impact is noted to result from the combination of prospective technological advances in flow laminarization, advanced structures and materials, etc.

Coen, Peter G.↗

Electrodynamic tether system study: Extended study

This document is the final report of a study performed by Ball Space Systems Division (BSSD) for the NASA Johnson Space Center under an extension to contract NAS9-17666. The tasks for the extended study were as follows: (1) Define an interface between the Electrodynamic Tether System (ETS) and the Space Station (SS); (2) Identify growth paths for the 100 kW ETS defined in the original study to a 200 kW level of performance; (3) Quantify orbit perturbations caused by cyclic day/night operations of a Plasma Motor/Generator (PMG) on the SS and explore methods of minimizing these effects; (4) Define the analyses, precursor technology, ground tests, and precursor demonstrations leading up to a demonstration mission for an electrodynamic tether system that would be capable of producing maneuvering thrust levels of 25 newtons; and (5) Propose a development schedule for the demonstration mission and preliminary cost estimates.

Source record↗

NASA in-house Commercially Developed Space Facility (CDSF) study report. Volume 1: Concept configuration definition

The results of a NASA in-house team effort to develop a concept definition for a Commercially Developed Space Facility (CDSF) are presented. Science mission utilization definition scenarios are documented, the conceptual configuration definition system performance parameters qualified, benchmark operational scenarios developed, space shuttle interface descriptions provided, and development schedule activity was assessed with respect to the establishment of a proposed launch date.

Deryder, L. J.↗

ARISTOTELES: A European approach for an Earth gravity field recovery mission

Under contract of the European Space Agency a system study for a spaceborne gravity field recovery mission was performed, covering as a secondary mission objective geodetic point positioning in the cm range as well. It was demonstrated that under the given programmatic constraints including dual launch and a very tight development schedule, a six months gravity field mission in a 200 km near polar, dawn-dusk orbit is adequate to determine gravity anomalies to better than 5 mgal with a spatial resolution of 100 x 100 km half wavelength. This will enable scientists to determine improved spherical harmonic coefficients of the Earth gravity field equation to the order and degree of 180 or better.

Benz, R.↗

United States planetary rover status: 1989

A spectrum of concepts for planetary rovers and rover missions, is covered. Rovers studied range from tiny micro rovers to large and highly automated vehicles capable of traveling hundreds of kilometers and performing complex tasks. Rover concepts are addressed both for the Moon and Mars, including a Lunar/Mars common rover capable of supporting either program with relatively small modifications. Mission requirements considered include both Science and Human Exploration. Studies include a range of autonomy in rovers, from interactive teleoperated systems to those requiring and onboard System Executive making very high level decisions. Both high and low technology rover options are addressed. Subsystems are described for a representative selection of these rovers, including: Mobility, Sample Acquisition, Science, Vehicle Control, Thermal Control, Local Navigation, Computation and Communications. System descriptions of rover concepts include diagrams, technology levels, system characteristics, and performance measurement in terms of distance covered, samples collected, and area surveyed for specific representative missions. Rover development schedules and costs are addressed for Lunar and Mars exploration initiatives.

Pivirotto, Donna L. S.↗

A technology assessment of alternative communications systems for the space exploration initiative

Telecommunications, Navigation, and Information Management (TNIM) services are vital to accomplish the ambitious goals of the Space Exploration Initiative (SEI). A technology assessment is provided for four alternative lunar and Mars operational TNIM systems based on detailed communications link analyses. The four alternative systems range from a minimum to a fully enhanced capability and use frequencies from S-band, through Ka-band, and up to optical wavelengths. Included are technology development schedules as they relate to present SEI mission architecture time frames.

Ponchak, Denise S.↗

Space Station - Infrastructure for radiation measurements in low earth orbit

The general configuration, development schedule, and capabilities of the NASA International Space Station are reviewed, with an emphasis on the possibilities for long-term measurements of high-energy cosmic and secondary radiation from the main Station spacecraft, coorbiting or polar-orbit platforms, or Station-supported GEO satellites. Also outlined are the organizational structure and the application procedures to be followed by potential users of the Station facilities. Diagrams and drawings are provided.

Meredith, B. D.↗

Earth orbital operations supporting manned interplanetary missions

The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

Sherwood, Brent↗

ASTROMAG coil cooling study

ASTROMAG is a planned particle astrophysics magnetic facility. Basically it is a large magnetic spectrometer outside the Earth's atmosphere for an extended period of time in orbit on a space station. A definition team summarized its scientific objectives assumably related to fundamental questions of astrophysics, cosmology, and elementary particle physics. Since magnetic induction of about 7 Tesla is desired, it is planned to be a superconducting magnet cooled to liquid helium 2 temperatures. The general structure of ASTROMAG is based on: (1) two superconducting magnetic coils, (2) dewar of liquid helium 2 to provide cooling capability for the magnets; (3) instrumentation, matter-anti matter spectrometer (MAS) and cosmic ray isotope spectrometer (CRIS); and (4) interfaces to the shuttle and space station. Many configurations of the superconducting magnets and the dewar were proposed and evaluated, since those are the heart of the ASTROMAG. Baseline of the magnet configuration and cryostat as presented in the phase A study and the one kept in mind while doing the present study are presented. ASTROMAG's development schedule reflects the plan of launching to the space station in 1995.

Maytal, Ben-Zion↗

Technology for the Future: In-Space Technology Experiments Program, part 1

The purpose of the Office of Aeronautics and Space Technology (OAST) In-Space Technology Experiment Program (In-STEP) 1988 Workshop was to identify and prioritize technologies that are critical for future national space programs and require validation in the space environment, and review current NASA (In-Reach) and industry/university (Out-Reach) experiments. A prioritized list of the critical technology needs was developed for the following eight disciplines: structures; environmental effects; power systems and thermal management; fluid management and propulsion systems; automation and robotics; sensors and information systems; in-space systems; and humans in space. This is part one of two parts and is the executive summary and experiment description. The executive summary portion contains keynote addresses, strategic planning information, and the critical technology needs summaries for each theme. The experiment description portion contains brief overviews of the objectives, technology needs and backgrounds, descriptions, and development schedules for current industry, university, and NASA space flight technology experiments.

Breckenridge, Roger A.↗

A technology assessment of alternative communications systems for the space exploration initiative

Telecommunications, Navigation, and Information Management (TNIM) services are vital to accomplish the ambitious goals of the Space Exploration Initiative (SEI). A technology assessment is provided for four alternative lunar and Mars operational TNIM systems based on detailed communications link analyses. The four alternative systems range from a minimum to a fully enhanced capability and use frequencies from S-band, through ka-band, and up to optical wavelengths. Included are technology development schedules as they relate to present SEI mission architecture time frames.

Ponchak, Denise S.↗