Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Laser Powder Bed Fusion Additive Manufacture Nb1Zr Development

Next generation fission and fusion nuclear reactors require materials that can withstand operating temperatures greater than 500 °C, neutron irradiation doses of up to 200 displacements per atom (dpa), and potentially corrosive coolants such as the alkali liquid metals sodium, lithium, and NaK (Na33K eutectic alloy). Refractory alloys, such as Nb1Zr (Nb-1wt%Zr) and Molybdenum alloy TZM (Mo-0.5wt%Ti-0.08wt%Zr) have been traditionally considered viable candidates for advanced fission and fusion reactor concepts. However, it is relatively difficult to generate complex geometries of interest from these alloys using traditional manufacturing methods. In addition, there needs to be a concentrated effort to address refractory metal challenges at elevated temperature operation. In order to generate complex geometries of interest, modern manufacturing techniques are considered to increase the technological readiness level (TRL), cost-effectiveness, and schedule savings. This work focused on the continued development of laser powder bed fusion (L-PBF) additive manufacturing (AM) to improve both design flexibility, evaluate microstructure and properties, and ultimately accelerate the TRL and qualification of these processes and alloys for components to potentially be put into service. Niobium alloy Nb1Zr was identified through a down-selection process outlined in previous reports as a candidate to develop in L-PBF AM. Historically, Nb1Zr had been explored for high temperature fast spectrum fission reactors for both terrestrial and space applications. Molybdenum alloy TZM has also been considered for these reactor concepts due to exceptional high-temperature strength, creep resistance, and stability under irradiation. L-PBF AM of TZM has previously been investigated at LANL under the Microreactor program, NASA, ORNL, and in academia. However, due to the crack prone nature of TZM, L-PBF AM of TZM resulted in significant microcracking and additional development is required to pursue viable maturation. Other AM methods have been found to be more successful in printing TZM, and those alternatives approaches are discussed in this effort. The efforts detailed in this report focused on continued development of Nb1Zr through L-PBF and development of TZM via L-PBF and electron powder bed fusion (E-PBF). The objective of this work was to further the development of these AM techniques for the chosen refractory alloys, elucidating and addressing associated challenges through characterization of several demonstration builds. At LANL, Nb1Zr builds were completed using an EOS M290 and M400 machines, and a refractory alloy-dedicated L-PBF system, the Xact Metal XM200G, was installed. The XM200G primary purpose was to do the Nb1Zr parameter development process; however, due to difficulties associated with the machine installation and qualification process, it was decided to pivot development to the larger M400 and M290 machines. Although the supply of Nb1Zr powder was limited, it was sufficient to generate sub-scale metallographic specimens for the purpose of parameter development. This was first accomplished on the EOS M400 then the M290 due to machine schedule availability. Further development of TZM has been initiated at the University of Texas El Paso (UTEP) under contract with LANL to use both a heated build envelope L-PBF machine and E-PBF machine that have been found in the literature to mitigate microcracking. UTEP was provided with TZM powder and build plates to support parallel TZM parameter development across both machines. As part of the contract, UTEP will also be conducting microstructural characterization once optimized process parameters have been identified. The optimized process parameters for each machine will be used to generate a series of metallographic, mechanical, and surface finish specimens for subsequent characterization and testing. In the next section, we provide a detailed discussion of the methodology used for investigating the feasibility of leveraging these alloys for use in advanced reactor applications.

36 MATERIALS SCIENCE↗

Stakeholder Questionnaire on Fish Passage Facilities at U.S. Hydropower Developments

To mitigate the environmental impacts of hydropower dams on fish populations in rivers, fish passage infrastructure may be required by regulatory authorities or recommended by state or federal agencies to allow migratory fish to pass hydropower barriers and complete their life histories. However, information on the location, types, and characteristics of fish passage infrastructure is incomplete at the national scale. This lack of information limits understanding of current fish passage capabilities and hinders efforts to anticipate future passage requirements during project licensing or relicensing. To address this knowledge gap, researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. As part of this effort, a stakeholder questionnaire was created and deployed to solicit information on fish passage infrastructure, including engineering characteristics, operational schedules, targeted species, and costs. This online questionnaire was designed to allow respondents to provide highly detailed information regarding fish passage capabilities at U.S. hydropower developments as efficiently as possible. The questionnaire improved database coverage and accuracy by providing valuable development- or passage-specific stakeholder knowledge that is not otherwise publicly available. However, questionnaire response rates were low, and stakeholders showed a preference for providing data via the spreadsheet template. This is likely because most stakeholders had high-level knowledge about fish passage existence and type at many features, and few stakeholders had highly detailed, feature-specific knowledge of fish passage infrastructure, cost, operational scheduling, and capabilities. Nonetheless, the development and deployment of the stakeholder questionnaire advanced the project in several fundamental ways, and a similar questionnaire may be valuable for future database expansion via targeted dissemination to stakeholders with confirmed knowledge of detailed fish passage information at specific hydropower projects.

13 HYDRO ENERGY↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

CRADA Number NFE-24-10110 with Qubit Engineering Inc. (CRADA Final Report)

Over the past year, the Qubit Engineering team has pushed the frontiers of power‑grid optimization, working in close collaboration with Oak Ridge National Laboratory (ORNL) and the Tennessee Valley Authority (TVA). Their progress is reflected in three newly submitted conference papers, “Unified Relational GNN Architecture for AC Optimal Power Flow Calculations in Electric Grids,” “Graph‑Based Attention Mechanisms for Solving the AC Optimal Power Flow Problem in Electrical‑Power Networks,” and “Enhanced Power‑Grid Maintenance Planning and Quantum‑Inspired Combinatorial Prospects.” These publications showcase state‑of‑the‑art graph‑neural‑network methods for AC‑OPF and novel quantum‑inspired heuristics for maintenance scheduling. Beyond the academic results, the Qubit team has converted the research into two production‑grade tools built on TVA data: Neuro‑Grid, an AI‑driven power‑flow simulator that provides instant, interactive full‑grid load‑flow visualizations, and Quanta‑Grid, a quantum‑inspired maintenance‑scheduling engine to support logistics optimization for power utilities. Together, these advances demonstrate how Qubit’s partnership with ORNL and TVA is delivering practical, physics‑grounded analytics for next‑generation grid management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Tolerant Decoding of QLDPC-GKP Codes with Circuit Level Soft Information

Concatenated bosonic-stabilizer codes have recently gained prominence as promising candidates for achieving low-overhead fault-tolerant quantum computing in the long term. In such systems, analog information obtained from the syndrome measurements of an inner bosonic code is used to inform decoding for an outer code layer consisting of a discrete-variable stabilizer code such as a surface code. The use of Quantum Low-Density Parity Check (QLDPC) codes as an outer code is of particular interest due to the significantly higher encoding rates offered by these code families, leading to a further reduction in overhead for large-scale quantum computing. Recent works have investigated the performance of QLDPC-GKP codes in detail, and the use of analog information from the inner code significantly boosts decoder performance. However, the noise models assumed in these works are typically limited to depolarizing or phenomenological noise. In this paper, we investigate the performance of QLDPC-GKP concatenated codes under circuit-level noise, based on a model introduced by Noh et al. in the context of the surface-GKP code. To demonstrate the performance boost from analog information, we investigate three scenarios: (a) decoding without soft information, (b) decoding with precomputed error probabilities but without real-time soft information, and (c) decoding with real-time soft information obtained from round-to-round decoding of the inner GKP code. Results show minimal improvement between (a) and (b), but a significant boost in (c), indicating that real-time soft information is critical for concatenated decoding under circuit-level noise. We also study the effect of measurement schedules with varying depths and show that using a schedule with minimum depth is essential for obtaining reliable soft information from the inner code.

Borah, Shantom K. [Arizona U. (main)]↗

Inputs to GCAM-USA: IM3 Phase 2 Experiments

Overview This dataset contains XML input files for the IM3 Phase 2 version of GCAM-USA. The files are organized into two categories: Scenario-specific inputs represent hydroclimate and socioeconomic effects on water availability, heating and cooling degree-hours, and agricultural productivity. They support eight IM3 canonical scenarios: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Model-improvement inputs extend GCAM-USA v5.3 with updated representations of coal and nuclear power plant retirements, electricity trade among U.S. interconnections, offshore carbon storage costs, and groundwater depletion constraints. Data structure Scenario-specific inputs rcp45_runoff/ and rcp85_runoff/XML files describing water availability by HUC2 basin under the RCP 4.5 and RCP 8.5 scenarios. rcp45_hdcd/ and rcp85_hdcd/XML files containing monthly-day and monthly-night heating and cooling degree-hours at the U.S. state level for different RCP-SSP combinations. rcp45_agyields/ and rcp85_agyields/XML files describing changes in agricultural productivity at the intersection of GCAM regions and HUC2 water basins for different RCP-SSP combinations. rcp45_emissions_pathway/The emissions-constraint XML file used to represent the RCP 4.5 pathway. Model-improvement inputs core_retire/Updates coal-fired power plant retirement schedules based on New England ISO. GCAMUSA_IM3_elec_trade_interconnect.xmlRestricts electricity trade to occur within the ERCOT, WECC, and IE interconnections. nuclear_USA.xmlUpdates the retirement schedules of the Diablo Canyon and Palisades nuclear power plants. high_cost_offshore_carbon.xmlUpdates the assumed cost of offshore carbon storage. water_supply_constrained_gleeson_5pct.xmlReplaces WaterGAP historical groundwater-depletion estimates with data from the Gleeson dataset and limits groundwater extraction to 5% of the available groundwater in each Superwell grid cell. How to use the data This dataset is designed for use with the IM3 version of GCAM-USA. Download or clone GCAM-USA from the IM3 GCAM GitHub repository at https://github.com/IMMM-SFA/gcam-core and check out the gcam-usa-im3 branch. Place the downloaded folder im3scenarios in the gcam-core/input directory while preserving the provided folder structure.

Energy↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

NLR HPC Kestrel Jobs Data

Overview: Anonymized job-level records from the Kestrel HPC system at the National Laboratory of the Rockies (NLR). Each record represents a Slurm batch job with scheduling metadata, resource requests, utilization, energy estimates, and efficiency metrics. Sensitive fields (user, account, job name, submit line, working directory, submit script, and job type) are replaced with 7-character cryptographic hashes. System & Timeframe: Kestrel is located at the NLR campus. Standard compute nodes have 104 cores and 256 GB RAM; bigmem nodes have 2,000 GB. GPU nodes (gpu-h100 partition) use NVIDIA H100 GPUs. Data covers jobs submitted August 2023 through December 2025. Funding provided by the U.S. Department of Energy, EERE. Files: esif.hpc.kestrel.job-anon.zip — Anonymized job records (Hive-partitioned Parquet) datacard.md — Full dataset documentation ~11 million rows, 50 variables. Readable with PyArrow, pandas, DuckDB, Apache Spark, or any Parquet-compatible tool. Data Collection: Jobs collected via sacct with timezone-aware export (SLURM_TIME_FORMAT="%Y-%m-%dT%H:%M:%S%z"), loaded into PostgreSQL. Calculated columns updated via database triggers and batch functions. All timestamps use timestamptz and correctly handle DST transitions. Preprocessing: Anonymization of name, user, account, submit_line, work_dir, submit_script, and job_type via 7-char hex hashes Derived columns: queue_wait, cpu_eff, max/min/avg_mem_eff, energy estimates Simplified job state mapping (e.g., "CANCELLED by 132357" → "CANCELLED") Boolean flags: python_job, reframe_job Temporal decomposition: year, month, day, day_of_week, hour, minute from submit_time Shared node tracking: shared_job_count, nodes_shared, jobs_shared Key Variables: Scheduling: job_id, partition, state_simple, submit_time, start_time, end_time, queue_wait Resources: nodes_req/used, processors_req/used, memory_req, wallclock_req/used, gpus_requested Efficiency: cpu_eff, max/min/avg_mem_eff Energy: cpu_energy_tdp_estimated_max/used_watt_hours, consumed_energy_raw_joules, consumed_energy_raw_watt_hours Sharing: shared_job_count, nodes_shared, jobs_shared Partitions: short, standard, debug, gpu-h100 Job States: CANCELLED, COMPLETED, FAILED, PENDING, RUNNING QoS Levels: normal, high Important Notes: Timestamps include timezone offsets; DST transitions are handled correctly, though adding intervals across DST boundaries requires offset adjustment shared_job_count reflects physical node co-residency, not use of the shared partition Job step records and raw Slurm JSONB fields are excluded Do not attempt to re-identify individuals from hashed fields

97 MATHEMATICS AND COMPUTING↗

NLR HPC Eagle Jobs Data and Additional Energy Metrics

Overview: Anonymized job-level records from the Eagle high-performance computing (HPC) system at the National Laboratory of the Rockies (NLR). Each record represents a Slurm batch job with scheduling metadata, resource requests, resource utilization, CPU/GPU energy consumption, and efficiency metrics. Sensitive fields (user, account, job name) are replaced with cryptographic hashes. System & Timeframe: Eagle was a 2,000-node, 8-petaflop system operated at NLR from 2019–2024. Data covers the full operational lifetime of the system. Slurm data was processed nightly; timestamps are in Mountain Time. Funding provided by the U.S. Department of Energy, EERE. Files: esif.hpc.eagle.job-anon.zip — Core anonymized job records (Hive-partitioned Parquet) esif.hpc.eagle.job-anon-energy-metrics.zip — Same records with additional iLO and Ganglia energy metrics datacard.md — Full dataset documentation ~13.8 million rows, 62 variables. Readable with PyArrow, pandas, DuckDB, Apache Spark, or any Parquet-compatible tool. Data Collection: Jobs collected via sacct through a pipeline: Eagle Jobs API → Redpanda → StreamSets → HPCMON API → PostgreSQL. Node-level power from iLO (HP Integrated Lights-Out); GPU power from Ganglia monitoring, joined to jobs via node lists and time ranges. Preprocessing: Anonymization of name, user, and account fields via cryptographic hashing Derived columns: queue_wait, cpu_eff, max_mem_eff Simplified job state mapping (e.g., "CANCELLED BY 12345" → "CANCELLED") QoS accounting rules (buy-in, standby, or Slurm QoS value) CPU energy estimated from TDP (200W, Intel Xeon Gold 6154, 18 cores) Timezone-aware columns (_tz) sourced from LEX accounting database to correctly handle DST transitions Key Variables: Scheduling: job_id, partition, state_simple, submit_time_tz, start_time_tz, end_time_tz, queue_waitResources: nodes_req/used, processors_req/used, memory_req, wallclock_req/used, gpus_requested Efficiency: cpu_eff, max_mem_eff Energy: cpu_energy_tdp_estimated_max/used_watt_hours, node_energy_total_watt_hours (iLO), gpu0/1_energy_total_watt_hours (Ganglia) Partitions: bigmem, bigmem-8600, bigscratch, csc, dav, ddn, debug, gpu, haswell, long, mono, short, standard Job States: CANCELLED, COMPLETED, FAILED, NODE_FAIL, OUT_OF_MEMORY, PENDING, RUNNING, TIMEOUT QoS Levels: Unknown, normal, buy-in, debug, penalty, high, standby Important Notes: Non-_tz timestamp columns may be off by one hour across DST boundaries; use _tz columns for time difference calculations Energy fields are null for jobs without monitoring coverage Job step records and raw Slurm JSONB fields are excluded from this extract Do not attempt to re-identify individuals from hashed fields

97 MATHEMATICS AND COMPUTING↗

Digital Twin Enabling Technologies for Online Condition Monitoring of Nuclear Power Plant Components

Online condition monitoring is an area of active research that may enable improved scheduling, maintenance, and safety of nuclear power plant components, reducing unnecessary derate while simultaneously improving operational capacity. Digital twins are one avenue to conduct online condition monitoring and are currently being explored by national laboratories and universities alike. Digital twins for online condition monitoring are, in essence, state concurrent models that emulate a physical process which predicts a parameter and compares it against a measured value. However, digital twins may also provide additional insights by combining and interpreting various sources of information. These insights may be used for preventative maintenance scheduling optimization or early fault detection and are projected to be valuable for meeting requirements under 10 CFR 50.55a. However, digital twin technologies are still under significant development; quantifying model uncertainties, improving unique fault identification, and multimodal sensor fusion are some areas under investigation. Therefore, in this work, we discuss and review the various enabling technologies, in the form of advanced sensors, instrumentation, and modelling methods, that may be used to implement and enhance digital twins for online condition monitoring. A potential use case for pump-motors is presented to demonstrate how these various pieces of enabling digital twin technologies may integrated together for online condition monitoring. Challenges and opportunities associated with the pump-motor digital twin enabling technologies are also identified and discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Circular Economy for Photovoltaics in Service of Energy Transition

The challenge of energy transition is immediate and immense; current projections target 75 TW of photovoltaics (PV) capacity by 2050. While any transition to renewable energy technology is preferable to the current fossil-based system, it is ideal to improve the sustainability of PV to minimize negative environmental and social impacts. Circular economy (CE) has been proposed as a method to improve the sustainability of PV, especially for emerging materials like perovskites. CE is a set of actions, principles, and systems which aim to design out waste and keep products and materials in use, to reduce environmental impacts and enable sustainable development. At the most basic level, CE is "reduce, reuse, recycle", the R-actions, in ranked order. CE of a PV technology can be metricized in a variety of ways, such as the Material Circularity Indicator (Smith and Jones, Ellen MacArthur Foundation, 2019) or recycling rates. Unfortunately, standard CE metrics have several shortcomings for measuring renewable energy technologies in the context of deployment for energy transition (Figge 2018, Saidani 2019): 1) Only measure mass flows; 2) De-prioritization of the use phase in favor of mass circularity when scoring; and 3) Tight focus on a single product scale The use phase and energy flows of PV are key to energy transition, and therefore need to be quantified. Additionally, correlating product-scale to system-scale is necessary for quantifying the environmental impacts of energy transition. Life Cycle Assessment (LCA) can address some of these concerns, but also focuses on a single product scale and has trouble capturing the dynamics of system-scale energy transition, such as the interaction of module lifetime with manufacturing demands for energy transition deployment schedules. Therefore, we developed an open-source Python-based system dynamics model to quantify the mass, energy and carbon impacts of CE R-actions for PV technologies in the energy transition; PV in the CE (PV ICE) (Ovaitt & Mirletz 2021). The tool captures supply chains from material extraction through end of life, incorporating 5 circular end of life pathways. PV ICE takes in any evolving bill of materials, module properties and deployment schedule to support researchers and decision makers with data-backed insights. In this work, we quantify and compare proposed CE sustainable PV module designs and lifecycle management strategies, spanning currently commercialized technologies, government and industry technology targets, and several low Technology Readiness Level (TRL) emerging PV technologies, including perovskites. Our analyses capture the projected evolutions of lifetime, efficiency and material circularity of these PV technologies, as well as their material supply chains. Our analyses emphasize the importance of examining a suite of metrics to identify priorities and tradeoffs, and inform design or lifecycle management decisions holistically. Previous analyses have demonstrated the central importance of PV module lifetime to support energy transition while minimizing impacts. High levels of material circularity (>90%) enable minimizing lifecycle wastes, can reduce virgin material demands if paired with improving efficiency, but demonstrate tradeoffs in energy return on investment. In the fervor of new material and technology development, it is important to remember that CE is not the end goal; decarbonization and energy transition are the end goal. CE should be used in service to improve the sustainability of PV, and R-actions evaluated for their usefulness and efficacy to this end.

carbon↗

Impact of Hydrological Data on Power System Operational Studies: Preprint

Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

Brick Schema Standardized Plug Load Control Strategies for Load Reduction: Preprint

Plug loads comprise a significant percentage of commercial building energy consumption. Applying intelligent controls to turn off plug loads when unused can provide dynamic load reduction and flexibility, which are key traits of grid-interactive efficient buildings. This capability is important for equitable decarbonization as it can enable disadvantaged communities to electrify buildings without costly upgrades to electrical infrastructure. In this work, we present the effectiveness of various control strategies along with the operational lessons that informed their design. During a three-year period, we operated over 600 smart outlets in 12 university office buildings. The attached plug loads consisted primarily of printers, TVs, water dispensers, and copiers. After recording baseline power measurements for one year, we designed plug load control (PLC) strategies for each plug load type, use, and for different risk tolerance levels because PLC can potentially be disruptive to daily work. We used the Brick Schema to facilitate the management of plug load locations and other metadata. For advanced controls, we integrated the smart plugs with heating, ventilation, and air conditioning (HVAC) systems through the campus building automation system. We found static schedules to be the least disruptive and most predictable for occupants, resulting in 38% and 66% energy savings in two studies. For printers, print server-triggered PLC produced 86% savings, the highest of all strategies with minimal occupant impact. Scheduling of water dispensers and digital signage TVs produced 49% and 70% savings respectively with opportunities to improve performance with the use of HVAC occupancy data.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

ADVANCED CONSTRUCTION TECHNOLOGY INITIATIVE (ACTI)

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, The National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) program aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR)-5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory in support of the development and qualification of tri-structural isotropic low-enriched fuel for use in high-temperature gas-cooled reactors. The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR-5/6/7 experiment were to: • Irradiate reference-design fuel particles to support fuel qualification. • Establish operating margins for the fuel, beyond normal operating conditions. • Provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective was to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR-5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast flux trap of the ATR with a planned duration of 500 effective full-power days. The northeast flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B–168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full-power days. Final burnup values, on a per-compact basis, ranged from 5.66 to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples had failed (the bottom three capsules lost all thermocouples). During the first five cycles (162B – 165A), the fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8–10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to a maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented a fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particles failed in Capsule 3, which was considered possible because the experiment was designed to operate beyond the high-temperature gas-cooled reactor normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to the lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, Cycle 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on the absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating Safety, Security, and Nuclear Operations for Advanced Reactors

The traditional separation between safety, security, and operations teams has created significant barriers to achieving optimal outcomes. When security considerations are introduced late in the design process, they often conflict with already-established architectural, operational, or engineering parameters. Retrofitting security measures can lead to increased costs, schedule delays, and compromises in security effectiveness. For instance, the need to retrofit physical barriers or surveillance systems often results in trade-offs that could have been avoided with earlier input from security professionals. Delayed integration can also affect regulatory processes and result in licensing delays. Security reviews conducted at later stages frequently identify gaps that necessitate significant redesign efforts, impacting not only scope, schedule, and budget, but also adding risk and lowering stakeholder confidence in the project. This paper aims to address these challenges by identifying practical opportunities for integrating security considerations seamlessly with design and operations teams throughout the entire lifecycle of nuclear facilities—from conceptual design to commissioning and beyond. The research emphasizes the value of early and continuous collaboration among stakeholders to ensure that security measures are robust, operationally effective, and cost-efficient. By examining case studies, analyzing past incidents, and leveraging best practices from other high-security industries, this study highlights actionable strategies for bridging the gap between safety, security, and operations teams.

Zineddin, Dr. Z. [ORNL] (ORCID:0009000848740725)↗