Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

An Assessment of the Nevada Test Site for Low-Level Waste Management

This report presents a summary of description information, facilities, and operating practices at the Nevada Test Site. It is concluded that NTS is not only a feasible location for surface and near-surface storage of low-level wastes, but also a potential site for underground storage of higher level wastes.

052002* -- Nuclear Fuels-- Waste Disposal & Storag↗

Miscanthus carbon flux data for SABR and UIEF

This eddy covariance (EC) gap-filled and partitioned flux dataset for Miscanthus from the SABR and UIEF farms was collected to evaluate carbon fluxes during the establishment phase of Miscanthus. The goal of this research is to quantify net carbon exchange using the EC technique at two sites and assess how carbon uptake varies with different planting densities. The dataset is contains two .csv files.

Aslan Sungur, Guler (Rojda) [Department of Agronom↗

Pyrolysis Vapor and Bio-Oil Preconditioning via Ex Situ Hydrodeoxygenation and Alkylation Using a Heteropolyacid Catalyst

Ex situ catalytic preconditioning of biomass pyrolysis vapors (partial deoxygenation) has the potential for both reducing the oxygen content and beneficially influencing the oxygen speciation of condense bio-oils for enhancement of downstream condensed phase upgrading processes. Here, condensed phase upgrading processes may refer to both coprocessing and hydroprocessing with vacuum gas-oil (VGO). Reduction of oxygen content to produce bio-oils with greater hydrophobicity can enhance VGO-solubility while tailoring of oxygen speciation by removal of reactive carbonyls (e.g., acetic acid) can lessen catalytic deactivation via coking reactions. 1,2 Furthermore, enhanced VGO-solubility and reduced coking leads to greater biogenic carbon incorporation in end-products from condensed phase upgrading processes. By leveraging the hydrodeoxygenation and alkylation activity of a titania-supported molybdenum-heteropolyacid (Mo-HPA/TiO2) catalyst, pyrolysis vapors and resulting condensed bio-oils were effectively preconditioned for downstream upgrading. 3 Data regarding the use of Mo-HPA/TiO2 for pyrolysis vapor preconditioning will be presented on, including method of employment, catalyst characterization, and impacts on bio-oil in relation to downstream condensed phase upgrading processes. Our approach is to: Compare Mo-HPA/TiO2 product distribution to HZSM-5; Investigate Mo-HPA/TiO2 regeneration and characterize changes in acid site character; Assess product differences in terms of enhanced VGO-solubility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

South Asia Group for Energy - Bhutan

Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.

Bhutan↗

Composite Analysis Solid Waste Release Data Reduction of Activity Flux from Waste Sites to the Vadose Zone for Baseline Assessment

This environmental calculation file (ECF) describes the data reduction methodology for the solid waste release datasets generated by the Composite Analysis Solid Waste Release (CASWR) model (CP-62766, Model Package Report: Composite Analysis Solid Waste Release Model [CASWR Model]) and documents the resulting reduced datasets for the updated Composite Analysis (CA) baseline assessment. This ECF is in support of the updated Hanford Site CA. The purpose of the updated Hanford Site CA is to provide an estimate of the cumulative radiological impacts from active and planned low-level radioactive waste disposals and other potentially interacting radioactive waste disposal sources that will remain following Hanford Site closure. The vadose zone modeling activities associated with the CA includes solid waste forms as contaminant sources. To support the modeling of solid waste transport from the vadose zone to the groundwater at the Hanford Site, the CASWR model was designed to generate deterministic radionuclide release rates for the Hanford Site Central Plateau solid waste disposal sites. The complete CASWR model-generated dataset for the CA Baseline Assessment consists of 2,378,831 sets of time and release rates (1,073,869 sets for the 200 East Area and 1,304,962 sets for the 200 West Area), representing a course of the simulation from year 1953 to year 12,069, 16 radiological contaminants of potential concern (COPCs), and 237 solid waste sources as documented in ECFHANFORD- 19-0112, Solid Waste Release Calculations for the Composite Analysis Baseline Assessment. For several of the STOMP vadose zone models, the number of release rate data pairs required for release at all waste sites would exceed the limitations imposed by the STOMP modelling software package used to simulate contaminant transport through the vadose zone. As a result, a data reduction of the CASWR dataset is required prior to its use as a source input for the CA vadose zone modeling activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCSP Task 6 Risk Assessment Report

For this Risk Assessment Plan, TCCSP has conducted a site-based risk assessment that quantifies the risk of CO 2 and/or brine leakage as a result of CO 2 injection at TCCSP. The risk assessment covers project planning, construction, injection, post-injection periods and closure of TCCSP. Key technical and non-technical Project risks are identified as part of the Risk Workshop and include a thorough evaluation of related scenarios. Mitigation strategies for the identified risk scenarios are defined to develop a scientifically sound, and community acceptable CO 2 storage Project.

58 GEOSCIENCES↗

Updated Application of Frequency of Detection Methods for the INL Site Ambient Air Monitoring Network

This report presents a quantitative assessment of the current INL Site air monitoring network using frequency of detection (FD) methods. The first assessment of the INL network was performed in 2015 and made recommendations for improving the network. As a result of changes made in response to the recommendations and the addition of new source locations, the network was modified and reassessed in 2017. Since 2017, administration of the air sampling program has been consolidated under one contractor, which resulted in additional changes to the network (sampler numbers and locations) and changes in radionuclide detection levels. As a result of these changes and others, an updated assessment of the INL Site ambient air monitoring network was performed. The same two exposure scenarios used in previous assessments were used for this assessment: a resident scenario and a shepherd/rancher scenario. The resident was assumed to be continuously present at their residence/business/farm operation outside the INL Site boundary while the shepherd/rancher was assumed to be present 24-hours at the nearest INL grazing allotment boundary in each of the 22.5-degree sectors along the sector centerline from each source. Updates to both the resident and shepherd/rancher receptor locations were included. Other changes include updates to flow rates for stack sources, expansion of the list of important radionuclides based on the most recent National Emission Standards for Hazardous Pollutants (NESHAPs) analysis, and updated dose coefficients. The assessment was conducted to determine whether the current INL monitoring network is capable of detecting releases of important radionuclides from INL Site sources that have the potential to exceed a conservative dose threshold for the two exposure scenarios. The assessment revealed that for the resident scenario, the current network meets the desired performance objective (FD = 95%) for all radionuclides and sources except for Cl-36 from the TRA-770 stack (94.4%). For the shepherd/rancher scenario, the FD performance objective is met for all radionuclides and sources except tritium from MFC-774 and TAN 679 (91% for both). An investigation of reported emissions for the past three years revealed that Cl 36 is not emitted from TRA-770, and routine tritium emissions from MFC-774 and TAN-679 are very small and the sources are likely incapable of emitting enough tritium to cause a release that should be detectable by the monitoring network. This assessment is based on a conservative dose threshold. This coupled with fact that the FD for Cl 36 is only slightly less than the performance objective and Cl-36 is not emitted from TRA-770, modifying the network (i.e. adding another sampler, increasing sampler flow rate, moving samplers) to meet the 95% performance objective for this radionuclide/source/receptor scenario is not warranted. Similarly, because tritium emissions from MFC-774 and TAN-679 are very small and these two sources are likely incapable of causing a dose due to tritium release that should be detectable by the network, modifications to increase tritium detection for these sources is also unwarranted at this time. However, if it is required to meet the performance objective for tritium for all sources and receptor scenarios, additional analysis determined the FD could be raised from 91% to > 99% for both sources by adding two tritium samplers to the network.

61 RADIATION PROTECTION AND DOSIMETRY↗

Resource Assessment for Distributed Wind Energy: An Evaluation of Best-Practice Methods in the Continental US

Current wind resources within the United States (US) indicate a potential to profitably install nearly 1,400 gigawatts of distributed wind (DW) capacity. This amount is equivalent to over half of the United States’ current energy demand from electricity, making it enough to power millions of homes and businesses and replace countless fossil fuel-based generating plants. Despite the potential growth of DW in the US, deployments are presently hindered by a lack of confidence in resource estimation methods. One potential challenge is that smaller-scale turbines, with hub heights of 40 meters or less, are disproportionately impacted by obstacles such as buildings and vegetation. These obstacles may produce complex wake effects, best modeled with high-fidelity complex fluid dynamics (CFD) models that are too computationally expensive to use for routine siting and resource assessment. Thus, installers today make use of heuristics and simple equations to approximate the impact of obstacles while also leveraging long-term resource data from commercial or publicly available atmospheric models. This study evaluates these historical and commonly used methods alongside new lower-order obstacle models produced from CFD simulations and measurement-based bias correction. The preliminary results from this study show the importance of taking care in the choice and application of mesoscale atmospheric models and the significant value of bias correction using measurements from nearby meteorological towers. Detailed obstacle modeling provides only modest additional gains in performance and, in some cases, can add error, especially at sites where turbines have already been located to avoid obvious impact from upwind obstacles. These findings reinforce the importance of collecting in situ measurements and suggest that obstacle models may be better applied in practice to automated or computer-aided siting, rather than in economic wind resource assessments.

17 WIND ENERGY↗

Ground-motions site and event specificity: Insights from assessing a suite of simulated ground motions in the San Francisco Bay Area

This article presents the results of a research that is part of a larger collaborative effort between the Lawrence Berkeley National Laboratory and the Pacific Earthquake Engineering Research Center, funded by the US Department of Energy Office of Cybersecurity, Energy Security and Emergency Response. The main objective of this study is to assess a suite of near and far-field simulated ground motions obtained from 20 realizations of an M7 Hayward Fault earthquake in the San Francisco Bay Area, California USA, and inform the selection of rupture simulation parameters leading to strong motions. To this aim, comparisons are conducted with NGA-W2 and directivity ground-motion models and a selected population of records. An archetypal steel moment-resisting frame is utilized to assess infrastructure response distributions. The analyses carried out for each simulated event and subdomain with consistent properties in terms of shallow shear-wave velocity proved to be instrumental for better interpreting the differences between simulated motions and empirical models. The main reasons identified for variances between simulations and empirical relationships included (1) directivity effects fully captured by the simulations across the full breadth of rupture models; (2) site vicinity to ruptures that incorporate large-slip patches, particularly if these are in the forward-directivity direction; and (3) presence of geologic structures that can “trap” seismic waves and produce ground motions with large amplitude and long signal duration. The analyses carried out in this work provide a path for interpreting ground-motion site and event specificity obtained from a suite of physics-based simulations, differing only in the rupture model characterization, to inform the selection of simulation scenarios for site-specific engineering analyses under strong excitations. Evidence from this work points to the possibility that current hazard models may underestimate ground-motion intensities in areas where the combined effect of directivity and site conditions results in large ground-motion amplitudes.

58 GEOSCIENCES↗

Representativeness assessment of the pan-Arctic eddy covariance site network and optimized future enhancements

Abstract. Large changes in the Arctic carbon balance are expected as warming linked to climate change threatens to destabilize ancient permafrost carbon stocks. The eddy covariance (EC) method is an established technique to quantify net losses and gains of carbon between the biosphere and atmosphere at high spatiotemporal resolution. Over the past decades, a growing network of terrestrial EC tower sites has been established across the Arctic, but a comprehensive assessment of the network's representativeness within the heterogeneous Arctic region is still lacking. This creates additional uncertainties when integrating flux data across sites, for example when upscaling fluxes to constrain pan-Arctic carbon budgets and changes therein. This study provides an inventory of Arctic (here > = 60∘ N) EC sites, which has also been made available online (https://cosima.nceas.ucsb.edu/carbon-flux-sites/, last access: 25 January 2022). Our database currently comprises 120 EC sites, but only 83 are listed as active, and just 25 of these active sites remain operational throughout the winter. To map the representativeness of this EC network, we evaluated the similarity between environmental conditions observed at the tower locations and those within the larger Arctic study domain based on 18 bioclimatic and edaphic variables. This allows us to assess a general level of similarity between ecosystem conditions within the domain, while not necessarily reflecting changes in greenhouse gas flux rates directly. We define two metrics based on this representativeness score: one that measures whether a location is represented by an EC tower with similar characteristics (ER1) and a second for which we assess if a minimum level of representation for statistically rigorous extrapolation is met (ER4). We find that while half of the domain is represented by at least one tower, only a third has enough towers in similar locations to allow reliable extrapolation. When we consider methane measurements or year-round (including wintertime) measurements, the values drop to about 1/5 and 1/10 of the domain, respectively. With the majority of sites located in Fennoscandia and Alaska, these regions were assigned the highest level of network representativeness, while large parts of Siberia and patches of Canada were classified as underrepresented. Across the Arctic, mountainous regions were particularly poorly represented by the current EC observation network. We tested three different strategies to identify new site locations or upgrades of existing sites that optimally enhance the representativeness of the current EC network. While 15 new sites can improve the representativeness of the pan-Arctic network by 20 %, upgrading as few as 10 existing sites to capture methane fluxes or remain active during wintertime can improve their respective ER1 network coverage by 28 % to 33 %. This targeted network improvement could be shown to be clearly superior to an unguided selection of new sites, therefore leading to substantial improvements in network coverage based on relatively small investments.

54 ENVIRONMENTAL SCIENCES↗

Update of Erosion Conditions and Assessment of Mitigation Options for the L-Bar Site

The L-Bar former uranium milling site was remediated and closed per regulations and is now under the long-term stewardship of the U.S. Department of Energy, Office of Legacy Management (DOE/LM). Since assuming stewardship in 2004, DOE/LM has observed erosion and sedimentation processes at the L-Bar Site that will challenge meeting the design closure criteria in the long term, and therefore erosion control structures were installed in several areas. Portions of these structures were subsequently damaged by summer convective storm events and they are being redesigned. At the request of DOE/LM, Desert Research Institute (DRI) reviewed the proposed redesign plans of the erosion control structures. The purpose of this review is to support DOE/LM decisions regarding mitigation of ongoing erosion processes, including assessing possible repair of the existing erosion control structures, as well as plan for effective long-term site management. This design review is performed in reference to the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards contained in 40 CFR 192.02 that require containment of residual radioactive material be effective for up to 1,000 years (if achievable, but certainly for 200 years), limit radon release, protect groundwater, and minimize future maintenance. The erosion control structures under review are not subject to the UMTRCA standard directly, but they contribute to the performance of the overall containment system by virtue of their relationship with the large diversion channels bounding the disposal cell. The 11 design drawings included in “Erosion Control Alternatives Analysis, L-Bar, New Mexico, Disposal Site, LTS-111-0043-08-002,” dated January 11, 2019, and listed in Appendix A, and supporting calculations in Weston (2019) are the focus of the review. Additionally, DOE/LM provided supporting data such as a 2018 photogrammetry-based digital elevation model of the site, precipitation records collected from an on-site weather station, and sedimentation records collected at an on-site basin. This assessment includes review of the proposed design to mitigate current site conditions but also addresses site changes between the initial erosion assessment report (Miller et al., 2012) and current conditions. The analysis is at a predesign engineering level and does not include development of hydraulic or sediment transport models. Site precipitation data are included in Miller et al. (2012). The natural conditions of the site, the design of site diversion systems, observed erosion at the site, and predesign engineering analysis are used to develop a holistic view of the challenges to L-Bar Site stability and possible responsive actions.

54 ENVIRONMENTAL SCIENCES↗

Assessment of the feedstock supply for siting single- and multiple-feedstock biorefineries in the USA and identification of prevalent feedstocks

An integrated multi-feedstock bioenergy (i.e., biofuel, biopower, or bioproduct) supply system has potential to reduce biomass supply system uncertainties and costs. This study identifies optimal configurations of multi-feedstock biomass-to-biorefinery supply chains and pertinent feedstock combinations based on spatial distribution of feedstock and lowest delivered cost to the biorefinery. We used the Supply Characterization Model (SCM) to allocate feedstock supplies to candidate biorefinery facilities. Model runs were performed for herbaceous energy crops, agriculture residue, and woody biomass available in 2017, 2022, 2025, and 2030 as estimated by the Policy Analysis System (POLYSYS) and Forest Sustainable and Economic Analysis Model (ForSEAM) models. Three feedstock supply scenarios were compared: (a) an herbaceous scenario: switchgrass, miscanthus, biosorghum, and corn stover; (b) a woody scenario: coppice wood, noncoppice wood, whole trees, and forestry residues, and (c) a mixed scenario: a combination of all feedstocks in herbaceous and woody scenarios. By 2030 the analyses predicted that 323, 168, and 473 biorefineries were sited in the herbaceous, woody, and mixed scenario, respectively, in the conterminous USA. Feedstock mixes supplied to the biorefineries were mostly dominated by a single feedstock. The most prominent feedstock mixes identified were: (1) switchgrass and miscanthus; (2) coppice and noncoppice wood; and (3) coppice wood, noncoppice wood, switchgrass and miscanthus. Biorefineries using multi-feedstock would be beneficial for growth of bioeconomy, however flexible and cost-effective conversion platforms should be developed to efficiently utilize multiple feedstocks. This analysis identifies biorefinery locations and feedstock supply mixes while minimizing delivered feedstock costs based on spatial and temporal feedstock availability.

09 BIOMASS FUELS↗

Site 300 Water Line - Zone 3 In Fill Assessment Soil Sampling and Analysis Plan (Addendum 1, March 2023)

The purpose of this addendum is to expand the Site 300 Water Line Project – Zone 3 In Fill Assessment Soil Sampling and Analysis Plan (SAP), (LLNL-AM-826971), dated August 2021. This addendum will be used in conjunction with the SAP. All policies and procedures set forth in the SAP that are not modified in this addendum will remain in effect for the duration of the project, where applicable.

54 ENVIRONMENTAL SCIENCES↗

Mutually beneficial outcomes for hydropower expansion and environmental protection at a basin scale

Reshaping the scale of planning for hydropower development, from reaches to basin-scales, has been recommended as a more effective way to ameliorate the environmental impacts of hydropower. One approach is identifying mutually exclusive areas where development is precluded for conservation purposes and areas of low conservation value that present fewer barriers to development. This strategy, however, is less adoptable in developed countries where hydropower is already widespread and large-scale construction of new dams is unlikely. To broaden the adoption of basin-scale planning, alternative approaches and planning tools are needed for identifying mutually beneficial opportunities for simultaneous increases in hydropower capacity while improving environmental conditions. In this study, we present the Basin Scale Opportunity Assessment as a methodology to improve environmental conditions through either direct (on-site) or indirect (off-site) mitigation. We assess whether direct or indirect mitigation activities lead to optimal results in terms of added hydropower, environmental improvement, and monetary cost at a basin scale. We present two case studies for the Connecticut River and Roanoke River Basins, USA. Significant opportunities for expanding hydropower generating capacity are numerous in both basins. Results suggest that total hydropower capacity could be increased 4 to 7 % in the Roanoke and Connecticut Basins, respectively, without new dam construction and with net improvements in environmental conditions. We found that environmentally and economically optimal win-win strategies for increasing hydropower capacity and improving environmental conditions included improving environmental conditions in rivers downstream of existing dams. Off-site mitigation opportunities, such as dam removal and wetland mitigation, were identified as optimum solutions for achieving net environmental improvements only when they were associated with new hydropower construction. Our results demonstrate that opportunities to increase hydropower capacity and improve environmental conditions are expanded by viewing cumulative benefits at basin scales; however, increasing regulatory flexibility may be required to realize these opportunities.

54 ENVIRONMENTAL SCIENCES↗