Search NASA⌕ Search

SEARCH · Search NASA

Results for “software cost estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Integrating Efficiency of Industry Processes and Practices Alongside Technology Effectiveness in Space Transportation Cost Modeling and Analysis

This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.

Zapata, Edgar↗

Manager's handbook for software development, revision 1

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

Source record↗

Utilizing Expert Knowledge in Estimating Future STS Costs

A method of estimating the costs of future space transportation systems (STSs) involves classical activity-based cost (ABC) modeling combined with systematic utilization of the knowledge and opinions of experts to extend the process-flow knowledge of existing systems to systems that involve new materials and/or new architectures. The expert knowledge is particularly helpful in filling gaps that arise in computational models of processes because of inconsistencies in historical cost data. Heretofore, the costs of planned STSs have been estimated following a "top-down" approach that tends to force the architectures of new systems to incorporate process flows like those of the space shuttles. In this ABC-based method, one makes assumptions about the processes, but otherwise follows a "bottoms up" approach that does not force the new system architecture to incorporate a space-shuttle-like process flow. Prototype software has been developed to implement this method. Through further development of software, it should be possible to extend the method beyond the space program to almost any setting in which there is a need to estimate the costs of a new system and to extend the applicable knowledge base in order to make the estimate.

Fortner, David B.↗

Use of multispectral data in design of forest sample surveys

The use of multispectral data in design of forest sample surveys using a computer software package is described. The system allows evaluation of a number of alternative sampling systems and, with appropriate cost data, estimates the implementation cost for each.

Titus, S. J.↗

Designing Control System Application Software for Change

The Unified Modeling Language (UML) was used to design the Environmental Systems Test Stand (ESTS) control system software. The UML was chosen for its ability to facilitate a clear dialog between software designer and customer, from which requirements are discovered and documented in a manner which transposes directly to program objects. Applying the UML to control system software design has resulted in a baseline set of documents from which change and effort of that change can be accurately measured. As the Environmental Systems Test Stand evolves, accurate estimates of the time and effort required to change the control system software will be made. Accurate quantification of the cost of software change can be before implementation, improving schedule and budget accuracy.

Boulanger, Richard↗

Economic and Jobs Impacts of Point-Source Carbon Capture in Cement Industry – Case Study

The cement industry accounts for an estimated 8% of global CO2 emissions, which surpasses that of the entire aviation sector. In contrast with other industries, where CO2 emissions can be drastically reduced via electrification or fuels substitution, cement production releases CO2 as part of its process, during the calcination of carbonates to yield oxides. Thus, point-source carbon capture has become a key technology in the cement industry’s decarbonization. Apart from the expected environmental benefits, point-source carbon capture in the cement industry can yield important economic benefits and create jobs. The objective of this study was to perform a preliminary assessment of the economic and workforce impacts associated with the construction and operation of a point-source carbon capture retrofit of an existing cement production facility, using as a basis the data from a front-end engineering design (FEED) study to install a 3.9 million metric tons per year (Mtpy) CO2 capture facility at Holcim Ste Genevieve cement plant in Missouri, United States of America. The advanced carbon capture technology used in this FEED study was Air Liquide’s Cryocap™ FG carbon capture technology. The study evaluated the direct, indirect, and induced economic impacts of the construction, operation, and maintenance activities of the project over its lifespan. It also covered how the project will generate new jobs, their nature, and quantity, along with strategies to prepare the workforce. To perform this study, construction, operation, and maintenance cost estimates, as well as construction and operation staffing plans from the FEED study were input into IMPLAN version 7.5 software, licensed by IMPLAN Group LLC (Huntersville, VC), to predict the direct, indirect and induced economic impacts of the project using industry multipliers from the software. Additionally, recruitment strategies were developed for hiring individuals who belong to groups that are historically underserved or underrepresented, as well as anticipated recruitment of workers from the local community (whether training will be required or if the skills are associated with an existing labor force). The analysis estimated that the construction and operation of the carbon capture at Holcim Ste. Genevive will result in over 24 thousand work-years of job opportunities, close to USD 10 billion of economic impacts, including over USD 460 million of tax revenue. These results encompass the direct, indirect, and induced effects. A strategy to maximize hiring from the project and neighboring counties was developed, leveraging training agreements with local trade groups and universities. The result of this study can be used for a strategic preliminary assessment of the potential regional economic and job impacts of retrofitting existing cement plants with point source carbon systems, and its methodology can be replicated to individual projects to aid in planning and workforce development.

01 COAL, LIGNITE, AND PEAT↗

Technology Benefit Estimator (T/BEST): User's Manual

The Technology Benefit Estimator (T/BEST) system is a formal method to assess advanced technologies and quantify the benefit contributions for prioritization. T/BEST may be used to provide guidelines to identify and prioritize high payoff research areas, help manage research and limited resources, show the link between advanced concepts and the bottom line, i.e., accrued benefit and value, and to communicate credibly the benefits of research. The T/BEST software computer program is specifically designed to estimating benefits, and benefit sensitivities, of introducing new technologies into existing propulsion systems. Key engine cycle, structural, fluid, mission and cost analysis modules are used to provide a framework for interfacing with advanced technologies. An open-ended, modular approach is used to allow for modification and addition of both key and advanced technology modules. T/BEST has a hierarchical framework that yields varying levels of benefit estimation accuracy that are dependent on the degree of input detail available. This hierarchical feature permits rapid estimation of technology benefits even when the technology is at the conceptual stage. As knowledge of the technology details increases the accuracy of the benefit analysis increases. Included in T/BEST's framework are correlations developed from a statistical data base that is relied upon if there is insufficient information given in a particular area, e.g., fuel capacity or aircraft landing weight. Statistical predictions are not required if these data are specified in the mission requirements. The engine cycle, structural fluid, cost, noise, and emissions analyses interact with the default or user material and component libraries to yield estimates of specific global benefits: range, speed, thrust, capacity, component life, noise, emissions, specific fuel consumption, component and engine weights, pre-certification test, mission performance engine cost, direct operating cost, life cycle cost, manufacturing cost, development cost, risk, and development time. Currently, T/BEST operates on stand-alone or networked workstations, and uses a UNIX shell or script to control the operation of interfaced FORTRAN based analyses. T/BEST's interface structure works equally well with non-FORTRAN or mixed software analysis. This interface structure is designed to maintain the integrity of the expert's analyses by interfacing with expert's existing input and output files. Parameter input and output data (e.g., number of blades, hub diameters, etc.) are passed via T/BEST's neutral file, while copious data (e.g., finite element models, profiles, etc.) are passed via file pointers that point to the expert's analyses output files. In order to make the communications between the T/BEST's neutral file and attached analyses codes simple, only two software commands, PUT and GET, are required. This simplicity permits easy access to all input and output variables contained within the neutral file. Both public domain and proprietary analyses codes may be attached with a minimal amount of effort, while maintaining full data and analysis integrity, and security. T/BESt's sotware framework, status, beginner-to-expert operation, interface architecture, analysis module addition, and key analysis modules are discussed. Representative examples of T/BEST benefit analyses are shown.

Generazio, Edward R.↗

Implications of equipping a DC-8-61 fleet with RNAV/two-segment approach avionics

Due to the costs of implementing two-segment approaches with special purpose computers, and the fact that such systems rely on special ground equipment not generally in use today, it is useful to consider the possibility of adding a two-segment approach capability to area navigation (RNAV) systems. The addition of the capability to provide two-segment approach navigation in an RNAV system which already interfaces with the standard instrument landing system is estimated to cost $1430 per aircraft. This includes the cost to add an approach progress display, to make necessary modifications to RNAV software, and to develop special approach plates.

Anderson, E. B.↗

Use of multispectral data in design of forest sample surveys

The use of multispectral data in design of forest sample surveys using a computer software package, WILLIAM, is described. The system allows evaluation of a number of alternative sampling systems and, with appropriate cost data, estimates the implementation cost for each.

Titus, S. J.↗

EVA Task and 3D Pose Recognition from Video

Extravehicular Activity (EVA) has been known to involve potential risks of biomechanical stresses and injuries to crewmembers. Gathering of EVA motion patterns is necessary for risk analysis and mitigation. However, many existing techniques, such as motion capture systems, are not only cost-prohibitive but are impractical for retrospective analysis of past missions. In this work, a software tool was developed, which can estimate the 3D poses of a spacesuit from photographs or videos, without using special sensors or equipment. The tool is based on the state-of-the-art artificial intelligence and machine learning (AI/ML) system, which was trained by studying and capturing motion patterns of past and current spacesuit test data. The AI/ML tool was further enhanced using synthetically generated data, in which the suit postures, backgrounds, camera angles and illumination conditions were parametrically adjusted and rendered for training. The tool, incorporated the methodologies of Convolutional Neural Network (CNN), was trained, and tested in the cloud computing environment. The trained model was then applied on new imagery and video to extract estimated joint positions and suit outlines. The joint positions were further processed to capture activity (“digging”), pose labels (“bending”), and other useful downstream information. The model performance on new imagery and video was successfully assessed for accuracy and reliability. This AI/ML based posture recognition tool thus allows for the quantification of injury risk and task performance characterization for both current and past missions and training, which can immensely help to improve EVA task and suit design.

Kyung Han Kim↗

Space transfer vehicle concepts and requirements study. Volume 3, book 1: Program cost estimates

The Space Transfer Vehicle (STV) Concepts and Requirements Study cost estimate and program planning analysis is presented. The cost estimating technique used to support STV system, subsystem, and component cost analysis is a mixture of parametric cost estimating and selective cost analogy approaches. The parametric cost analysis is aimed at developing cost-effective aerobrake, crew module, tank module, and lander designs with the parametric cost estimates data. This is accomplished using cost as a design parameter in an iterative process with conceptual design input information. The parametric estimating approach segregates costs by major program life cycle phase (development, production, integration, and launch support). These phases are further broken out into major hardware subsystems, software functions, and tasks according to the STV preliminary program work breakdown structure (WBS). The WBS is defined to a low enough level of detail by the study team to highlight STV system cost drivers. This level of cost visibility provided the basis for cost sensitivity analysis against various design approaches aimed at achieving a cost-effective design. The cost approach, methodology, and rationale are described. A chronological record of the interim review material relating to cost analysis is included along with a brief summary of the study contract tasks accomplished during that period of review and the key conclusions or observations identified that relate to STV program cost estimates. The STV life cycle costs are estimated on the proprietary parametric cost model (PCM) with inputs organized by a project WBS. Preliminary life cycle schedules are also included.

Peffley, Al F.↗

Autonomous Aerobraking Development Software: Phase 2 Summary

NASA has used aerobraking at Mars and Venus to reduce the fuel required to deliver a spacecraft into a desired orbit compared to an all-propulsive solution. Although aerobraking reduces the propellant, it does so at the expense of mission duration, large staff, and DSN coverage. These factors make aerobraking a significant cost element in the mission design. By moving on-board the current ground-based tasks of ephemeris determination, atmospheric density estimation, and maneuver sizing and execution, a flight project would realize significant cost savings. The NASA Engineering and Safety Center (NESC) sponsored Phase 1 and 2 of the Autonomous Aerobraking Development Software (AADS) study, which demonstrated the initial feasibility of moving these current ground-based functions to the spacecraft. This paper highlights key state-of-the-art advancements made in the Phase 2 effort to verify that the AADS algorithms are accurate, robust and ready to be considered for application on future missions that utilize aerobraking. The advancements discussed herein include both model updates and simulation and benchmark testing. Rigorous testing using observed flight atmospheres, operational environments and statistical analysis characterized the AADS operability in a perturbed environment.

Cianciolo, Alicia D.↗

A cost and utility analysis of NIM/CAMAC standards and equipment for shuttle payload data acquisition and control systems. Volume 1: Summary

The cost effectiveness of utilizing the Nuclear Instrumentation Modular (NIM) and the Computer Automated Measurement Control (CAMAC) equipment for Spacelab payload instrumentation was determined. Representative shuttle sortie payloads were analyzed for applicability and commonality. Modification of NIM/CAMAC equipment was analyzed for its suitability in Spacelab environments and to determine the cost. NIM/CAMAC equipment usage requirements for Spacelab payloads were converted to pool size requirements and time-phased equipment procurement requirements. A programmatic estimate of the pool equipment costs and a management plan were prepared for the pool concept. The implementation and impact of CAMAC software were assessed.

Source record↗

An interactive program for software reliability modeling

With the tremendous growth in computer software, the demand has arisen for producing cost effective reliable software. Over the last 10 years an area of research has developed which attempts to address this problem by estimating a program's current reliability by modeling either the times between error detections or the error counts in past testing periods. A new tool for interactive software reliability analysis using the computer is described. This computer program allows the user to perform a complete reliability analysis using any of eight well-known models appearing in the literature. Some of the capabilities of the program are illustrated by means of an analysis of a set of simulated error data.

Farr, W. H.↗

Image Guider Subsystem Analysis for the GHAPS Project

The Gondola for High-Altitude Planetary Science (GHAPS) project is a balloon-borne astronomical observatory designed operate in the UV, Visible, and near-mid IR spectral region. The GHAPS Optical Telescope Assembly (OTA) is designed around a one meter aperture narrow field-of-view telescope with near-diffraction-limited performance. GHAPS will utilize Wallops Arc-Second Pointing System (WASP) for pointing the OTA with an accuracy of 1 arc second or better. WASP relies heavily on a self-contained star tracker assembly to determine the OTA line of sight. Preliminary structural analysis indicates that potential misalignments could be present between the OTA line of sight and the star tracker FOV center during the expected flight conditions that could compromise GHAPS pointing accuracy. In response the GHAPS project undertook a trade study to resolve the following issues: (1) estimate the worst case long-term (or bias) pointing misalignments for the GHAPS opto-mechanical configuration, (2) examine the need for additional hardware to correct pointing errors, and (3) determine the best hardware and software implementation to do so. Quantitative comparisons of performance and qualitative estimates of other factors such as mass, volume, power consumption, and cost are combined into an overall assessment of potential solutions. Results are discussed and a recommended implementation is given that is optimized to best achieve pointing performance goals, while minimizing impact to the design, cost, and resources of the GHAPS project.

Star Tracker↗

Battery Life Prediction Using Reduced-Order Physics Models and Machine Learning (CRADA Final Report)

Phase 1 (Original CRADA, plus no-cost extension modifications #1-3, 6/1/2017 to 3/13/2021): The Australian Department of Defence (AUDoD) is performing accelerated aging tests of Li-ion batteries to benchmark their reliability and degradation characteristics. Using its previously developed battery lifetime predictive model framework, the National Laboratory of the Rockies (NLR) will develop analytical models based the AUDoD data to predict lifetime of the multiple Li-ion battery chemistries under real-world use scenarios of interest to AUDoD. The NLR model is based on physical degradation mechanisms encountered by Li-ion batteries and has been previously validated. Phase 2 (CRADA modification #4, plus no-cost extension modification #5, 2/22/2021 to 3/30/2025): Train and support Australian Department of Defence personnel to use NLR software for model-based estimation of Li-ion battery lifetime using accelerated battery aging data collected by the Australian Department of Defence. Under separate DOE funding from 2019 to 2021, NLR enhanced its battery life-prediction software using machine learning algorithms to automate portions of the model-fitting process, requiring significantly less labor and expert judgment and also adding uncertainty quantification, increasing statistical rigor. Under Phase 2, NLR will customize NLR Software and provide it to AuDoD. NLR will enhance its NLR Model to capture aging modes of AuDoD's multi-cell modules, including cell-balancing effects. NLR will develop example single-cell and multi-cell models based on one AuDoD battery aging dataset. NLR will train AuDoD personnel on NLR Software. By the conclusion of the project, NLR will have provided AuDoD the training materials, a user manual and software needed to perform their own analysis of additional and/or future battery aging datasets.

33 ADVANCED PROPULSION SYSTEMS↗

Implementation and Simulation Results using Autonomous Aerobraking Development Software

An Autonomous Aerobraking software system is currently under development with support from the NASA Engineering and Safety Center (NESC) that would move typically ground-based operations functions to onboard an aerobraking spacecraft, reducing mission risk and mission cost. The suite of software that will enable autonomous aerobraking is the Autonomous Aerobraking Development Software (AADS) and consists of an ephemeris model, onboard atmosphere estimator, temperature and loads prediction, and a maneuver calculation. The software calculates the maneuver time, magnitude and direction commands to maintain the spacecraft periapsis parameters within design structural load and/or thermal constraints. The AADS is currently tested in simulations at Mars, with plans to also evaluate feasibility and performance at Venus and Titan.

Maddock, Robert W.↗