Search NASA⌕ Search

SEARCH · Search NASA

Results for “software training plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Computer In The Loop: A Paradigm For Software Augmentation Of Terrestrial Medical Support In Asynchronous Communication Environments

As humans plan for missions beyond the reach of real-time communication supported by terrestrially-based crews (i.e., increasingly earth-independent spaceflight missions), we need to consider how to maximize this effectiveness despite asynchronous communication with Earth. Medical events – especially those involving the sparing of life, limb, or eyesight - often need to be acted on immediately, in real-time. Often the expertise necessary to successfully complete such action covers an enormous range of training that is unrealistic to expect from crews engaged in exploration spaceflight. Thus, the medical support paradigm for asynchronous environments must account for both the limitations and coordinate seamlessly among ground-based expertise, the need for real-time interventions, and the limited crew time and knowledge resources.

D R Levin↗

CMS Analysis School Model

To impart hands-on training in physics analysis, CMS experiment initiated the concept of CMS Data Analysis School (CMSDAS). It was born over three years ago at the LPC (LHC Physics Centre), Fermilab and is based on earlier workshops held at the LPC and CLEO Experiment. As CMS transitioned from construction to the data taking mode, the nature of earlier training also evolved to include more of analysis tools, software tutorials and physics analysis. This effort epitomized as CMSDAS has proven to be a key for the new and young physicists to jump start and contribute to the physics goals of CMS by looking for new physics with the collision data. With over 400 physicists trained in six CMSDAS around the globe, CMS is trying to engage the collaboration in its discovery potential and maximize physics output. As a bigger goal, CMS is striving to nurture and increase engagement of the myriad talents, in the development of physics, service, upgrade, education of those new to CMS and the career development of younger members. An extension of the concept to the dedicated software and hardware schools is also planned, keeping in mind the ensuing upgrade phase.

Malik, S.↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Volume 2: Baseline architecture report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

INTEGRITY - Integrated Human Exploration Mission Simulation Facility

It is proposed to develop a high-fidelity ground facility to carry out long-duration human exploration mission simulations. These would not be merely computer simulations - they would in fact comprise a series of actual missions that just happen to stay on earth. These missions would include all elements of an actual mission, using actual technologies that would be used for the real mission. These missions would also include such elements as extravehicular activities, robotic systems, telepresence and teleoperation, surface drilling technology-all using a simulated planetary landscape. A sequence of missions would be defined that get progressively longer and more robust, perhaps a series of five or six missions over a span of 10 to 15 years ranging in duration from 180 days up to 1000 days. This high-fidelity ground facility would operate hand-in-hand with a host of other terrestrial analog sites such as the Antarctic, Haughton Crater, and the Arizona desert. Of course, all of these analog mission simulations will be conducted here on earth in 1-g, and NASA will still need the Shuttle and ISS to carry out all the microgravity and hypogravity science experiments and technology validations. The proposed missions would have sufficient definition such that definitive requirements could be derived from them to serve as direction for all the program elements of the mission. Additionally, specific milestones would be established for the "launch" date of each mission so that R&D programs would have both good requirements and solid milestones from which to .build their implementation plans. Mission aspects that could not be directly incorporated into the ground facility would be simulated via software. New management techniques would be developed for evaluation in this ground test facility program. These new techniques would have embedded metrics which would allow them to be continuously evaluated and adjusted so that by the time the sequence of missions is completed, the best management techniques will have been developed, implemented, and validated. A trained cadre of managers experienced with a large, complex program would then be available.

Henninger, Donald L.↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Operations concept report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Phased development plan

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Space Station Simulation Computer System (SCS) study for NASA/MSFC. Volume 1: Baseline architecture report

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned MSFC Payload Training Complex (PTC) required to meet this need will train the Space Station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is made up of the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS Study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs.

Source record↗

Jet Noise Reduction

The Acoustics Branch is responsible for reducing noise levels for jet and fan components on aircraft engines. To do this, data must be measured and calibrated accurately to ensure validity of test results. This noise reduction is accomplished by modifications to hardware such as jet nozzles, and by the use of other experimental hardware such as fluidic chevrons, elliptic cores, and fluidic shields. To insure validity of data calibration, a variety of software is used. This software adjusts the sound amplitude and frequency to be consistent with data taken on another day. Both the software and the hardware help make noise reduction possible. work properly. These software programs were designed to make corrections for atmosphere, shear, attenuation, electronic, and background noise. All data can be converted to a one-foot lossless condition, using the proper software corrections, making a reading independent of weather and distance. Also, data can be transformed from model scale to full scale for noise predictions of a real flight. Other programs included calculations of Over All Sound Pressure Level (OASPL), Effective Perceived Noise Level (EPNL). OASPL is the integration of sound with respect to frequency, and EPNL is weighted for a human s response to different sound frequencies and integrated with respect to time. With the proper software correction, data taken in the NATR are useful in determining ways to reduce noise. display any difference between two or more data files. Using this program and graphs of the data, the actual and predicted data can be compared. This software was tested on data collected at the Aero Acoustic Propulsion Laboratory (AAPL) using a variety of window types and overlaps. Similarly, short scripts were written to test each individual program in the software suite for verification. Each graph displays both the original points and the adjusted points connected with lines. During this summer, data points were taken during a live experiment at the AAPL to measure Nozzle Acoustic Test Rig (NATR) background noise levels. Six condenser microphones were placed in strategic locations around the dome and the inlet tunnel to measure different noise sources. From the control room the jet was monitored with the help of video cameras and other sensors. The data points were recorded, reduced, and plotted, and will be used to plan future modifications to the NATR. The primary goal to create data reduction test programs and provide verification was completed. As a result of the internship, I learned C/C++, UNIX/LINUX, Excel, and acoustic data processing methods. I also recorded data at the AAPL, then processed and plotted it. These data would be useful to compare against existing data. In addition, I adjusted software to work on the Mac OSX platform. And I used the available training resources.

Kenny, Patrick↗

A national center for biocomputation: in search of a patient-specific interactive virtual surgery workbench

This report describes the three-dimensional imaging and virtual environment technologies developed in NASA's Biocomputation Center for scientific purposes that have now led to applications in the field of medicine. A major goal is to develop a virtual environment surgery workbench for planning complex craniofacial and breast reconstructive surgery, and for training surgeons.

NASA Discipline Neuroscience↗

Engineering Quality while Embracing Change: Lessons Learned

In an increasingly complex technical environ-ment, failure is accepted as a way of maximizing potential, a way of growing up. Experience can be utilized to improve designs, advance product maturity, and at the same time, can increase team’s training and education. It is not enough to understand the development tools to ensure a project’s success. Understanding how to plan, measure, communicate, interact, and work in teams is mandatory to make a project successful. A manager cannot enforce a process of good communication between team members. Project teams have to work together in supporting each other and establish a constant communication environment. This paper presents lessons learned during the development process of operations research software. The team members have matured and learned during the process to plan successfully, adapt to changes, use Agile methodologies, and embrace a new attitude towards failures and communication.

Marinovici, Maria C.↗

QUIC-Fire: 3D Fire-Atmosphere Feedback Model for Wildland Fire Management

Los Alamos National Laboratory, U.S. Forest Service, and Tall Timbers Research Station developed QUIC-Fire, the first laptop-capable, real-time wildland fire prediction software that captures the critical influences of 3D vegetation structure, interactions between multiple fires, variable winds, and complex topography at meter-scale resolutions. Prescribed burns are needed to prevent catastrophic wildfires in the U.S. QUIC-Fire transforms a prescribed fire manager’s ability to assess risk, optimize fuel treatments, and plan prescribed burns. Los Alamos, U.S. Forest Service, Tall Timbers Research Station, U.S. Fish and Wildlife Service, Spatial Information Group, and Applied Interagency Prescribed Training Center have used QUIC-Fire.

54 ENVIRONMENTAL SCIENCES↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 1: Overview and summary

NASA's Space Station Freedom Program (SSFP) planning efforts have identified a need for a payload training simulator system to serve as both a training facility and as a demonstrator to validate operational concepts. The envisioned Marshall Space Flight Center (MSFC) Payload Training Complex (PTC) required to meet this need will train the space station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex at MSFC. The purpose of this SCS study is to investigate issues related to the SCS, alternative requirements, simulator approaches, and state-of-the-art technologies to develop candidate concepts and designs. This study was performed August 1988 to October 1989. Thus, the results are based on the SSFP August 1989 baseline, i.e., pre-Langley configuration/budget review (C/BR) baseline. Some terms, e.g., combined trainer, are being redefined. An overview of the study activities and a summary of study results are given here.

Source record↗

Software for Autonomous Spacecraft Maneuvers

The AutoCon computer programs facilitate and accelerate the planning and execution of orbital control maneuvers of spacecraft while analyzing and resolving mission constraints. AutoCon-F is executed aboard spacecraft, enabling the spacecraft to plan and execute maneuvers autonomously; AutoCon-G is designed for use on the ground. The AutoCon programs utilize advanced techniques of artificial intelligence, including those of fuzzy logic and natural-language scripting, to resolve multiple conflicting constraints and automatically plan maneuvers. These programs can be used to satisfy requirements for missions that involve orbits around the Earth, the Moon, or any planet, and are especially useful for missions in which there are requirements for frequent maneuvers and for resolution of complex conflicting constraints. During operations, the software targets new trajectories, places and sizes maneuvers, and controls spacecraft burns. AutoCon-G provides a userfriendly graphical interface, and can be used effectively by an analyst with minimal training. AutoCon-F reduces latency and supports multiple-spacecraft and formation-flying missions. The AutoCon architecture supports distributive processing, which can be critical for formation- control missions. AutoCon is completely object-oriented and can easily be enhanced by adding new objects and events. AutoCon-F was flight demonstrated onboard GSFC's EO-1 spacecraft flying in formation with Landsat-7.

Bristow, John↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Software For Monitoring A Computer Network

SNMAT is rule-based expert-system computer program designed to assist personnel in monitoring status of computer network and identifying defective computers, workstations, and other components of network. Also assists in training network operators. Network for SNMAT located at Space Flight Operations Center (SFOC) at NASA's Jet Propulsion Laboratory. Intended to serve as data-reduction system providing windows, menus, and graphs, enabling users to focus on relevant information. SNMAT expected to be adaptable to other computer networks; for example in management of repair, maintenance, and security, or in administration of planning systems, billing systems, or archives.

Lee, Young H.↗

Aniak Energy Action Plan

In 2017, the Native Village of Aniak received a grant for the Aniak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy policy and programs. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Aniak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the seven project buildings as well as the Aniak Traditional Council’s goals for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Aniak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Aniak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Kwigillingok Energy Action Plan

In 2017, the Native Village of Kwigillingok received a grant for the Kwigillingok Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Kwigillingok and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the six project buildings as well as the I.R.A. Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project, which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Kwigillingok Energy Efficiency Project but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Kwigillingok for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Atmautluak Energy Action Plan

In 2017, the Native Village of Atmautluak received a grant for the Atmautluak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Atmautluak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the six project buildings as well as the Traditional Council’s goal for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Atmautluak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Atmautluak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗