Search NASA⌕ Search

SEARCH · Search NASA

Results for “solar array deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Hubble Space Telescope EVA Power Ratchet Tool redesign

The Power Ratchet Tool (PRT) is a self contained, power-driven, 3/8 inch drive ratchet wrench which will be used by astronauts during Extravehicular Activities (EVA). This battery-powered tool is controlled by a dedicated electonic controller. The PRT was flown during the Hubble Space Telescope (HST) Deployment Mission STS-31 to deploy the solar arrays if the automatic mechanisms failed. The PRT is currently intended for use during the first HST Servicing Mission STS-61 as a general purpose power tool. The PRT consists of three major components; the wrench, the controller, and the battery module. Fourteen discrete combinations of torque, turns, and speed may be programmed into the controller before the EVA. The crewmember selects the desired parameter profile by a switch mounted on the controller. The tool may also be used in the manual mode as a non-powered ratchet wrench. The power is provided by a silver-zinc battery module, which fits into the controller and is replaceable during an EVA. The original PRT did not meet the design specification of torque output and hours of operation. To increase efficiency and reliability the PRT underwent a redesign effort. The majority of this effort focused on the wrench. The original PRT drive train consisted of a low torque, high speed brushless DC motor, a face gear set, and a planocentric gear assembly. The total gear reduction was 300:1. The new PRT wrench consists of a low speed, high torque brushless DC motor, two planetary gear sets and a bevel gear set. The total gear reduction is now 75:1. A spline clutch has also been added to disengage the drive train in the manual mode. The design changes to the controller will consist of only those modifications necessary to accomodate the redesigned wrench. The battery design will be unaffected.

Richards, Paul W.↗

30th Aerospace Mechanisms Symposium

The proceedings of the 30th Aerospace Mechanisms Symposium are reported. NASA Langley Research Center hosted the proceedings held at the Radisson Hotel in Hampton, Virginia on May 15-17, 1996, and Lockheed Martin Missiles and Space Company, Inc. co-sponsored the symposium. Technological areas covered include bearings and tribology; pointing, solar array, and deployment mechanisms; orbiter/space station; and other mechanisms for spacecraft.

Bradley, Obie H., Jr.↗

Earth Observing System (EOS) Terra Spacecraft 120 Volt Power Subsystem: Requirements, Development and Implementation

Built by the Lockheed-Martin Corporation, the Earth Observing System (EOS) TERRA spacecraft represents the first orbiting application of a 120 Vdc high voltage spacecraft electrical power system implemented by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC). The EOS TERRA spacecraft's launch provided a major contribution to the NASA Mission to Planet Earth program while incorporating many state of the art electrical power system technologies to achieve its mission goals. The EOS TERRA spacecraft was designed around five state-of-the-art scientific instrument packages designed to monitor key parameters associated with the earth's climate. The development focus of the TERRA electrical power system (EPS) resulted from a need for high power distribution to the EOS TERRA spacecraft subsystems and instruments and minimizing mass and parasitic losses. Also important as a design goal of the EPS was maintaining tight regulation on voltage and achieving low conducted bus noise characteristics. This paper outlines the major requirements for the EPS as well as the resulting hardware implementation approach adopted to meet the demands of the EOS TERRA low earth orbit mission. The selected orbit, based on scientific needs, to achieve the EOS TERRA mission goals is a sun-synchronous circular 98.2degree inclination Low Earth Orbit (LEO) with a near circular average altitude of 705 kilometers. The nominal spacecraft orbit is approximately 99 minutes with an average eclipse period of about 34 minutes. The scientific goal of the selected orbit is to maintain a repeated 10:30 a.m. +/- 15 minute descending equatorial crossing which provides a fairly clear view of the earth's surface and relatively low cloud interference for the instrument observation measurements. The major EOS TERRA EPS design requirements are single fault tolerant, average orbit power delivery of 2, 530 watts with a defined minimum lifetime of five years (EOL). To meet these mission requirements, while minimizing mass and parasitic power losses, the EOS TERRA project relies on 36, 096 high efficiency Gallium Arsenide (GaAs) on Germanium solar cells adhered to a deployable flexible solar array designed to provide over 5,000 watts of power at EOL. To meet the eclipse power demands of the spacecraft, EOS TERRA selected an application of two 54-cell series connected Individual Pressure Vessel (IPV) Nickel-Hydrogen (NiH2) 50 Ampere-Hour batteries. All of the spacecraft observatory electrical power is controlled via the TERRA Power Distribution Unit (PDU) which is designed to provide main bus regulation of 120 Vdc +/- -4% at all load interfaces through the implementation of majority voter control of both the spacecraft's solar array sequential shunt unit (SSU) and the two battery bi-directional charge and discharge regulators. This paper will review the major electrical power system requirement drivers for the EOS TERRA mission as well as some of the challenges encountered during the development, testing, and implementation of the power system. In addition, spacecraft test and early on orbit performance results will also be covered.

Keys, Denney J.↗

Zarya Resource Reel

An overview of the Zarya Module (part of the International Space Station) is given through various clips of its construction, launch, and installation. Computerized animations show the deployment of Zarya's solar panels, Zarya's motor firing to a higher orbit, and the installation of Zarya to the Unity Module using the STS-88 Endeavour's robotic arm. Live footage shows the following: (1) Zarya and the Proton Rocket under construction at the Khrunichev State Research and Production Center in Moscow, Russia; (2) Zarya launch preparations (test deployment of solar arrays) at the Baikonur Cosmodrome in Kazakstan, Russia; (3) prelaunch activities (inspection, Proton Rocket rollout to launch pad); (4) the launch of Zarya on the Proton Rocket at the Baikonur Cosmodrome; and (5) Endeavour's capture of Zarya and its berthing to Unity.

Source record↗

35th Aerospace Mechanisms Symposium

The proceedings of the 35th Aerospace Mechanisms Symposium are reported. Ames Research Center hosted the conference, which was held at the Four Points Sheraton, Sunnyvale, California, on May 9-11, 2001. The symposium was sponsored by the Mechanisms Education Association. Technology areas covered included bearings and tribology; pointing, solar array, and deployment mechanisms; and other mechanisms for spacecraft and large space structures.

Boesiger, Edward A.↗

Preliminary Report on Mission Design and Operations for Critical Events

Mission-critical events are defined in the Jet Propulsion Laboratory s Flight Project Practices as those sequences of events which must succeed in order to attain mission goals. These are dependent on the particular operational concept and design reference mission, and are especially important when committing to irreversible events. Critical events include main engine cutoff (MECO) after launch; engine cutoff or parachute deployment on entry, descent, and landing (EDL); orbital insertion; separation of payload from vehicle or separation of booster segments; maintenance of pointing accuracy for power and communication; and deployment of solar arrays and communication antennas. The purpose of this paper is to report on the current practices in handling mission-critical events in design and operations at major NASA spaceflight centers. The scope of this report includes NASA Johnson Space Center (JSC), NASA Goddard Space Flight Center (GSFC), and NASA Jet Propulsion Laboratory (JPL), with staff at each center consulted on their current practices, processes, and procedures.

Hayden, Sandra C.↗

Nancy Grace Roman Space Telescope Observatory Implementation and Challenges

NASA’s Nancy Grace Roman Space Telescope (Roman), previously referred to as Wide Field Infrared Survey Telescope (WFIRST), was named after Dr. Nancy Grace Roman, an astronomer and NASA pioneer of modern space-based astronomy who is known as the “mother of the Hubble Space Telescope”. Roman is a deep space infrared observatory with a Hubble-sized telescope and wide field of view instrument (greater than 100 times that of Hubble’s) that will conduct a high latitude time-domain survey, a high latitude imaging and spectroscopic survey, and a galactic bulge time-domain survey to characterize dark energy and expand the census of exoplanets in our galaxy while allowing a broad range of astrophysics research. Roman will also demonstrate exoplanet coronagraphy with active wave front control technology and provide general investigator programs for the science community. Roman is finishing the critical design phase and is planning for launch in 2026. It will operate in a quasi-halo orbit about Sun-Earth L2, 1.5 million kilometers from Earth, for a five-year primary mission life. The Observatory features an Optical Telescope Assembly with an existing, repurposed 2.4m primary mirror, a Wide Field Instrument with a focal plane array comprised of 18 HgCdTe near-infrared detectors and a grism, prism and filter elements for imaging and spectroscopy in support of the primary surveys, as well as a Coronagraph instrument technology demonstration with starlight suppression technology for direct imaging and spectroscopy of exoplanets. The telescope is mounted to the Instrument Carrier composite truss structure which also optically meters each instrument, includes a Launch Load and Vibration Isolation System to provide passive isolation of spacecraft jitter sources while also supporting the payload during launch and is attached to the Spacecraft Bus. The Spacecraft also includes a Solar Array Sunshield ,Deployable Aperture Cover, Lower Instrument Sunshade, High Gain Antenna System, and Outer Barrel Assembly. Figure 1 shows an overview of the Roman Observatory. When fully integrated, Roman will be the largest Observatory assembled and tested at NASA’s Goddard Space Flight Center. Figure 1. Roman Observatory Overview Development of scientific satellites is challenging by nature, as the pursuit to broaden scientific knowledge always pushes the boundary of what has come before. The implementation of the Roman mission is a prime example and expected challenges have been augmented by the foundational decision to use the existing telescope components, developed in the early 2000s by another Government agency for a different application. Other unique aspects of the Roman mission, such as its survey nature, the vast amount of data required to meet science objectives, and packaging of the Observatory elements around the existing telescope components, create constrained design spaces that drive competing requirements across Observatory subsystems. Given these challenges, systems engineering has been a critical discipline in balancing implementation decisions for the Roman mission and will continue to play a key role going forward. This paper will discuss details of the Roman Observatory configuration, as well as some of the systems engineering challenges and the decision-making process used to mature the Roman Space Telescope preliminary design to implementation.

Lisa Ml Bartusek↗

Nancy Grace Roman Space Telescope Observatory Implementation and Challenges

NASA’s Nancy Grace Roman Space Telescope (Roman) is a deep space infrared observatory with a Hubble-sized telescope and wide field of regard with a boresight view greater than 200 times that of the Hubble Wide Field Camera 3infrared field of view, that will conduct a suite of science surveys to characterize dark energy and expand the census of exoplanets in our galaxy. Roman will also demonstrate exoplanet coronagraphy with active wavefront control technology and provide general investigator opportunities for the science community. Roman is finishing the critical design phase and is planning for launch in 2026. It will operate at the second Sun-Earth-Moon Lagrange for a five-year primary mission life. The Observatory features a telescope with an existing, repurposed 2.4m primary mirror, a Wide Field Instrument with a near-infrared detector focal plane array and optical elements for imaging and spectroscopy, as well as a Coronagraph instrument technology demonstration for direct imaging and spectroscopy of exoplanets. The telescope and instruments are mounted to an Instrument Carrier for optical metering and isolation from Spacecraft-induced disturbances. The Spacecraft includes a Bus, Solar Array Sunshield, Deployable Aperture Cover, Outer Barrel Assembly, and Star Tracker/Inertial Reference Unit Bench. When fully integrated, Roman will be the largest Observatory assembled and tested at NASA’s Goddard Space Flight Center. The development of scientific satellites is challenging and pushes engineering boundaries to broaden scientific knowledge. The Roman mission implementation is a prime example and expected challenges have been amplified by the foundational decision to use existing, repurposed telescope components. Other unique aspects of the Roman mission, including its survey nature, large data volume, and Observatory packaging, create constrained design spaces that drive competing requirements across Observatory subsystems. Given these challenges, systems engineering has been a critical discipline in balancing implementation decisions and will continue to play a key role in the development of the Roman mission. This paper will discuss details of the Roman Observatory configuration, systems engineering challenges and the decision-making process used to mature the Roman Space Telescope from preliminary design to implementation.

Lisa M L Bartusek↗

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William↗

An on-orbit experiment for dynamics and control of large structures

Attention is given to the definition of the on-orbit dynamic testing that is currently being planned for the flight of a large solar array test article, the Solar Array Flight Experiment (SAFE 1), which consists of a coilable longeron mast that deploys a large solar array blanket. Also discussed is the design of an additional experiment employing this structure in conjunction with a two- or three-axis gimbal system, in order to demonstrate control techniques applicable to such large structures. SAFE 1 experiment objectives, hardware, software, and the experimental operations foreseen are discussed.

Buchanan, H. J.↗

STS-97 Mission Highlights Resource Tape

A continuation of 'STS-97 Mission Highlights Resource Tape, Part 1 of 3' (document ID 20010020281), the activities of flight days four through six are seen. Footage includes the spacewalks performed by Noriega and Tanner, the deployment of the Solar Array Blanket Box (SABB), various shots of Endeavour's payload bay and the International Space Station (ISS), and the deployment of the solar radiators on the ISS. Flight days seven through eleven and Endeavour's landing are shown in 'STS-97 Mission Highlights Resource Tape, Part 3 of 3' (document ID 20010020283).

Source record↗

Compact Telescoping Surface Array for Mars Solar Power

This paper describes a lightweight, large-area solar array concept for Mars surface power called the Compact Telescoping Surface Array (CTSA). The design is derived from the Compact Telescoping Array (CTA) proposed in 2015 for high-power spacecraft. The CTSA deploys horizontally from Mars landers, provides 1000 sq.m of solar cell area, and generates about 50-80 kW daytime and 10 kW nighttime power (from energy storage) near the equator with clear skies. The total mass is about 1500 kg, and the stowed volume is about 10 cu.m, equivalent to 200 W/kg and 30 kW/cu.m at 1 astronomical unit (AU) from the sun. These challenging mass and volume goals require compact, lightweight structures to deploy and tension thin solar cell blankets in the Mars 0.38 g gravity field. Other features include single-axis rotation for daily or seasonal sun tracking, dust shedding, and feathering in high winds and sufficient strength for sustained 40 m/s winds in dust storms and brief 100 m/s winds in dust devils (dynamic pressure of 120 Pa). Based on preliminary design and analysis reported in the paper, CTSA appears to be a feasible approach for 1000 sq.m-class Mars solar arrays that autonomously deploy from landers prior to human arrival.

Pappa, Richard↗

Small satellite solar array substrate

The SMall EXplorer (SMEX) Fast Auroral SnapshoT (FAST) spacecraft was developed to investigate plasma physics of auroral phenomena at high orbital altitude. The FAST satellite comprises a variety of deployable booms with sensors on the ends, and instruments that protrude from the main body of the spacecraft to obtain the plasma and electromagnetic fields data. This required the plasma disturbance around the satellite to be kept to a minimum. A non deployable, body mounted solar array was implemented. This led to the design of a light weight solar array substrate with a high degree of structural integrity.

Fiore, John N.↗

Blue Rock CropSpanPV - Low Cost Racking for Agricultural Solar Photovoltaics

In this work, a total of four solar panel layouts, applied to Agrivoltaics, are investigated. This study presents two hypotheses: 1. Prefabrication - Lower total cost can be achieved by constructing a pre-assembled, pre-wired solar array in a factory, with automation, then rapidly deploying it in the field. 2. Tension Structures - Using tension structures in a way to suspend an overhead solar array also reduces costs when compared to conventional support methods. Designs are presented for frames to hold the panels. Configurations are advanced to connect the frames into arrays. Supports and foundations to hold the arrays in the desired layout are calculated, selected and presented. Cost models are prepared for the four layouts, which include definition of the business enterprise, the manufacturing operation, and the required facility for production at scale. Cost models include, detail material and task/labor take-offs for both manufacturing and installation. Comparisons with conventional system adapted to Agrivoltaics reveal that the two hypotheses do not hold true. A prefabricated array requires additional material that is not needed in the base system and the cost of this additional material is not outweighed by the cost savings of reduced field installation. The cost of wire rope for a tension structure does result in an economy of material, however, the cost of end connections and tensioning devices adds significantly to the cost of the overall tension structure. Foundation loads with tension structures, especially the large wind uplift seen with a fixed tilt solar array, impose significant constraints and high costs. The following conclusions are recommended for further consideration: 1. Best Case Agrivoltaic Configuration - The best value/lowest cost configuration for agrivoltaics is the installation of solar panels mounted on a single axis tracker in either a 2-in-portrait or 2-in landscape arrangement. This is useful for grazing lands and for staple crops which require high light levels. These applications represent the vast majority of the potential agrivoltaic market. Important elements in this configuration are the specific geometric layout coordinated with the various field operations and a control system linked between the farm equipment and single axis tracker. The control system is to monitor location and orientation, then actively tilt the solar panels or brake the field equipment to provide clearance and avoid collisions. 2. Long Span Applications - The use of tension structures for an overhead fixed tilt array is beneficial where long spans are a necessity, especially where the base support in the project location has consolidated rock near the surface or some other solid structure. One application is spanning wide irrigation canals. Another may be as an installation at the top deck of parking structures. 3. Direct Ground Mount Configuration – Having skids at the base of a pre-fabricated array that extend when the array is deployed, could be a successful design. This could be a useful strategy for dense, flat, ground-mount configurations like that employed by a couple of successful commercial operations (5G Maverick and Erthos). Arrays would be orientated north and south, deployed very low on prepared grade. Arrays would be aligned closely next to each other and anchored with small ground screws or simply with ballast. This same product arrangement could be very useful for rapid deployment and set-up of solar arrays for temporary deployments, disaster response and the military operations

14 SOLAR ENERGY↗

Flexible solar-array mechanism

One of the key elements of the flexible rolled-up solar array system is a mechanism to deploy, retract, and store the flexible solar-cell arrays. The selection of components, the design of the mechanism assembly, and the tests that were performed are discussed. During 6 months in orbit, all mission objectives were satisfied, and inflight performance has shown good correlation with preflight analyses and tests.

Olson, M. C.↗

Finite Element Analysis of a Deployable Space Structure

The dynamic characteristics of the Solar Array Flight Experiment (SAFE) structure during deployment and retraction are investigated. The SAFE structure consists of a deployable mast with an attached solar blanket designed with accordion type folds to permit packaging in a small volume. The planar form of the blanket geometry during deployment is maintained by a blanket tension/guidewire system. Structurally, the mast is modeled as an Euler beam column with inplane and out of plane bending and finite torsional stiffness. For out of plane motion, the blanket is modeled as a distributed mass uniformly supported by the three guidewires. For inplane motion the blanket displacements are assumed to vary linearly from the mast base to the mast tip. The mathematical model uses a virtual work formulation, required because the axial loading on the mast is nonconservative, combined with assumed beam modes to derive the differential equations of motion. Consideration of the time dependent boundary conditions results in an infinite set of ODE with time dependent coefficients. Finally, correlation of mast tip accelerations to mast base bending moments for specified modal motions are indicated.

Weeks, G. E.↗

Thermally-Induced Structural Disturbances of Rigid Panel Solar Arrays

The performance of a significant number of spacecraft has been impacted negatively by attitude disturbances resulting from thermally-induced motions of flexible structures. Recent examples of spacecraft affected by these disturbances include the Hubble Space Telescope (HST) and the Upper Atmosphere Research Satellite (UARS). Thermally-induced structural disturbances occur as the result of rapid changes in thermal loading typically initiated as a satellite exits or enters the Earth's shadow. Temperature differences in flexible appendages give rise to structural deformations, which in turn result in disturbance torques reacting back on the spacecraft. Structures which have proven susceptible to these disturbances include deployable booms and solar arrays. This paper investigates disturbances resulting from thermally-induced deformations of rigid panel solar arrays. An analytical model for the thermal-structural response of the solar array and the corresponding disturbance torque are presented. The effect of these disturbances on the attitude dynamics of a simple spacecraft is then investigated using a coupled system of governing equations which includes the effects of thermally-induced deformations. Numerical results demonstrate the effect of varying solar array geometry on the dynamic response of the system.

Johnston, John D.↗

Lucy Orbit Determination Performance From Launch Through EGA-1

Lucy is a 12-year long NASA Discovery-class mission which launched on October 16, 2021 and is currently on its way to the Jupiter-Trojan asteroids at the L4 and L5 Lagrange points. On its journey to the Trojan asteroids, Lucy will also fly by two main belt asteroids, and perform 3 Earth fly bys. This paper summarizes primarily the Orbit Determination (OD) aspect of the first year of the mission from launch through the first Earth fly by (EGA-1). Some challenges were encountered for OD as part of the +Y solar array not fully deploying, but these were resolved within the first year of flight. The high quality radio-metric data from the Deep Space Network including 2- and 3-way Doppler, sequential 2-way ranging, complemented by delta differential one-way ranging (∆DOR) has enabled the OD team to characterize the Solar Radiation Pressure force, resolve desaturation maneuvers, generate both maneuver reconstructions and accurate long-term predicted trajectories. This paper discusses the filter setup and strategies implemented, as well as the OD performance from launch, through cruise, and including EGA-1.

Jeroen L. Geeraert↗