Search NASA⌕ Search

SEARCH · Search NASA

Results for “space flight cables”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

A simplified generic cryostat thermal model for predicting cryogen mass and lifetime

This study presents a simple generic cryostat thermal model developed for predicting cryogen mass and the lifetime of cryogenic space telescopes. The model is based on a lumped parameter representation of eight nodes and over 35 conductors. The major telescope Dewar components represented as nodes are the main cryogen tank, the three vapor-cooled shields, the outer shell, barrel baffle, and the barrel baffle heat exchanger. The input to the model consists of the vapor-cooled shield, support straps and instrument cable geometry, and the cryostat heat loads from the instrument and through the aperture. The predictions from the model were compared with those from the more detailed models of IRAS, COBE, and SIRTF. Correlation of the helium flow rates of the IRAS and COBE Dewars was 12 percent above the actual flight or ground test data and for SIRTF it was less than 2 percent of the prediction from the detailed model.

Birur, G. C.↗

Plug-in Plan Tool v3.0.3.1

The role of PLUTO (Plug-in Port UTilization Officer) and the growth of the International Space Station (ISS) have exceeded the capabilities of the current tool PiP (Plug-in Plan). Its users (crew and flight controllers) have expressed an interest in a new, easy-to-use tool with a higher level of interactivity and functionality that is not bound by the limitations of Excel. The PiP Tool assists crewmembers and ground controllers in making real-time decisions concerning the safety and compatibility of hardware plugged into the UOPs (Utility Outlet Panels) onboard the ISS. The PiP Tool also provides a reference to the current configuration of the hardware plugged in to the UOPs, and enables the PLUTO and crew to test Plug-in locations for constraint violations (such as cable connector mismatches or amp limit violations), to see the amps and volts for an end item, to see whether or not the end item uses 1553 data, and the cable length between the outlet and the end item. As new equipment is flown or returned, the database can be updated appropriately as needed. The current tool is a macroheavy Excel spreadsheet with its own database and reporting functionality. The new tool captures the capabilities of the original tool, ports them to new software, defines a new dataset, and compensates for ever-growing unique constraints associated with the Plug-in Plan. New constraints were designed into the tool, and updates to existing constraints were added to provide more flexibility and customizability. In addition, there is an option to associate a "Flag" with each device that will let the user know there is a unique constraint associated with it when they use it. This helps improve the safety and efficiency of real-time calls by limiting the amount of "corporate knowledge" overhead that has to be trained and learned through use. The tool helps save time by automating previous manual processes, such as calculating connector types and deciding which cables are required and in what order.

Andrea-Liner, Kathleen E.↗

Flight set 360T004 (STS-30) field joint protection system, volume 7

The Redesigned Solid Rocket Motors (RSRM) of the Space Transportation System have three field joints that are protected by the Joint Protection Systems (JPS). The igniter heater was mounted on the igniter flange. This report documents the performance of the JPS and igniter heaters on the pad and the post-flight condition of the JPS components. All observations that were written up as Squawks and/or Problem Reports are also discussed. The primary heaters performed satisfactorily and maintained the field joint temperatures within the required temperature range. A secondary heater failed Dielectric Withstanding Voltage (DWV) test during the joint closeout prior to launch. This heater was not used, however, since the primary heater functioned properly. Post-test inspection revealed that pin A of the heater power cable was shorted to the connector shell. Design changes have been implemented to resolve the heater power cable problem. All field joint assemblies met all of the performance requirements.

Hale, Elgie↗

STS-88 Post Flight Presentation

The flight crew of the STS-88 mission, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, Jerry L. Ross, James H. Newman, and Sergei K. Krikalev, present a video mission over-view of their space flight. Images include prelaunch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the "white room" for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once the seven-day mission begins, the astronauts comment on the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which was already in orbit, and two EVAs that were planned to connect power and data transmission cables between the Node and the FGB. The crew can also be seen conducting a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB.

Source record↗

Technology That's Ready and Able to Inspect Those Cables

Attempting to locate a malfunctioning wire in a complex bundle of wires or in a cable that is concealed behind a wall is as difficult as trying to find a needle in a haystack. The result of such an effort can also be costly, time-consuming, and frustrating, whether it is the tedious process of examining cable connections for the Space Shuttle or troubleshooting a cable television hookup. Furthermore, other maintenance restrictions can compound the effort required to locate and repair a particular wiring problem. For example, on the Space Shuttle, once a repair is completed, all systems that have a wire passing through any of the connectors that were disconnected during troubleshooting are affected and, therefore, must undergo retesting, an arduous task that is completely unrelated to the original problem. In an effort to streamline wire inspection and maintenance, two contractors supporting NASA's Kennedy Space Center invented the Standing Wave Reflectometer (SWR) in 1999. In doing so, they leveraged technology that was first developed to detect problems that could lead to aircraft accidents, such as the one that resulted in the catastrophic failure of TWA flight 800 in 1996. The SWR performs a non-intrusive inspection that verifies the condition of electrical power and signal-distribution systems inside the Space Shuttle orbiters. Such testing reduces processing delays and ensures safe operation of these systems.

Source record↗

Results from the EPL monkey-pod flight experiments conducted aboard the NASA/Ames CV-990, May 1976

The participation of the Environmental Physiology Laboratory (EPL) in the general purpose laboratory concept verification test 3 is documented. The EPL Monkey-Pod Experiment was designed to incorporate a 10-12 kg, pig tailed monkey, Macaca nemestrina, into the pod and measure the physiological responses of the animal continously. Four major elements comprise the EPL Monkey-Pod Experiment System: (1) a fiberglass pod containing the instrumented monkey plus feeder and watering devices, (2) an inner console containing the SKYLAB mass spectrometer with its associated valving and electronic controls, sensing, control and monitoring units for lower body negative pressure, feeder activity, waterer activity, temperatures, and gas metabolism calibration, (3) an umbilical complex comprising gas flow lines and electrical cabling between the inner and outer console and (4) an outer console in principle representing the experiment support to be provided from general space craft sources.

Rahlmann, D. F.↗

Genetic Optimization of a Tensegrity Structure

Marshall Space Flight Center (MSFC) is charged with developing advanced technologies for space telescopes. The next generation of space optics will be very large and lightweight. Tensegrity structures are built of compressive members (bars), and tensile members (strings). For most materials, the tensile strength of a longitudinal member is larger than its buckling strength; therefore a large stiffness to mass ratio can be achieved by increasing the use of tensile members. Tensegrities are the epitome of lightweight structures, since they take advantage of the larger tensile strength of materials. The compressive members of tensegrity structures are disjoint allowing compact storage of the structure. The structure has the potential to eliminate the requirement for assembly by man in space; it can be deployed by adjustments in its cable tension. A tensegrity structure can be more reliably modeled since none of the individual members experience bending moments. (Members that experience deformation in more than one dimension are much harder to model.) Structures that can be more precisely modeled can be more precisely controlled. Furthermore, an astoundingly wide variety of natural systems, including carbon atoms, water molecules, proteins, viruses, cells, tissues and even human and other living creatures are tensegrity structures. Through the process of evolution, nature continually improves the design of living creatures for the environment they live in. Since tensegrities are nature's structure of choice, it is conceivable that they have other benefits we are unaware of. A. Keane and S. Brown designed a satellite boom truss system with an enhanced vibration performance. They started with a standard truss system, then used a genetic algorithm to alter the design, while optimizing the vibration performance. An improvement of over 20,000% in frequency-averaged energy levels was obtained using this approach. In this report an introduction to tensegrity structures is given, along with a description of how to generate the nodal coordinates and connectivity of a multiple stage cylindrical tensegrity structure. A description of how finite elements can be used to develop a stiffness and mass matrix so that the modes of vibration can be determined from the eigenvalue problem is shown. A brief description of a micro genetic algorithm is then presented.

Jaime R. Taylor↗

Second Generation RLV Program

During the time period covered by this report, SAIC: 1) Continued to develop and assess processes and approaches that can be applied to Second Generation Reuseable Launch Vehicles (RLV) technologies prioritization. An approach based on the use of analytic Saaty scale functions has been defined and is being investigated. 2) Planned and facilitated technologies prioritization workshops, supported development of systems program algorithms based on the concept of influence diagramming, and assessment of analogies between aircraft and space systems developments. 3) Video interviews held with X-37 personnel at Dryden. The CD-ROM is being concluded and a near-final review disc is expected soon. 4) CD-ROMS were produced by Engineered Multimedia, Inc. (EMI) under subcontract to SAIC. These two CD-ROM products, "Microgravity" and "New Horizons", were delivered to MSFS technical representatives at a briefing at SAID on January 18, 2001. 5) Presentation brochure, "Aviation/Space Analog Team Interim Report" was provided to Space Propulsion Synergy Team (SPST) members and to NASA personnel. Wrap-up of effort will be a mid-April briefing to both MSFC and the full SPST membership. Support to Phase 2 of CCPD ends 3/31/01. Phase 3 continuation effort planned with emphasis on technical info content. 6) Recommended that eliminating the B-52 flights of the X-37 in favor of alternate approached be evaluated. Discovered that a required change to the thruster valves of the X-37 had not been made. Repair work continues on the lower fuselage section of the X-37, in the areas that experienced core collapse. The currently catalogued potential weight increases and decreases are about equal, but this does not include the impact of the cable weight underestimate reported earlier. The CFD for RCS testing correlates well with the wind tunnel data. 7) The Level IV CCB approved SCN-4 to the MC-1 Engine SPecification. Approved changes have been incorporated into the specification, and Revision D has been released to the Repository. Billy Gonterman, SAIC, traveled to SSC to perform a five-day readiness assessment on the progress of facilities activation. Implemented modifications to the MC-1 Engine TPA Component Database. 8) Replaced 25 Combined-Cycle Propulsion Database (CCPD) documents; modified the low-on screen to include a direct email link for user contact; prepared a summary presentation of current and proposed tasks.

Laue, Jay↗

Results of the Updated NASA Kennedy Space Center 50-MHz Doppler Radar Wind Profiler Operational Acceptance Test

We present here the methodology and results of the Operational Acceptance Test (OAT) performed on the new Kennedy Space Center (KSC) 50-MHz Doppler Radar Wind Profiler (DRWP). On day-of-launch (DOL), space launch vehicle operators have used data from the DRWP to invalidate winds in prelaunch loads and trajectory assessments due to the DRWP's capability to quickly identify changes in the wind profile within a rapidly-changing wind environment. The previous DRWP has been replaced with a completely new system, which needs to undergo certification testing before being accepted for use in range operations. The new DRWP replaces the previous three-beam system made of coaxial cables and a copper wire ground plane with a four-beam system that uses Yagi antennae with enhanced beam steering capability. In addition, the new system contains updated user interface software while maintaining the same general capability as the previous system. The new DRWP continues to use the Median Filter First Guess (MFFG) algorithm to generate a wind profile from Doppler spectra at each range gate. DeTect (2015) contains further details on the upgrade. The OAT is a short-term test designed so that end users can utilize the new DRWP in a similar manner to the previous DRWP during mission operations at the Eastern Range in the midst of a long-term certification process. This paper describes the Marshall Space Flight Center Natural Environments Branch's (MSFC NE's) analyses to verify the quality and accuracy of the DRWP's meteorological data output as compared to the previous DRWP. Ultimately, each launch vehicle program has the responsibility to certify the system for their own use.

Barbre', Robert E., Jr.↗

Get the Power You Need, When and Where You Need It Aboard the International Space Station (ISS) Using the ISS Plug-In Plan (IPiP) Requirement Request Process

Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.

Moore, Kevin D.↗

A 60-meter erectable assembly concept for a control of flexible structures flight experiment

A flight experiment which proposes to use a 60-m deployable/retractable truss beam attached to the Space Shuttle to study dynamic characterization and control of flexible structures is being studied by NASA. The concept requires a relatively complex mechanism for deploying and retracting the truss on-orbit. Development of such a mechanism having a high degree of reliability will be expensive. An alternative method for constructing the truss is discussed requiring no new technology development or complex mechanisms and has already been demonstrated on-orbit. The alternative method proposes an erectable truss beam which can be assembled by two astronauts in EVA. The EVA crew would have to manually assemble the beam from 468 struts and 165 nodes, and install 7 instrumentation platforms with signal and power cabling. The predicted assembly time is 3 hr and 23 min. The structure would also have to be disassembled and restowed following testing, thus 2 EVA days would be required. To allow 25 hr for data collection (probably a bare minimum to accomplish meaningful tests), current Shuttle operations policy dictates a 9-day mission. The design, assembly procedure and issues associated with the alternative concept are discussed.

Watson, Judith J.↗

Radiating dipole model of interference induced in spacecraft circuitry by surface discharges

Spacecraft in geosynchronous orbit can be charged electrically to high voltages by interaction with the space plasma. Differential charging of spacecraft surfaces leads to arc and blowoff discharging. The discharges are thought to upset interior, computer-level circuitry. In addition to capacitive or electrostatic effects, significant inductive and less significant radiative effects of these discharges exist and can be modeled in a dipole approximation. Flight measurements suggest source frequencies of 5 to 50 MHz. Laboratory tests indicate source current strengths of several amperes. Electrical and magnetic fields at distances of many centimeters from such sources can be as large as tens of volts per meter and meter squared, respectively. Estimates of field attenuation by spacecraft walls and structures suggest that interior fields may be appreciable if electromagnetic shielding is much thinner than about 0.025 mm (1 mil). Pickup of such fields by wires and cables interconnecting circuit components could be a source of interference signals of several volts amplitude.

Metz, R. N.↗

Space station resistojet system requirements and interface definition study

Preliminary resistojet design requirements were established based on initial technical requirements imposed by the results of NASA and Rocketdyne studies. The requirements are directed toward long life, simplicity, flexibility, and commonality with other space station components. The resistojet assembly is comprised of eight resistojets, fluid components downstream of the waste fluid storage system, a power controller, structure, and shielding. It consists of two identical subassemblies, one of which is redundant. Each subassembly consists of four 500-W resistojets, series redundant latch values, a power controller, a water vaporizer, two pressure regulators, filters, check valves, disconnects, fluid tubing, and electrical cables. All components are packaged at the end of the stinger aft of the JEM and Columbus modules. Different flow and power control methods were studied. A constant inlet pressure and a two-power setting controller were tentatively selected based on simplicity and reasonably high specific impulse for the range of waste gas compositions that are anticipated. The constant pressure is supplied by pressure regulators. The two set point power control includes individual power supplies to each resistojet heater and water vaporizer. An embedded data processor, a multiplexer-demultiplexer, and a network interface unit that are standard space station components are included in the power controller. The total dry weight of the resistojet assembly is approximately 172 lb. The total cost for design, development, test, evaluation, qualification, and flight hardware is estimated to be $16 million.

Heckert, Bruce J.↗

Flight Demonstration of Novel Atmospheric Satellite Concept

The major focus of the Phase II effort described herein is to develop and demonstrate an aircraft capable of autonomously sailing (i.e., to cruise without propulsion or external assistance), and thereby prove that the dual-aircraft platform (DAP) atmospheric satellite concept is potentially viable. This sailing mode of flight was identified as the number-1 enabling technology required for the stratospheric DAP concept (also known as Stratosat) in the NIAC (NASA Innovative Advanced Concept) Phase I effort. No scientific demonstration of this technology has ever been done or documented to our knowledge. This report describes efforts to take a major step towards the sailing mode of flight capability using a single aircraft connected by cable to a moving ground vehicle which uses sufficient crosswind to cruise without propulsion while "pulling" the ground vehicle forward (i.e., without external assistance). The development of a prototype aircraft is described in terms of novel and key hardware and software elements. A specialized prototype aircraft is described, including a novel cable release mechanism, novel "lateron" control surfaces, and a highly-accurate onboard wind measurement system. Additionally, a novel means to safely connect the aircraft to the moving ground vehicle is described involving a fishing rod/reel and integrated load cell. All of these devices were designed and developed in-house and validated in flight testing. Software is developed to provide look-up tables that give the flight condition targets (i.e., 3-D position relative to ground vehicle, forward speed, aircraft orientation, etc.), based on current wind speed and direction. These tables are successfully validated in flight simulation and used onboard the aircraft. High fidelity analysis of the aircraft aerodynamics are described - required to produce accurate target sailing flight conditions. A novel wind tunnel measurement technique is developed to accurately assess the aerodynamics of the ultra-thin cable. A new specialized flight simulator is described which is utilized to develop and verify the flight software required onboard the aircraft, and to support training of pilots for flying the aircraft while tethered to a ground vehicle. The DAP flight simulator was developed within the Matlab-Simulink framework and included detailed treatment of aircraft/cable aerodynamics, cable dynamics, experimentally-derived propeller-motor thrust curves, actuator responsiveness, and realistic air turbulence. The specialized formation flight controller algorithm, developed using this flight simulator, and onboard the aircraft is described. Finally, a novel auto-tuning software is described and verified within the flight simulator that is shown to refine the sailing flight condition targets during flight using an optimization technique involving doublet maneuvers. Virtual flights using the auto-tuning software indicate that the prototype aircraft should be able to reach and hold sailing conditions despite moderate levels of turbulence provided there is sufficient mean wind available. An overview of the flight testing program is provided. Hundreds of short flights were conducted, primarily using a “dead” short runway at Deland Municipal Airport which permitted use of a moving ground vehicle. Additional flight tests at Space Florida’s Shuttle Landing Facility are also described. First year results from these tests in which the aircraft is controlled manually, demonstrated that excessive flight testing would be required for a pilot to learn to sail with visual cues. However, second year results from autonomous flight these tests included successful demonstration of the closed-loop autonomous formation flight capability (i.e., autonomously determine, reach, and hold the required 3-D location relative to the ground vehicle required for sailing). The next step of using the auto-tune software to autonomously refine the aircraft orientation targets to finally achieve sailing remains the primary goal of future work.

Flight↗

A report of work activities on the NASA Spacelink public electronic library

NASA Spacelink is a comprehensive electronic data base of NASA and other source educational and informational materials. This service originates at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. This is an education service of NASA Headquarters, through the MSFC Education Office, that first began in February of 1988. The new NASA Spacelink Public Electronic Library was the result of a study conducted to investigate an upgrade or redesign of the original NASA Spacelink. The UNIX Operating System was chosen to be the host operating system for the new NASA Spacelink Public Electronic Library. The UNIX system was selected for this project because of the strengths built into the embedded communication system and for its simple and direct file handling capabilities. The host hardware of the new system is a Sun Microsystems SPARCserver 1000 computer system. The configuration has four 50-MHz SuperSPARC processors with 128 megabytes of shared memory; three SB800 serial ports allowing 24 cable links for phone communications; 4.1 gigabytes of on-line disk storage; and ten (10) CD-ROM drives. Communications devices on the system are sufficient to support the expected number of users through the Internet, the local dial services, long distance dial services; the MSFC PABX, and the NPSS (NASA Packet Switching System) and 1-800 access service for the registered teachers.

Smith, Willard A.↗

Influence of Load Profile on Biomechanics of the Squat and Deadlift

Long duration space travel will expose astronauts to extended periods of reduced gravity. Since gravity is not present to assist loading, astronauts will use resistive and aerobic exercise regimes for the duration of the space flight to counteract the effect reduced gravity has on the body. Astronauts will exercise on a flywheel based device on the second Orion Exploration Mission (EM2). The effect that the flywheel load profile has on biomechanics is unknown when compared to free weights or a simulated free weight profile. The purpose of this evaluation is to compare the differences in lower body kinematics and kinetics between the flywheel and free weight profile. Test subjects were instrumented with reflective markers for motion capture data collection while exercising on the Device for Aerobic and Resistive Training (DART) prototype developed by TDA Research, Inc. of Wheat Ridge, CO. Exercises performed were either the squat while wearing a harness or deadlift while grasping a T-bar, both of which interfaced with the DART through a rope cable. The DART, a motorized device controlled via software, is capable of producing different load profiles. Profiles include simulated free weights with adjustable eccentric overload capability and flywheel. Test variables included the applied device load and the load profile, both set through the DART software interface. Motion capture data was collected with a 12 camera system (Smart-DX, BTS Bioengineering, Brooklyn, NY). Bilateral ground reaction force data were collected with force plates (P6000, BTS Bioengineering). DART cable force was recorded through an internal load cell. Data was collected from a total of four test subjects. The three repetition maximum was determined for each test subject for both squat and deadlift. High, medium and low loads were determined based on this maximum. The test subject performed five repetitions of each exercise at each load and each test trial was repeated twice. Cadence was controlled during exercising. Biomechanical data were used to drive the models utilizing the OpenSim software platform. Subject specific models were scaled to match the anthropometrics of the test subjects and used to estimate the peak joint angle, joint range of motion, the peak joint moment and the joint moment impulse of the lower extremity joints and the lumbar joint.These are preliminary results because the data analysis is ongoing. There was a lot of inter-subject variability, however, in general, there was a greater peak lumbar flexion angle for the flywheel squat exercise. There was a trend towards a greater range of motion at the hip for the squat exercise with free weight. There was also a greater hip extension, lumbar extension and ankle plantar flexion impulse moment during the squat exercise with free weight. During the deadlift exercise, the peak knee flexion angle and peak knee extension moment were greater when using the free weight profile. For deadlift, the hip extension, lumbar extension and ankle plantar flexion impulse moment tended to be greater with the free weight profile. Overall, the kinematic and kinetic outcomes for the flywheel profile were either statistically the same as free weight profile in many cases, significantly reduced in a few cases, and rarely higher.

Bioengineering↗

Thomas Leps Internship Abstract

An optical navigation system is being flown as the backup system to the primary Deep Space Network telemetry for navigation and guidance purposes on Orion. This is required to ensure Orion can recover from a loss of communication, which would simultaneously cause a loss of DSN telemetry. Images taken of the Moon and Earth are used to give range and position information to the navigation computer for trajectory calculations and maneuver execution. To get telemetry data from these images, the size and location of the moon need to be calculated with high accuracy and precision. The reentry envelope for the Orion EM-1 mission requires the centroid and radius of the moon images to be determined within 1/3 of a pixel 3 sigma. In order to ensure this accuracy and precision can be attained, I was tasked with building precise dot grid images for camera calibration as well as building a hardware in the loop test stand for flight software and hardware proofing. To calibrate the Op-Nav camera a dot grid is imaged with the camera, the error between the image dot location and the actual dot location can be used to build a distortion map of the camera and lens system so that images can be fixed to display truth locations. To build the dot grid images I used the Electro Optics Lab optical bench Bright Object Simulator System, and gimbal. The gimbal was slewed to a series of elevations and azimuths. An image of the collimated single point light source was then taken at each position. After a series of 99 images were taken at different locations the single light spots were extracted from each image and added to a composite image containing all 99 points. During the development of these grids it was noticed that an intermittent error in the artificial "star" locations occurred. Prior to the summer this error was attributed to the gimbal having glitches in it's pointing direction and was going to be replaced, however after further examining the issue I determined it to be a software issue. I have since narrowed the likely source of the error down to a Software Development Kit released by the camera supplier PixeLink. I have since developed a workaround in order to build star grids for calibration until the software bug can be isolated and fixed. I was also tasked with building a Hardware in the Loop test stand in order to test the full Op-Nav system. A 4k screen displays simulated Lunar and Terrestrial images from a possible Orion trajectory. These images are then projected through a collimator and then captured with an Op-Nav camera controlled by an Intel NUC computer running flight software. The flight software then analyzes the images to determine attitude and position, this data is then reconstructed into a trajectory and matched to the simulated trajectory in order to determine the accuracy of the attitude and position estimates. In order for the system to work it needs to be precisely and accurately aligned. I developed an alignment procedure that allows the screen, collimator and camera to be squared, centered and collinear with each other within a micron spatially and 5 arcseconds in rotation. I also designed a rigid mount for the screen that was machined on site in Building 10 by another intern. While I was working in the EOL we received a $500k Orion startracker for alignment procedure testing. Due to my prior experience in electronics development, as an ancillary duty, I was tasked with building the cables required to operate and power the startracker. If any errors are made building these cables the startracker would be destroyed, I was honored that the director of the lab entrusted such a critical component with me. This internship has cemented my view on public space exploration. I always preferred public sector to privatization because, as a scientist, the most interesting aspects of space for me are not necessarily the most profitable. I was concerned that the public sector was faltering however, and that in order to improve human space exploration I would be forced into private sector. I now know that, at least at JSC, human spaceflight is still progressing, and exciting work is still being done. I am now actively seeking employment at JSC after I complete my Ph.D and have met with my branch chiefs and mentor to discuss transitioning to a grad Co-op position.

Leps, Thomas↗

STS-110 Flight Day 7 Highlights

On the seventh day of STS-110, Mission Specialists Steven Smith and Rex Walheim are shown preparing for their second extravehicular activity (EVA) and the third of the mission, with the assistance of Mission Specialist Jerry Ross. Following this mission, Ross and Smith will be the first and second most experienced spacewalkers, respectively, in history. A camera mounted on the Space Shuttle Atlantis shows footage of the International Space Station. While Smith and Walheim are on EVA, Mission Specialists Ross and Lee Morin will provide choreography from inside the Atlantis crew cabin, Pilot Stephen Frick will operate the robotic arm, and Commander Mike Bloom will control the cameras on the robotic arm. Smith and Walheim are shown exiting the airlock hatch and then installing an PFR (Portable Foot Restraint) on the end of the robotic arm, from which much of the work will be done. Following the switching off of a circuit breaker, the main EVA task of rewiring umbilical cables that provide power, commands, and video is begun. These cables will be connected to the Mobile Transporter's (MT) robotic arm. The MT, an external transportation system which runs on rails, is seen with a helmet mounted camera as the astronauts work to release bolts that had served to secure the MT during launch. After a final check of the umbilical connections mated, the Umbilical Reconfiguration Panel is fitted over the cables, and the astronauts make their way to the airlock hatch.

Source record↗