Search NASA⌕ Search

SEARCH · Search NASA

Results for “space telescopes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Space Telescope pointing control

The Space Telescope Pointing Control System is used to slew the optical axis of the telescope from one target star region of the celestial sphere to the next, and to maintain precision pointing on the target star. A digital computer is employed in the processing of attitude and rate sensor data, in order to generate torque commands for the reaction wheels. The System comprises four major elements: a command generator, the electronic control system, attitude update processing, and momentum management. Emphasis is given to control-related flexibility effects of the Space Telescope's solar cell array and vehicle, and the acquisition methodology and development testing employed, in addition to Pointing Control System design features.

Dougherty, H.↗

Progress in the Fabrication and Testing of Telescope Mirrors for the James Webb Space Telescope

The telescope of the James Webb Space Telescope (JWST) is an f/20, three mirror anastigmat design, passively cooled (40K) in an L2 orbit. The design provides diffraction limited performance (Strehl > or = 0.8) at .=2 m. To fit within the launch vehicle envelope (Arianne V), the 6.6 meter primary mirror and the secondary mirror support structure are folded for launch, then deployed and aligned in space. The primary mirror is composed of 18 individual, 1.3 meter (flat flat) hexagonal segments, each adjustable in seven degrees of freedom (six rigid body + radius of curvature) provided by a set of high precision actuators. The actuated secondary mirror (approx.0.74m) is similarly positioned in six degrees of rigid body motion. The approx..70x.51m, fixed tertiary and approx. 0.17m, flat fine steering mirror complete the telescope mirror complement. The telescope is supported by a composite structure optimized for performance at cryogenic temperatures. All telescope mirrors are made of Be with substantial light-weighting (21 kg for each 1.3M primary segment). Additional Be mounting and supporting structure for the high precision (approx.10nm steps) actuators are attached to the primary segments and secondary mirror. All mirrors undergo a process of thermal stabilization to reduce stress. An extensive series of interferometric measurements guide each step of the polishing process. Final polishing must account for any deformation between the ambient temperature of polishing and the cryogenic, operational temperature. This is accomplished by producing highly precise, cryo deformation target maps of each surface which are incorporated into the final polishing cycle. All flight mirrors have now completed polishing, coating with protected Au and final cryo testing, and the telescope is on track to meet all system requirements. We here review the measured performance of the component mirrors and the predicted performance of the flight telescope.

Bowers, Charles↗

Data Processing for High-Contrast Imaging with the James Webb Space Telescope

The James Webb Space Telescope (JWST) will probe circumstellar environments at an unprecedented sensitivity.However, the performance of high-contrast imaging instruments is limited by the residual light from the star at close separations (<2-3”), where the incidence of exoplanets increases rapidly. There is currently no solution to get rid of the residual light down to the photon noise level at those separations, which may prevent some crucial discoveries. JWST’s debut is planned for October 2021 for a baseline mission lifetime of only five years. Thus,it is crucial to find a solution to this problem before its launch. We are further developing and implementing an innovative approach of post-processing built on a Bayesian framework that provides a more robust determination of faint astrophysical structures around a bright source. This approach uses a model of high-contrast imaging instrument that takes advantage of prior information, such as data from wavefront sensing (WFS) operations on JWST, to estimate simultaneously instrumental aberrations and the circumstellar environment. With this approach, our goal is to further improve the contrast gain over the contrast that can be achieved with JWST instruments, starting with NIRCam imaging and coronagraphic imaging. This work will pave the way for the future space-based high-contrast imaging instruments such as the Nancy Grace Roman Space Telescope Coronagraph Instrument (Roman CGI). This technique will be crucial to make the best use of the telemetry data that will be collected during the CGI operations.

Jewell, Jeffrey B.↗

The James Webb Space Telescope Mission: Optical Telescope Element Design, Development, and Performance

The James Webb Space Telescope (JWST) is a large, infrared space telescope that has recently started its science program which will enable breakthroughs in astrophysics and planetary science. Notably, JWST will provide the very first observations of the earliest luminous objects in the universe and start a new era of exoplanet atmospheric characterization. This transformative science is enabled by a 6.6 m telescope that is passively cooled with a 5 layer sunshield. The primary mirror is comprised of 18 controllable, low areal density hexagonal segments, that were aligned and phased relative to each other in orbit using innovative image-based wave front sensing and control algorithms. This revolutionary telescope took more than two decades to develop with a widely distributed team across engineering disciplines. We present an overview of the telescope requirements, architecture, development, superb on-orbit performance, and lessons learned. JWST successfully demonstrates a segmented aperture space telescope and establishes a path to building even larger space telescopes.

Infrared observatories↗

Hubble Space Telescope Program on STS-95 Supported by Space Acceleration Measurement System for Free Flyers

John Glenn's historic return to space was a primary focus of the STS 95 space shuttle mission; however, the 83 science payloads aboard were the focus of the flight activities. One of the payloads, the Hubble Space Telescope Orbital System Test (HOST), was flown in the cargo bay by the NASA Goddard Space Flight Center. It served as a space flight test of upgrade components for the telescope before they are installed in the shuttle for the next Hubble Space Telescope servicing mission. One of the upgrade components is a cryogenic cooling system for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). The cooling is required for low noise in the receiver's sensitive electronic instrumentation. Originally, a passive system using dry ice cooled NICMOS, but the ice leaked away and must be replaced. The active cryogenic cooler can provide the cold temperatures required for the NICMOS, but there was a concern that it would create vibrations that would affect the fine pointing accuracy of the Hubble platform.

Kacpura, Thomas J.↗

Key space telescope design considerations

The Space Telescope (ST), a 2.4 meter aperture astronomical telescope, will be launched into low earth orbit by the Space Shuttle in the mid-1980's. This high resolution telescope will be capable of operating from Lyman-alpha (121.6 nm) through the near infrared; support five different scientific instruments at its focal plane (two cameras, two spectrographs, and one photometer); and by periodic on-orbit servicing and ground refurbishment be able to operate with technologically current scientific instruments for at least 15 years. This paper identifies the critical Space Telescope design requirements and describes design techniques which were selected to satisfy these requirements.

Olivier, J. R.↗

Control of optical performance on the Space Telescope

A large astronomical telescope, termed the Space Telescope, is expected to be placed in orbit in the early 1980's. It will be operated as an international observatory that will enable astronomers to detect electromagnetic radiation over a much broader spectrum than is possible from ground observatories. The image quality (not degraded by atmospheric effects) will be limited only by the quality of the optics and by aperture diffraction. This opportunity to approach diffraction-limited imagery on an astronomical telescope of this size (2.4-m aperture) sets unusually stringent tolerances on the optical quality. The budgeting and control of these qualities throughout the design, fabrication, assembly, and operation of the Space Telescope is described. A feedback control system which will maintain the telescope at peak performance in the orbital environment is examined.

Jones, C. O.↗

Status of the James Webb Space Telescope Mission

The James Webb Space Telescope ( Webb) is the largest space telescope realized to-date, with a 6.5 m segmented primary mirror that must be folded to fit within its Ariane 5 launcher fairing. This infrared telescope is passively cooled using a five-layer sunshield that will keep the optical telescope and its four science instruments in the shade throughout the lifetime of the mission in an L2 orbit. Webb's science instruments include near- and mid­ infrared imagers and spectrometers that cover the spectral range from 0.6-28.5 µm. The Webb mission has a long history with numerous first of its kind technology developments, ground support equipment innovations, and algorithmic characterization advances. This conference proceeding summarizes the technical progress over the past two years, from the Spacecraft Element environmental testing to the Observatory integration and testing, and the final Observatory test plans leading up to launch, on-orbit commissioning, and science operations.

Michael W McElwain↗

Overview of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is a large aperture, space telescope designed to provide imaging and spectroscopy from 1.0 micron to 28 microns. JWST will be launched to an orbit at L2 aboard an Ariane 5 launcher in 2013. The Goddard Space Flight Center (GSFC) is the lead center for the JWST program and manages the project for NASA. The prime contractor for JWST is Northrop Grumman Aerospace Systems (NGST). JWST is an international partnership with the European Space Agency (ESA), and the Canadian Space Agency (CSA). ESA will contribute the Ariane 5 launch, and a multi-object infrared spectrograph. CSA will contribute the Fine Guidance Sensor (FGS), which includes the Tunable Filter Imager (TFI). The European consortium, in collaboration with the Jet Propulsion Laboratory (JPL), builds the mid-infrared imager (MIRI). In this paper we present an overview of the JWST science program, and discuss recent progress in the development of the observatory.

Clampin, Mark↗

Performance of the Center-Of-Curvature Optical Assembly During Cryogenic Testing of the James Webb Space Telescope

The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 meters in diameter and consists of 18 hexagonal segments, each 1.5 meters point-to-point. Each segment has a 6 degree-of-freedom hexapod actuation system and a radius-of-curvature (ROC) actuation system. The full telescope was tested at its cryogenic operating temperature at Johnson Space Center (JSC) in 2017. This testing included center-of-curvature measurements of the PM wavefront error using the Center-of-Curvature Optical Assembly (COCOA), along with the Absolute Distance Meter Assembly (ADMA). The COCOA included an interferometer, a reflective null, an interferometer-null calibration system, coarse and fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer was used to enable alignment and phasing of the PM segments. By combining measurements at two laser wavelengths, synthetic wavelengths up to 15 millimeters could be achieved, allowing mirror segments with millimeter-level piston errors to be phased to the nanometer level. The ADMA was used to measure and set the spacing between the PM and the focus of the COCOA null (i.e., the PM center-of-curvature) for determination of the ROC. This paper describes the COCOA, the PM test setup, the testing performed, the test results, and the performance of the COCOA in aligning & phasing the PM segments and measuring the final PM wavefront error.

JWST↗

Analysis of space telescope data collection systems

The Multiple Access (MA) communication link of the Space Telescope (ST) is described. An expected performance bit error rate is presented. The historical perspective and rationale behind the ESTL space shuttle end-to-end tests are given. The concatenated coding scheme using a convolutional encoder for the outer coder is developed. The ESTL end-to-end tests on the space shuttle communication link are described. Most important is how a concatenated coding system will perform. This is a go-no-go system with respect to received signal-to-noise ratio. A discussion of the verification requirements and Specification document is presented, and those sections that apply to Space Telescope data and communications system are discussed. The Space Telescope System consists of the Space Telescope Orbiting Observatory (ST), the Space Telescope Science Institute, and the Space Telescope Operation Control Center. The MA system consists of the ST, the return link from the ST via the Tracking and Delay Relay Satellite system to White Sands, and from White Sands via the Domestic Communications Satellite to the STOCC.

Ingels, F. M.↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

The James Webb Space Telescope

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approx.40K). The JWST Observatory architecture includes the Optical Telescope Element and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The ISIM optical metering structure is a roughly 2.2x1.7x2.2mY, asymmetric frame that is composed of carbon fiber and resin tubes bonded to invar end fittings and composite gussets and clips. The structure supports the SIs, isolates the SIs from the OTE, and supports thermal and electrical subsystems. The structure is attached to the OTE structure via strut-like kinematic mounts. The ISM structure must meet its requirements at the approx.40K cryogenic operating temperature. The SIs are aligned to the structure s coordinate system under ambient, clean room conditions using laser tracker and theodolite metrology. The ISM structure is thermally cycled for stress relief and in order to measure temperature-induced mechanical, structural changes. These ambient-to-cryogenic changes in the alignment of SI and OTE-related interfaces are an important component in the JWST Observatory alignment plan and must be verified.

Nowak, Maria↗

25 Years of Contamination Control on the James Webb Space Telescope

The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performed by thousands of people across the globe in dozens of disciplines. From the start, effective contamination control was considered essential for the JWST mission due to the large, exposed optics and tight sensitivity required to measure first light and faint signals at the dawn of the universe. This paper will present the JWST mission and requirements overview, including mission requirements that led to optimizing performance for collecting light in the Near Infrared (NIR, 0.6μm) – Mid Infrared (MIR, 29μm) range. Molecular films absorb in the IR bands and can alter thermal emissivity, resulting in increased noise at the longer wavelengths (MIRI). Particles increase light scatter and background noise levels at the shorter wavelengths (NIRSpec, NIRCam and FGS). The passively cooled design of JWST led to an open architecture for the optical telescope element (OTE), presenting the challenge of maintaining cleanliness throughout assembly, integration, and test in a multitude of environments. The paper will describe the mission and will introduce the specific areas of contamination control developed and advanced to keep JWST clean at an unsurpassed level of cleanliness.

Contamination Control↗

Science operations with Space Telescope

The operation, instrumentation, and expected contributions of the Space Telescope are discussed. Space Telescope capabilities are described. The organization and nature of the Space Telescope Science Institute are outlined, including the allocation of observing time and the data rights and data access policies of the institute.

Giacconi, R.↗

Space telescope pointing control system

The Space Telescope is a free-flying spacecraft designed for Space Shuttle launch. The Space Telescope's pointing control system slews the optical axis from one target star region of the celestial sphere to the next, and maintains precision pointing for the target star for up to 24 hours. The spacecraft digital computer processes the precision attitude and rate sensor data to generate torque commands for the reaction wheels. The pointing control system has four major elements: the command generator, the control system, the attitude reference processing, and momentum management. The emphasis is on relating design requirements to the hardware and software implementation.

Dougherty, H.↗

Overview and Status of the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments spanning the wavelength range of 0.6 microns to 28 microns. JWST's primary science goals are to detect and characterize the first galaxies, study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST has a unique design based on the concept of passive cooling by means of a multi-layer sunshield to achieve the telescope's cryogenic operating temperature. Each of the five layers of the sunshield is approximately the size of a tennis court, and made of aluminized kapton. By maintaining an observatory attitude whereby the sunshield keeps the telescope in the shade from the sun's rays, the telescope and science instruments can operate at cryogenic temperature (-40 K). On the sun facing side of the observatory the spacecraft bus houses most of the electronic sub-systems, and provides a platform for the solar array and communications hardware. JWST is sufficiently large that it cannot fit inside .the fairing of its Ariane 5 launcher without being stowed in a more compact configuration, so the ability to deploy its major SUb-systems such as the telescope optics and sunshield after launch are another major feature of the observatory. Development of observatory is making rapid progress as major hardware SUb-systems nearcompletion. Polishing of the JWST telescope mirrors is complete with 18 primary mirror segments, the secondary mirror, tertiary and fine steering mirror all gold coated and through acceptance testing. Engineering test articles of each sunshield membrane layer are underway. The first layer 3 membrane is complete and is undergoing testing to evaluate its tensioned shape for compliance with alignment tolerances. As each major SUb-system is tested, the expected scientific performance of the observatory can be evaluated using test results and integrated system models of the observatory. We will discuss key performance parameters of the observatory, including thermal performance, image quality, sensitivity, and the ability to achieve background-limited observations. The observatory deployment after launch will also be discussed in the context of recent sub-system testing of deployment mechanisms.

Clampin, Mark↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗