Search NASA⌕ Search

SEARCH · Search NASA

Results for “staffing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Managers Handbook for Software Development

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

Agresti, W.↗

NASA's role in aeronautical research

Past and current research in the aeronautical field conducted by NASA is reviewed. The first national center for aeronautical research, the Langley Memorial Aeronautical Laboratory, was established in 1917 by the then formed National Advisory Committee for Aeronautics (NACA). Two other research centers established later by NACA (Lewis and Ames) were staffed with research cadres from Langley. These three research centers formed the nucleus of NASA when it was established in 1958. Studies conducted today by NASA's research centers include: a concept for commuter-style aircraft, turbofan engines for military supersonic fighter aircraft, strength and durability of man-made fiber materials, and maneuverability problems in high speed aircraft. In addition, at Ames, research is being conducted on short-haul aviation, and short and vertical takeoff while at Lewis studies concentrate on propulsion system and engines. At Langley the emphasis is on basic research, stressing aircraft structure improvements, stall avoidance and noise abatement. Finally, the importance of NASA's educational program is discussed.

Parker, M.↗

Aeroelasticity at the NASA Langley Research Center Recent progress, new challenges

Recent progress in aeroelasticity, particularly at the NASA Langley Research Center is reviewed to look at the questions answered and questions raised, and to attempt to define appropriate research emphasis needed in the near future and beyond. The paper is focused primarily on the NASA Langley Research Center (LaRC) Program because Langley is the lead NASA center for aerospace structures research, and essentially is the only one working in depth in the area of aeroelasticity. Historical trends in aeroelasticity are reviewed broadly in terms of technology and staffing particularly at the LaRC. Then, selected studies of the Loads and Aeroelasticity Division at LaRC and others over the past three years are presented with attention paid to unresolved questions. Finally, based on the results of these studies and on perceptions of design trends and aircraft operational requirements, future research needs in aeroelasticity are discussed.

Hanson, P. W.↗

Spacelab Mission Implementation Cost Assessment (SMICA)

A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.

Guynes, B. V.↗

Software life cycle dynamic simulation model: The organizational performance submodel

The submodel structure of a software life cycle dynamic simulation model is described. The software process is divided into seven phases, each with product, staff, and funding flows. The model is subdivided into an organizational response submodel, a management submodel, a management influence interface, and a model analyst interface. The concentration here is on the organizational response model, which simulates the performance characteristics of a software development subject to external and internal influences. These influences emanate from two sources: the model analyst interface, which configures the model to simulate the response of an implementing organization subject to its own internal influences, and the management submodel that exerts external dynamic control over the production process. A complete characterization is given of the organizational response submodel in the form of parameterized differential equations governing product, staffing, and funding levels. The parameter values and functions are allocated to the two interfaces.

Tausworthe, Robert C.↗

Preparation for microgravity: The role of the microgravity materials science laboratory

A laboratory dedicated to ground based materials processing in preparation for space flight was established at the NASA Lewis Research Center. Experiments are performed to delineate the effects of gravity on processes of both scientific and commercial interest. Processes are modeled physically and mathematically. Transport model systems are used where possible to visually track convection, settling, crystal growth, phase separation, agglomeration, vapor transport, diffusive flow, and polymers reactions. The laboratory contains apparatus which functionally duplicates apparatus available for flight experiments and other pieces instrumented specifically to allow process characterization. Materials addressed include metals, alloys, salts, glasses, ceramics, and polymers. The Microgravity Materials Science Laboratory is staffed by engineers and technicians from a variety of disciplines and is open to users from industry and academia as well as the government. Examples will be given of the laboratory apparatus typical experiments and results.

Johnston, J. Christopher↗

Calibration support for the Earth Observing System Project

The Earth Observing System Project (EOS) program guidelines establishes significantly more stringent requirements on calibrations of instruments. This requirement is driven by the need for long-term continuity of acquired data sets and the use of measurements in interdisciplinary investigations. Personnel from the Standards and Calibration Office have been supporting the Program and Project in interpreting these goals into specific requirements. Contributions to EOS have included participation in the Panel of Experts which produced a list of consensus items necessary for accomplishing an accurate calibration and suggested EOS Project Calibration Policy, and drafting the announcement of opportunity and bidders information package positions on instrument calibration and data product validation. Technical staffing was provided to the NASA delegates to the Committee on Earth Orbiting Satellites (club of space-faring nations) for the standing working group on Calibration and Data Validation.

Guenther, B. W.↗

National Aero-Space Plane technology development overview

The paper discusses the management structure and organization that was developed in early 1986 to focus the national technology resource pool on the enabling technologies for the NASP. The NASP program is developing technologies in parallel with total system studies that are aimed at single stage to orbit (SSTO) capability. In order to manage the technology development seven teams were established by discipline and charged with the task of recommending specific programs to be funded by the NASP Joint Program Office (JPO). The teams were staffed by representatives from NASA Research Centers, Johns Hopkins University, and the Air Force Laboratories at Wright-Patterson AFB. In addition several special teams were established to recommend development programs for specific areas of technical concern that became apparent when the total system studies identified the technology to be critical and sensitive in the analysis that would enable a single stage to orbit vehicle.

Wright, Howard T.↗

Engineering visualization utilizing advanced animation

Engineering visualization is the use of computer graphics to depict engineering analysis and simulation in visual form from project planning through documentation. Graphics displays let engineers see data represented dynamically which permits the quick evaluation of results. The current state of graphics hardware and software generally allows the creation of two types of 3D graphics. The use of animated video as an engineering visualization tool is presented. The engineering, animation, and videography aspects of animated video production are each discussed. Specific issues include the integration of staffing expertise, hardware, software, and the various production processes. A detailed explanation of the animation process reveals the capabilities of this unique engineering visualization method. Automation of animation and video production processes are covered and future directions are proposed.

Sabionski, Gunter R.↗

Middle management of research

The role of the middle manager in a research organization is discussed. The middle manager serves as a liaison between upper management and researchers to assure that individual research projects manifest the goals of the organization. The author draws on his long experience in this role to describe management practices that have proven successful. A general discussion is presented of the makeup of a research environment, derived from a study of a division involved in aerospace research and development (R and D). The study emphasized the importance of planning and management style in producing an attractive environment. Management practices are described, which include goal setting, planning, staffing, reviewing and evaluating, and rewarding. The importance of selecting and defining an appropriate research area is discussed. It is emphasized that in relating to the staff the middle manager must cultivate the human side of supervision, develop the art of delegating responsibility, judiciously select facilities, and provide recognition and meaningful rewards to develop a productive research staff. The development of the staff is probably the most important and challenging role of the manager.

Graham, Robert W.↗

Low thrust rocket test facility

A low thrust chemical rocket test facility has recently become operational at the NASA-Lewis. The new facility is used to conduct both long duration and performance tests at altitude over a thruster's operating envelope using hydrogen and oxygen gas for propellants. The facility provides experimental support for a broad range of objectives, including fundamental modeling of fluids and combustion phenomena, the evaluation of thruster components, and life testing of full rocket designs. The major mechanical and electrical systems are described along with aspects of the various optical diagnostics available in the test cell. The electrical and mechanical systems are designed for low down time between tests and low staffing requirements for test operations. Initial results are also presented which illustrate the various capabilities of the cell.

Arrington, Lynn A.↗

Low thrust rocket test facility

A low thrust chemical rocket test facility has recently become operational at the NASA-Lewis. The new facility is used to conduct both long duration and performance tests at altitude over a thruster's operating envelope using hydrogen and oxygen gas for propellants. The facility provides experimental support for a broad range of objectives, including fundamental modeling of fluids and combustion phenomena, the evaluation of thruster components, and life testing of full rocket designs. The major mechanical and electrical systems are described along with aspects of the various optical diagnostics available in the test cell. The electrical and mechanical systems are designed for low down time between tests and low staffing requirements for test operations. Initial results are also presented which illustrate the various capabilities of the cell.

Arrington, Lynn A.↗

Manager's handbook for software development, revision 1

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

Source record↗

Spaceport aurora: An orbiting transportation node

With recent announcements of the development of permanently staffed facilities on the Moon and Mars, the national space plan is in need of an infrastructure system for transportation and maintenance. A project team at the University of Houston College of Architecture and the Sasakawa International Center for Space Architecture, recently examined components for a low Earth orbit (LEO) transportation node that supports a lunar build-up scenario. Areas of investigation included identifying transportation node functions, identifying existing space systems and subsystems, analyzing variable orbits, determining logistics strategies for maintenance, and investigating assured crew return systems. The information resulted in a requirements definition document, from which the team then addressed conceptual designs for a LEO transportation node. The primary design drivers included: orbital stability, maximizing human performance and safety, vehicle maintainability, and modularity within existing space infrastructure. For orbital stability, the power tower configuration provides a gravity gradient stabilized facility and serves as the backbone for the various facility components. To maximize human performance, human comfort is stressed through zoning of living and working activities, maintaining a consistent local vertical orientation, providing crew interaction and viewing areas and providing crew return vehicles. Vehicle maintainability is accomplished through dual hangars, dual work cupolas, work modules, telerobotics and a fuel depot. Modularity is incorporated using Space Station Freedom module diameter, Space Station Freedom standard racks, and interchangeable interior partitions. It is intended that the final design be flexible and adaptable to provide a facility prototype that can service multiple mission profiles using modular space systems.

Source record↗

Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

Melnick, Gary J.↗

CCSDS Advanced Orbiting Systems - International data communications standards for the Space Station Freedom

Established in 1982, the Consultative Committee for Space Data Systems (CCSDS) is an international organization that is staffed by data-handling experts from nearly all of the world's major space agencies. Its goal is to develop standard data-communications techniques so that several agencies may cross-support each other's data flow and thus allow complex, international missions to be flown. Under the general umbrella of Advanced Orbiting Systems (AOS), an international CCSDS task force was formed in 1985 to develop standard data-communications concepts for manned missions, such as the Space Station Freedom and the Hermes space plane, and large unmanned vehicles, such as polar orbiting platforms. The history of the CCSDS and the development of the AOS recommendation are reviewed, and the user services and protocols embodied in its systems architecture are introduced.

Hooke, Adrian J.↗

Design of mission operations systems for scientific remote sensing

The present work describes the mission operations system (MOS) design process for remote-sensing missions. A MOS is defined as the system required to perform, monitor, and control an operation, encompassing personnel, hardware, software and/or documentation. Attention is given to telecommunications and remote-sensing instrumentation, MOS definition program phases and reviews, and MOS organization, management, and staffing. Also treated are the uplink and downlink processes, anomalies and contingency plans, the illustrative case of the MOS for the Magellan radar sensing mission, and a projection of future MOSs incorporating AI.

Wall, Stephen D.↗

Automated Estimation Of Software-Development Costs

COSTMODL is automated software development-estimation tool. Yields significant reduction in risk of cost overruns and failed projects. Accepts description of software product developed and computes estimates of effort required to produce it, calendar schedule required, and distribution of effort and staffing as function of defined set of development life-cycle phases. Written for IBM PC(R)-compatible computers.

Roush, George B.↗