Search NASA⌕ Search

SEARCH · Search NASA

Results for “stakeholder training”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

131 records · Page 8

An Educational Program on Concentrated Solar Power and Heliostats for Power Generation and Industrial Processes

The objective of this project was to design and implement a comprehensive educational and applied research program in Concentrated Solar Thermal Power (CSTP) and heliostat technologies at Northeastern University. In alignment with the U.S. Department of Energy's Heliostat Consortium (HelioCon) goals, the project aimed to expand student and public understanding of CSTP systems while simultaneously contributing to workforce development and the broader decarbonization strategy. A particular emphasis was placed on integrating hands-on student design projects and publicly disseminating educational content relevant to CSTP systems. The project addressed a critical gap in renewable energy education: CSTP and heliostats, despite their importance in utility-scale solar energy, are rarely included in standard mechanical engineering programs. This project established new pathways for students to engage with the topic through the creation of a 4-credit graduate/senior elective course, development of five industry-facing short courses, and the inclusion of CSTP-based capstone design projects. Over two academic years, 36 students across six senior design teams developed and tested technologies such as deformable heliostats, beacon-based tracking systems, and solar-powered pyrolizers for biomass-to-biochar conversion. Concurrently, 30 undergraduate and graduate students were enrolled in the new academic course centered around CSTP principles. To ensure the relevance and accessibility of the short course content, the project team engaged with industry professionals, technical policy stakeholders, and potential course participants through structured surveys and informal consultations. Feedback from 28 respondents guided the structure, length, and delivery format of the courses - resulting in a modular design broken into five workshops. The feedback emphasized the need for flexible, asynchronous delivery and practical case studies, particularly in areas such as heliostat control, thermal storage, and solar fuel production. This engagement helped align the courses with the evolving knowledge demands of the renewable energy workforce and ensured that participants from both technical and policy backgrounds could meaningfully benefit from the material. The research and educational activities advanced the understanding of heliostat control systems, optical performance under misalignment, and thermal system integration in solar-driven pyrolysis applications. Methods and designs explored in this project proved to be both technically effective and economically feasible at the lab scale. Prototypes were constructed using commercially available components and custom-fabricated elements, demonstrating that meaningful performance improvements can be achieved with modest material and fabrication costs, supporting the feasibility of student-led research in this field. The public benefit of this project is twofold. First, it cultivates a pipeline of engineers trained to be familiar with CSTP principles, an essential workforce need identified by the Department of Energy for achieving its 2030 cost and deployment targets. Second, it contributes openly accessible educational materials, course content, and experimental frameworks to the broader community, enabling other institutions to adopt or adapt similar programming. Through outreach activities, curriculum integration, and technical exposure, this project contributes to a more informed and capable renewable energy workforce while supporting innovation in heliostat and CSTP system design. A new technical report is being prepared to document the development of the course and its outcomes, with plans to publish it in the ASME Open Access Journal of Engineering to ensure global accessibility, free of cost.

14 SOLAR ENERGY↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

State Insights On The Water-Energy Nexus And Policy Ideas To Achieve Greater Savings

Governors, state policymakers, utilities and other stakeholders across the country are increasingly aware of the connection between energy and water production and use, and the need to conserve both resources to meet economic and environmental goals. It requires substantial amounts of water to produce energy and considerable amounts of energy to treat and deliver water. The critical interdependence between energy and water was clearly illustrated during the recent winter storm in Texas and other parts of the South in February 2021. Initial power outages contributed to a longer-term water crisis. Power outages led to water pump failures while water demand increased from frozen water pipes that burst. This caused low water pressure that can lead to harmful bacteria growth in the water. The power outages also prevented water treatment plants from properly treating the water for several days, thereby leaving many residents without clean drinking water and worsening the storm’s impacts. The National Governors Association has been working with states on this connection between water and energy and strategies for conserving those resources for several years. NGA held a Water-Energy Nexus Learning Lab in September 2020. This event invited two leading states in the water-energy nexus space, Arizona and Wisconsin, to showcase some of their model policies and programs to other states, Maryland, Nevada, North Carolina, North Dakota, and Washington, looking for greater savings opportunities. This paper provides an overview of challenges that states are facing in developing integrated water and energy conservation policies; provides background on Arizona and Wisconsin’s innovative water-energy policies and programs; and summarizes action items the participating state teams identified for their respective states. The main categories of policy solutions identified by states at NGA’s Water-Energy Nexus Learning Lab were: Funding & Financing – providing financial incentives for water efficiency modeled after established energy efficiency programs, and an emphasis on financial support for small water and energy utilities. Education & Technical Assistance – providing more education and training opportunities about ways to achieve cost-effective energy and water savings, and the needs of resource-constrained small and medium utilities for training and other assistance. Structural Changes to Encourage Conservation – developing ways to incentivize agricultural conservation such as through water allocation strategies; adopting water reuse or water loss standards; and requiring electric utilities to consider water impacts as part of their integrated resource planning process. Communications & Data – conducting energy audits, reviewing water data provided to state agencies, and developing data benchmarking tools to measure and better manage energy and water use. Climate Strategy – establishing a multi-agency working group or other collaborative approach to determine ways to integrate energy and water savings in state policies and help meet the state climate objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗