Search NASA⌕ Search

SEARCH · Search NASA

Results for “task allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

128 records · Page 8

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life Cycle Inventory of Current Photovoltaic Module Recycling Processes in Europe

With the rapid and accelerating growth of PV module installation and an increase of PV modules from the nineteen eighties and nineties reaching the end of their 30 year lifespan, their proper end of life treatment gets into focus. This report deals with the approaches, the environmental impacts and the recovered materials of PV module recycling. In this report, the environmental life cycle assessment of the current generation recycling of crystalline silicon (c-Si) and cadmium telluride (CdTe) PV modules is described. Due to the still limited waste stream today, c-Si PV modules are mainly treated in recycling plants designed for treatment of laminated glass, metals or electronic waste. Only the bulk materials glass, aluminium and copper are recovered, while the cells and other materials such as plastics are incinerated. CdTe PV modules have been treated in dedicated recycling plants for many years and life cycle inventories of this process have been published. The semiconductor is recovered in addition to glass and copper. Life cycle inventories of the recycling of current c-Si and CdTe PV modules are compiled following two modelling approaches related to recycling. The cut-off approach uses economic allocation to divide the total efforts of the recycling process between the treatment of the used PV module and the recovered products. The end-of-life approach considers the recycling process separately from the potentially avoided burdens due to recovered materials. The life cycle inventories of c-Si PV module recycling are based on data obtained from four European recyclers surveyed between 2015 and 2016. For CdTe PV module recycling, the life cycle inventories were established based on published data for the First Solar recycling facility in Germany. The life cycle impact assessment is done based on six environmental indicators previously identified as most relevant for PV electricity: particulate matter, freshwater ecotoxicity, human toxicity non-cancer effects, human toxicity cancer effects, mineral, fossil and renewable resource depletion and climate change. The life cycle inventories according to the cut-off approach can be applied to complement existing life cycle inventory data on PV systems. The environmental impacts of the recycling of c-Si PV modules are very small (maximum 1.1 %) compared to the impacts caused by the production of a 3 kWp residential PV system mounted on a slanted roof. In the case of CdTe PV module recycling, the treatment of the PV panels has the highest but still rather minor contribution in the indicator climate change (4.8 %). The life cycle inventories according to the end-of-life approach allow an assessment of the net environmental benefits of recycling. The recovery of glass, metals, and semiconductor material from c-Si and CdTe PV modules causes lower environmental impacts than the extraction, refinement and supply of the respective materials from primary resources. The highest potential benefits are observed in the indicator mineral, fossil and renewable resource depletion. The data quality of the recycling of c-Si PV modules is classified as fair since only limited information is available. In contrast, the data quality of CdTe PV module recycling is considered very good. The study was financed by the Swiss Federal Office of Energy (SFOE) and carried out in the framework of the Task 12 of the Photovoltaic Powers System Programme (PVPS) of the International Energy Agency (IEA).

14 SOLAR ENERGY↗