Search NASA⌕ Search

SEARCH · Search NASA

Results for “task scenario”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Developing a Hybrid Space Suit Simulator as a Research Tool for Assessing Extravehicular Activity Relevant Workload

Suited testing time is limited and hard to come by, expensive, and requires a whole team to operate and monitor the suit; however, pressurized spacesuits are not always necessary for initial developmental efforts or assessment of informatics. The Human Physiology, Performance, Protection & Operations Laboratory (H-3PO) at NASA Johnson Space Center (JSC) is developing a Hybrid Space Suit Simulator (HS3) to support characterization of human performance during planetary surface exploration analogs. The primary goal of HS3 is to create a low cost, modular, and unpressurized suit simulator for use as a research tool which provides relevant physical and cognitive workload approximations with EVA-like immersion during planetary extravehicular activity (EVA) simulations. HS3 consists of a soft suit, communication, thermal control, gloves, boots, helmet, and integrated bioinformatics/sensors. The modular design of HS3 allows it to be modified to support test objectives as needed. HS3 enables H-3PO and NASA to complete critical human health and performance testing to address open risks and knowledge gaps in a timely, repeatable, and controlled manner. Four engineering runs were completed with HS3 as a baseline for capability. General workload was assessed while traversing on a passive treadmill and conducting geology tasks. Liquid cooling temperature, suit temperature, and metabolic rates were collected during one extended three-hour engineering run. For the duration of the engineering run the suit temperature was 26.6 ± 1.58 °C while suit humidity was 53.7 ± 5.11 %. Helmet temperature was higher than suit temperature at 27.8 ± 1.58 °C. Helmet humidity was lower than average suit humidity at 50.12 ± 11.3 °C. The liquid cooling temperature remained stable at 22.4 ± 1.62 °C. Resting metabolic rate was 597 ± 88 BTU/hr while metabolic rate increased during traverse tasks at 1500 ± 319 BTU/hr and geology tasks at 921 ± 129 BTU/hr. Following the engineering runs, a characterization study will be conducted. The subjects will perform EVA-like scenarios in both a shirtsleeve only and donned HS3, consisting of EVA task circuit focused on traversing, geological rock sampling, and task board manipulation. The characterization study will provide data capability for implementing HS3 in analog EVA testing environments.

Monica Hew↗

A Mars airplane

An airplane specifically designed for Mars flight is described, emphasizing its conceivable role as an aerial surveyor for visual imaging, gamma-ray and IR reflectance spectroscopy, studies of atmospheric composition and dynamics, and gravity-field, magnetic-field, and electromagnetic sounding. Possible imaging systems and surveying tasks are considered, along with a plausible mission scenario for a fleet of 12 airplanes, which would be taken to Mars in squadrons of four by three Shuttle/IUS Twin Stage/spacecraft carriers. A basic configuration closely resembling that of a competition glider is examined, and four types of airplane are discussed: hydrazine-powered cruisers and landers and electrically powered cruisers and landers. Attention is given to navigation, guidance, and control avionics, vehicle weight, the use of composite materials for the wing, and flight testing on earth.

Clarke, V. C.↗

Initial planetary base construction techniques and machine implementation

Conceptual designs of (1) initial planetary base structures, and (2) an unmanned machine to perform the construction of these structures using materials local to the planet are presented. Rock melting is suggested as a possible technique to be used by the machine in fabricating roads, platforms, and interlocking bricks. Identification of problem areas in machine design and materials processing is accomplished. The feasibility of the designs is contingent upon favorable results of an analysis of the engineering behavior of the product materials. The analysis requires knowledge of several parameters for solution of the constitutive equations of the theory of elasticity. An initial collection of these parameters is presented which helps to define research needed to perform a realistic feasibility study. A qualitative approach to estimating power and mass lift requirements for the proposed machine is used which employs specifications of currently available equipment. An initial, unmanned mission scenario is discussed with emphasis on identifying uncompleted tasks and suggesting design considerations for vehicles and primitive structures which use the products of the machine processing.

Crockford, William W.↗

User engineering: A new look at system engineering

User Engineering is a new System Engineering perspective responsible for defining and maintaining the user view of the system. Its elements are a process to guide the project and customer, a multidisciplinary team including hard and soft sciences, rapid prototyping tools to build user interfaces quickly and modify them frequently at low cost, and a prototyping center for involving users and designers in an iterative way. The main consideration is reducing the risk that the end user will not or cannot effectively use the system. The process begins with user analysis to produce cognitive and work style models, and task analysis to produce user work functions and scenarios. These become major drivers of the human computer interface design which is presented and reviewed as an interactive prototype by users. Feedback is rapid and productive, and user effectiveness can be measured and observed before the system is built and fielded. Requirements are derived via the prototype and baselined early to serve as an input to the architecture and software design.

Mclaughlin, Larry L.↗

The Flight Telerobotic Servicer (FTS) NASA's first operational robotic system

NASA has completed the preliminary definition phase of the Flight Telerobotic Servicer (FTS) and is now preparing to begin the detailed design and fabrication phase. The FTS will be designed and built by Martin Marietta Astronautics Group in Denver, CO, for the Goddard Space Flight Center, in support of the Space Station Freedom Program. The design concepts for the FTS are discussed, as well as operational scenarios for the assembly, maintenance, servicing and inspection tasks which are being considered for the FTS. The upcoming Development Test Flight (DTF-1) is the first of two shuttle test flights to test FTS operations in the environment of space and to demonstrate the FTS capabilities in performing tasks for Space Station Freedom. Operational planning for DTF-1 is discussed as well as development plans for the operational support of the FTS on the space station.

Andary, J.↗

Putting EVM to the Test

IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

Kerby, Jerald↗

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange

Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange is a two-year research effort to visualize the U. S. aviation industry at a point 50 years in the future, and to define potential communication solutions to meet those future data exchange needs. The research team, led by XCELAR, was tasked with identifying future National Airspace System (NAS) scenarios, determining requirements and functions (including gaps), investigating technical and business issues for air, ground, & air-to-ground interactions, and reporting on the results. The project was conducted under technical direction from NASA and in collaboration with XCELAR's partner, National Institute of Aerospace, and NASA technical representatives. Parallel efforts were initiated to define the information exchange functional needs of the future NAS, and specific communication link technologies to potentially serve those needs. Those efforts converged with the mapping of each identified future NAS function to potential enabling communication solutions; those solutions were then compared with, and ranked relative to, each other on a technical basis in a structured analysis process. The technical solutions emerging from that process were then assessed from a business case perspective to determine their viability from a real-world adoption and deployment standpoint. The results of that analysis produced a proposed set of future solutions and most promising candidate technologies. Gap analyses were conducted at two points in the process, the first examining technical factors, and the second as part of the business case analysis. In each case, no gaps or unmet needs were identified in applying the solutions evaluated to the requirements identified. The future communication solutions identified in the research comprise both specific link technologies and two enabling technologies that apply to most or all specific links. As a result, the research resulted in a new analysis approach, viewing the underlying architecture of ground-air and air-air communications as a whole, rather than as simple "link to function" paired solutions. For the business case analysis, a number of "reference architectures" were developed for both the future technologies and the current systems, based on three typical configurations of current aircraft. Current and future costs were assigned, and various comparisons made between the current and future architectures. In general, it was assumed that if a future architecture offers lower cost than the current typical architecture, while delivering equivalent or better performance, it is likely that the future solution will gain industry acceptance. Conversely, future architectures presenting higher costs than their current counterparts must present a compelling benefit case in other areas or risk a lack of industry acceptance. The business case analysis consistently indicated lower costs for the proposed future architectures, and in most cases, significantly so. The proposed future solutions were found to offer significantly greater functionality, flexibility, and growth potential over time, at lower cost, than current systems. This was true for overall, fleet-wide equipage for domestic and oceanic air carriers, as well as for single, General Aviation (GA) aircraft. The overall research results indicate that all identified requirements can be met by the proposed solutions with significant capacity for future growth. Results also illustrate that the majority of the future communication needs can be met using currently allocated aviation RF spectrum, if used in more effective ways than it is today. A combination of such optimized aviation-specific links and commercial communication systems meets all identified needs for the 50-year future and beyond, with the caveat that a new, overall function will be needed to manage all information exchange, individual links, security, cost, and other factors. This function was labeled "Delivery Manager" (DM) within this research. DM employs a distributed client/server architecture, for both airborne and ground communications architectures. Final research results included identifying the most promising candidate technologies for the future system, conclusions and recommendations, and identifying areas where further research should be considered.

Communications↗

Geothermal Reservoir Simulation Analysis in Support of Electricity Co-Production Feasibility Study at the Blackburn Oil Field, Nevada: Preprint

Geothermal electricity co-production is a viable option for oil reservoirs producing large water cuts with elevated wellhead-observed temperatures. Repurposing existing oil wells significantly reduces initial investment costs historically associated with geothermal resource utilization. The National Renewable Energy Laboratory (NREL), partnering with Gradient Geothermal, Inc. (formerly known as Transitional Energy) and Grant Canyon Oil and Gas, has been tasked to evaluate the feasibility of geothermal electricity co-production at the Blackburn Oil Field with Organic Rankine Cycle (ORC) generators. The Devonian steady-state reservoir has historically been producing high water cuts of 240 degrees F (115.6 degrees C) observed at the wellhead without documented pressure drawdown or thermal breakthrough. An estimated initial reservoir temperature of approx. 260degreesF (126.7 degrees C) has been observed in the field and history-matched in a wellbore production analysis and reservoir simulation. Our objective was to develop a conceptual geological model of the subsurface, simulate a natural-state reservoir, model production scenarios, and complete a technical feasibility analysis to accomplish this task. Through extensive modeling and the use of available proprietary and public data, it was possible simulate three scenarios that indicated minimal thermal decline over the duration of a simulated ten-year production and re-injection scheme.

Blackburn Nevada↗

Geothermal Reservoir Simulation Analysis in Support of Electricity Co-Production Feasibility Study at the Blackburn Oil Field, Nevada

Geothermal electricity co-production is a viable option for oil reservoirs producing large water cuts with elevated wellhead temperatures. Repurposing existing oil wells significantly reduces initial investment costs historically associated with geothermal resource utilization. The National Renewable Energy Laboratory (NREL), partnering with Gradient Geothermal, Inc. (formerly known as Transitional Energy) and Grant Canyon Oil and Gas, has been tasked to evaluate the feasibility of geothermal electricity co-production at the Blackburn Oil Field with Organic Rankine Cycle (ORC) generators. The Devonian steady-state reservoir has historically been producing high water cuts of 240 degrees F (115.6 degrees C) observed at the wellhead without documented pressure drawdown or thermal breakthrough. An estimated initial reservoir temperature of approx. 260 degrees F (126.7 degrees C) has been observed in the field and history-matched in a wellbore production analysis and reservoir simulation. Our objective was to develop a conceptual geological model of the subsurface, simulate a natural-state reservoir, model production scenarios, and complete a technical feasibility analysis to accomplish this task. Through extensive modeling and the use of available proprietary and public data, it was possible simulate three scenarios that indicated minimal thermal decline over the duration of a simulated ten-year production and re-injection scheme.

Blackburn Nevada↗

Modeling Leadership Styles in Human-Robot Team Dynamics

The recent proliferation of robotic systems in our society has placed questions regarding interaction between humans and intelligent machines at the forefront of robotics research. In response, our research attempts to understand the context in which particular types of interaction optimize efficiency in tasks undertaken by human-robot teams. It is our conjecture that applying previous research results regarding leadership paradigms in human organizations will lead us to a greater understanding of the human-robot interaction space. In doing so, we adapt four leadership styles prevalent in human organizations to human-robot teams. By noting which leadership style is more appropriately suited to what situation, as given by previous research, a mapping is created between the adapted leadership styles and human-robot interaction scenarios-a mapping which will presumably maximize efficiency in task completion for a human-robot team. In this research we test this mapping with two adapted leadership styles: directive and transactional. For testing, we have taken a virtual 3D interface and integrated it with a genetic algorithm for use in &le-operation of a physical robot. By developing team efficiency metrics, we can determine whether this mapping indeed prescribes interaction styles that will maximize efficiency in the teleoperation of a robot.

Cruz, Gerardo E.↗

Inflight evaluation of pilot workload measures for rotorcraft research

The effectiveness of heart-rate monitoring and the NASA TLX workload rating scale (Hart et al., 1985) in measuring helicopter-pilot workloads is investigated experimentally. Four NASA test pilots flew two 2-h missions each in an SH-3G helicopter, following scenarios with takeoff, hover, cross-country, and landing tasks; pilot performance on the tasks undertaken near the landing area was measured by laser tracking. The results are presented in graphs and discussed in detail, and it is found that the TLX ratings clearly distinguish the flight segments and are well correlated with the performance data. The mean heart rate (measured as interbeat interval) is correlated (r = -0.69) with the TLX workload, but only the standard deviation of the interbeat interval is able to distinguish between flight segments; the correlation between standard deviation and TLX ratings is negative but not significant.

Shively, Robert J.↗

Pilot Convective Weather Decision Making in En Route Airspace

The present research investigates characteristics exhibited in pilot convective weather decision making in en route airspace. In a part-task study, pilots performed weather avoidance under various encounter scenarios. Results showed that the margins of safety that pilots maintain from storms are as fluid as deviation decisions themselves.

Wu, Shu-Chieh↗

Credibility Assessment and Evaluation of the Astronaut Musculoskeletal Boot/Ankle Injury Scenario Using Open SIM(TM) Computational Modeling

The musculoskeletal system of astronauts is subject to physiological changes, potentially leading to injuries due to the exposure to different gravitational environments experienced during spaceflight. These injuries can occur while an astronaut is performing an extravehicular activity (EVA) in space, on lunar or planetary surfaces or while wearing a spacesuit during terrestrial training for an EVA. One area of concern are injuries occurring at the feet and ankles due to a poor fit of the spacesuit boot. These injuries can occur if the boot does not support the ankle sufficiently and the astronaut steps awkwardly, twisting the ankle or foot, during an EVA. The OpenSimTM software can assess EVA induced musculoskeletal injuries for muscle strains, ligament injuries and joint injuries. A modeling and simulation credibility assessment of the OpenSim musculoskeletal modeling and simulation procedures, applied to the boot/ankle injury scenario injury mechanisms that may occur while carrying out tasks in these environments, is performed. These modeling and simulation credibility assessments give information on the credibility of the model’s use in simulating foot/ankle related injury mechanisms.

C A Gallo↗

Structural technology challenges for evolutionary growth of Space Station Freedom

A proposed evolutionary growth scenario for Space Station Freedom was defined recently by a NASA task force created to study requirements for a Human Exploration Initiative. The study was an initial response to President Bush's July 20, 1989 proposal to begin a long range program of human exploration of space including a permanently manned lunar base and a manned mission to Mars. This growth scenario evolves Freedom into a critical transportation node to support lunar and Mars missions. The growth scenario begins with the Assembly Complete configuration and adds structure, power, and facilities to support a Lunar Transfer Vehicle (LTV) verification flight. Evolutionary growth continues to support expendable, then reusable LTV operations, and finally, LTV and Mars Transfer Vehicle (MTV) operations. The significant structural growth and additional operations creating new loading conditions will present new technological and structural design challenges in addition to the considerable technology requirements of the baseline Space Station Freedom program. Several structural design and technology issues of the baseline program are reviewed and related technology development required by the growth scenario is identified.

Doiron, Harold H.↗

Development of the Suited Injury Modes and Effects Analysis for Identification of Top Injury Risks in Lunar Missions and Training

A new Exploration Extravehicular Activity Suit (xEVAS) is being designed to replace the current Extravehicular Mobility Unit (EMU) for the National Aeronautics and Space Administration’s (NASA’s) Artemis program to return astronauts to the lunar surface. This new suit will allow for increased range of motion compared the current EMU and Apollo era suits and will have additional features that will enhance the health and safety of exploration. With the design of lunar missions and the xEVAS progressing, it is important to consider possible injuries and injury mechanisms that could occur in the suit. To address these concerns, the suited Injury Modes and Effects Analysis (IMEA) was developed to outline suited injury scenarios and rank them based on risk score. The IMEA documents possible scenarios and underlying mechanisms of injury while wearing an extravehicular activity (EVA) suit. Tasks during lunar surface EVA as well as training events to prepare for lunar missions were considered as history has shown that more suit injuries occur during training than in flight. Each scenario is ranked with a consequence and likelihood scoring based on our current understanding of the suit and Artemis design reference missions to identify high-risk cases that will drive further work in suited injury. Injuries, mechanisms of injury, and mitigation strategies are evaluated within each scenario. The Suited Injury Summit was held on January 5, 2022, to vet the IMEA with external experts. This was an all-day virtual meeting with the suited injury team, ergonomists, suit engineers, safety engineers, the flight operations directorate, flight doctors, astronauts, astronaut strength, conditioning, and rehabilitation specialists (ASCRS), and external subject matter experts (SMEs). External SMEs consisted of surgeons with varying specialties. The intent of this meeting was to walk through the top injury risks identified in the analysis, identify any gaps that were not captured, and discuss mitigations. With participation from all groups, countless lessons-learned came from the Summit meeting. Using the lessons-learned and discussion from the Summit, the top 10 risks have been identified: neutral buoyancy laboratory training, hand/glove injuries, poor suit fit, field training, specific EVA tasks/design of task, boots/ankle injuries, falls from heights, background radiation, repetitive contact, and ambulation/long-distance ambulation. Mitigation steps have also been determined for each of the top risks. The IMEA and documentation of top risks is a living document. Yearly meetings are planned to update the analysis and reevaluate top risks and mitigations. The IMEA is being used to drive work in suited injury, and this work will continue to evolve with IMEA and lunar mission updates.

Teresa Reiber↗

Development of the Suited Injury Modes and Effects Analysis for Identification of Top Injury Risks in Lunar Missions and Training

A new Exploration Extravehicular Activity Suit (xEVAS) is being designed to replace the current Extravehicular Mobility Unit (EMU) for the National Aeronautics and Space Administration’s (NASA’s) Artemis program to return astronauts to the lunar surface. This new suit will allow for increased range of motion compared the current EMU and Apollo era suits and will have additional features that will enhance the health and safety of exploration. With the design of lunar missions and the xEVAS progressing, it is important to consider possible injuries and injury mechanisms that could occur in the suit. To address these concerns, the suited Injury Modes and Effects Analysis (IMEA) was developed to outline suited injury scenarios and rank them based on risk score. The IMEA documents possible scenarios and underlying mechanisms of injury while wearing an extravehicular activity (EVA) suit. Tasks during lunar surface EVA as well as training events to prepare for lunar missions were considered as history has shown that more suit injuries occur during training than in flight. Each scenario is ranked with a consequence and likelihood scoring based on our current understanding of the suit and Artemis design reference missions to identify high-risk cases that will drive further work in suited injury. Injuries, mechanisms of injury, and mitigation strategies are evaluated within each scenario. The Suited Injury Summit was held on January 5, 2022, to vet the IMEA with external experts. This was an all-day virtual meeting with the suited injury team, ergonomists, suit engineers, safety engineers, the flight operations directorate, flight doctors, astronauts, astronaut strength, conditioning, and rehabilitation specialists (ASCRS), and external subject matter experts (SMEs). External SMEs consisted of surgeons with varying specialties. The intent of this meeting was to walk through the top injury risks identified in the analysis, identify any gaps that were not captured, and discuss mitigations. With participation from all groups, countless lessons-learned came from the Summit meeting. Using the lessons-learned and discussion from the Summit, the top 10 risks have been identified: neutral buoyancy laboratory training, hand/glove injuries, poor suit fit, field training, specific EVA tasks/design of task, boots/ankle injuries, falls from heights, background radiation, repetitive contact, and ambulation/long-distance ambulation. Mitigation steps have also been determined for each of the top risks. The IMEA and documentation of top risks is a living document. Yearly meetings are planned to update the analysis and reevaluate top risks and mitigations. The IMEA is being used to drive work in suited injury, and this work will continue to evolve with IMEA and lunar mission updates.

Tessa Reiber↗

The reliability and validity of flight task workload ratings

Twelve instrument-rated general aviation pilots each flew two scenarios in a motion-base simulator. During each flight, the pilots verbally estimated their workload every three minutes. Following each flight, they again estimated workload for each flight segment and also rated their overall workload, perceived performance, and 13 specific factors on a bipolar scale. The results indicate that time (a priori, inflight, or postflight) of eliciting ratings, period to be covered by the ratings (a specific moment in time or a longer period), type of rating scale, and rating method (verbal, written, or other) may be important variables. Overall workload ratings appear to be predicted by different specific scales depending upon the situation, with activity level the best predictor. Perceived performance seems to bear little relationship to observer-rated performance when pilots rate their overall performance and an observer rates specific behaviors. Perceived workload and performance also seem unrelated.

Childress, M. E.↗

STITCHES: a Python package to amalgamate existing Earth system model output into new scenario realizations

Understanding the interaction between humans and the Earth system is a computationally daunting task, with many possible approaches depending on resources available and questions of interest. For example, state-of-the-art impact models require decade-long time series of relatively high frequency, spatially resolved and often multiple variables representing climatic impact-drivers (Ruane et al., 2022). Most commonly these are derived from the outputs of detailed, computationally expensive Earth System Models (ESMs) run according to a standard, limited set of future scenarios, the latest being the SSP-RCPs run under CMIP6/ScenarioMIP (Eyring et al., 2016; O’Neill et al., 2016). At the time of writing, O’Neill et al. (2016) has been cited more than 1750 times and Eyring et al. (2016) more than 5000 times, highlighting the broad, general applications of this data. Often, however, impact modeling seeks to explore new scenarios that were not part of the ScenarioMIP protocol, and/or needs a larger set of initial condition ensemble members than are typically available to quantify the effects of ESM internal variability. In addition, the recognition that the human and Earth systems are fundamentally intertwined, and may feature potentially significant feedback loops, is making integrated, simultaneous modeling of the coupled human-Earth system increasingly necessary, if computationally challenging with most existing tools (Thornton et al., 2017). For impact modelers, climate model emulators can be the answer to meet both the needs of: 1) creating realizations for novel scenarios and 2) achieving a simplified, computationally tractable representation of ESM behavior in a coupled human-Earth system modeling framework. We proposed a new, comprehensive approach to such emulation of gridded, multivariate ESM outputs for novel scenarios without the computational cost of a full ESM, STITCHES (Tebaldi et al., 2022). The approach outlined in Tebaldi et al. (2022) should be extensible to future CMIP eras, although the STITCHES software at present is strictly focused on CMIP6/ScenarioMIP data hosted on Pangeo (https://gallery.pangeo.io/repos/pangeo-gallery/cmip6/). The corresponding STITCHES Python package uses existing archives of ESMs’ scenario experiments from CMIP6/ScenarioMIP to construct gridded, multivariate realizations of new scenarios provided by reduced complexity climate models (Hartin et al., 2015; Meinshausen et al., 2011; Smith et al., 2018), or to enrich existing initial condition ensembles. Its output provides the same characteristics as the emulated ESM output: multivariate (spanning potentially all variables that the ESM has saved), spatially resolved (down to the native grid of the ESM), and preserving the same high frequency as the original data. A new realization of multiple variables can be generated on the order of minutes with STITCHES, rather than the hours or sometimes days that ESMs require.

97 MATHEMATICS AND COMPUTING↗