Wind turbine generator application places unique demands on tower design and materials
The most relevant contractual tower design requirements and goal for the Mod-1 tower are related to steel truss tower construction, cost-effective state-of-the-art design, a design life of 30 years, and maximum wind conditions of 120 mph at 30 feet elevation. The Mod-1 tower design approach was an iterative process. Static design loads were calculated and member sizes and overall geometry chosen with the use of finite element computer techniques. Initial tower dynamic characteristics were then combined with the dynamic properties of the other wind turbine components, and a series of complex dynamic computer programs were run to establish a dynamic load set and then a second tower design.