Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deployable Power Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Photovoltaic and Behind-the-Meter Battery Storage: Advanced Smart Inverter Controls and Field Demonstration

Electric utilities have little visibility of the electrical distribution system, and consequently, limited diagnostic capabilities. The distribution grid was designed for a unidirectional power flow, where energy is supplied by few large centralized power plants; however, this is set to change to meet California’s aggressive decarbonization goals. The large-scale deployment of distributed renewable generation, such as photovoltaics (PV), can have many negative effects on an unprepared grid. As illustrated in the California “duck curve,” PV generation modifies load profiles during the day, which causes steep ramping in the evening. This effect indicates the need to revise the electrical grid’s design and operation. This project sought to (a) create a centralized resource in California to test and validate distribution technology controls with industry standard PV, storage, and high-fidelity sensors, (b) support strategic and operational decisions for new grid architectures by providing simulation models, (c) promote new ways to control clusters of PV smart inverters, in accordance with California Rule 21, and (d) innovate, develop, and field test a predictive controller to maximize economic profit for the customer while supporting the grid. The controller was built using the state-of-the-art model predictive control methodology to optimally control behind-the-meter PV and battery storage. In consideration of the duck curve, the controller optimally controls the battery dispatch by charging during excess generation periods and discharging during the critical afternoon demand hours. The controller was evaluated in annual simulations and revealed the potential cost-effectiveness of behind-the-meter battery storage. The simulations showed that the annual electricity bill could be reduced by as much as 35 percent, with a payback period of the investment in battery storage in about 6 years – significantly shorter than the manufacturer’s 10-year warranty. All developed simulation models, the grid event library, and the MPC controller are open-source and available online.

Model Predictive control↗

High-Frequency Signature-Based Fault Detection for Future MV Distribution Grids: Preprint

Increased deployment of Distributed Energy Resources (DERs) and microgrids are significantly changing the operation of distribution grid. Increasing penetration of power electronics based DERs also raise several operational problems such as protection coordination issues, voltage raise, recloser synchronization, stability, and frequency control. Legacy systems are designed for unidirectional power flow. Bidirectional power flows, and varying short circuit levels are some of the major challenges in implementing these legacy protection schemes for future power grid with high penetration of power electronics based DERs. Inverter based DER’s can contribute to a maximum of 2 p.u. fault current. Interconnection standards might require even lower fault current contribution. If these protection related challenges are not addressed, it will result in limiting the penetration of DERs in distribution feeders. In this paper, the feasibility of high frequency signature generated by transients is evaluated to identify and locate faults in a distribution system. The paper will discuss the need for an accurate line modeling approach to accurately capture the high frequency signatures. These high frequency signatures are naturally occurring electromagnetic transients for events such as switching events in the network, faults events, etc. This is different than that implemented in transmission systems as the proposed approach utilizes advanced signal processing techniques to retrieve valuable information from the high frequency signatures generated during faults and does not just rely on time delay measurements between reflections of the high frequency signals. In the full paper, information of a modified IEEE distribution feeder test system to accurately model the high frequency signatures will be provided. The distribution lines will be modeled using universal line modeling (ULM) technique in an electromagnetic transients program (EMTP) modeling platform. Different test cases will be simulated and these test cases will include different fault types, multiple fault locations, capacitor bank switching, etc. The feeder system modeled for these simulations will also include power electronics based DERs. Additionally, experimental results demonstrating the high frequency signatures generated due to a transient event in a medium voltage (13.8 kV) distribution line will also be presented in the full paper. Furthermore, the analysis combined with simulation and experimental results in the full paper will help demonstrate the feasibility and efficacy of the proposed protection scheme. The developed protection scheme will not just help solve problems generated by bidirectional current flow, varying short-circuit current capacity, but also help in proliferation of DERs in distribution systems.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Electricity Capacity Expansion Modeling, Analysis, and Visualization. A Summary of High-Renewable Modeling Experience for China

Mathematical and computational models are widely used for the analysis and design of both physical and financial systems. Modeling the electric grid is of particular importance to China for three reasons. First, power-sector assets are expensive and long-lived, and they are critical to any country's development. China's electric load, transmission, and other energy-related infrastructure are expected to continue to grow rapidly; therefore it is crucial to understand and help plan for the future in which those assets will operate (NDRC ERI 2015). Second, China has dramatically increased its deployment of renewable energy (RE), and is likely to continue further accelerating such deployment over the coming decades. Careful planning and assessment of the various aspects (technical, economic, social, and political) of integrating a large amount of renewables on the grid is required. Third, companies need the tools to develop a strategy for their own involvement in the power market China is now developing, and to enable a possible transition to an efficient and high RE future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Energy Development on the FSST Reservation

FSST undertook this project to install PV solar with the goal of reducing retail power consumption at 11 Tribal buildings. A combined total of 318kW has been installed over these sites and power savings are being recorded on a regular basis. The Tribe entered into the project with several specific objectives that made this a unique effort. First of all, all of the systems were installed by Tribal maintenance personnel with some technical support. This model had been developed with previous projects that Nebraska Renewable Energy Systems (NRES) had completed and had shown great success. This approach helped to ensure we met the DOE goal of ‘building capacity’ within the Tribe. There was some skepticism about this model in Flandreau at the onset of discussions, but the excellent final results spoke for themselves! A second objective was to overcome the sore lessons that were learned after FSST invested in early deployment of pole mounted solar systems that were not sturdy enough for SD winds. It was a very courageous decision to move forward again with solar pole mounts (and other types) in this very high wind area. We shall report that the Tribe was fully successful in achieving what they set out to do there. The final major objective was to deploy the PV Solar systems in such a way as to integrate them into their surroundings wherever possible. In some cases the mounting choice was clear, but in several locations, the system was designed to be a functional and aesthetically enhancing part of their surroundings. These elevated systems allowed the PV system to act as a shade structure and create useful space under them as well as making power. FSST had these elevated ground mount systems specially designed for our application by Ironridge and were rated for the tough winds of South Dakota (120MPH+).

14 SOLAR ENERGY↗

A Framework to Design Consumer-Centric Operational Strategies for Resilience Enhancement

Extreme temperature-related events like heat waves or cold snaps can significantly stress the power distribution grid as electricity demand spikes leading to brownouts or blackouts if not managed properly. In addition, such extreme events can exacerbate inequity, with vulnerable populations (for example, houses with poor insulation, located in non-critical zones, and lack of local resources) at greater risk. There is a growing deployment of distribution systems automation technologies such as advanced metering infrastructure, sensors, and automated control systems to enhance the visibility of the entire distribution grid while meeting resilience objectives. Here, this paper proposes a framework for investigating how automation can improve the distribution system's resilience and ensure customers' health and safety during such extremes. The proposed framework's efficacy will be demonstrated for the Electricity Reliability Council of Texas (ERCOT) during winter storm Uri with varying levels of distribution automation technologies such as feeder isolation using smart switches, remote outage signals using advanced meters, and comfort-aware outage using advanced analytics and communication. Simulation results show that an outage strategy involving advanced grid technology and communication can reduce the occupant exposure to severe cold by 93% and, simultaneously, reduce expected energy not served by 73.2% when compared against feeder isolation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quality Assurance Framework for Mini-Grids

Providing clean and affordable energy services to the more than 1 billion people globally who lack access to electricity is a critical driver for poverty reduction, economic development, improved health, and social outcomes. More than 84% of populations without electricity are located in rural areas where traditional grid extension may not be cost-effective; therefore, distributed energy solutions such as mini-grids are critical. To address some of the root challenges of providing safe, quality, and financially viable mini-grid power systems to remote customers, the U.S. Department of Energy (DOE) teamed with the National Renewable Energy Laboratory (NREL) to develop a Quality Assurance Framework (QAF) for isolated mini-grids. The QAF for mini-grids aims to address some root challenges of providing safe, quality, and affordable power to remote customers via financially viable mini-grids through two key components: (1) Levels of service: Defines a standard set of tiers of end-user service and links them to technical parameters of power quality, power availability, and power reliability. These levels of service span the entire energy ladder, from basic energy service to high-quality, high-reliability, and high-availability service (often considered 'grid parity'); (2) Accountability and performance reporting framework: Provides a clear process of validating power delivery by providing trusted information to customers, funders, and/or regulators. The performance reporting protocol can also serve as a robust monitoring and evaluation tool for mini-grid operators and funding organizations. The QAF will provide a flexible alternative to rigid top-down standards for mini-grids in energy access contexts, outlining tiers of end-user service and linking them to relevant technical parameters. In addition, data generated through implementation of the QAF will provide the foundation for comparisons across projects, assessment of impacts, and greater confidence that will drive investment and scale-up in this sector. The QAF implementation process also defines a set of implementation guidelines that help the deployment of mini-grids on a regional or national scale, helping to insure successful rapid deployment of these relatively new remote energy options. Note that the QAF is technology agnostic, addressing both alternating current (AC) and direct current (DC) mini-grids, and is also applicable to renewable, fossil-fuel, and hybrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Needs for Robotic Assessments of Nuclear Disasters

Following the nuclear disaster at the Fukushima nuclear reactor plant in Japan, the need for systems which can assist in dynamic high-radiation environments such as nuclear incidents has become more apparent. The INL participated in delivering robotic technologies to Japan and has identified key components which are needed for success and obstacles to their deployment. In addition, we are proposing new work and methods to improve assessments and reactions to such events in the future. Robotics needs in disaster situations include phases such as: Assessment, Remediation, and Recovery Our particular interest is in the initial assessment activities. In assessment we need collection of environmental parameters, determination of conditions, and physical sample collection. Each phase would require key tools and efforts to develop. This includes study of necessary sensors and their deployment methods, the effects of radiation on sensors and deployment, and the development of training and execution systems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Optimal deployment of thermal energy storage under diverse economic and climate conditions

This paper presents an investigation of the economic benefit of thermal energy storage (TES) for cooling, across a range of economic and climate conditions. Chilled water TES systems are simulated for a large office building in four distinct locations, Miami in the U.S.; Lisbon, Portugal; Shanghai, China; and Mumbai, India. Optimal system size and operating schedules are determined using the optimization model DER-CAM, such that total cost, including electricity and amortized capital costs are minimized. The economic impacts of each optimized TES system is then compared to systems sized using a simple heuristic method, which bases system size as fraction (50percent and 100percent) of total on-peak summer cooling loads. Results indicate that TES systems of all sizes can be effective in reducing annual electricity costs (5percent-15percent) and peak electricity consumption (13percent-33percent). The investigation also indentifies a number of criteria which drive TES investment, including low capital costs, electricity tariffs with high power demand charges and prolonged cooling seasons. In locations where these drivers clearly exist, the heuristically sized systems capture much of the value of optimally sized systems; between 60percent and 100percent in terms of net present value. However, in instances where these drivers are less pronounced, the heuristic tends to oversize systems, and optimization becomes crucial to ensure economically beneficial deployment of TES, increasing the net present value of heuristically sized systems by as much as 10 times in some instances.

25 ENERGY STORAGE↗

Restricted Authentication and Encryption for Cyber-physical Systems

Cyber-physical systems (CPS) are characterized by the close linkage of computational resources and physical devices. These systems can be deployed in a number of critical infrastructure settings. As a result, the security requirements of CPS are different than traditional computing architectures. For example, critical functions must be identified and isolated from interference by other functions. Similarly, lightweight schemes may be required, as CPS can include devices with limited computing power. One approach that offers promise for CPS security is the use of lightweight, hardware-based authentication. Specifically, we consider the use of Physically Unclonable Functions (PUFs) to bind an access request to specific hardware with device-specific keys. PUFs are implemented in hardware, such as SRAM, and can be used to uniquely identify the device. This technology could be used in CPS to ensure location-based access control and encryption, both of which would be desirable for CPS implementations.

97 MATHEMATICS AND COMPUTING↗

Design and Instrumentation of a Measurement and Calibration System for an Acoustic Telemetry System

The Juvenile Salmon Acoustic Telemetry System (JSATS) is an active sensing technology developed by Portland District, the U.S. Army Corps of Engineers for detecting and tracking small fish. It is used at hydroelectric projects and in the laboratory for evaluating behavior and survival of juvenile salmonids migrating through the Federal Columbia River Power System to the Pacific Ocean. It provides critical data for salmon protection and development of more “fish-friendly” hydroelectric facilities. The objective of this study was to design and build a measurement and calibration system for evaluating the JSATS component, because the JSATS requires comprehensive acceptance and performance testing in a controlled environment before it is deployed in the field. The system consists of a reference transducer, a water test tank lined with anechoic material, a motion control unit, a reference receiver, a signal conditioner and amplifier unit, a data acquisition board, MATLAB control and analysis interface, and a computer. The fully integrated system has been evaluated successfully at various simulated distances and using different encoded signals at frequencies within the bandwidth of the JSATS transmitter. It provides accurate acoustic mapping capability in a controlled environment and automates the process that allows real-time measurements and evaluation of the piezoelectric transducers, sensors, or the acoustic fields. The measurement and calibration system has been in use since 2009 for acceptance and performance testing of, and further improvements to, the JSATS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a Novel Synchrophasor-based Situational Awareness System: Wide Area Power System Visualization, On-line Event Replay and Early Warning of Grid Problems

Since the large North Eastern power system blackout on August 14, 2003, U.S. electric utilities have spent lot of effort on preventing power system cascading outages. Two of the main causes of the August 14, 2003 blackout were inadequate situational awareness and inadequate operator training In addition to the enhancements of the infrastructure of the interconnected power systems, more research and development of advanced power system applications are required for improving the wide-area security monitoring, operation and planning in order to prevent large- scale cascading outages of interconnected power systems. It is critically important for improving the wide-area situation awareness of the operators or operational engineers and regional reliability coordinators of large interconnected systems. With the installation of large number of phasor measurement units (PMU) and the related communication infrastructure, it will be possible to improve the operators’ situation awareness and to quickly identify the sequence of events during a large system disturbance for the post-event analysis using the real-time or historical synchrophasor data. The purpose of this project was to develop and demonstrate a novel synchrophasor-based comprehensive situational awareness system for control centers of power transmission systems. The developed system named WASA (Wide Area Situation Awareness) is intended to improve situational awareness at control centers of the power system operators and regional reliability coordinators. It consists of following main software modules: • Wide-area visualizations of real-time frequency, voltage, and phase angle measurements and their contour displays for security monitoring. • Online detection and location of a major event (location, time, size, and type, such as generator or line outage). • Near-real-time event replay (in seconds) after a major event occurs. • Early warning of potential wide-area stability problems. The system has been deployed and demonstrated at the Tennessee Valley Authority (TVA) and ISO New England system using real-time synchrophasor data from openPDC. Apart from the software product, the outcome of this project consists of a set of technical reports and papers describing the mathematical foundations and computational approaches of different tools and modules, implementation issues and considerations, lessons learned, and the results of lidation processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Identifiability of Power Distribution Network Topologies With Limited Monitoring

Recovering the distribution grid topology in real time is essential to perform several distribution system operator (DSO) functions. DSOs often do not have any direct monitoring of switch statuses to track reconfiguration. At the same time, installing real-time meters at a large number of buses is challenging due to the cost of endowing every metered bus with a real-time communication channel. The goal of this letter is to develop a meter placement strategy allowing DSOs to deploy only few real-time meters. After casting the topology recovery task as an optimization problem, a meter placement strategy ensuring unique recovery of the true topology is devised. A graph-theoretical approach is pursued to partition the grid into connected portions called observable islands . The proposed strategy then simply requires installing a meter in the path between every pair of boundary nodes , i.e., ends of edges connecting two different islands. Under some ideal assumptions, this placement strategy ensures unique recovery of the topology. The approach is also validated through numerical simulations under realistic scenarios using a standard IEEE benchmark feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Results of the engineering run of the Coherent Neutrino Nucleus Interaction Experiment (CONNIE)

The CONNIE detector prototype is operating at a distance of 30 m from the core of a 3.8 GW(th) nuclear reactor with the goal of establishing Charge-Coupled Devices (CCD) as a new technology for the detection of coherent elastic neutrino-nucleus scattering. We report on the results of the engineering run with an active mass of 4 g of silicon. The CCD array is described, and the performance observed during the first year is discussed. A compact passive shield was deployed around the detector, producing an order of magnitude reduction in the background rate. The remaining background observed during the run was stable, and dominated by internal contamination in the detector packaging materials. The in-situ calibration of the detector using X-ray lines from fluorescence demonstrates good stability of the readout system. The event rates with the reactor ON and OFF are compared, and no excess is observed coming from nuclear fission at the power plant. The upper limit for the neutrino event rate is set two orders of magnitude above the expectations for the standard model. The results demonstrate the cryogenic CCD-based detector can be remotely operated at the reactor site with stable noise below 2 e – RMS and stable background rates. In conclusion, the success of the engineering test provides a clear path for the upgraded 100 g detector to be deployed during 2016.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Best Practices Handbook for the Collection and Use of Solar Resource Data for Solar Energy Applications: Third Edition

As the world looks for low-carbon sources of energy, solar power stands out as the single most abundant energy resource on Earth. Harnessing this energy is the challenge for this century. Photovoltaics, solar heating and cooling, and concentrating solar power (CSP) are primary forms of energy applications using sunlight. These solar energy systems use different technologies, collect different fractions of the solar resource, and have different siting requirements and production capabilities. Reliable information about the solar resource is required for every solar energy application. This holds true for small installations on a rooftop as well as for large solar power plants; however, solar resource information is of particular interest for large installations because they require substantial investment, sometimes exceeding 1 billion dollars in construction costs. Before such a project is undertaken, the best possible information about the quality and reliability of the fuel source must be made available. That is, project developers need reliable data about the solar resource available at specific locations, including historic trends with seasonal, daily, hourly, and (preferably) subhourly variability to predict the daily and annual performance of a proposed power plant. Without these data, an accurate financial analysis is not possible. Additionally, with the deployment of large amounts of distributed photovoltaics, there is an urgent need to integrate this source of generation to ensure the reliability and stability of the grid. Forecasting generation from the various sources will allow for larger penetrations of these generation sources because utilities and system operators can then ensure stable grid operations. Developed by the foremost experts in the field who have come together under the umbrella of the International Energy Agency’s Solar Heating and Cooling Task 46, this handbook summarizes state-of-the-art information about all these topics.

14 SOLAR ENERGY↗

Data-Driven Simulation-Based Planning for Electric Airport Shuttle Systems: A Real-World Case Study

Many airports are adopting battery electric buses in their shuttle fleets due to concerns over air quality and regulations. This study proposes a simulation-based optimization modeling framework to help airport shuttle operators effectively deploy electric buses. We evaluated a planned airport electric shuttle system with an event-driven simulator. Empirical data collected from existing systems were used to drive the simulations. We then proposed a simulation-based optimization model to determine the battery capacity, charging power, and number of chargers so that predefined objective(s) (e.g., minimizing total capital cost, minimizing emissions) are optimized. Compared to existing studies, the primary contribution of the proposed method is that it can model the real-world stochastic nature of operations in an electric bus system with much higher fidelity. To demonstrate the proposed modeling framework, we study a real-world shuttle system at the Dallas-Fort Worth International Airport, and present extensive numerical studies. When considering partial fleet electrification, the model can provide a set of Pareto optimal solutions. When considering full fleet electrification, the optimal solution requires a 50-kWh battery capacity and four 210-kW chargers, resulting in a total capital cost of $26,744,000. The results demonstrate that the proposed modeling framework can effectively optimize the planning of electric airport shuttle systems with partial or full fleet electrification.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Dynamic Model Validation of PV Inverters Under Short-Circuit Conditions: Preprint

Photovoltaic (PV) modules have dramatically decreased in price in the past few years, spurring the expansion of photovoltaic deployment. Residential and commercial rooftop installations are connected to the distribution network; large-scale installation PV power plants (PVPs) have benefited from tax incentives and the low cost of PV modules. As the level penetration of PV generation increases, the impact on power system reliability will also be greater. Utility power system planners must consider the role of PV generation in power systems more realistically by representing PV generation in dynamic stability analyses. Dynamic models of PV inverters have been developed in the positive sequence representation. NREL has developed a PV inverter dynamic model in PSCAD/EMTDC. This paper validates the dynamic model with an actual hardware bench test conducted by Southern California Edison's Distributed Energy Resources laboratory. All the fault combinations -- symmetrical and unsymmetrical -- were performed in the laboratory. We compare the simulation results with the bench test results.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Vincent Mullins Landfill in Tucson, Arizona

The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vincent Mullins Landfill in Tucson, Arizona, for a feasibility study of renewable energy production. Under the RE-Powering America's Land initiative, the EPA provided funding to the National Renewable Energy Laboratory (NREL) to support the study. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this report is to assess the site for a possible PV installation and estimate the cost and performance of different PV configurations, as well as to recommend financing options that could assist in the implementation of a PV system. In addition to the Vincent Mullins site, four similar landfills in Tucson are included as part of this study. The feasibility of a PV system depends greatly on both site-specific and economic factors. Site specific factors include the available area for an array, solar resource, distance to transmission lines, and distance to major roads. In addition, the operating status, ground conditions, and restrictions associated with redevelopment of contaminated sites impact the feasibility of a PV system. Economic factors include purchase price of the electricity produced, power purchase agreement (PPA) price, and retail electric rates along with federal, state, and utility incentives for PV systems. Based on an assessment of these factors, the Vincent Mullins Landfill and other closed landfills in Tucson were found to be suitable sites for deployment of utility-scale PV systems. This study evaluated two development scenarios for implementing large-scale PV systems on Tucson’s landfills—one in which the city owns and operates the system, and one where a private entity is allowed to develop the site using a PPA. Table ES-1 summarizes the predicted economics of the two scenarios along with the system size, energy production, and cost.

14 SOLAR ENERGY↗

Multiscale Electricity Modeling for Evaluating Carbon Capture and Sequestration Technologies (Final Report)

Carbon capture and sequestration (CCS) technologies that can operate with a high degree of operating flexibility could provide necessary electric grid flexibility in a system with high shares of variable renewables. This project examines the deployment and dispatch potential of twelve unique flexible CCS (FLECCS) technologies that encompass post-combustion carbon dioxide (CO 2 ) capture designs, concepts using a storage media to enable energy arbitrage, and hybrid processes that integrate CCS with direct air capture (DAC) for flexibility with net zero or negative CO 2 emissions. FLECCS technology potential is explored with a multi-model, multi-scale framework including the Regional Energy Deployment System (ReEDS) electric sector capacity expansion model (CEM) and the PLEXOS production cost model (PCM). Innovative methods were developed to represent FLECCS technology operating modes, performance, and cost in the two models. ReEDS was then used to simulate nine scenarios for each FLECCS technology, three CO 2 emissions price futures reaching $\$$150, $\$$225, and $\$$300/tCO 2 in 2050; and three scenarios for FLECCS technology deployment favorability relative to competing technologies. For each CO 2 price and reference FLECCS favorability, the 2050 infrastructures from ReEDS model are downscaled and implemented in PLEXOS to examine hourly dispatch under detailed operational constraints that are not included in ReEDS. FLECCS technologies exhibited a wide range of deployment potential ranging from none to several hundred gigawatts of capacity, with outcomes highly sensitive to input cost and performance parameters that are inherently highly uncertain. When deployed, FLECCS tended to displace a combination of wind, solar, and natural gas-based technologies rather than supporting increased renewable deployment. As a result, CO 2 emissions reductions facilitated by FLECCS deployment tended to come with higher overall system costs and electricity prices. When economically competitive, FLECCS technologies can contribute significant flexible generation and firm capacity to the grid, but continued technology development and an expanded analytical scope are necessary to fully understand FLECCS deployment potential its impact on the electric power sector. Follow-on analysis incorporating captured CO 2 tax credit value from the Inflation Reduction Act (IRA) and other potential policy scenarios could be particularly valuable, as this policy can substantially change the relative competitiveness of FLECCS technologies.

03 NATURAL GAS↗