Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Direction on characterization of fuel debris for defueling process in Fukushima Daiichi Nuclear Power Station

For the decommissioning of Fukushima Daiichi Nuclear Power Station (1F), defueling of the fuel debris in the reactor core of Units 1-3 is planned to start within 10 years. Preferential items in the characterization of the fuel debris were identified for this work, in which the procedure and handling tools were assumed on the basis of information on 1F and experience after the Three Mile Island Unit 2 (TMI-2) accident. The candidates for defueling tools for 1F were selected from among the TMI- 2 defueling tools. It was found that they could be categorized into six groups according to their operating principles. The important properties of the fuel debris for defueling were selected considering the effect of the target materials on the tool performance. The selected properties are shape, size, density, thermal conductivity, heat capacity, melting point, hardness, elastic modulus, and fracture toughness. Of these properties, the mechanical properties (hardness, elastic modulus, fracture toughness) were identified as preferential items, because too few data on these characteristics of fuel debris are available in past severe accident studies. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

The U.S. Nuclear Regulatory Commission has developed regulations regarding the siting and design of nuclear power plants (NPPs) that are aimed at addressing various natural hazards, including flooding. Flood barriers are designed to prevent water from entering NPP areas containing structures, systems, and components (SSCs) important to safety. The barriers are used at NPPs along with drains, sumps, pumps, valves, plugs, and site grading as part of the plant flood protection features that protect SSCs from experiencing external or internal flooding and mitigate the effects of flooding on NPP operations. The performance of flood protection features, including flood barriers at NPPs, has been an ongoing concern. Domestic and international operational experience provides clear indications that flood barrier performance has significant safety implications, especially for aging NPPs. The observed deficiencies show that flood barriers should be designed and installed properly, then adequately tested, inspected, and maintained in order to ensure that they perform their intended functions during flooding events. Here, this paper reviews available information related to flood barriers employed at U.S. NPPs and provides an overview and categorization of NPP flood barriers. It identifies potential domestic and international flood barrier testing facilities, including operating and decommissioned U.S. NPPs. Finally, this paper presents the technical and logistical considerations that should be made when developing specific testing strategies and protocols for flood barriers, such as the selection of flood barriers, test locations, testing approach, performance criteria, and testing parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overview of IAEA MODARIA II Program Working Group 1 on Assessment and Decision Making of Existing Exposure Situations for NORM and Nuclear Legacy Sites - 18308

The International Atomic Energy Agency (IAEA) launched the Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme in October. As part of the IAEA effort to enhance the capabilities of its Member States in assessing radiological impacts of radionuclides released to the environment from sites that were not operated in accordance with current standards, and to ensure protection of the public and the environment, the MODARIA II Programme aims to: (1) test the performance of models developed for predicting the transfer of radionuclides in the environment and assessing radiological impacts to the public and the environment; (2) develop and improve models for particular environments and, where appropriate, to agree on data sets that are generally applicable for use in testing environmental transfer models; and (3) provide an international forum for the exchange of experiences, ideas and research information. The Programme will run for 3 years from 2016 to 2019. The Programme comprises seven working groups covering a wide range of topics (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129). MODARIA II Working Group 1 (WG1) is focused on dose assessment and decision making regarding existing exposure situations due to naturally occurring radioactive material (NORM) and nuclear legacy sites. WG1 was formed as a combination of two MODARIA I WGs: WG1 focused on application of decision-aiding tools in remediation; and WG3 focused on risk assessment for NORM and radioactively contaminated legacy sites (https://wwwns.iaea.org/projects/modaria/default.asp?s=8 and l=129). It was recognized that the decision-making needs will inform the scope of risk assessments, and the risk insights and structured decision analyses will aid in informed decision-making. Therefore, MODARIA II WG1 is focused on developing methods and toolsets for risk-informed decision-making for NORM and nuclear legacy sites, including demonstration of decision-making processes and tools through case studies. MODARIA II WG1 has 91 registered participants from 33 Member States and IAEA (as of November 2017), some 30 of whom are actively engaged in various collaborative research and development activities within WG1. Members of WG1 participated in the First Technical Meeting of MODARIA II, which was held in Vienna, Austria from 31 October to 4 November 2016. The group then held its First Interim Meeting in Brussels, Belgium from 26 to 30 June 2017, which included a field trip to the legacy Tessenderlo Chemie (TCH) Phosphate Processing Site. At this meeting, the TCH Site and the Pridneprovsky Chemical Plant (PChP) in Ukraine were selected for case studies. The Los Alamos National Laboratory (LANL) Material Disposal Area B in the USA and the Beaverlodge Uranium Mill and Mill Site in northern Canada were selected as examples for sharing of good practices and lessons learned in risk-informed decision-making for environmental remediation and land conveyance. At the Second Technical Meeting held in Vienna on 30 October to 3 November 2017, an additional NORM site for tin processing in Brazil was added to the case studies, with another NORM site in Yunnan, China included for consideration at the Second Interim Meeting of WG1. The Second Interim Meeting will be held in in early to mid-May, 2018. The group has also decided to prepare an Interim Report by October 2018 to document the WG1 discussions and analyses for the period of 2016-2018, which will be finalized at the conclusion of MODARIA II in October 2019. Initial assignments have been discussed for IM1 participants to collect data, conduct modelling and analyses, and prepare draft sections for the Interim Report. This paper will provide an overview of the work plans for WG1. It will also highlight some near-term activities that the group is currently working on. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating the Decommissioning of the Sellafield Pile Fuel Storage Pond Using Innovative Remote Tooling Developed with the Supply Chain - 16437

The Pile Fuel Storage Pond (PFSP) at Sellafield and adjoining de-canning building provided the storage, cooling and de-canning facility for used fuel and isotopes from the two Windscale reactors and later some Magnox fuel from the Calder Hall reactors. Operations ceased in the 1970's and the facilities are now undergoing a programme of accelerated decommissioning. The pond is a sub-divided outdoor storage pond containing skips of irradiated fuel and miscellaneous waste items and the building contains a series of sub-ponds, known as bays, connected underwater to the main pond. The radiation environment and access limitations necessitate the use of remote technology for the decommissioning programme. This paper describes the philosophy and approach and the technology and equipment adopted for the removal and export of key plant equipment and waste items from within the PFSP. In order to progress the project cost effectively and speedily, the Sellafield project team looked for partners in the supply chain with the required experience, expertise and facilities to supply and test 'commercial off-the-shelf' (COTS) or modified proprietary equipment. This COTS approach minimised the need for multiple, expensive and lengthy design and manufacturing tasks associated with bespoke equipment. Sellafield partnered with specialist remote handling contractor, James Fisher Nuclear, and the respective project teams worked closely together at every stage of the project from qualifying requirements, identifying potential solutions, through to development, testing, training and final deployment. Optioneering of potential solutions involved early 'proof of principle' trials in JFN rig hall facilities, utilising existing equipment and plant mock-ups, along with other equipment manufactured in-house. Together the project teams selected the best solution to take forward, adopting a practical and trials based approach, which allowed rapid and cost effective modification of the solution throughout the project with minimal impact on the programme. When the final solution was validated, plant operators then gained familiarity and training on the equipment so they could execute the work efficiently on plant and so minimise their dose uptake. The removal of a Large De-canner is described in detail. This was a significant obstruction to the emptying, modification and re-use of the bay and a key milestone in the clean-up of the PFSP. The de-canners are large and heavy pieces of equipment which weigh 6.5 t each and approximately 6.5 m long. Their removal was further complicated by limited equipment and man access, radiological contamination from de-canning fuel, challenging material properties, unknown equipment condition and complex lifting requirements. Sellafield Ltd and JFN project teams worked closely together to rapidly develop, trial and deploy a succession of adapted 'commercial off-the-shelf' (COTS) tools whilst addressing emerging challenges and completing the overall task on time and budget. The Sellafield and JFN project and design teams provided an underwater: wheel stop removal tool; towing trolley; grinder on a carbon fibre pole, chute cutting 600 mm circular saw and hydraulic 6 t winch. The suite of tools will be reused on the remaining de-canners in the PFSP and First Generation Magnox Fuel Storage Pond (FGMSP) giving cost and programme savings. Each of the tools can also be used, and some have already been, for other tasks in the bay retrievals such as the size reduction of support frames, large steel sections and chemical de-canner preparatory works. The 'learning from experience' acquired during the project was shared by the Sellafield project with other decommissioning projects across the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completion of the first NGNP Advanced Gas Reactor Fuel Irradiation Experiment, AGR-1, in the Advanced Test Reactor

The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating up to seven separate low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). The ATR has a long history of irradiation testing in support of reactor development and the INL has been designated as the United States Department of Energy’s lead laboratory for nuclear energy development. The ATR is one of the world’s premiere test reactors for performing long term, high flux, and/or large volume irradiation test programs. These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States, and will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the irradiation experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of at least six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and completed a very successful irradiation in early November 2009. The design of AGR-1 test train and support systems used to monitor and control the experiment during irradiation will be discussed and the results of the experiment will be presented. The second experiment (AGR-2) is currently being assembled, and the status as well as the new fuel and irradiation conditions for that experiment will also be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear photonics

With the planned new {gamma}-beam facilities like MEGa-ray at LLNL (USA) or ELI-NP at Bucharest (Romania) with 10{sup 13}{gamma}/s and a band width of {Delta}E{gamma}/E{gamma} Almost-Equal-To 10{sup -3}, a new era of {gamma} beams with energies up to 20MeV comes into operation, compared to the present world-leading HI{gamma}S facility at Duke University (USA) with 10{sup 8}{gamma}/s and {Delta}E{gamma}/E{gamma} Almost-Equal-To 3 Dot-Operator 10{sup -2}. In the long run even a seeded quantum FEL for {gamma} beams may become possible, with much higher brilliance and spectral flux. At the same time new exciting possibilities open up for focused {gamma} beams. Here we describe a new experiment at the {gamma} beam of the ILL reactor (Grenoble, France), where we observed for the first time that the index of refraction for {gamma} beams is determined by virtual pair creation. Using a combination of refractive and reflective optics, efficient monochromators for {gamma} beams are being developed. Thus, we have to optimize the total system: the {gamma}-beam facility, the {gamma}-beam optics and {gamma} detectors. We can trade {gamma} intensity for band width, going down to {Delta}E{gamma}/E{gamma} Almost-Equal-To 10{sup -6} and address individual nuclear levels. The term 'nuclear photonics' stresses the importance of nuclear applications. We can address with {gamma}-beams individual nuclear isotopes and not just elements like with X-ray beams. Compared to X rays, {gamma} beams can penetrate much deeper into big samples like radioactive waste barrels, motors or batteries. We can perform tomography and microscopy studies by focusing down to {mu}m resolution using Nuclear Resonance Fluorescence (NRF) for detection with eV resolution and high spatial resolution at the same time. We discuss the dominating M1 and E1 excitations like the scissors mode, two-phonon quadrupole octupole excitations, pygmy dipole excitations or giant dipole excitations under the new facet of applications. We find many new applications in biomedicine, green energy, radioactive waste management or homeland security. Also more brilliant secondary beams of neutrons and positrons can be produced.

43 PARTICLE ACCELERATORS↗

The LHC Compact Muon Solenoid experiment detector control system

The Compact Muon Solenoid (CMS) experiment at CERN is a multi-purpose experiment designed to exploit the physics of proton-proton collisions at the Large Hadron Collider collision energy (14TeV at centre of mass) over the full range of expected luminosities (up to 10(34)cm(-')(2)s(-')(1)). The CMS detector control system (DCS) ensures a safe, correct and efficient operation of the detector so that high quality physics data can be recorded. The system is also required to operate the detector with a small crew of experts who can take care of the maintenance of its software and hardware infrastructure. The subsystems size sum up to more than a million parameters that need to be supervised by the DCS. A cluster of roughly 100 servers is used to provide the required processing resources. A scalable approach has been chosen factorizing the DCS system as much as possible. CMS DCS has made clear a division between its computing resources and functionality by creating a computing framework allowing plugging in of functional components. DCS components are developed by the subsystems expert groups while the computing infrastructure is developed centrally. To ensure the correct operation of the detector, DCS organizes the communication between the accelerator and the experiment systems making sure that the detector is in a safe state during hazardous situations and is fully operational when stable conditions are present. This paper describes the current status of the CMS DCS focusing on operational aspects and the role of DCS in this communication.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Developing small vacuum spark as an x-ray source for calibration of an x-ray focusing crystal spectrometer

A new technique of x-ray focusing crystal spectrometers' calibration is the desired result. For this purpose the spectrometer is designed to register radiated copper K{alpha} and K{beta} lines by using a flat {alpha}-quartz crystal. This experiment uses pre-breakdown x-ray emissions in low vacuum of about 2.5-3 mbar. At this pressure the pinch will not form so the plasma will not radiate. The anode material is copper and the capacity of the capacitor bank is 22.6 nF. This experiment designed and mounted a repetitive triggering system to save the operator time making hundreds of shots. This emission amount is good for calibration and geometrical adjustment of an optical crystal x-ray focusing spectrometer.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A three-layer magnetic shielding for the MAIUS-1 mission on a sounding rocket

Bose-Einstein-Condensates (BECs) can be used as a very sensitive tool for experiments on fundamental questions in physics like testing the equivalence principle using matter wave interferometry. Since the sensitivity of these experiments in ground-based environments is limited by the available free fall time, the QUANTUS project started to perform BEC interferometry experiments in micro-gravity. After successful campaigns in the drop tower, the next step is a space-borne experiment. The MAIUS-mission will be an atom-optical experiment that will show the feasibility of experiments with ultra-cold quantum gases in microgravity in a sounding rocket. The experiment will create a BEC of 10{sup 5} {sup 87}Rb-atoms in less than 5 s and will demonstrate application of basic atom interferometer techniques over a flight time of 6 min. The hardware is specifically designed to match the requirements of a sounding rocket mission. Special attention is thereby spent on the appropriate magnetic shielding from varying magnetic fields during the rocket flight, since the experiment procedures are very sensitive to external magnetic fields. A three-layer magnetic shielding provides a high shielding effectiveness factor of at least 1000 for an undisturbed operation of the experiment. The design of this magnetic shielding, the magnetic properties, simulations, and tests of its suitability for a sounding rocket flight are presented in this article.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The FERMI@Elettra free-electron-laser source for coherent X-ray physics: photon properties, beam transport system, and applications

FERMI@Elettra is comprised of two free electron lasers (FELs) that will generate short pulses (tau ~;; 25 to 200 fs) of highly coherent radiation in the XUV and soft X-ray region. The use of external laser seeding together with a harmonic upshift scheme to obtain short wavelengths will give FERMI@Elettra the capability to produce high quality, longitudinal coherent photon pulses. This capability together with the possibilities of temporal synchronization to external lasers and control of the output photon polarization will open new experimental opportunities not possible with currently available FELs. Here we report on the predicted radiation coherence properties and important configuration details of the photon beam transport system. We discuss the several experimental stations that will be available during initial operations in 2011, and we give a scientific perspective on possible experiments that can exploit the critical parameters of this new light source.

36 MATERIALS SCIENCE↗

Model-based feasibility assessment and evaluation of prostate hyperthermia with a commercial MR-guided endorectal HIFU ablation array

Purpose: Feasibility of targeted and volumetric hyperthermia (40–45 °C) delivery to the prostate with a commercial MR-guided endorectal ultrasound phased array system, designed specifically for thermal ablation and approved for ablation trials (ExAblate 2100, Insightec Ltd.), was assessed through computer simulations and tissue-equivalent phantom experiments with the intention of fast clinical translation for targeted hyperthermia in conjunction with radiotherapy and chemotherapy. Methods: The simulations included a 3D finite element method based biothermal model, and acoustic field calculations for the ExAblate ERUS phased array (2.3 MHz, 2.3 × 4.0 cm{sup 2}, ∼1000 channels) using the rectangular radiator method. Array beamforming strategies were investigated to deliver protracted, continuous-wave hyperthermia to focal prostate cancer targets identified from representative patient cases. Constraints on power densities, sonication durations and switching speeds imposed by ExAblate hardware and software were incorporated in the models. Preliminary experiments included beamformed sonications in tissue mimicking phantoms under MR temperature monitoring at 3 T (GE Discovery MR750W). Results: Acoustic intensities considered during simulation were limited to ensure mild hyperthermia (T{sub max} < 45 °C) and fail-safe operation of the ExAblate array (spatial and time averaged acoustic intensity I{sub SATA} < 3.4 W/cm{sup 2}). Tissue volumes with therapeutic temperature levels (T > 41 °C) were estimated. Numerical simulations indicated that T > 41 °C was calculated in 13–23 cm{sup 3} volumes for sonications with planar or diverging beam patterns at 0.9–1.2 W/cm{sup 2}, in 4.5–5.8 cm{sup 3} volumes for simultaneous multipoint focus beam patterns at ∼0.7 W/cm{sup 2}, and in ∼6.0 cm{sup 3} for curvilinear (cylindrical) beam patterns at 0.75 W/cm{sup 2}. Focused heating patterns may be practical for treating focal disease in a single posterior quadrant of the prostate and diffused heating patterns may be useful for heating quadrants, hemigland volumes or even bilateral targets. Treatable volumes may be limited by pubic bone heating. Therapeutic temperatures were estimated for a range of physiological parameters, sonication duty cycles and rectal cooling. Hyperthermia specific phasing patterns were implemented on the ExAblate prostate array and continuous-wave sonications (∼0.88 W/cm{sup 2}, 15 min) were performed in tissue-mimicking material with real-time MR-based temperature imaging (PRFS imaging at 3.0 T). Shapes of heating patterns observed during experiments were consistent with simulations. Conclusions: The ExAblate 2100, designed specifically for thermal ablation, can be controlled for delivering continuous hyperthermia in prostate while working within operational constraints.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Key findings and remaining questions in the areas of core-concrete interaction and debris coolability

The reactor accidents at Fukushima-Dai-ichi have rekindled interest in late phase severe accident behavior involving reactor pressure vessel breach and discharge of molten core melt into the containment. Two technical issues of interest in this area include core-concrete interaction and the extent to which the core debris may be quenched and rendered coolable by top flooding. The OECD-sponsored Melt Coolability and Concrete Interaction (MCCI) programs at Argonne National Laboratory included the conduct of large scale reactor material experiments and associated analysis with the objectives of resolving the ex-vessel debris coolability issue, and to address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. These tests provided a broad database to support accident management planning, as well as the development and validation of models and codes that can be used to extrapolate the experiment results to plant conditions. This paper provides a high level overview of the key experiment results obtained during the program. Finally, a discussion is also provided that describes technical gaps that remain in this area, several of which have arisen based on the sequence of events and operator actions during Fukushima.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status of ProtoDUNE Dual Phase

The Deep Underground Neutrino Experiment (DUNE) is a dual-site experiment for long baseline neutrino oscillation studies, and for neutrino astrophysics and nucleon decay searches. DUNE will comprise four 10 kton fiducial liquid argon time-projection-chamber (LAr TPC) modules placed at the Sanford Underground Research Facility (South Dakota, USA). One of these modules will profit form the dual phase (DP) technology where the charge is extracted, amplified, and detected in gaseous argon above the liquid surface allowing a fine readout pitch, a low energy threshold, and good pattern reconstruction of the events. To gain experience in building and operating such a large-scale DP LAr detector, a prototype is currently being assembled at the CERN Neutrino Platform. The ProtoDUNE-DP detector consists of a 6x6x6 m3 LAr TPC and commissioning started in Summer 2019.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

White Paper: Research & Development for the Time at Temperature Approach

Recent advancements in nuclear power research are greatly improving reactor safety and performance through the development of Accident Tolerant Fuel (ATF) and Low-Enriched Uranium Plus (LEU+). These innovations can address Departure from Nucleate Boiling (DNB) margins, which are vital for reactor safety. DNB happens when the coolant switches to film boiling, significantly decreasing heat transfer and posing a risk of fuel cladding failure. The U.S. Nuclear Regulatory Commission (NRC) employs conservative DNB criteria, which can potentially restrict the operational flexibility and efficiency of reactors. The Time at Temperature (TaT) approach could provide a more detailed and adaptable operational guideline by establishing acceptable time-temperature limits, accounting for the duration a material can withstand elevated temperatures without losing its integrity. This method allows reactors to operate more efficiently and safely, offering additional operational margins, faster power adjustments, and improved fuel cycle economics. TaT criteria allow for higher power levels and more flexible responses to operational transients, particularly applicable for anticipated operational occurrences (AOOs) that result in short durations of post-DNB conditions. It enhances plant operational flexibility, allows faster startup times, and enables quicker power level adjustments, optimizing fuel loading patterns and improving fuel cycle economics. Implementing TaT limits reduces core design constraints, lowers fuel usage, and reduces costs, essential for the long-term sustainability of Light Water Reactors (LWRs). TaT maximizes the use of advanced fuel technologies like ATF and LEU+, further enhancing their economic and environmental benefits. To apply the TaT approach in existing LWRs, collaborative research activities among various DOE-sponsored programs are essential. These efforts should incorporate fuel experiments, physics-based high-fidelity modeling, ML-based surrogate modeling, and optimization techniques. This whitepaper proposes four research and development areas: 1) Investigation of the feasibility of new operations of LWR with updated safety limits; 2) Assessment of reactor operation limits through uncertainty reduction; 3) Evaluation of power uprate in virtual environment; and 4) Lattice and reactor core design for power uprate. Each area includes why this research is in need and a suggested scope of work. These comprehensive research areas ensure practical and beneficial advancements for existing reactors, translating innovations in nuclear fuel and cladding technology into improved reactor performance and safety.

42 - ENGINEERING↗

Next Generation Nuclear Plant Reactor Pressure Vessel Materials Research and Development Plan (PLN-2803)

The U.S. Department of Energy (DOE) has selected the High-Temperature Gas-cooled Reactor (HTGR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production, with an outlet gas temperature in the range of 750°C, and a design service life of 60 years. The reactor design will be a graphite-moderated, helium-cooled, prismatic, or pebble bed reactor and use low-enriched uranium, Tri-Isotopic (TRISO)-coated fuel. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. Selection of the technology and design configuration for the NGNP must consider both the cost and risk profiles to ensure that the demonstration plant establishes a sound foundation for future commercial deployments. The NGNP challenge is to achieve a significant advancement in nuclear technology while setting the stage for an economically viable deployment of the new technology in the commercial sector soon after 2020. This technology development plan details the additional research and development (R&D) required to design and license the NGNP RPV, assuming that A 508/A 533 is the material of construction. The majority of additional information that is required is related to long-term aging behavior at NGNP vessel temperatures, which are somewhat above those commonly encountered in the existing database from LWR experience. Additional data are also required for the anticipated NGNP environment. An assessment of required R&D for a Grade 91 vessel has been retained from the first revision of the R&D plan in Appendix B in somewhat less detail. Considerably more development is required for this steel compared to A 508/A 533 including additional irradiation testing for expected NGNP operating temperatures, high-temperature mechanical properties, and extensive studies of long-term microstructural stability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Research plan for the development of optical fiber pressure sensors for nuclear applications

Fiber optic pressure sensors are desirable for nuclear applications because they are low mass/small size, immune to electromagnetic interference, high sensitivity, and have multiplexing and multimodal measurement capabilities. Much research and development has been conducted on developing fiber optic based sensors and they are now considered a class of standard instrumentation in many industries. Specifically, for pressure sensing, a wide range of fiber based sensors have been developed for various pressure ranges and environments. This vast body of research will be leveraged for the development of pressure sensors for nuclear applications. Four pressure measurement scenarios were considered which would benefit from a fiber optic based pressure sensor. These scenarios include pressure measurement in the fuel rod plenum, coolant pressure during LOCA testing, advanced coolant (helium, sodium, molten salt) pressure for flow loop operation, and high pressures resulting for direct fuel-coolant interaction. Each scenario has unique pressure, temperature, and material requirements for the sensor. From a survey of commercially available sensors and a literature review; it has been determined that an extrinsic Fabry-Perot interferometer approach is the most appropriate for the various measurement requirements. The experience and knowledge base for Fabry-Perot interferometers can be leveraged since they are the most common fiber optic based pressure sensors available commercially and found in literature. These pressure sensors rely on the interference of light in a gas filled cavity, which minimizes the impact of radiation induced attenuation and compaction on the measurement, compared to intrinsic sensing techniques. The measurement range of these sensors is based on the stiffness of the diaphragm that deflects under pressure. This allows for a suite of fiber based sensors to be developed by interchanging this diaphragm for the requirements of each application. Key material and design considerations have been identified for the development of a Fabry-Perot interferometry pressure measurement for nuclear applications. These include high temperature bonding between the glass fiber optic and metal housing, identifying diaphragm materials & geometry, and minimizing cross sensitivity to temperature or implementing compensation techniques found in literature. Overcoming these challenges will develop a pathway for a fiber optic based pressure sensor for nuclear applications, and additionally can be leveraged for other sensing application based on Fabry-Perot interferometers, such as temperature, strain (creep & deformation), vibration, and index of refraction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The AMP (Advanced MultiPhysics) Nuclear Fuel Performance Code

The AMP (Advanced MultiPhysics) Nuclear Fuel Performance code is a new, three-dimensional, multi-physics tool that uses state-of-the-art solution methods and validated nuclear fuel models to simulate the nominal operation and anticipated operational transients of nuclear fuel. The AMP Nuclear Fuel Performance code leverages existing validated material models from traditional fuel performance codes and the Scale/ORIGEN-S spent-fuel characterization code to provide an initial capability that is shown to be sufficiently accurate for a single benchmark problem and anticipated to be accurate for a broad range of problems. The thermomechanics-chemical foundation can be solved in a time-dependent or quasi-static approach with any variation of operator-split or fully-coupled solutions at each time step. The AMP Nuclear Fuel Performance code provides interoperable interfaces to leading computational mathematics tools, which will simplify the integration of the code into existing parallel code suites for reactor simulation or lower-length-scale coupling. A baseline validation of the AMP Nuclear Fuel Performance code has been performed through the modeling of an experiment in the Halden Reactor Project (IFA-432), which is the first validation problem incorporated in the FRAPCON Integral Assessment report.

Clarno, Kevin T↗