Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Toward a Benchmark for Multi-Threaded Testing Tools

Looking for intermittent bugs is a problem that has been getting prominence in testing. Multi-threaded code is becoming very common, mostly on the server side. As there is no silver bullet solution, research focuses on a variety of partial solutions. We outline a road map for combining the research on the different disciplines of testing multi-threaded programs and on evaluating its quality. The project goals are to create a benchmark that can be used to evaluate different solutions, to create a framework with open API's that enables combining techniques in the multithreading domain, and to create a focus for the research in this area around which a community of people who try to solve similar problems with different techniques, could congregate. The benchmark, apart from containing programs with documented bugs, includes other artifacts, such as traces, that are used for evaluating some of the technologies. We have started creating such a bench mrk and detail the lesson learned in the process. The framework will enable technology developers, for example, race detectors, to concentrate on their components and use other ready made components, (e.g., instrumentor) to create a testing solution.

Eytani, Yaniv↗

X-Ray Backscatter Machine Support Frame

This summer at Kennedy Space Center, I spent 10 weeks as an intern working at the Prototype Development Lab. During this time I learned about the design and machining done here at NASA. I became familiar with the process from where a design begins in Pro/Engineer and finishes at the hands of the machinists. As an intern I was given various small jobs to do and then one project of my own. My personal project was a job for the Applied Physics Lab; in their work they use an X-Ray Backscatter machine. Previously it was resting atop a temporary frame that limited the use of the machine. My job was to design a frame for the machine to rest upon that would allow a full range of sample sizes. The frame was required to support the machine and provide a strain relief for the cords attached to the machine as it moved in the x and y directions. Calculations also had to be done to be sure the design would be able to withstand any loads or outside sources of stress. After the calculations proved the design to be ready to withstand the requirements, the parts were ordered or fabricated, as required. This helped me understand the full process of jobs sent to the Prototype Development Lab.

Cannon, Brooke↗

Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

Earth Science↗

NASA's Gravitational-Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consists of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance. Three mission concepts have been studied by Team-X, JPL's concurrent design facility, to refine the conceptual design, evaluate key performance parameters, assess risk and estimate cost and schedule. The status of the Study are reported.

Stebbins, Robin↗

Stress Analysis and Testing at the Marshall Space Flight Center to Study Cause and Corrective Action of Space Shuttle External Tank Stringer Failures

After the launch scrub of Space Shuttle mission STS-133 on November 5, 2010, large cracks were discovered in two of the External Tank intertank stringers. The NASA Marshall Space Flight Center, as managing center for the External Tank Project, coordinated the ensuing failure investigation and repair activities with several organizations, including the manufacturer, Lockheed Martin. To support the investigation, the Marshall Space Flight Center formed an ad-hoc stress analysis team to complement the efforts of Lockheed Martin. The team undertook six major efforts to analyze or test the structural behavior of the stringers. Extensive finite element modeling was performed to characterize the local stresses in the stringers near the region of failure. Data from a full-scale tanking test and from several subcomponent static load tests were used to confirm the analytical conclusions. The analysis and test activities of the team are summarized. The root cause of the stringer failures and the flight readiness rationale for the repairs that were implemented are discussed.

Wingate, Robert J.↗

Structured Innovation of High-Performance Wave Energy Converter Technology: Preprint

Wave energy converter (WEC) technology development has not yet delivered the desired commercial maturity nor, and more importantly, the techno-economic performance. The reasons for this have been recognized and fundamental requirements for successful WEC technology development have been identified. This paper describes a multi-year project pursued in collaboration by the National Renewable Energy Laboratory and Sandia National Laboratories to innovate and develop new WEC technology. It specifies the project strategy, shows how this differs from the state-of-the-art approach and presents some early project results. Based on the specification of fundamental functional requirements of WEC technology, structured innovation and systemic problem solving methodologies are applied to invent and identify new WEC technology concepts. Using Technology Performance Levels (TPL) as an assessment metric of the techno-economic performance potential, high performance technology concepts are identified and selected for further development. System performance is numerically modelled and optimized and key performance aspects are empirically validated. The project deliverables are WEC technology specifications of high techno-economic performance technologies of TPL 7 or higher at TRL 3 with some key technology challenges investigated at higher TRL. These wave energy converter technology specifications will be made available to industry for further, full development and commercialisation (TRL 4 - TRL 9).

17 WIND ENERGY↗

Emissions mitigation technology for advanced water-lean solvent-based CO 2 capture processes

This technical final report submitted to DOE/NETL presents all the research activities performed during the entirety of DE-FE0031660 project-Emissions Mitigation Technology for Advanced Water-Lean Solvent-Based CO 2 Capture Processes which spans from October 2018 through March 2022. RTI International has been conducting studies from fundamental and operational aspects to reduce the overall amine emissions from the advanced Water-Lean Solvent (WLS) systems, specifically RTI’s Non-Aqueous Solvent (NAS). This technical final report will highlight the key findings from project which align closely to the project objectives which are: Identify the contribution of vapor loss, entrainment, and aerosols to the overall emissions of water-lean systems; Determine the significance of CO 2 capture system operating parameters to the amine emissions; Develop an emissions model based on critical operating parameters; Evaluate the effectiveness of emissions mitigation devices to reduce the amine emissions to <1 ppm under flue coal-fired flue gas; and, Determine the contribution of the ECTs to the overall CO 2 capture cost. The following are the key findings based on numerous tests using both lab-scale setups and parametric testing performed at RTI’s Bench-scale Gas Absorption System (BsGAS). During the BP1, the aerosol generation system and monitoring equipment were installed at BsGAS to produce and determine the aerosol characteristics during the NAS CO 2 capture process. The aerosol produced by this setup produced aerosols with the peak diameter and concentration of 50 micron and 1.2E10 7 cm -3 , respectively. These particle sizes and concentrations are matched to those observed in the actual coal-fired power plant flue gases and expected to be found at the absorber inlet of the CO 2 capture system. Over 1,300 hours of parametric testing have been conducted to evaluate the impact of the aerosols and operating conditions during the CO 2 capture with NAS on the overall amine emissions in the treated flue gas. At the worse condition tested, the presence of the aerosols in the flue gas could increase the overall emissions by 10X compared to the baseline emissions from NAS’s vapor pressure. CO 2 capture rate was found to be a main factor impacting the overall emissions as well as aerosol size and concentrations in the absorber off-gas. The higher CO 2 capture rate, the higher amine emissions in the treated gas. The temperature difference between the temperature bulge seen in the absorber and the water wash temperature also impacts the particle growth where the larger the temperature difference, the more amine emissions from aerosols in the treated gas. The majority of the aerosols did not grow substantially in the system, and the particle concentrations remained nearly constant between the absorber inlet and wash outlet. Only a small portion of the particles were found to grow significantly. The high efficiency demister with mesh size of 5-10 micron can be installed to remove a portion of the aerosols from the gas stream leaving the water wash. Overall, these results from parametric testing have established the emission baseline and validate our assumption on the need of emission control technologies (ECT) in order to minimize the emissions from the baseline NAS CO 2 capture process. Over 2,000 of BsGAS operating hours was used to investigate a handful of process improvements which led to a selection of the vital few changes that effectively control the amine emissions. These process improvements are lime-coated-filters for absorber gas inlet, advanced demister at the top of the absorber, a second water wash with amine recovery unit were designed, installed, and tested at BsGAS at the end of BP1. The result showed that the NAS CO 2 capture process with these additional emission control devices could lower the amine emission in the treated gas to about 1 ppm using a simulated coal-fire flue gas stream. The main contributor in lowering the amine emission came from the second water wash with amine recovery unit where the amine concentration in the scrubbing water was kept below 2 wt% through a continuous amine removal via an adsorbent bed, resulting in a low amine vapor pressure. The adsorbent bed was regenerated via a direct steam regeneration and the recover amine was returned to the absorber to minimize wastewater and makeup amine. A flue gas generation system was designed and installed during the first half of BP2 to support the emission testing using a real coal-derived flue gas. The system is capable of generating both coal- and natural gas- derived flue gases with the composition of the gaseous species highly resemble to that of the power plant flue gases. The particulates detected in the coal-derived flue gas showed the mean diameter of 1 micron. The CO 2 capture operating was then proceed using the real coal-derived flue gas where the amine emission was controlled to be about 0-3 ppm for the total run time of about 200 hours. Similar testing was conducted with natural gas-derived flue gas and the result showed a highly amine emission of 30 ppm under the total run time of 200 hours. The Principal Component Analysis (PCA) and the Partial Least Squares Projection to Latent Structures (PLS) techniques were applied to the parametric testing data to derive a multivariate statistical model. The model was validated and trained with half of the data collected, and the predictive ability of the model was evaluated using the remaining half of the data. The resulting empirical model was capable of predicting the overall emissions from the NAS process without the ECTs with ±15% accuracy (average absolute deviation, AAD) in BP1. As more emission data were obtained under the real coal-flue gas in the BP2, the model incorporated these new set of data to reflect the final process configuration, operating parameters, and amine emission. This results in the updated empirical model predicting the amine emission from the NAS CO 2 capture process with 84% goodness-of-fit (R 2 ), 85% predictability (Q 2 ), and 15% AAD. The study evaluates the use of RTI’s Non-Aqueous Solvent technology for 90% CO 2 capture from a net 650 MWe pulverized coal power plant, downstream of the flue-gas desulfurization unit. The captured CO 2 has a purity of > 95% CO 2 , and is dried, compressed to 15.3 MPa (2,215 psia), ready for sequestration. The analysis uses Case B12B from the DOE Baseline study on Bituminous Coal, Revision 4 where the Cansolv CO 2 capture plant is replaced by the RTI CO 2 Capture plant. The CO 2 capture plant has been sized to capture >90% CO 2 from flue gas derived from a net 650 MWe supercritical pulverized coal power plant. The CO 2 capture plant is equipped with emission control technologies that limits the amine emissions to < 1 ppm. Two different cases were evaluated for the technoeconomic study. The key difference between the two cases is the regenerator pressure. In Case 1, the regenerator operates at 0.195 MPa (28.3 psia), whereas in Case 2, the regenerator pressure is 0.44 MPa (64 psia) thus removing the need for the first stage of compression of the eight-stage compression train. Results from the TEA are compared against the DOE reference cases for SCPC plant with and without CO 2 Capture (Case B12A and Case B12B of the DOE Baseline study, respectively). Case 2 with CO 2 regeneration at higher pressure results in the lower cost of CO 2 capture. The total capital cost of the capture process has been estimated using 2018 dollars in Aspen Process Economic Analyzer and was estimated to be $579 MM. The capture plant operation leads to a total parasitic power loss rate of 96 MWe, resulting in a decrease in pulverized coal power plant efficiency of 7.8% points. The resulting cost of electric power increases from 64.4 mills/kWh, for no capture, to 97.5 mills/kWh, with 90% capture, an increase of 51% in the COE. The cost of capturing 90% CO 2 was estimated to be $38.2/tonne-CO 2 , and meets the DOE target of $40/t-CO 2 . Emission control technologies (ECT) investigated in this project includes a second water wash with use of activated carbon beds for removal of amine from the wash water prior to recirculation in the water wash. These ECT allow operation of the CO 2 capture plant with < 1 ppm amine emissions with the treated flue gas and contributes to $2.4/t-CO 2 captured. Amine emissions derived from thermal and oxidative degradations were investigated under this project along with the emissions derived from aerosols for the NAS system. The thermally degraded of the lean NAS showed less than 4% decreased of the original total amine content in the NAS at 150 °C while the result obtained at 120 °C showed no drop in total amine content, suggesting that thermal degradation of the NAS is minimal. These results also suggested that the thermally degraded species are not likely formed and contributed to the emissions due to the low regeneration temperature of the NAS at 90-105 °C. The oxidative degradation, on the other hand, could become problematic as some of these oxidative degraded species were observed during the NAS-5 testing at National Carbon Capture Center (NCCC) and SINTEF in our previous project. The rapid screening of selected inhibitors suggested that oxidative degradation of NAS can be suppressed using thiol containing compounds in amounts of at least 1 mol%. The detailed mechanistic degradation pathway was conceived for a specific amine used in NAS formulation during BP2. he reduction of the nitrosamines caused by the NO x present in the flue gas was also examined. The study suggested that the thermo-chemical treatment of the NAS solvent would be a more effective and economically viable compared to removing NO x at the DCC.

01 COAL, LIGNITE, AND PEAT↗

Emerging Technologies Review: Water Microgrid

Project 69643 Task 10 - The Air Force Civil Engineer Center has tasked Pacific Northwest National Laboratory with investigating emerging technologies to inform the Air Force’s understanding of the technology and to guide key considerations for implementing technologies that are resilient and alternative sources to the traditional methods used in the Air Force today. This report explores the concept of a water microgrid for deployment at Air Force installations. A water microgrid is a local water system that supplies, treats, and distributes water, with the primary objective to meet mission critical water demand during a disruption of the primary supply. A water microgrid can advance an Air Force installation’s water infrastructure and water resilience by being at the ready for meeting critical missions during a utility outage.

42 ENGINEERING↗

Economical graphics display system for flight simulation avionics

During the past academic year the focal point of this project has been to enhance the economical flight simulator system by incorporating it into the aero engineering educational environment. To accomplish this goal it was necessary to develop appropriate software modules that provide a foundation for student interaction with the system. In addition experiments had to be developed and tested to determine if they were appropriate for incorporation into the beginning flight simulation course, AERO-41B. For the most part these goals were accomplished. Experiments were developed and evaluated by graduate students. More work needs to be done in this area. The complexity and length of the experiments must be refined to match the programming experience of the target students. It was determined that few undergraduate students are ready to absorb the full extent and complexity of a real-time flight simulation. For this reason the experiments developed are designed to introduce basic computer architectures suitable for simulation, the programming environment and languages, the concept of math modules, evaluation of acquired data, and an introduction to the meaning of real-time. An overview is included of the system environment as it pertains to the students, an example of a flight simulation experiment performed by the students, and a summary of the executive programming modules created by the students to achieve a user-friendly multi-processor system suitable to an aero engineering educational program.

Source record↗

NASA's Gravitational - Wave Mission Concept Study

With the conclusion of the NASA/ESA partnership on the Laser Interferometer Space Antenna (LISA) Project, NASA initiated a study to explore mission concepts that will accomplish some or all of the LISA science objectives at lower cost. The Gravitational-Wave Mission Concept Study consisted of a public Request for Information (RFI), a Core Team of NASA engineers and scientists, a Community Science Team, a Science Task Force, and an open workshop. The RFI yielded were 12 mission concepts, 3 instrument concepts and 2 technologies. The responses ranged from concepts that eliminated the drag-free test mass of LISA to concepts that replace the test mass with an atom interferometer. The Core Team reviewed the noise budgets and sensitivity curves, the payload and spacecraft designs and requirements, orbits and trajectories and technical readiness and risk. The Science Task Force assessed the science performance by calculating the horizons. the detection rates and the accuracy of astrophysical parameter estimation for massive black hole mergers, stellar-mass compact objects inspiraling into central engines. and close compact binary systems. Three mission concepts have been studied by Team-X, JPL's concurrent design facility. to define a conceptual design evaluate kt,y performance parameters. assess risk and estimate cost and schedule. The Study results are summarized.

Stebbins, Robin↗

A Miniaturized Variable Pressure Scanning Electron Microscope (MVP-SEM) for the Surface of Mars: An Instrument for the Planetary Science Community

The Miniaturized Variable Pressure Scanning Electron Microscope(MVP-SEM) project, funded by the NASA Planetary Instrument Concepts for the Advancement of Solar System Observations (PICASSO) Research Opportunities in Space and Earth Science (ROSES), will build upon previous miniaturized SEM designs for lunar and International Space Station (ISS) applications and recent advancements in variable pressure SEM's to design and build a SEM to complete analyses of samples on the surface of Mars using the atmosphere as an imaging medium. By the end of the PICASSO work, a prototype of the primary proof-of-concept components (i.e., the electron gun, focusing optics and scanning system)will be assembled and preliminary testing in a Mars analog chamber at the Jet Propulsion Laboratory will be completed to partially fulfill Technology Readiness Level to 5 requirements for those components. The team plans to have Secondary Electron Imaging(SEI), Backscattered Electron (BSE) detection, and Energy Dispersive Spectroscopy (EDS) capabilities through the MVP-SEM.

Mars↗

Information Fusion and Data Analytics for Human Lunar Exploration (CIF REPORT: Detailed PI Write-up)

The Information Fusion & Data Analytics (IFDA) project commenced in FY20, continued through FY21, and its final platform development phase continues in FY22. The objective remains the fusion and rapid accessibility of large quantities of disparate sourced human spaceflight data. IFDA is a platform tailored for NA (S&MA) to develop highly advanced operational data integration and analysis techniques. IFDA leverages the JSC ER7 modeling, simulation,and data fusion capabilities to collect, warehouse, and augment data human exploration data integration and analysis techniques. The IFDA project’s integrated data visualizations have been demonstrated in two validation scenarios in FY21, and provided the architecture and platform basis for development of a full-scale data analysis suite and storage solution useful to all JSC organizations engaged in real time operations and safety tasks. Scenarioand prototypical development including the construction of a full scale data analysis suite and storage solution, useful to all JSC organizations engaged in real time operations and safety tasks, is central to IFDA Phase 3 and provides a demonstrable pathway for the Digital Transformation Program. IFDA Phase 3 is focused on data provider, data utilizer, and SME hands-on workshops that will conclude the Dem / Valphase and deliver a program-ready data integration tool as a product.

information fusion↗

Information Fusion & Analytics for Human Lunar Exploration

The Information Fusion & Data Analytics (IFDA) project commenced in FY20, continued through FY21, and its final platform development phase continues in FY22. The objective remains the fusion and rapid accessibility of large quantities of disparate sourced human spaceflight data. IFDA is a platform tailored for NA (S&MA) to develop highly advanced operational data integration and analysis techniques. IFDA leverages the JSC ER7 modeling, simulation,and data fusion capabilities to collect, warehouse, and augment data human exploration data integration and analysis techniques. The IFDA project’s integrated data visualizations have been demonstrated in two validation scenarios in FY21, and provided the architecture and platform basis for development of a full-scale data analysis suite and storage solution useful to all JSC organizations engaged in real time operations and safety tasks. Scenarioand prototypical development including the construction of a full scale data analysis suite and storage solution, useful to all JSC organizations engaged in real time operations and safety tasks, is central to IFDA Phase 3 and provides a demonstrable pathway for the Digital Transformation Program. IFDA Phase 3 is focused on data provider, data utilizer, and SME hands-on workshops that will conclude the Dem / Valphase and deliver a program-ready data integration tool as a product.

information fusion↗

IN-LINE CHEMICAL SENSOR DEPLOYMENT IN A TRITIUM PLANT

The Savannah River Tritium Plant (TP) relies on well understood but aging sensor technology for process gas analysis. Though new sensor technologies have been brought to various readiness levels, the TP has been reluctant to install technologies that have not been tested in tritium service. This gap between sensor technology development and incorporating new technologies into practical applications demonstrates fundamental challenges that exist when transitioning from status quo to state-of-the-art in an extreme environment such as a tritium plant. These challenges stem from three root obstacles: 1) The need for a comprehensive assessment of process sensing needs and requirements; 2) The lack of a pick-list of process-compatible sensor technologies; and 3) The need to test technologies in a tritium-contaminated process environment without risking production. At Savannah River, these issues are being addressed in a two phase project. In the first phase, TP sensing requirements were determined by a team of process experts. Meanwhile, Savannah River National Laboratory sensor experts identified candidate technologies and related them to the TP processing requirements. The resulting roadmap links the candidate technologies to actual plant needs. To provide accurate assessments of how a candidate sensor technology would perform in a contaminated process environment, an instrument demonstration station was established within a TP glove box. This station was fabricated to TP process requirements and designed to handle high activity samples. The combination of roadmap and demonstration station provides the following assets: Creates a partnership between the process engineers and researchers for sensor selection, maturation, and insertion, Selects the right sensors for process conditions Provides a means for safely inserting new sensor technology into the process without risking production, and Provides a means to evaluate off normal occurrences where and when they occur. This paper discusses the process to identify and demonstrate new sensor technologies for the Savannah River TP.

07 ISOTOPE AND RADIATION SOURCES↗

Building America Case Study: Occupant Comfort from a Mini-Split Heat Pump, San Antonio, Texas

IBACOS worked with builder Imagine Homes to evaluate the performance of an occupied new construction test house following construction of the house in the hot, humid climate of San Antonio, Texas. The project measures the effectiveness of a space conditioning strategy using a multihead mini-split heat pump (MSHP) system in a reduced-load home to achieve acceptable comfort levels (temperature and humidity) and energy performance. IBACOS collected long-term data and analyzed the energy consumption and comfort conditions of the occupied house after one year of operation. Although measured results indicate that the test system provides comfort both inside and outside the ASHRAE Standard 55-2010 range, the occupants of the house claimed both adequate comfort and appreciation of the ease of use and flexibility of the installed MSHP system. IBACOS also assisted the builder to evaluate design and specification changes necessary to comply with Zero Energy Ready Home, but the builder chose to not move forward with it because of concerns about the 'solar ready' requirements of the program.

30 DIRECT ENERGY CONVERSION↗

Turning Bacteria into Biofuel: Development of an Integrated Microbial Electrocatalytic (MEC) System for Liquid Biofuel Production from CO2

Electrofuels Project: LBNL is improving the natural ability of a common soil bacteria called Ralstonia eutropha to use hydrogen and carbon dioxide for biofuel production. First, LBNL is genetically modifying the bacteria to produce biofuel at higher concentrations. Then, LBNL is using renewable electricity obtained from solar, wind, or wave power to produce high amounts of hydrogen in the presence of the bacteria—increasing the organism’s access to its energy source and improving the efficiency of the biofuel-creation process. Finally, LBNL is tethering electrocatalysts to the bacteria’s surface which will further accelerate the rate at which the organism creates biofuel. LBNL is also developing a chemical method to transform the biofuel that the bacteria produce into ready-to-use jet fuel.

Advanced Fuels↗

Incentivizing Cold-Climate Efficiency in Juneau (Final Report)

This is the final technical report for the DOE EERE BTO project Incentivizing Cold-Climate Efficiency in Juneau. The project implemented a community energy campaign to deploy heat pumps and efficiency for residents of Juneau, in Southeast Alaska. The project helped Juneau make progress towards its renewable energy goal of reaching 80% renewable energy for space heating by 2045. The Incentivizing Cold-Climate Efficiency in Juneau (ICE-Juneau) project began in 2020 and concluded three years later in 2023. During that time, a group of implementation partners and a research advisory team instituted a beneficial electrification campaign to promote energy savings and carbon reduction in residences of Juneau, Alaska. The campaign, Thermalize Juneau, focused on the installation of single head ductless mini-split heat pumps along with other efficiency upgrades. Thermalize Juneau was the first campaign of its kind in Alaska. After several months of planning, registration opened to the public in early 2021, and over the course of six months 164 participants enrolled. Campaign staff provided education to homeowners on heat pumps and efficiency, and each participant received a one-on-one heat pump assessment using a custom Microsoft Excel-based calculator that estimated energy savings for their residence based on building characteristics and past utility bills. Participants could also obtain a free energy audit from one of the two local energy auditors to further inform their decision. A heat pump installer, electrician, and builder were selected via a competitive RFP process. Participants who felt ready to install a heat pump or other efficiency upgrades received a site visit and custom quote from each of these contractors free of charge, and if they still felt energy upgrades were right for them, could move forward with an individual contract. Participants received a $400 heat pump installation rebate, offered by the installer if 40 heat pump installations occurred through the campaign. Overall, the campaign facilitated 75 heat pump installations (including participants that went with another contractor or heat pump model) and 30 efficiency upgrades (including participants that went with another builder or did DIY upgrades). The campaign created 3 new jobs as the heat pump installer hired an administrative assistant and two apprentices over the course of the campaign. It also helped Juneau work toward achieving its renewable energy goal of 80% renewable energy for space heating by 2045 by upgrading houses from fuel oil to heat pumps powered by the hydropower electric grid. Researchers conducted four surveys to inform Thermalize Juneau and future energy campaigns. The first surveyed existing and prospective heat pump owners in Juneau to identify barriers the campaign could address and inform recruitment efforts. Entry and exit surveys provided information on participant demographics, goals, outcomes, and suggestions for improving future campaigns. And a final survey of community members who had not participated in Thermalize Juneau gave insight on ways future campaigns could include a greater diversity of participants so they could realize similar benefits. Researchers also used pre-campaign energy modeling to predict energy savings, which was then compared to the savings estimated through aggregation of heat pump assessments and energy audits, and later to actual energy savings of 10 participants who installed a heat pump and were able to provide complete energy use data sets. In addition to energy savings, and to assist the electric utility in future planning efforts, researchers analyzed the overall change in electric use across participants with energy data and heat pump installations. They also completed a life cycle cost analysis, showing positive net present values for those displacing a fuel oil appliance, and a more mixed case for those switching from electric baseboard. This project proved the feasibility of energy campaigns, with a goal of beneficial electrification, in cold, remote locations. The Thermalize Juneau team compiled a Guidebook to Thermalize Campaigns, available online. In addition to documenting what occurred in Alaska’s first thermalize campaign, it provides tips and resources for other communities wishing to implement a similar program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Conformal image-guided microbeam radiation therapy at the ESRF biomedical beamline ID17

Purpose: Upcoming veterinary trials in microbeam radiation therapy (MRT) demand for more advanced irradiation techniques than in preclinical research with small animals. The treatment of deep-seated tumors in cats and dogs with MRT requires sophisticated irradiation geometries from multiple ports, which impose further efforts to spare the normal tissue surrounding the target. Methods: This work presents the development and benchmarking of a precise patient alignment protocol for MRT at the biomedical beamline ID17 of the European Synchrotron Radiation Facility (ESRF). The positioning of the patient prior to irradiation is verified by taking x-ray projection images from different angles. Results: Using four external fiducial markers of 1.7 mm diameter and computed tomography-based treatment planning, a target alignment error of less than 2 mm can be achieved with an angular deviation of less than 2{sup ∘}. Minor improvements on the protocol and the use of smaller markers indicate that even a precision better than 1 mm is technically feasible. Detailed investigations concerning the imaging dose lead to the conclusion that doses for skull radiographs lie in the same range as dose reference levels for human head radiographs. A currently used online dose monitor for MRT has been proven to give reliable results for the imaging beam. Conclusions: The ESRF biomedical beamline ID17 is technically ready to apply conformal image-guided MRT from multiple ports to large animals during future veterinary trials.

60 APPLIED LIFE SCIENCES↗