Resources for Energy Efficiency and Renewable Energy Vendors (Fact Sheet)
To do business with the Federal Government, it is best to target the appropriate program. This document outlines resources for doing business with the Federal Government.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
To do business with the Federal Government, it is best to target the appropriate program. This document outlines resources for doing business with the Federal Government.
NASA space communications systems have the challenge of designing SDRs with highly-constrained Size, Weight and Power (SWaP) resources. A study is being conducted to assess the effectiveness of applying the MDA Platform-Independent Model (PIM) and one or more Platform-Specific Models (PSM) specifically to address NASA space domain real-time issues. This paper will summarize our experiences with applying MDA to SDR for Space to model real-time issues. Real-time issues to be examined, measured, and analyzed are: meeting waveform timing requirements and efficiently applying Real-time Operating System (RTOS) scheduling algorithms, applying safety control measures, and SWaP verification. Real-time waveform algorithms benchmarked with the worst case environment conditions under the heaviest workload will drive the SDR for Space real-time PSM design.
A critical goal to both science and exploration is to understand the form and location of lunar polar volatiles. The lateral and vertical distributions of these volatiles inform us of the processes that control the emplacement and retention of these volatiles, as well as helping to formulate in-situ resource utilization (ISRU) architectures. While significant progress has been made from orbital observations, measurements at a range of scales from centimeters to kilometers across the lunar surface are needed to generate adequate "volatile mineral models" for use in evaluating the resource potential of volatiles at the Moon. VIPER is a solar and battery powered rover mission designed to operate over multiple lunar days, traversing several kilometers as it continuously monitors for subsurface hydrogen and other surface volatiles. In specific thermal terrain types, including permanently shadowed terrain and locales that permit near-surface ice stability, subsurface samples will be examined for volatile content using a one-meter drill. This talk will provide an overview of the VIPER mission which is scheduled for flight to the Lunar South Pole in December 2022.
I was asked to give a presentation as part of the upcoming West Virginia NASA IV&V Education Resource Center's 'Virtual NASA Day in the Park' event for middle schoolers in WV. This presentation covers some basics of aircraft and highlights two well known NASA advanced concepts - the TTBW and N3-X - both at a very high level targeting middle school aged children. I used only NASA owned images in this presentation, and there is no sensitive or otherwise restricted data or information in this presentation. I'm sorry for the relatively late submission (the presentation is scheduled for 10:30a EST on 10/14); I only recently received final guidance on this request late last week and had to quickly put together this presentation.
The Space Environment Dynamometer (SED) chamber was designed to conduct research in cryobotics; an area of study that focuses on robotic systems and rotating machinery operating in extreme cold environments including Earth, low Earth orbit, Mars, Moon, asteroids, Solar orbit, planetary orbit, or those encountered during travel among these destinations. The test chamber incorporates a modular dynamometer, consisting of a variety of brakes, torque sensors and motors to be easily interchanged between tests. Each test employs a unique test profile that incorporates different setpoints of applied torques and velocities for a given period or number of rev- olutions. The modularity of the dynamometer setup allows for any combination of motor, gearbox to be tested. This chamber is one of a kind and resides at the Swamp Works facility within the Granular Mechanics and Regolith Operations laboratory (GMRO) at NASA Kennedy Space Center. Other cold chambers exist, however they are project specific and do not simultaneously output real time torque, temperature and efficiency data. The modularity of this extreme cold environment test chamber, coupled with the custom software and instrumentation, makes it one of a kind. The chamber is capable of stabilizing cryogenic temperatures and pressures to commensurate moon environments. Tests have successfully been conducted on motors and gearboxes for various cryogenic temperature set points, torques, and angular velocities. Relevant internal temperatures of the test article and chamber were recorded using a variety of temperature sensors. The temperature setpoints, on the motors and gearboxes tested, were stabilized by using PID gain scheduling of the PWM signal for the various heaters. The heat removal for the motor was provided by creating a thermally conductive path from a cryohead directly to the test article using copper straps. A variety of strainwave gears (SWGs), also known as Harmonic drives, planetary gear systems and DC motor actuator configurations have been tested in the chamber. The experiments performed were for various projects including Bulk Metallic Glass Gears (BMGG), Volatiles Investigating Polar Exploration Rover (VIPER), In-Situ Resource Utilization Pilot Excavator (IPEX) . Various upgrades have been made to the extreme cold environment test chamber for the use of cryobotic research. These upgrades greatly increased the autonomous capabilities of the test set up by providing redundancies in the hardware and software. The redundancies were primarily added to protect the integrity of the cryohead. A new strapping and insulation method was performed to create the thermal conductive path from the actuators to the cryohead. The software was upgraded to include temperature setpoint control, further increasing the autonomous capabilities of the test. This paper goes into detail regarding the upgrades made to the extreme cold environment test chamber, as well as highlights the results from a COLDArm acceptance test.
Usually the transition period is supposed to last around 5 years and to cover the eventual defueling of the reactor and the reactor cooling pool, completion of the characterization survey and preparation of all necessary documents to start the decommissioning activities in accordance with the decommissioning strategy chosen and the decommissioning plan approved. It was not the case for the Chernobyl NPP due to a number of reasons and obstacles, including delayed defueling due to unavailability of the storage capacities, lack of preparatory work due to prescheduled decommissioning, luck of experience of RBMK-type reactors decommissioning, influence of the destroyed Chernobyl-4 Unit and related works on site. All these factors not only delayed the completion of the characterization survey, but added complications to development of the decommissioning strategy and the decommissioning plan. De facto the issue of end state is still open as the end state for the destroyed Chernobyl-4 as well as the prospects of the exclusion zone transformation need further clarifications and justifications. As a result, the need to reconsider the standard concept of transition period was recognized already by the end of 2000, when Chernobyl-1 and Chernobyl-2 were out of operation for a few years. It was clear that the personnel had generally a bad perception of the prescheduled permanent shutdown decision and a low motivation to change and to learn. The first signs of organizational degradation were visible and the framework of the operational license did not fit well to prevent it. So it was decided to start the legal and organizational transformation into the decommissioning mode without waiting for polishing of the decommissioning strategy and decommissioning plan as in this case both documents seemed to need further adjustments anyway. The transition period (or the termination of operation as it called in the national nuclear safety regulations) was considered as the first phase of decommissioning to be covered by the decommissioning license. The detailed plan of activities for the transition period with proper safety justification documents was the main part of the relevant license application. Human resource management plan and adoption of the management system were important constituents as well. It was also considered reasonable to start some dismantling works already at this phase to avoid further delays and degradation, the works being carefully justified. Eventually such approach added to streamlining the decommissioning process and to avoid further organizational and technical degradation. Flexibility in transition from operation to decommissioning seems necessary in cases of prescheduled or post-accidental decommissioning but may be also beneficial for a scheduled decommissioning case. (authors)
Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may be required to execute side payments to participants whose costs are not covered through energy sales as determined via traditional locational marginal pricing schemes. Convex hull pricing minimizes this and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. Computing convex hull prices involves solving either a large-scale linear program or the Lagrangian dual of the corresponding non-convex scheduling problem. Further, the former approach requires explicit descriptions of market participants' convex hulls. While linear programs for computing convex hull prices are large, their structure is naturally decomposable by generators. Here, in this work, we propose and empirically analyze a Benders decomposition approach to computing convex hull prices that leverages recent advances in convex hull formulations for thermal generating units. We demonstrate across a large set of test instances that our decomposition approach only requires modest computational effort, obtaining solutions at least an order of magnitude faster than the equivalent large-scale linear programming approach. Overall, we provide a computationally feasible method for computing convex hull prices for industrial scale market clearing problems, enabling the possibility of practical adoption of this advanced pricing mechanism.
Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)
Risk management is a tool that has been used by project managers for several decades to help manage scope, cost, and schedule baselines and to improve the likelihood of project success. More recently, the risk management process has been applied to the management of companies and corporations under the designation of Enterprise Risk Management (ERM) where it is used to help ensure success in meeting strategic objectives. All of this focus on risk (related to events or conditions that may occur) is normally done without considering how issues (related to events or conditions that will or has occurred) may impact the allocation of resources required to address risks, and perhaps more importantly, how resources required to support normal work scope may be impacted. This paper suggests the use of an integrated risk and issue management process, where risks and issues are managed concurrently using similar but separate and distinct processes. The benefit of using an integrated process is the organization and centralization of data related to risks and issues that becomes available for decision makers to use in prioritizing and allocating limited resources between performing normal work, addressing risks, or resolving issues. Applying integrated risk and issue management to any activity will lead to better decisions, whether the activity is personal, project, program, or enterprise. (authors)
Cold load pickup (CLPU) phenomenon is identified as the persistent power inrush upon a sudden load pickup after an outage. Under the active distribution system (ADS) paradigm, where distributed energy resources (DERs) are extensively installed, the decreased outage duration can induce a strong interdependence between CLPU pattern and load pickup decisions. In this paper, we propose a novel modelling technique to tractably capture the decision-dependent uncertainty (DDU) inherent in the CLPU process. Subsequently, a two-stage stochastic decision-dependent service restoration (SDDSR) model is constructed, where first stage searches for the optimal switching sequences to decide step-wise network topology, and the second stage optimizes the detailed generation schedule of DERs as well as the energization of switchable loads. Further, to tackle the computational burdens introduced by mixed-integer recourse, the progressive hedging algorithm (PHA) is utilized to decompose the original model into scenario-wise subproblems that can be solved in parallel. The numerical test on modified IEEE 123-node test feeders has verified the efficiency of our proposed SDDSR model and provided fresh insights into the monetary and secure values of DDU quantification.
The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.
The purpose of the workshop was to review concepts for Discover-class missions that would follow the first two missions (MESUR-Pathfinder and NEAR) of this new program. The concepts had been generated by scientists involved in NASA's Solar System Exploration Program to carry out scientifically important investigations within strict guidelines -- $150 million cap on development cost and 3 year cap on development schedule. Like the Astrophysics Small Explorers (SMEX), such 'faster and cheaper' missions could provide vitality to solar system exploration research by returning high quality data more frequently and regularly and by involving many more young researchers than normally participate directly in larger missions. An announcement of opportunity (AO) to propose a Discovery mission to NASA is expected to be released in about two years time. One purpose of the workshop was to assist Code SL in deciding how to allocate its advanced programs resources. A second, complimentary purpose was to provide the concept proposers with feedback to allow them to better prepare for the AO.
The question "Why In-Situ Resource Utilization (ISRU)?" is addressed in this presentation. The reasons given concentrate on Cost reduction, Mass reduction, Risk reduction, the expansion of human exploration and presence and the enabling of industrial exploitation. A review of the Martian and Lunar resources available for ISRU is presented. Other ISRU concepts (i.e., In-Situ Consumable production (ISCP) and In-Situ Propellant Production (ISPP)) are introduced and further explained. The objectives of a Mars ISRU System Technology (MIST) include (1) the characterization of technology and subsystem performance for mission modeling and technology funding planning, (2) reduce risk and concerns arising from sample return and human missions utilizing ISRU, and (3) demonstrate the environmental suitability of ISRU components/processes and systems. A proof of concept demonstration schedule and a facility overview for MIST is presented.
The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.
Owing to increased penetration of three-phase and single-phase microgrids, distributed energy resources (DERs), and responsive loads, the maintenance of a three-phase balance by distribution networks is a significant challenge. Existing literature on distributed energy management for networked microgrids generally neglects the distribution network or employs a simplified phase balanced distribution network; thus, these evaluations are not applicable. Further, the underlying mutual coupling between the different phases of distribution feeders results in a more challenging situation. Here, to solve this issue, this study sought to propose distributed energy management based on a three-phase unbalanced distribution network. Various three-phase or single-phase microgrids, utility-owned DERs, and responsive loads were coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) updated the schedules of the DERs and responsive loads under their jurisdiction separately. The price signals were then updated according to the generation-load mismatch at each node and distributed to the corresponding MCs and DMS for the next iteration. The iteration continued until a sufficiently small generation-load mismatch was achieved at all nodes, that is, a balanced generation and load at all nodes under the agreed price signals. Considering a three-phase unbalanced distribution network, the price signals were determined per phase per node. Overall, the proposed distributed energy management coordinates microgrids, utility-owned DERs, responsive loads with guaranteed network constraints, and preserves the privacy of microgrid customers. This distributed energy management method was further demonstrated through various case studies on a three-phase networked microgrid test system.
In order to add more capabilities to Halide, we have designed a new framework called Tiramisu and integrated this framework into Halide. Since Tiramisu enables Halide to target heterogeneous architectures, our development efforts have been refocused on Tiramisu. Most high-performance computer systems today are complex and increasingly heterogeneous; they may have CPUs, GPUs and FPGAs. Achieving best performance requires taking full advantage of all these different architectures. To address this issue, we have designed Tiramisu, an optimization framework that enables Halide (and other DSLs) to target heterogeneous architectures. Tiramisu is an optimization framework that takes as input a high level, architecture-independent representation of code and a set of scheduling and data mapping commands that guide code transformation. The input can either be generated by a domain-specific language (DSL) compiler such as Halide or directly written by a programmer. Tiramisu then applies the user-specified code and data-layout transformations and generates an architecture-specific, low-level intermediate representation (IR) that takes advantage of modern architectural features such as multicore parallelism, non-uniform memory (NUMA) hierarchies, clusters, and accelerators like GPUs and FPGAs. We integrated Tiramisu within Halide and implemented a representative set of benchmarks to evaluate this integration. Tiramisu is now open source and is available for public use (http://tiramisu-compiler.org/). A paper about Tiramisu was published, it shows that Tiramisu extends Halide with many new capabilities and that Tiramisu can generate efficient code for multicores, GPUs, FPGAs and distributed heterogeneous systems. The performance of code generated by the Tiramisu backends matches or exceeds hand optimized reference implementations. For example, the multicore backend matches the highly optimized Intel MKL library on many kernels and shows speedups reaching 4x over the original Halide. In addition to making Tiramisu more robust, we have used Tiramisu to implement a set of representative tensor operation for constructing baryon building blocks required for multi baryon contractions in LQCD. In order to implement this code, we needed to generalize Tiramisu in two ways: first we needed to support indirect array accesses, and second, we needed to add support for complex numbers to Tiramisu. The code generated by Tiramisu is 6x faster than the reference code. Our efforts towards an MPI based multi-node version of tiramisu have matured and the resulting code scales well on multiple nodes (tests up to 512 KNL nodes have been undertaken).
A new analytic queueing approach was described which relates stockage levels, repair level decisions, and the project network schedule of prelaunch operations directly to the probability distribution of the space transportation system launch delay. Finite source population and limited repair capability were additional factors included in this logistics management model developed specifically for STS maintenance requirements. Data presently available to support logistics decisions were based on a comparability study of heavy aircraft components. A two-phase program is recommended by which NASA would implement an integrated data collection system, assemble logistics data from previous STS flights, revise extant logistics planning and resource requirement parameters using Bayes-Lin techniques, and adjust for uncertainty surrounding logistics systems performance parameters. The implementation of these recommendations can be expected to deliver more cost-effective logistics support.
One of the most exciting endeavors pursued by human kind is the search for life in the Solar System and the Universe at large. NASA is leading this effort by designing, deploying and operating robotic systems that will reach planets, planet moons, asteroids and comets searching for water, organic building blocks and signs of past or present microbial life. None of these missions will be achievable without substantial advances in.the design, implementation and validation of autonomous control agents. These agents must be capable of robustly controlling a robotic explorer in a hostile environment with very limited or no communication with Earth. The talk focuses on work pursued at the NASA Ames Research center ranging from basic research on algorithm to deployed mission support systems. We will start by discussing how planning and scheduling technology derived from the Remote Agent experiment is being used daily in the operations of the Spirit and Opportunity rovers. Planning and scheduling is also used as the fundamental paradigm at the core of our research in real-time autonomous agents. In particular, we will describe our efforts in the Intelligent Distributed Execution Architecture (IDEA), a multi-agent real-time architecture that exploits artificial intelligence planning as the core reasoning engine of an autonomous agent. We will also describe how the issue of plan robustness at execution can be addressed by novel constraint propagation algorithms capable of giving the tightest exact bounds on resource consumption or all possible executions of a flexible plan.