Search NASA⌕ Search

SEARCH · Search NASA

Results for “STORMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Supplemental Environmental Projects - Accord Pueblo Outreach: Storm Water Sampling Equipment Transfer to Pueblo of Santa Clara

A Settlement Agreement and Stipulated Final Order (Settlement Agreement) between the New Mexico Environment Department (NMED), U.S. Department of Energy (DOE), and Los Alamos National Security, LLC (LANS), collectively, the Parties, for the purposes of resolving Compliance Order No. HWB-14-20 (the Compliance Order), issued on December 6, 2014, related to Los Alamos National Laboratory (LANL) resulted in the development of five Supplemental Environmental Projects (SEPs). One of these SEPs is the Accord Pueblo Outreach.

54 ENVIRONMENTAL SCIENCES↗

Updated Stormwater Management Program Plan: For coverage under the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit for stormwater discharges within the Middle Rio Grande Watershed (v.3)

The SWMPP describes the best management practices (BMPs) employed at SNL, measurable goals, and anticipated implementation dates for compliance with the Permit requirements to ensure that stormwater discharges from the SNL MS4 do not contribute pollutants to Waters of the United States (WOTUS), namely the Tijeras Arroyo and the Rio Grande. The SWMPP is updated annually, and as necessary, to include new information and/or document the development, implementation and assessment of program elements, as required in Part III.B of the Permit. Version 3 of the SWMPP documents compliance activities and program elements developed and implemented between July 1, 2016 and June 30, 2017; it is required to be submitted on or before December 1, 2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗