Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a network hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAR regulation technologies as an example to illustrate system setups, communication requirements among different HIL test systems, and connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

digital twin, distribution system, co-simulation, ↗

On-board Radiation Sensor and Low-Altitude Contour Mapping of Radiation Fields using UAS Swarm - 18239

This paper addresses the design of light weight radiation sensors for the small-scale unmanned aerial system (UAS), and its implementation for low-altitude radiation source localization and contour mapping. The compact, high-resolution gamma-ray CZT sensors were integrated to UAS platforms as plug-and-play components using Robot Operation System (ROS). In this work, the UAS swarm consists of three platforms positioned in circular formation. The onboard data analysis provides time and position stamped intensities of gamma-ray peaks for each UAS-based sensor that are used as the input data for the swarm flight control algorithm. Each UAS measures radiation simultaneously for estimating gradient of radiation to compute a bulk heading angle of the swarm for contour mapping, which can provide relatively precise boundary of the safe area for potential human exploration. The UAS radiation sensors allow measurements from just few meters up to hundreds of meters thus filling the gap between land- and helicopter- based platforms. The swarm of UAS has advantages over a single agent based approach in detecting radiative sources and effectively mapping the area. The proposed method can locate sources of radiation as well as mapping the contaminated area for enhancing situation awareness capabilities for first responders. Computer simulation is presented for UAS swarm based source localization and contour mapping in the simulated radiation fields created by the MCNP code. Selected key gradient estimation and contour mapping algorithms are validated experimentally with small scale multicopter UAS in the indoor flight test bed. (authors)

42 ENGINEERING↗

Grid Resiliency with a 100% Renewable Microgrid

San Diego Gas & Electric Company (SDG&E) installed America’s first and largest utility-scale microgrid in Borrego Springs in 2013. The first generation Borrego Springs Microgrid utilized diesel generators to form and stabilize the microgrid island, with support from grid-scale batteries and local solar photovoltaic (PV) generation. In this project, SDG&E in partnership with National Renewable Energy Laboratory (NREL) demonstrated through modeling, simulation and utility field testing that blackstart and islanding of the microgrid can be led with 100% renewable, inverter based resources (IBRs), to help reduce community reliance on conventional generation resources. Through equipment upgrades, grid-forming island leader capability was transitioned to a battery IBR instead of the Borrego Springs Microgrid diesel generators. A new microgrid controller was integrated to the microgrid and programmed to control and manage multiple energy storage systems. Synchrophasor and other power quality data verified autonomous, high-speed response of the IBRs through blackstart, islanding, and load step testing. Results of project field evaluations provide distribution systems operators (DSO) with increased confidence that renewable, IBR can replace traditional generators to blackstart and island microgrids and rapidly establish stable island frequency with rapid changes in peak power demand. Importantly, the project validated the integration feasibility of a distributed energy resource management system (DERMS) controller that manages multiple grid-forming and grid-following IBRs, establishing a standard design interface to reduce the complexity of integrating new DERs in the future and supporting replication by the industry. As a result of learnings in this project, SDG&E has implemented the microgrid controller strategy at multiple other microgrid sites, thereby validating the replicability of the solution. Hardware-in-the-loop (HIL) simulations including power and controller HIL hardware — along with electromagnetic transient (EMT) simulations of Borrego Springs Microgrid —informed adjustments to inverter parameters and were important to characterize the performance of the IBRs in relevant operating conditions before deployment. The EMT and HIL simulations of islanding the entire community are important contributions in providing confidence in IBR performance prior to future islanding of the community in the field. High-fidelity EMT and/or HIL simulation of IBRs can de-risk field operations, and its relevance and importance as a tool is increasing as distribution grids and microgrids become more complex and dynamic with an increasing proportion of renewable generation, distributed energy storage, and two-way power and energy flows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Performance Comparison of Heating and Air Conditioning Systems for Multi-Family Residential Buildings

The type of heating, ventilation and air conditioning (HVAC) system has a large impact on the heating and cooling energy consumption in multifamily residential buildings. This paper compares the energy performance of three HVAC systems: a direct expansion (DX) split system, a split air source heat pump (ASHP) system, and a closed-loop water source heat pump (WSHP) system with a boiler and an evaporative fluid cooler as the central heating and cooling source. All three systems use gas furnace for heating or heating backup. The comparison is made in a number of scenarios including different climate conditions, system operation schemes and applicable building codes. It is found that with the minimum code-compliant equipment efficiency, ASHP performs the best among all scenarios except in extremely code climates. WSHP tends to perform better than the split DX system in cold climates but worse in hot climates.

15 GEOTHERMAL ENERGY↗

Evaluation of Variable Refrigerant Flow Systems Performance and the Enhanced Control Algorithm on Oak Ridge National Laboratory's Flexible Research Platform

A research project “Evaluation of Variable Refrigerant Flow (VRF) Systems Performance and the Enhanced Control Algorithm on Oak Ridge National Laboratory’s (ORNL’s) Flexible Research Platform” was performed to (1) install and validate the performance of Samsung VRF systems compared with the baseline rooftop unit (RTU) variable-air-volume (VAV) system and (2) evaluate the enhanced control algorithm for the VRF system on the two-story flexible research platform (FRP) in Oak Ridge, Tennessee. Based on the VRF system designed by Samsung and ORNL, the system was installed from February 18 through April 15, 2014. The final commissioning and system optimization were completed on June 2, 2014, and the initial test for system operation was started the following day, June 3, 2014. In addition, the enhanced control algorithm was implemented and updated on June 18. After a series of additional commissioning actions, the energy performance data from the RTU and the VRF system were monitored from July 7, 2014, through February 28, 2015. Data monitoring and analysis were performed for the cooling season and heating season separately, and the calibrated simulation model was developed and used to estimate the energy performance of the RTU and VRF systems. This final report includes discussion of the design and installation of the VRF system, the data monitoring and analysis plan, the cooling season and heating season data analysis, and the building energy modeling study

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Risk and Cost Analysis of Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plant (NPP) operators in USA have announced to close their plants despite there are remaining years on their operating licenses. The cause of these closures is because the plant operators suffer financial losses. Approximately 80% of USA NPPs would have undergone financial losses if they were situated in a deregulated electricity market. In a deregulated market, electricity generators are independent entities separate from the transmission companies and Independent System Operator (ISO) which manages the market. NPPs in this market are termed merchant NPPs, and their profitability is determined solely from electricity generation revenues. Meanwhile, regulated and public power nuclear units’ profitability is determined by the regulatory process in place for each unit. Due to the complexity of differentiating each regulated and public power NPP’s regulations 36 NPPs are at an immediate risk of retiring early to stop losses, while 27 units will likely to follow in the long run. Today, cost is well-recognized and important factor in NPP decision-making that cannot be ignored. Therefore, it is essential to consider risk and cost together in decision-making to strengthen the position of the nuclear industry in an economically challenging energy market. With operational and maintenance (O&M) cost at 70% of the total operating expenditure of an NPP and some plants closing prematurely despite excellent safety record, there is an urgent need to address the high O&M cost. One of the novel entities that provide additional safety resulting in reduced risk of nuclear power plants is Flex equipment. Flex strategies were postulated by the US NRC in the wake of Fukushima Dai-chi accident to address beyond design-basis accidents and improve plant flexibility. Flex strategy comprise both onsite and off-site component storage for the provision of additional materials and equipment. This work explored innovative ways of utilizing the onsite Flex equipment during regular plant operation, for purposes in addition to the intended use of beyond design basis accidents. This report describes the risk and cost analysis of using Flex equipment during regular or unplanned maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Resilience Metric Formulation Considering Transactive Systems

To help understand the effects of risk and uncertainty on power system operation, particularly during deleterious events, a model for resilience that defines four specific phases of resilience and associated activity was adopted, refined, and contextualized. Given this model, a comparison is made to the well-established field in power systems of reliability and an integrated framework is developed. The role of transactive energy systems in resilience activity is discussed and the strong alignment between properties of transactive energy systems and resilient systems is made. Finally, a scenario-based framework for risk metrics is proposed; the proposed framework allows for the direct comparison in performance between existing (business-as-usual) and transactive energy systems in improving resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guidelines for locating supports for nuclear power plant piping

Rules and guidelines are given for the location of pipe hangers and snubbers for straight piping, spans with concentrated loads, and crossovers. Recommended minimum support stiffnesses and limitations are given. Evaluations of construction considerations and system operability are also presented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Qualitative and Quantitative Assessment of Nuclear Materials Contained in High-Activity Waste Arising from the Operations at the 'SHELTER' Facility

As a result of the nuclear accident at the Chernobyl NPP in 1986, the explosion dispeesed nuclear materials contained in the nuclear fuel of the reactor core over the destroyed facilities at Unit No. 4 and over the territory immediately adjacent to the destroyed unit. The debris was buried under the Cascade Wall. Nuclear materials at the SHELTER can be characterized as spent nuclear fuel, fresh fuel assemblies (including fuel assemblies with damaged geometry and integrity, and individual fuel elements), core fragments of the Chernobyl NPP Unit No. 4, finely-dispersed fuel (powder/dust), uranium and plutonium compounds in water solutions, and lava-like nuclear fuel-containing masses. The new safe confinement (NSC) is a facility designed to enclose the Chernobyl NPP Unit No. 4 destroyed by the accident. Construction of the NSC involves excavating operations, which are continuously monitored including for the level of radiation. The findings of such monitoring at the SHELTER site will allow us to characterize the recovered radioactive waste. When a process material categorized as high activity waste (HAW) is detected the following HLW management operations should be involved: HLW collection; HLW fragmentation (if appropriate); loading HAW into the primary package KT-0.2; loading the primary package filled with HAW into the transportation cask KTZV-0.2; and storing the cask in temporary storage facilities for high-level solid waste. The CDAS system is a system of 3He tubes for neutron coincidence counting, and is designed to measure the percentage ratio of specific nuclear materials in a 200-liter drum containing nuclear material intermixed with a matrix. The CDAS consists of panels with helium counter tubes and a polyethylene moderator. The panels are configured to allow one to position a waste-containing drum and a drum manipulator. The system operates on the ‘add a source’ basis using a small Cf-252 source to identify irregularities in the matrix during an assay. The platform with the source is placed under the measurement chamber. The platform with the source material is moved under the measurement chamber. The design allows one to move the platform with the source in and out, thus moving the drum. The CDAS system and radioactive waste containers have been built. For each drum filled with waste two individual measurements (passive/active) will be made. This paper briefly describes the work carried out to assess qualitatively and quantitatively the nuclear materials contained in high-level waste at the SHELTER facility. These efforts substantially increased nuclear safety and security at the facility.

Cherkas, Dmytro↗

Coordinated Integration of Renewable Generation and Small Modular Reactors in Puerto Rico – an Initial Study

With a growing interest and awareness to support clean and sustainable sources of energy, several countries have ambitious plans to significantly increase the penetration of renewable energy in the grid. However, the sources of renewable energy, such as solar and wind, are highly intermittent and therefore can pose additional challenges to maintain reliable system operations; one such challenge being flexibility requirement. This paper addresses the concerns of increasing flexibility needs with high renewable penetration, and also study the coordinated integration of nuclear small modular reactor and inverter-based renewable generation sources in a system to achieve high levels of carbon-free and sustainable energy. In this paper, balancing reserve and short-term flexibility requirements were considered for the analysis purpose. Also, methodology was developed to calculate metrics for calculating short-term flexibility requirements in the time-scale of hours. Small modular reactors are considered as potential sources of generation flexibility to complement renewables.

Agrawal, Urmila↗

Net Load Forecasting With Disaggregated Behind-the-Meter PV Generation

As worldwide use of residential photovoltaic (PV) systems grows, system operators and utilities will need to transition from forecasting pure demand to forecasting net load with behind-the-meter (BTM) PV generation. However, PV generation can be difficult to predict and the measurements of PV generation from BTM residential systems are often invisible behind a measurement of the net load, making net load forecasting challenging. This paper proposes a novel two-stage framework for net load forecasting in areas with limited observability and high BTM PV generation. First, the profiles of observable customers are used to disaggregate the net load measurements into the pure load and PV generation. Then, separate models are used to forecast the PV generation and pure load individually, and the results are combined for a net load forecast. Further, this paper also proposes a compensator for correcting the error of the net load forecast, using historical forecast errors of the PV generation, pure load, and net load. The proposed framework is tested through two case studies for areas with high BTM PV penetration and less than 10% observable customers. The two-stage forecasting model is compared to two benchmark methods - a time series forecasting model, and a model that forecasts the net load directly using historical net load measurements. Results show that the proposed disaggregation-forecasting framework reduces the error of the net load forecast compared to both benchmark models. In addition, when the net load forecast error is periodic, the compensator can correct the error to improve the forecast accuracy.

14 SOLAR ENERGY↗

CloudZero Phase 2 Technical Report

Expand upon the successful Phase 1 net zero cloud test proof of concept by moving actual OT systems to the cloud and proving cloud feasibility to support various OT technologies such as IoT, Machine Learning, etc. Explore threat analysis when these technologies are moved to the cloud. A detailed analysis in NREL ARIES Cyber Range will be used to conduct deeper analysis of cloud suitability to support OT and net zero system operations in a higher fidelity representative environment. Outputs will identify, quantify, and document the results and cyber security risks associated with the move of these OT technologies in a formal delivered report. Programmatic Benefits: Identify cloud integration challenges for energy systems characterize the cloud threat space, contribute to policy and standards discussions, empower the sector to change their cloud culture where appropriate.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Channel Auto-Dilution System for Remote Continuous Monitoring of High Soil-CO2 Fluxes

Geological sequestration has the potential capacity and longevity to significantly decrease the amount of anthropogenic CO2 introduced into the atmosphere by combustion of fossil fuels such as coal. Effective sequestration, however, requires the ability to verify the integrity of the reservoir and ensure that potential leakage rates are kept to a minimum. Moreover, understanding the pathways by which CO2 migrates to the surface is critical to assessing the risks and developing remediation approaches. Field experiments, such as those conducted at the Zero Emissions Research and Technology (ZERT) project test site in Bozeman, Montana, require a flexible CO2 monitoring system that can accurately and continuously measure soil-surface CO2 fluxes for multiple sampling points at concentrations ranging from background levels to several tens of percent. To meet this need, PNNL is developing a multi-port battery-operated system capable of both spatial and temporal monitoring of CO2 at concentrations from ambient to at least 150,000 ppmv. This report describes the system components (sampling chambers, measurement and control system, and power supply) and the results of a field test at the ZERT site during the late summer and fall of 2008. While the system performed well overall during the field test, several improvements to the system are suggested for implementation in FY2009.

01 COAL, LIGNITE, AND PEAT↗

Method and apparatus for faulty memory utilization

A method for faulty memory utilization in a memory system includes: obtaining information regarding memory health status of at least one memory page in the memory system; determining an error tolerance of the memory page when the information regarding memory health status indicates that a failure is predicted to occur in an area of the memory system affecting the memory page; initiating a migration of data stored in the memory page when it is determined that the data stored in the memory page is non-error-tolerant; notifying at least one application regarding a predicted operating system failure and/or a predicted application failure when it is determined that data stored in the memory page is non-error-tolerant and cannot be migrated; and notifying at least one application regarding the memory failure predicted to occur when it is determined that data stored in the memory page is error-tolerant.

97 MATHEMATICS AND COMPUTING↗

Process Heating Assessments Using DOE’s Manufacturing Energy Assessment Software for Utility Reduction (MEASUR) Tool Suite

Process heating is the most energy-intensive manufacturing process for most sectors of industry. To quantify energy savings from various energy conservation measures, the Department of Energy (DOE) sponsored the development of the Process Heating Assessment and Survey Tool (PHAST) and similar tools for other industrial systems in the early 2000s. It has been used extensively in the Save Energy Now Program’s Energy Savings Assessments and the Better Plants Program’s In-Plant Trainings. Since the initial development of the legacy tools, both computer operating systems and software development have evolved significantly. Thus, DOE has invested in the modernization of PHAST and other legacy software tools to create the Manufacturing Energy Assessment Software for Utility Reduction (MEASUR) tool suite. MEASUR offers a collection of software tools that can aid manufacturing facilities in improving the efficiency of energy systems and equipment (specifically pumps, fans, steam, and process heating) and in conducting “Energy Treasure Hunts”. Eventually, the tool will also add compressed air and process cooling systems. The Process Heating Assessment (PHA) module of MEASUR is an upgrade of the PHAST tool. PHA provides the means to model fuel-fired, steam-based, and electric process heating systems, covering process heating for most industrial plants in manufacturing sector. It also includes several key upgrades, including the ability to consider multi-component charge loads and account for several different areas of energy losses. The new tool includes a comprehensive flue gas calculator to quantify available heat and heat loss for various gaseous, liquid, and solid fuels and new heat loss calculators. It generates a report and a dynamic Sankey diagram to show the energy consumption in various areas of energy use. MEASUR has significantly improved the user experience by adopting a modern software design. This paper details the structure and workflow of PHA and presents a real-world case study to demonstrate energy savings quantification and MEASUR’s outstanding reporting capabilities.

Nimbalkar, Sachin U.↗