Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Solar power satellite system definition study. Volume 4: Solid State SPS Analysis, Phase 3

A 2500 megawatt solid ground output Solar Power Satellite (SPS) of conventional configuration was designed and analyzed. Because the power per receiving antenna is halved, as compared with the klystron reference, twice the number of receiving antennas are needed to deliver the same total power. The solid state approach appears feasible with a slightly greater specific mass and slightly higher cost than the klystron SPS design.

Source record↗

Systems definition study for shuttle demonstration flights of large space structures, Volume 2: Technical Report

The development of large space structure (LSS) technology is discussed, with emphasis on space fabricated structures which are automatically manufactured in space from sheet-strip materials and assembled on-orbit. It is concluded that an LSS flight demonstration using an Automated Beam Builder and the orbiter as a construction base, could be performed in the 1983-1984 time period. The estimated cost is $24 million exclusive of shuttle launch costs. During the mission, a simple space platform could be constructed in-orbit to accommodate user requirements associated with earth viewing and materials exposure experiments needs.

Source record↗

A user need study and system plan for an Arizona Natural Resources Information System report to the Arizona state legislature

A survey instrument was developed and implemented in order to evaluate the current needs for natural resource information in Arizona and to determine which state agencies have information systems capable of coordinating, accessing and analyzing the data. Data and format requirements were determined for the following categories: air quality, animals, cultural resources, geology, land use, soils, water, vegetation, ownership, and social and economic aspects. Hardware and software capabilities were assessed and a data processing plan was developed. Possible future applications with the next generation LANDSAT were also identified.

Source record↗

Environmental assessment for the Satellite Power System (SPS): Studies of honey bees exposed to 2.45 GHz continuous wave electromagnetic energy

Post treatment brood development was normal and teratological effects were not detected at exposures of 3 to 50 mw sq cm for 30 minutes. Post treatment survival, longevity, orientation, navigation, and memory of adult bees were also normal after exposures of 3 to 50 mw sq cm for 30 minutes. Post treatment longevity of confined bees in the laboratory was normal after exposures of 3 to 50 mw sq cm for 24 hours. Thermoregulation of brood nest, foraging activity, brood rearing, and social interaction were not affected by chronic exposure to 1 mw sq cm during 28 days. In dynamic behavioral bioassays the frequency of entry and duration of activity of unrestrained, foraging adult bees was identical in microwave exposed areas versus control areas.

Gary, N. E.↗

Manned geosynchronous mission requirements and system analysis study extension. Manned Orbital Transfer Vehicle (MOTV) capabilities handbook and user guide

The primary change in crew capsule definition is a smaller MOTV crew capsule, switching from a 3-man capsule to a 2-man capsule. A second change permitted crew accommodations for sleeping and privacy to be combined with the flight station. The current baseline DRM, ER1, requires 2 men for 3 to 4 days to repair a multi-disciplined GOE Platform and a modest amount of mission dedicated hardware. A 2-man MOTV crew capsule to be used as a design reference point for the OTV, and its interfaces between the STS and other associated equipment or facilities are described in detail. The functional capabilities of the 2-man capsule, as well as its application to a wide range of generic missions, is also presented. The MOTV turnaround is addressed and significant requirements for both space based and ground based scenarios are summarized.

Source record↗

Extravehicular Crewman Work System (ECWS) study program: Prebreathe elimination study

The study examined impacts of changing Orbiter cabin pressure and EMU EVA pressure to eliminate pure O2 prebreathing prior to EVA. The investigation defines circumscribing physiological boundaries and identifies changes required within Orbiter to reduce cabin pressure. The study also identifies payload impacts, payload flight assignment constraints, and impacts upon EMU resulting from raising EVA pressure. The study presents the trade-off which optimizes the choice of reduced cabin pressure and increased EVA pressure.

Wilde, R. L.↗

Satellite services system analysis study. Volume 1: Executive summary

Service requirements are considered. Topics include development of on-orbit operations scenarios, service equipment summary, crew interaction, and satellite features facilitating servicing. Service equipment concepts are considered. Topics include payload deployment, close proximity retrieval, on-orbit servicing, backup/contingency, delivery/retrieval of high energy payloads, Earth return, optional service, and advanced capabilities. Program requirements are assessed.

Source record↗

Satellite services system analysis study. Volume 2: Satellite and services user model

Satellite services needs are analyzed. Topics include methodology: a satellite user model; representative servicing scenarios; potential service needs; manned, remote, and automated involvement; and inactive satellites/debris. Satellite and services user model development is considered. Groundrules and assumptions, servicing, events, and sensitivity analysis are included. Selection of references satellites is also discussed.

Source record↗

Satellite services system analysis study. Volume 3: Service equipment requirements

Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.

Source record↗

Satellite services system analysis study. Volume 3A: Service equipment requirements, appendix

Spacecraft descriptions and mission sequences, mission and servicing operations functional analyses, servicing requirements, and servicing equipment are discussed for five reference satellites: the X-ray Timing Explorer, the Upper Atmospheric Research Satellite, the Advanced X-ray Astrophysics Facility, the Earth Gravity Field Survey Mission, and the Orbiting Astronomical Observatory.

Source record↗

System architecture study of an orbital GPS user terminal

The generic RF and applications processing requirements for a GPS orbital navigator are considered. A line of demarcation between dedicated analog hardware, and software/processor implementation, maximizing the latter is discussed. A modular approach to R/PA design which permits several varieties of receiver to be constructed from basic components is described. It is a basic conclusion that software signal processing of the output of the baseband correlator is the best choice of transition from analog to digital signal processing. High performance sets requiring multiple channels are developed from a generic design by replicating the RF processing segment, and modifying the applications software to provide enhanced state propagation and estimation.

Martin, D. P.↗

Manned geosynchronous mission requirements and systems analysis study add-on

An MOTV mission model was constructed in order to establish the baseline condition for SOC basing. A mission model to reflect satellite servicing was extended. Yearly traffic was projected. Driver missions were categorized. Cost trades and sensitivity to traffic rates were performed and service equipment needs were identified.

Sherman, S. W.↗